Plotted By: ALAN TIU Plot Date: 9/28/2018 12:48:12 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\23-SAG16056.01_M\redone drawings\18759M-001.dwg Save Date: 11/28/2017 07:32 PM
SYMBOLS AND
ABBREVIATIONS
M-001
Plotted By: ALAN TIU Plot Date: 9/28/2018 12:48:19 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\23-SAG16056.01_M\redone drawings\18759MH-01.dwg Save Date: 09/24/2018 03:42 PM
FIRST FLOOR PLAN - HVAC
M-101
Plotted By: ALAN TIU Plot Date: 9/28/2018 12:48:26 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\23-SAG16056.01_M\redone drawings\18759MH-02.dwg Save Date: 09/24/2018 03:41 PM
SECOND FLOOR PLAN -
HVAC
M-102
Plotted By: ALAN TIU Plot Date: 9/28/2018 12:48:31 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\23-SAG16056.01_M\redone drawings\18759MH-03.dwg Save Date: 09/24/2018 03:48 PM
PENTHOUSE AND ROOF
PLAN - HVAC
M-103
Plotted By: ALAN TIU Plot Date: 9/28/2018 12:48:39 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\23-SAG16056.01_M\redone drawings\18759MP-01.dwg Save Date: 09/24/2018 03:41 PM
4'0 8' 16'
SCALE: 1/8"=1'-0"
FIRST FLOOR PLAN - PIPING
M-201
Plotted By: ALAN TIU Plot Date: 9/28/2018 12:48:46 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\23-SAG16056.01_M\redone drawings\18759MP-02.dwg Save Date: 09/24/2018 03:40 PM
SECOND FLOOR PLAN -
PIPING
M-202
SCALE 1/4" = 1'-0"SCALE 1/4" = 1'-0"
WEST WING FIRST & SECOND FLOOR
EAST WING FIRST & SECOND FLOOR
SCALE 1/4" = 1'-0"
EAST WING PENTHOUSE
SCALE 1/4" = 1'-0"
WEST WING PENTHOUSE
Plotted By: ALAN TIU Plot Date: 9/28/2018 12:48:50 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\23-SAG16056.01_M\redone drawings\18759M-301.dwg Save Date: 11/28/2017 07:29 PM
SECTIONS
M-301
Plotted By: ALAN TIU Plot Date: 9/28/2018 12:48:56 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\23-SAG16056.01_M\redone drawings\18759M-401.dwg Save Date: 09/24/2018 03:31 PM
ENLARGED PENTHOUSE
HVAC & PIPING
M-401
Plotted By: ALAN TIU Plot Date: 9/28/2018 12:48:59 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\23-SAG16056.01_M\redone drawings\18759M-501.dwg Save Date: 12/20/2017 02:48 PM
DETAILS
M-501
Plotted By: ALAN TIU Plot Date: 9/28/2018 12:49:03 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\23-SAG16056.01_M\redone drawings\18759M-502.dwg Save Date: 12/20/2017 02:50 PM
M-502
Plotted By: ALAN TIU Plot Date: 9/28/2018 12:49:06 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\23-SAG16056.01_M\redone drawings\18759M-503.dwg Save Date: 12/20/2017 03:00 PM
M-503
Plotted By: ALAN TIU Plot Date: 9/28/2018 12:49:09 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\23-SAG16056.01_M\redone drawings\18759M-504.dwg Save Date: 11/28/2017 07:27 PM
AIR HANDLING UNIT
M-504
Plotted By: ALAN TIU Plot Date: 9/28/2018 12:49:12 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\23-SAG16056.01_M\redone drawings\18759M-601.dwg Save Date: 11/28/2017 07:27 PM
SCHEDULES
M-601
Plotted By: ALAN TIU Plot Date: 9/28/2018 12:49:15 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\23-SAG16056.01_M\redone drawings\18759M-602.dwg Save Date: 11/28/2017 07:26 PM
SCHEDULES
M-602
CHILLED WATER ICE STORAGE PIPING SCHEMATIC - EAST WINGHEATING WATER PIPING SCHEMATIC - EAST WING
HEATING WATER PIPING SCHEMATIC - WEST WING CHILLED WATER ICE STORAGE PIPING SCHEMATIC - WEST WING
Plotted By: ALAN TIU Plot Date: 9/28/2018 12:49:17 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\23-SAG16056.01_M\redone drawings\18759M-701.dwg Save Date: 11/28/2017 07:26 PM
FLOW DIAGRAM
M-701
Plotted By: ALAN TIU Plot Date: 9/28/2018 12:49:20 PM Saved By: ALAN.TIU File: B:\SAG\2016\SAG16056.01\23-SAG16056.01_M\redone drawings\18759M-801.dwg Save Date: 09/28/2018 12:18 PM
CONTROL DIAGRAMS
M-801
Plotted By: ALAN TIU Plot Date: 9/28/2018 12:49:23 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\23-SAG16056.01_M\redone drawings\18759M-802.dwg Save Date: 11/28/2017 07:25 PM
CONTROL DIAGRAMS
M-802
P-3A/6A
3/4"Ø
SEE PLAN SHEETS
FOR LOCATION
TO AHU'S AND AIR
TERMINAL UNIT
VFD
P-3B/6B
VFD
H W
S
H W
R
DPS-1
4"Ø
HWR
HWS
4"Ø
T
C
CHEMICAL
FEEDER
3/4"Ø
HWS
4"Ø
TO FLOOR
DRAIN
3/4"Ø
T-2/4
B&G 87 AIR VENT
B&G 87 AIR VENT
PRV-1/2 1"Ø
CW
AIR SEPARATOR
AS-1/2
TO DRAIN
HWS
4"Ø
4"Ø
4"Ø
3"Ø
3"Ø
BOILER DRAIN LINE TO
NEAREST FLOOR DRAIN
TO FLOOR DRAIN
B-1B/2A
B-1A/2A
TO FLOOR
DRAIN
4"Ø
4"Ø
T-5/6 T-5/6 T-5/6
T cws
4"Ø
4"Ø
4"Ø
CWR
T-7/8
FLEXIBLE
CONNECTIONDPS-1
DRAIN
DIFFERENTIAL
PRESSURE
SWITCH
DIFFERENTIAL
PRESSURE
GAUGE TYPCH-1/4
4"Ø
C
FLEXIBLE
CONNECTIONDPS-2
DRAIN
DIFFERENTIAL
PRESSURE
SWITCH
DIFFERENTIAL
PRESSURE
GAUGE TYPCH-2/3
4"Ø
4"Ø
PRESSURE SWITCH
1"Ø
3/4"Ø
T-1
GLYCOL-WATER
MAKE-UP SYSTEM
PACKAGE
PLAIN OUTLET
FAUCET
LCW LEVEL
SWITCH
CCLD WATER
MAKE-UP BY
PLUMBING3/4"Ø
P-2A/5A
THERMAL ENERGY FLOW METER
6"Ø
C W
R
SCWR
6"Ø
6"Ø
6"Ø
SCWS
SCWR
SEE PLAN SHEET
FOR LOCATION
P-2B/5B
6"Ø TO BLDG.
TC DDC SYSTEM
VFD-4
VFD-3
T
P-1A/4A
P-1B/4B
3/4"Ø
3/4"Ø
1"Ø
TO GLYCOL
MAKEUP TANK
CHEMICAL
FEEDER
DPS-3
C
S
HEATING WATER PIPING CHILLED WATER ICE STORAGE PIPING SCHEMATIC - EAST & WEST WING
HEATING WATER SYSTEM SEQUENCE OF OPERATION:
BOILER MANUFACTURER SHALL PROVIDE BOILERS WITH A FULL-MODULATION SEQUENCING CONTROLLER (SC). ALL PROGRAMS AND LOGIC REQUIRED FOR TEMPERATURE CONTROL, TEMPERATURE RESET, FIRING RATE MODULATION AND SEQUENCING OF BOILERS SHALL BE CONTAINED IN THE SC OF THE CORRESPONDING BOILER AND SHALL BE COMPLETE WITH ALL REQUIRED PROGRAMMING. EACH SC AND ITS ASSOCIATED PROGRAMS SHALL BE CAPABLE OF OPERATING COMPLETELY INDEPENDENTLY AND SHALL BE CONNECTED TO INTEROPERABLE WITH THE BUILDING AUTOMATED SYSTEM (BAS), AS INDICATED. EACH SC SHALL BE WALL MOUNTED BY CONTRACTOR PER
MANUFACTURER RECOMMENDATION.
HOT WATER SYSTEM CONSISTS OF TWO BOILERS (B-1A &B-1B) & TWO HOT WATER PUMPS (P-3A & P-3B) WITH VARIABLE FREQUENCY DRIVE AND ASSOCIATED APPURTENANCES SERVING BUILDING AIR HANDLING UNITS/ROOF
TOP UNITS PRE HEAT COILS & REHEAT VAV'S.
THE HOT WATER SYSTEM SHALL BE ENABLED BY THE HOT WATER SYSTEM CONTROLLER WHEN ANY ONE OF THE
FOLLOWING OCCUR:
1. AMBIENT TEMPERATURE IS BELOW 60°F (ADJ).
2. ONE (ADJ) CALL FOR HEATING.
3. ONE (ADJ) CALL FOR DEHUMIDIFICATION.
1. BOILER START/STOP:
HOT WATER SYSTEM SHALL START AND STOP THROUGH THE BAS OR THROUGH MANUAL OVERRIDE LOCATED ON BAS CONTROLLER. WHEN DESIRED, HOT WATER PUMP SHALL BE ENERGIZED ON AN ADJUSTABLE LEAD LAG SEQUENCE AS PROGRAMMED AT THE BAS AND, AFTER AN ADJUSTABLE DELAY OF 1 MINUTE AND PROOF STATUS OF WATER FLOW, AS SENSED BY DIFFERENTIAL PRESSURE SENSORS, SEQUENCING CONTROLLER SHALL BE ENABLED.
IF PRIMARY PUMP FAILS TO START, OR FAILS DURING NORMAL OPERATION, STAND-BY PUMP SHALL BE ENERGIZED AND OPERATE AS INDICATED BELOW AND AN AUDIBLE ALARM SHALL BE SENT TO CONTROLLER AND BAS WORK
STATION.
2. PUMP ALTERNATION:
PUMPS ALTERNATE TO EQUALIZE RUNTIME. SELECTION OF THE LEAD PUMP IS EVALUATED ON A WEEKLY BASIS.
THE PUMP WITH THE LEAST RUNTIME IS THE LEAD PUMP. THE ISOLATION VALVE FOR THE LEAD PUMP SHALL BE OPEN AND THE ISOLATION VALVE FOR THE LAG PUMP SHALL BE CLOSED. ONLY ONE HOT WATER PUMP WILL RUN AT A TIME. THE BAS USES CURRENT SWITCHES TO CONFIRM THE PUMPS ARE IN THE DESIRED STATE (ON OR OFF) AND GENERATES AN ALARM IF STATUS DEVIATES FROM BAS START/STOP CONTROL AFTER A DEFINED "PROOFING"
PERIOD (1 MIN ADJ). IF THE LEAD PUMP GOES INTO ALARM, THE LAG PUMP STARTS.
PUMP VARIABLE SPEED CONTROL: BAS CONTROLLER SHALL COMPARE DIFFERENTIAL PRESSURE (DPS-2 & 3), AS SENSED BY DIFFERENTIAL PRESSURE SENSOR (DPS-1), TO THE DESIRED DIFFERENTIAL PRESSURE SET POINT (ADJ), AS DETERMINED BY THE TAB CONTRACTOR, AND MODULATE PUMP OPERATING SPEED TO MAINTAIN SET POINT.
TAB CONTRACTOR SHALL MEASURE AND PROVIDE CONTRACTOR WITH VFD MINIMUM OUTPUT VECTOR GRAPH (MOVG) SETTINGS FOR EACH PUMP AND PUMP COMBINATION. THE MOVG WILL IDENTIFY MINIMUM PUMP/VFD SPEEDS REQUIRED TO MAINTAIN MINIMUM EQUIPMENT FLOW AT 5 INDIVIDUAL OPERATING DP SETTINGS.
3. BOILER ALTERNATION:
BOILERS ALTERNATE TO EQUALIZE RUNTIME. SELECTION OF THE LEAD BOILER IS EVALUATED ON A WEEKLY BASIS.
THE BOILER WITH THE LEAST RUNTIME IS THE LEAD BOILER. THE ISOLATION VALVE FOR THE LEAD BOILER SHALL BE
OPEN AND THE ISOLATION VALVE FOR THE LAG BOILER SHALL BE CLOSED.
4. BOILER SEQUENCING CONTROLLER (SC) INTERFACE:
EACH BOILER SHALL BE PROVIDED WITH A MANUAL "LOCAL/REMOTE" SWITCH WHICH SHALL BE NORMALLY OPERATED IN ITS "REMOTE" POSITION, WITH SWITCH IN "LOCAL" POSITION, BOILER SHALL BE CONTROLLED BY INTERNAL CONTROLS, WHICH SHALL MODULATE THE BOILER FIRING RATE TO MAINTAIN A FIXED SUPPLY WATER TEMPERATURE, INDEPENDENT OF THE SC. THE SWITCH IN "REMOTE" POSITION, BOILER TEMPERATURE CONTROL, HOT WATER TEMPERATURE RESET, BOILER FIRING RATE MODULATION AND BOILER OPERATIONAL SEQUENCING
SHALL BE CONTROLLED BY SC AS STATED BELOW.
5. BOILER CONTROL:
ON A FALL IN HOT WATER SUPPLY TEMPERATURE (TS-1), THE LEAD BOILER SHALL ENERGIZE AT LOW FIRING RATE.
FIRING RATE SHALL GRADUALLY MODULATE UPWARDS UNTIL BOILER SUPPLY WATER TEMPERATURE SET POINT IS REACHED. WHEN THE LEAD BOILER FIRING RATE REACHES 60% AND THE SYSTEM HOT WATER SUPPLY
TEMPERATURE (TS-1) IS STILL BELOW SET POINT, FOLLOWING AN ADJUSTABLE PERIOD OF 20 MINUTES, THE SECOND BOILER SHALL BE ENERGIZED AND MAINTAIN ALL BOILERS AT LOW FIRING RATE. FIRING RATE SHALL GRADUALLY MODULATE UPWARDS UNTIL BOILER SUPPLY WATER TEMPERATURE SET POINT IS REACHED. THIS SEQUENCE SHALL CONTINUE UNTIL THE BOILER SEQUENCING SYSTEM SHALL ENABLE THE REMAINING STANDBY BOILER. THE STANDBY BOILER'S ISOLATION VALVE SHALL BE INTERLOCKED WITH THE ASSOCIATED BOILER. IF ALL OF THE BOILERS ARE ENABLED & ADDITIONAL HEAT IS REQUIRED, BOILER CONTROLLER SHALL MODULATE ALL BOILERS IN UNISON AND THE FIRING RATE OF ALL BOILERS SHALL BE AT THE SAME PERCENTAGE AT ANY GIVEN TIME WHEN MULTIPLE BOILERS ARE OPERATING, UNTIL THE HOT WATER SUPPLY TEMPERATURE REACHES SET POINT, AS RESET
BY ADJUSTABLE OUTSIDE AIR TEMPERATURE RESET SCHEDULE.
WHEN THE SYSTEM LOAD DECREASES THAT THE DIFFERENTIAL BETWEEN HWS AND HWR TEMPERATURES IS LESS THAN 10°F (ADJ). THE BOILERS SHALL MODULATE DOWNWARDS THEN DE-ENERGIZED, ONE AT A TIME, IN THE SAME SEQUENCE AS THEY WERE ENERGIZED, COMPLETE WITH THE SAME INDEPENDENTLY ADJUSTABLE TIME DELAY BETWEEN BOILER DEACTIVATION. WHEN BOILERS ARE OPERATING, THE FIRING RATE OF EACH BOILER SHALL BE MODULATED IN PARALLEL (PER BOILER SC) TO MAINTAIN HOT WATER SUPPLY TEMPERATURE SET POINT AT TS-1, SUBJECT TO THE HIGH LIMIT SET POINT OF EACH BOILER SUPPLY WATER TEMPERATURE. IF ANY BOILER FAILS TO START, OR FAILS DURING NORMAL OPERATION, THE REMAINING BOILER(S) SHALL BE ENERGIZED AND OPERATE AS INDICATED ABOVE; AND AN AUDIBLE ALARM SHALL BE SENT TO THE CORRESPONDING SC AND TO THE BAS USER TERMINAL. THE BOILERS SHALL ROTATE LEAD LAG POSITION AUTOMATICALLY FROM THE BAS BASED ON A PRESET
ADJUSTABLE SCHEDULE.
9. HOT WATER TEMPERATURE RESET:
HOT WATER SUPPLY TEMPERATURE SET POINT SHALL BE AUTOMATICALLY RESET LINEARLY BASED ON OUTSIDE AIR
TEMPERATURE SENSOR (TS-OA) AND ACCORDING TO FOLLOWING SCHEDULE:
OA TEMP. HWS TEMP.
60°F (ADJ.) 95°F
30°F (ADJ.) 140°F
10. DIFFERENTIAL PRESSURE SET POINT:
10.1. DIFFERENTIAL SET POINT SHALL BE AUTOMATICALLY RESET BETWEEN 25PSI TO 5 PSI (ADJ.)
10.2. BMS SHALL MONITOR THE HEATING COIL CONTROL VALVE POSITION FOR ALL HEATING COILS. THE CRITICAL
ZONE SHALL BE UNIT THAT IS WIDEST OPEN TO THE COIL.
10.3. WHEN THE CRITICAL ZONE IS LESS THAN 85% OPEN, THE DIFFERENTIAL PRESSURE SET POINT SHALL BE
RESET DOWNWARD FROM IT'S MAXIMUM (CZ-1) SETTING AT 1 PSI EVERY 5 MINUTES (ESTABLISHED DURING TAB PROCESS -ADJ.). UNTIL THE CRITICAL ZONE IS GREATER THAN 95% OPEN OR THE MINIMUM DIFFERENTIAL
PRESSURE SET POINT OF 5 PSI IS REACHED. (ADJ.)
10.4. WHEN THE CRITICAL ZONE IS GREATER THAN 97% OPEN, THE REVERSE SHALL OCCUR AT 2 PSI EVERY 5
MINUTES UNTIL THE CRITICAL ZONE DAMPER REACHES 85%.
10.5. THIS SEQUENCE SHALL REQUIRE CONTRACTOR TO TUNE AND DOCUMENT OPERATION TO ENSURE PID
HUNTING AND OVERSHOOT DO NOT OCCUR.
11. GAS PRESSURE MONITORING:
EACH BOILER SC SHALL BE CAPABLE OF MONITORING AND MODULATING THE GAS PRESSURE OF ITS BOILER AND
SHALL DISPLAY THE GAS PRESSURE ON THE BAS WORKSTATION.
12. BOILER PLANT EMERGENCY SHUTDOWN:
THERE SHALL BE HARDWIRED INTERFACE BETWEEN THE BOILERS AND THE MANUAL MUSHROOM TYPE SHUT-OFF SWITCHES LOCATED AT EACH DOORWAY. NO BMS PROGRAMMING SHALL BE REQUIRED FOR THE INTERFACE. UPON DETECTING AN ALARM CONDITION AT ANY OF THE MANUAL SWITCHES, THE HARDWIRE INTERLOCK SHALL ACTIVATE A SAFETY SHUTDOWN OF ALL OF THE BOILERS AND AN ALARM SHALL BE GENERATED AT THE BMS INDICATING
BOILER PLANT EMERGENCY SHUTDOWN.
13. TEMPERATURE SET POINT OVERRIDE:
EACH SC SHALL BE CAPABLE OF BEING SET TO ACCEPT A VARYING HOT WATER SUPPLY TEMPERATURE SET POINT FROM BAS. BAS SHALL BE PROGRAMMED TO SEND HOT WATER SUPPLY TEMPERATURE SET POINT TO SC.
TS-1
TS-2
DDC CONTROLLER INPUT/OUTPUT SUMMARY
DDC CONTROLLER INPUT/OUTPUT LEGEND ANALOG IN ANALOG OUT BINARY IN BINARY OUT TRENDING GENERAL
CA
RB
ON
DI
OX
ID
E
CA
RB
ON
MO
NO
XI
DE
CU
RR
EN
T
FL
OW
HU
MI
DI
TY
MA
SS
-A
IR
F
LO
W
PO
SI
TI
VE
FE
ED
BA
CK
PR
ES
SU
RE
TE
MP
ER
AT
UR
E
VA
LV
E
MO
DU
LA
TI
ON
VA
RI
AB
LE
SP
EE
D
CO
NT
RO
L
CO
NT
RO
L P
OI
NT
AD
JU
ST
ME
NT
PE
RC
EN
T
OP
EN
SP
EE
D/
LE
VE
L/F
L
OW
FL
OW
S W
IT
CH
EN
D
SW
IT
CH
ST
AT
US
/P
RO
OF
AU
XI
LIA
RY
CO
NT
AC
TS
OP
EN
/C
LO
SE
ON
/O
FF
ST
AR
T/
ST
OP
HI
GH
/LO
W
MI
SC
EL
LA
NE
OU
S
TR
EN
D
EV
ER
Y
MI
NU
TE
S
TR
EN
D
EV
ER
Y
HO
UR
TR
EN
D
BY
EX
CE
PT
IO
N
AL
L P
OI
NT
LO
G
AL
AR
M
SU
MM
AR
Y
LO
G
ST
AT
US
SU
MM
AR
Y
LO
G
TI
ME
E
VE
NT
LO
G
AU
DI
BL
E
AL
AR
M
GR
AP
HI
C
DI
SP
LA
Y
EM
AI
L + T
EX
T
ME
SS
AG
E
CONTROL DEVICE
TAG ID DESCRIPTION
DPS-1 DIFFERENTIAL PRESSURE 1
DPS-2 DIFFERENTIAL PRESSURE 2
DPS-3 DIFFERENTIAL PRESSURE 3
CP-1 CHILLER PUMP 1
CP-2 CHILLER PUMP 2
CP-3 CHILLER PUMP 3
CP-4 CHILLER PUMP 4
FM-1 FLOW METER 1
FM-2 FLOW METER 2
VFD-1 VARIABLE FREQUENCY DRIVE 1
VFD-2 VARIABLE FREQUENCY DRIVE 2
VFD-3 VARIABLE FREQUENCY DRIVE 3
VFD-4 VARIABLE FREQUENCY DRIVE 4
TS-1 TEMPERATURE SENSOR 1
TS-2 TEMPERATURE SENSOR 2
TS-3 TEMPERATURE SENSOR 3
TS-4 TEMPERATURE SENSOR 4
TS-5 TEMPERATURE SENSOR 5
TS-6 TEMPERATURE SENSOR 6
TS-7 TEMPERATURE SENSOR 7
TS-8 TEMPERATURE SENSOR 8
V-1 VALVE MODULATION 1
V-2 VALVE MODULATION 2
ENTERING AND LEAVING CHILLED WATER
TEMPERATURE
ENTERING AND LEAVING CHILLED WATER PRESSURE
CHILLED WATER FLOW
SELF DIAGNOSTIC
OPERATION STATUS
OPERATION HOURS
NUMBER OF STARTS
COMPRESSOR STATUS ON/OFF
COMPRESSOR LOAD (%)
REFRIGERANT DISCHARGE & SUCTION PRESSURES
OIL PRESSURE
NUMBER OF PURGE CYCLES OVER THE LAST 7 DAYS
NOTE:
1. LOCKOUT ALARM WHEN UNIT IS DE-ENERGIZED. PROVIDE 15-MINUTE STARTUP DELAY PRIOR TO ENABLING ALARM.
2. NOT ALL VIRTUAL POINTS ARE SHOWN. PROVIDE ALL POINTS REQUIRED FOR SOFTWARE OPERATION.
AIR COOLED CHILLER WITH PRIMARY AND SECONDARY PUMPING POINT LIST TABLE
HOT WATER BOILER POINT LIST TABLE
CHILLED WATER SYSTEM CONTROL SEQUENCE:
a. SEQUENCE OF OPERATION - CHILLED WATER SYSTEM
1. CHILLED WATER SYSTEM IS MANUALLY STARTED AND RUNS CONTINUOUSLY.
2. PRIMARY CHILLED WATER PUMPS
a) WHEN CHILLED WATER SYSTEM IS STARTED, THE LEAD PRIMARY CHILLED WATER PUMP STARTS AND RUNS
CONTINUOUSLY.
(1) LEAD CHILLER IS ACTIVATED.
b) IN EVENT OF FAILURE OF LEAD PUMP, THE SECOND PUMP SHALL BE AUTOMATICALLY STARTED AND AN ALARM ANNUNCIATED AT THE OPERATOR'S WORKSTATION. LEAD PUMP MAY BE MANUALLY ROTATED FROM OPERATOR'S
WORKSTATION AND CAN BE SET TO ROTATE AUTOMATICALLY AT A FIXED TIME INTERVAL.
c) PROVIDE A DIFFERENTIAL PRESSURE SENSOR AT EACH CHILLER. SENSOR SHALL MEASURE PRESSURE DROP
BETWEEN CHILLED WATER SUPPLY AND RETURN TO EVAPORATOR.
d) PRESSURE SIGNAL FROM ACTIVE CHILLER SHALL CONTROL SPEED OF ACTIVE PRIMARY CHILLED WATER PUMP TO
MAINTAIN CONSTANT FLOW THROUGH CHILLER EVAPORATOR.
e) WHEN BOTH CHILLERS ARE OPERATING, PRESSURE SIGNALS FROM BOTH SENSORS SHALL BE AVERAGED, AND
AVERAGE SIGNAL SHALL BE USED TO CONTROL PUMP SPEED.
(1) BOTH PRIMARY PUMPS SHALL OPERATE. SPEED OF BOTH PUMPS SHALL BE CONTROLLED IN TANDEM TO
MAINTAIN CONSTANT FLOW THROUGH BOTH CHILLER EVAPORATORS.
3. CHILLERS
a) WHEN CHILLER IS ACTIVATED, ISOLATION VALVE OPENS FULLY.
b) WHEN FLOW IS VERIFIED BY DIFFERENTIAL PRESSURE SWITCH, CHILLER INTERNAL CONTROLS ARE ACTIVATED.
c) MANUFACTURER-PROVIDED INTERNAL CONTROL SYSTEM OPERATES COMPRESSORS AND CONDENSER FANS TO
MAINTAIN CHILLED WATER SETPOINT.
d) CHILLER PERFORMANCE IS LIMITED BY INTERNAL POWER LIMIT CONTROL. LIMIT CONTROL SETTING MAY BE
ADJUSTED BY THE DDC SYSTEM. SEE ICE STORAGE BELOW.
e) LEAD AND STANDBY CHILLER ARE MANUALLY SELECTED FROM THE OPERATOR'S WORKSTATION AND CAN BE SET
TO ROTATE AUTOMATICALLY AT A FIXED TIME INTERVAL.
4. SECONDARY CHILLED WATER PUMPS
a) WHEN CHILLED WATER SYSTEM IS STARTED, THE LEAD SECONDARY CHILLED WATER PUMP STARTS AND RUNS
CONTINUOUSLY.
(1) DDC PUMP CONTROLLER SHALL INTERFACE WITH EACH ADJUSTABLE FREQUENCY DRIVE BY STARTING AND STOPPING MOTOR AND BY TRANSMITTING A 4 TO 20 MA DC SIGNAL TO MODULATE PUMP SPEED FROM MINIMUM TO
FULL SPEED.
b) DDC CONTROLLER SHALL MODULATE ALL OPERATING PUMPS IN UNISON TO MAINTAIN WATER PRESSURE SETTING
AT DIFFERENTIAL PRESSURE SENSOR.
(1) ON A DECREASE IN SYSTEM DIFFERENTIAL PRESSURE, LEAD PUMP SHALL MODULATE TOWARD FULL SPEED. IF IT IS UNABLE TO MAINTAIN SYSTEM PRESSURED, SECOND PUMP SHALL BE STARTED AND PUMPS SHALL BE MODULATED
TOGETHER TO MAINTAIN SYSTEM PRESSURE.
(2) ON AN INCREASE IN SYSTEM PRESSURE THE REVERSE SHALL OCCUR.
(3) VALVE V-2 IS MODULATED TO MAINTAIN SECONDARY CHILLED WATER TEMPERATURE NO COLDER THAN 5.5 DEGREES C.WHEN BOTH SECONDARY CHILLED WATER PUMPS ARE OFF, V-2 CLOSES FULLY TO SECONDARY CIRCUIT, BYPASSING ALL PRIMARY WATER BACK TO CHILLER.
c) IN EVENT OF FAILURE OF A PUMP, THE NEXT PUMP IN SEQUENCE SHALL BE AUTOMATICALLY STARTED AND AN ALARM ANNUNCIATED AT THE OPERATOR'S WORKSTATION. LEAD PUMP MAY BE A MANUALLY ROTATED FROM
OPERATOR'S WORKSTATION.
d) IN EVENT OF COMMUNICATIONS NETWORK FAILURE, PUMP SPEED WILL BE CONTROLLED AT A FIXED SPEED.
5. BUILDING COOLING LOAD MONITOR
a) DDC SYSTEM MEASURES SECONDARY CHILLED WATER FLOW, CHILLED WATER SUPPLY TEMPERATURE TO
BUILDING, AND CHILLED WATER RETURN TEMPERATURE FROM BUILDING.
b) DDC SYSTEM CALCULATES CHILLED WATER DIFFERENTIAL TEMPERATURE ACCURATE TO ±0.5 DEGREES C, MULTIPLIES THIS BY FLOW RATE, AND DERIVES BUILDING COOLING LOAD ACCURATE TO ±5% OF PEAK CHILLER LOAD.
THIS VALUE MAY BE READ OUT ON THE OPERATOR'S WORKSTATION AND USED AS AN INPUT INTO OTHER
CALCULATIONS.
6. ICE STORAGE
a) ICE STORAGE SYSTEM OPERATES IN ONE OF THREE MODES:
1) MAKE ICE:
(a) MAKE ICE MODE STARTS WHEN ALL THE FOLLOWING CONDITIONS ARE MET:
(1) TIME PROGRAM INDICATES LOW ELECTRICAL DEMAND BILLING RATE IN EFFECT.
(2) ICE INVENTORY SENSOR INDICATES ICE INVENTORY IS NO GREATER THAN 80% OF MAXIMUM.
(b) SYSTEM MAY BE MANUALLY SET TO MAKE ICE MODE AT THE OPERATOR'S WORKSTATION.
2) USE ICE:
(a) USE ICE MODE STARTS WHEN ALL THE FOLLOWING CONDITIONS ARE MET:
(1) TIME PROGRAM INDICATES HIGH ELECTRICAL DEMAND BILLING RATE IN EFFECT.
(2) ICE INVENTORY SENSOR INDICATES ICE INVENTORY IS GREATER THAN 25% OF MAXIMUM.
(3) ONE OR BOTH SECONDARY CHILLED WATER PUMPS RUNNING.
(b) SYSTEM MAY BE MANUALLY SET TO USE ICE MODE AT THE OPERATOR'S WORKSTATION.
3) BYPASS:
(a) IF CONDITIONS ARE NOT MET FOR EITHER MAKE ICE OR USE ICE MODES, THE SYSTEM GOES INTO BYPASS MODE.
(b) SYSTEM MAY BE MANUALLY SET TO BYPASS MODE AT THE OPERATOR'S WORKSTATION.
b) MAKE ICE:
1) LEAD PRIMARY CHILLED WATER PUMP AND LEAD CHILLER RUN.
2) CHILLER CAPACITY CONTROL IS LIMITED ONLY BY POWER LIMITER AND INTERNAL SAFETIES AND IS NOT UNDER CONTROL OF CWS SETPOINT CONTROLLER. POWER LIMIT CONTROLLER IS SET FOR “LOW ELECTRIC DEMAND
RATE” SETPOINT (ADJUSTABLE FROM OPERATOR'S WORKSTATION).
3) ICE STORAGE CONTROL VALVE V-1 IS FULLY OPEN TO STORAGE TANKS.
4) SYSTEM OPERATES IN MAKE ICE MODE UNTIL ICE STORAGE DISCHARGE TEMPERATURE FALLS TO -2.2 DEGREES C.
5) SYSTEM THEN SWITCHES TO USE ICE MODE IF ALL REQUIRED CONDITIONS ARE MET, OTHERWISE IT SWITCHES TO
BYPASS.
c) USE ICE:
1) PRIMARY CHILLED WATER PUMPS AND CHILLERS OPERATE AS INDICATED ABOVE.
2) VALVE V-1 IS CONTROLLED TO MAINTAIN 5.5 DEGREES C PRIMARY CHILLED WATER SUPPLY TEMPERATURE.
3) CHILLER IS CONTROLLED TO MAINTAIN 5.5 DEGREES C CWS TEMPERATURE, AND OPERATION IS LIMITED BY POWER LIMITER. POWER LIMIT CONTROLLER IS SET TO “HIGH ELECTRIC DEMAND” SETPOINT (ADJUSTABLE FROM
OPERATOR'S WORKSTATION).
d) BYPASS:
1) VALVE V-1 REMAINS FULLY CLOSED TO STORAGE TANKS.
2) PRIMARY CHILLED WATER PUMPS AND CHILLERS OPERATE AS INDICATED ABOVE.
3) IF BOTH SECONDARY PUMPS ARE STOPPED, ALL PRIMARY PUMPS AND ALL CHILLERS ARE SHUT DOWN.
TS-3
TS-4
V-3
V-4
V-1
V-2
DPS-2
DPS-3
OA DUCT REFERENCE TEMPERATURE
SENSOR OVER BACNET FOR
OA TEMP
AHU 3/6 OA
TS-1 TS-2
TS-4
TS-3
TS-6
TS-5
V-2
FM-1
VFD-1
VFD-2
TS-7
TS-8
V-1
FM-2
Plotted By: ALAN TIU Plot Date: 9/28/2018 12:49:28 PM Saved By: BRUCE.MCINTOSH File: B:\SAG\2016\SAG16056.01\23-SAG16056.01_M\redone drawings\18759M-803.dwg Save Date: 11/28/2017 07:25 PM
SEQUENCE OF OPERATIONS
M-803
C
SP-1
OA
VP
EXHAUST
AIR
VP
LAB FUME HOOD EXHAUST WITH STANDBY FAN
(EF-1&2, EF-4&5, EF-10&11 EF-12&13)
C
LAB FUME
HOOD EXHAUST
OA
VP
EXHAUST
AIR
RETURN
AIR
FILTER HEATING COOLING
SUPPLY
AIR
SPACE
TEMPERATURE
T
H W
S H
W R
C W
S C
W R
C
FAN COIL UNITS
(FCU-1, 2, & 3)
GENERAL LABORATORY
(EF-3, 6, 14 & 15)
OA TEMP SENSOR
PROVIDE (1) PER
MECH. EQUIPMENT ROOM
LOCATE IN OA
INTAKE PLENUM
TS-1
SD-1
ES
NC
DP-1
FILTER HEATING
NO
TS-1
H W
S H
W R
Fs-1
COOLING DP-2 SUPPLY
FAN
SILENCER
S C
W S
S C
W R
FINAL
FILTER
HS-1
VFD-1 AIR FLOWRATE
SENSOR
TS-4
SD-2
SP-1
DSP-1
SUPPLY
AIR
ES
NC
C C
TS-2
TS-3
NC
C
LABORATORY AIR HANDLING UNIT
NO SCALE AHU - 1,2,4, AND 5
LAB FUME HOOD
EXHAUST
GENERAL LABORATORY SEQUENCE OF OPERATION:
1. GENERAL:
1.1. THE HIGH PLUME EXHAUST FAN SHALL HAVE ITS OWN FACTORY-INSTALLED CONTROL
SYSTEM WITH INDEPENDENT DDC AND ASSOCIATED CONTROLLER CONTAINED IN A FACTORY
INSTALLED UNIT-MOUNTED CONTROL PANEL. ALL PROGRAMS AND LOGIC REQUIRED FOR
THE FUNCTIONS AND SEQUENCES OF OPERATION DESCRIBED IN THE CONTRACT
DOCUMENTS SHALL RESIDE IN THE UNIT-MOUNTED CONTROLLER. THE CONTROLLERS AND
ASSOCIATED PROGRAMS SHALL BE CAPABLE OF OPERATING COMPLETELY INDEPENDENTLY
AND SHALL BE CONNECTED TO AND INTEROPERABLE WITH THE BUILDING AUTOMATION
SYSTEM (BAS) USING DDC.
1.2. ALL SENSORS, CONTROLLER SETTINGS, AND CONTROL MODULE SETTINGS SHALL BE TESTED
AND CALIBRATED IN ACCORDANCE WITH THE SEQUENCE OF OPERATION AS INDICATED.
1.3. ALL SET POINTS SHALL BE FIELD ADJUSTED DURING THE COMMISSIONING PROCESS TO
MEET THE REQUIREMENTS OF ACTUAL FIELD CONDITIONS.
1.4. ALL SET POINTS SHALL BE ADJUSTABLE (ADJ).
1.5. THE BAS SHALL MONITOR AND TREND ALL ANALOG VALUES EVERY 15 MINUTES. ALL
STATUSES SHALL BE TRENDED ON AN CHANGE OF VALUE. THE SYSTEM SHALL ARCHIVE THIS
INFORMATION FOR A MINIMUM OF 60 DAYS.
1.6. ALL POINTS SHALL BE PROVIDED WITH DYNAMIC COLOR DISPLAY.
2. CONTROL OPERATION:
2.1. WHEN THE SELECTOR SWITCH ON THE VFD IS INDEXED INTO THE “AUTO” POSITION, THE
EXHAUST FAN SHOULD BE CONTROLLED BY THE DDC EXHAUST FAN CONTROLLER VIA BAS.
WHEN THE SELECTOR SWITCH IS INDEXED INTO “HAND” POSITION, THE EXHAUST FAN MOTOR
SHALL BE ENERGIZED AND THE FAN SHALL RUN CONTINUOUSLY.
2.2. FANS SHALL BE ALTERNATED DAILY.
2.3. EXHAUST FAN SHALL RUN CONTINUOUSLY. BAS SHALL MONITOR DIFFERENTIAL PRESSURE
SENSORS LOCATED ON EACH FLOOR AND SHALL SELECT DP SENSOR REQUIRING THE
GREATEST DEMAND.
2.4. DISCHARGE AIR VELOCITY CONTROL: EXHAUST FAN CONTROLLER SHALL KEEP MONITORING
THE AIRFLOW RATE OF EACH EXHAUST OUTLET WITH AIRFLOW MEASURING STATION AND
MODULATE OUTSIDE AIR DAMPER(S) TO MAINTAIN THE FAN DISCHARGE VELOCITY AT ITS
MINIMUM 3500FPM. HOWEVER, THE OUTSIDE AIR DAMPER(S) SHALL CLOSE DURING START UP
OF THE FAN SYSTEM AND THEN SHALL MODULATE OPEN AS NEEDED AFTER EXHAUST STATIC
PRESSURE STABILIZES.
3. ALARMS:
3.1. ALARM: IF THE EXHAUST SYSTEM STATIC PRESSURE FALLS BELOW OR EXCEEDS THE SET
POINT FOR A PERIOD OF TIME IN EXCESS OF AN ADJUSTABLE ALARM DELAY PERIOD, A
STATIC PRESSURE ALARM CONDITION SHALL BE INDICATED TO EXHAUST FAN CONTROLLER
AND BAS WORKSTATION.
GENERAL LABORATORY SEQUENCE OF OPERATION:
1. GENERAL:
1.1. THE HIGH PLUME EXHAUST FAN SHALL HAVE ITS OWN FACTORY-INSTALLED CONTROL
SYSTEM WITH INDEPENDENT DDC AND ASSOCIATED CONTROLLER CONTAINED IN A FACTORY
INSTALLED UNIT-MOUNTED CONTROL PANEL. ALL PROGRAMS AND LOGIC REQUIRED FOR
THE FUNCTIONS AND SEQUENCES OF OPERATION DESCRIBED IN THE CONTRACT
DOCUMENTS SHALL RESIDE IN THE UNIT-MOUNTED CONTROLLER. THE CONTROLLERS AND
ASSOCIATED PROGRAMS SHALL BE CAPABLE OF OPERATING COMPLETELY INDEPENDENTLY
AND SHALL BE CONNECTED TO AND INTEROPERABLE WITH THE BUILDING AUTOMATION
SYSTEM (BAS) USING DDC.
1.2. ALL SENSORS, CONTROLLER SETTINGS, AND CONTROL MODULE SETTINGS SHALL BE TESTED
AND CALIBRATED IN ACCORDANCE WITH THE SEQUENCE OF OPERATION AS INDICATED.
1.3. ALL SET POINTS SHALL BE FIELD ADJUSTED DURING THE COMMISSIONING PROCESS TO
MEET THE REQUIREMENTS OF ACTUAL FIELD CONDITIONS.
1.4. ALL SET POINTS SHALL BE ADJUSTABLE (ADJ).
1.5. THE BAS SHALL MONITOR AND TREND ALL ANALOG VALUES EVERY 15 MINUTES. ALL
STATUSES SHALL BE TRENDED ON AN CHANGE OF VALUE. THE SYSTEM SHALL ARCHIVE THIS
INFORMATION FOR A MINIMUM OF 60 DAYS.
1.6. ALL POINTS SHALL BE PROVIDED WITH DYNAMIC COLOR DISPLAY.
2. CONTROL OPERATION:
2.1. WHEN THE SELECTOR SWITCH ON THE VFD IS INDEXED INTO THE “AUTO” POSITION, THE
EXHAUST FAN SHOULD BE CONTROLLED BY THE DDC EXHAUST FAN CONTROLLER VIA BAS.
WHEN THE SELECTOR SWITCH IS INDEXED INTO “HAND” POSITION, THE EXHAUST FAN MOTOR
SHALL BE ENERGIZED AND THE FAN SHALL RUN CONTINUOUSLY.
2.2. FANS SHALL BE ALTERNATED DAILY.
2.3. A MINIMUM OF ONE EXHAUST FAN SHALL RUN CONTINUOUSLY. BAS SHALL MONITOR
DIFFERENTIAL PRESSURE SENSORS LOCATED ON EACH FLOOR AND SHALL SELECT DP
SENSOR REQUIRING THE GREATEST DEMAND.
2.5. FAN CUT-IN: IF THE EXHAUST SYSTEM STATIC PRESSURE SET POINT CANNOT BE MAINTAINED WITH ONE EXHAUST FAN AT MAXIMUM FLOW RATES FOR A TIME INTERVAL OF 1 MINUTE (ADJ), EXHAUST FAN CONTROLLER SHALL START THE SECOND EXHAUST FAN. AFTER A TIME DELAY
OF 15 SECONDS (ADJ) WITH ITS MINIMUM SPEED OF 15 HZ (ADJ), THE FAN CONTROLLER
SHALL OPEN ITS ON-OFF AUTOMATIC AIR DAMPER GRADUALLY. VFD SHOULD NOT RAMP
ABOVE ITS MINIMUM FAN SPEED SET POINT UNTIL THE DAMPER HAS PROVEN OPEN. WHEN
THE DAMPER IS FULLY OPEN AS SENSED BY THE END SWITCH AT THE DAMPER, RECEIVING A
SIGNAL FROM THE EXHAUST SYSTEM STATIC PRESSURE SENSOR(S), THE EXHAUST FAN
CONTROLLER SHALL MODULATE THE FAN MOTOR SPEEDS VIA VFDS IN UNISON TO MAINTAIN
THE STATIC PRESSURE SET POINT.
2.6. FAN CUT-OUT: IF THE STATIC PRESSURE IS AT SET POINT AND TWO FANS ARE ON AND AT
64% SPEED (ADJ) FOR A TIME INTERVAL OF 5 MINUTES, THE EXHAUST FAN CONTROLLER
SHALL STOP THE SECOND EXHAUST FAN.
2.7. DISCHARGE AIR VELOCITY CONTROL: EXHAUST FAN CONTROLLER SHALL KEEP MONITORING
THE AIRFLOW RATE OF EACH EXHAUST OUTLET WITH AIRFLOW MEASURING STATION AND
MODULATE OUTSIDE AIR DAMPER(S) TO MAINTAIN THE FAN DISCHARGE VELOCITY AT ITS
MINIMUM 3500FPM. HOWEVER, THE OUTSIDE AIR DAMPER(S) SHALL CLOSE DURING START UP
OF THE FAN SYSTEM AND THEN SHALL MODULATE OPEN AS NEEDED AFTER EXHAUST STATIC
PRESSURE STABILIZES.
3. ALARMS:
3.1. ALARM: IF THE EXHAUST SYSTEM STATIC PRESSURE FALLS BELOW OR EXCEEDS THE SET
POINT FOR A PERIOD OF TIME IN EXCESS OF AN ADJUSTABLE ALARM DELAY PERIOD, A
STATIC PRESSURE ALARM CONDITION SHALL BE INDICATED TO EXHAUST FAN CONTROLLER
AND BAS WORKSTATION.
LABORATORY AIR HANDLING UNIT SEQUENCE OF OPERATION:
1. GENERAL:
1.1. THE AIR HANDLING UNIT (AHU) SHALL HAVE ITS OWN FACTORY-INSTALLED CONTROL SYSTEM WITH INDEPENDENT DDC AND ASSOCIATED CONTROLLER CONTAINED IN A FACTORY INSTALLED UNIT-MOUNTED CONTROL PANEL. ALL PROGRAMS AND LOGIC REQUIRED FOR THE FUNCTIONS AND SEQUENCES OF OPERATION DESCRIBED IN THE CONTRACT DOCUMENTS SHALL RESIDE IN THE UNIT-MOUNTED CONTROLLER. THE CONTROLLERS AND ASSOCIATED PROGRAMS SHALL BE CAPABLE OF OPERATING COMPLETELY INDEPENDENTLY AND SHALL BE CONNECTED TO AND INTEROPERABLE WITH THE BUILDING AUTOMATION SYSTEM (BAS) USING DDC.
CONTROLLER SHALL BE BACNET COMPLIANT.
1.2. ALL SENSORS, CONTROLLER SETTINGS, AND CONTROL MODULE SETTINGS SHALL BE TESTED AND CALIBRATED IN ACCORDANCE WITH THE SEQUENCE OF OPERATION
AS INDICATED.
1.3. ALL SET POINTS SHALL BE FIELD ADJUSTED DURING THE COMMISSIONING PROCESS TO MEET THE REQUIREMENTS OF ACTUAL FIELD CONDITIONS.
1.4. ALL SET POINTS SHALL BE ADJUSTABLE (ADJ).
1.5. PROVIDE HAND-OFF-AUTO ON ALL MAJOR EQUIPMENT.
1.6. THE BAS SHALL MONITOR AND TREND ALL ANALOG VALUES EVERY 15 MINUTES. ALL STATUSES SHALL BE TRENDED ON AN CHANGE OF VALUE. THE SYSTEM SHALL
ARCHIVE THIS INFORMATION FOR A MINIMUM OF 60 DAYS.
1.7. ALL POINTS SHALL BE PROVIDED WITH DYNAMIC COLOR DISPLAY
2. START/STOP:
2.1. THE UNIT SHALL BE STARTED AND STOPPED, BASED ON A TIME OF DAY SCHEDULE, THROUGH THE PROGRAM LOGIC RESIDING IN THE CONTROL SYSTEM AND AT THE
CONTROLLER, OR THROUGH OVERRIDE LOCATED ON THE CONTROLLER AND AT THE BAS.
3. COOLING AND HEATING:
3.1. THE CHILLED WATER AND HOT WATER CONTROL VALVES SHALL MODULATE TO RESET DISCHARGE AIR TEMPERATURE BETWEEN 55°F - 65°F BASED ON OUTSIDE AIR
TEMPERATURE.
4. SUPPLY FAN:
4.1. THE SUPPLY FANS SHALL OPERATE CONTINUOUSLY.
4.2. BAS SHALL MONITOR DIFFERENTIAL PRESSURE SENSORS LOCATED ON EACH FLOOR AND SHALL SELECT DP SENSOR REQUIRING THE GREATEST DEMAND.
4.3. ALL FOUR SUPPLY FANS IN EACH AHU SHALL OPERATE AT SAME SPEED.
4.4. AHU-1 & AHU-2 SUPPLY AIR FANS SHALL OPERATE AT SAME SPEED. EACH VFD SHALL MODULATE TO MAINTAIN A STATIC PRESSURE SET POINT.
4.5. AHU-3 & AHU-4 SUPPLY AIR FANS SHALL OPERATE AT SAME SPEED. EACH VFD SHALL MODULATE TO MAINTAIN A STATIC PRESSURE SET POINT.
5. SUPPLY AIR DUCT STATIC PRESSURE SET POINT:
5.1. THE BAS SHALL CONTINUOUSLY MONITOR THE DAMPER POSITION OF ALL VAV TERMINAL UNITS FLOOR BY FLOOR. THE SUPPLY AIR DUCT STATIC PRESSURES SHALL BE SENSED BY STATIC PRESSURE SENSORS LOCATED 3/4 DISTANCE DOWN EACH FLOOR RUN. SPECIFIC LOCATIONS OF DIFFERENTIAL SENSORS SHALL BE RECORDED ON AS-BUILTS AND SHOW ON BAS GRAPHICS. RECORD AND CLEARLY LABEL THE STATIC PRESSURE SET POINTS, FROM THE TAB PROCEDURE, FOR FUTURE REFERENCE. INITIAL STATIC PRESSURE SET POINT SHALL BE 1.5" (ADJ). MAXIMUM AND MINIMUM SETTING DEFINED BY TAB CONTRACTOR.
5.2. WHEN ANY VAV TERMINAL UNIT IS MORE THAN 95% (ADJ) OPEN, THE ASSOCIATED SUPPLY AIR DUCT STATIC PRESSURE SET POINT SHALL BE RESET UPWARD BY 5% (ADJ) OF THE MAXIMUM SYSTEM STATIC PRESSURE SET POINT AT A FREQUENCY OF 10 MINUTES (ADJ) UNTIL NO DAMPER IS MORE THAN 95% OPEN OR THE STATIC PRESSURE SET POINT HAS RESET UPWARD TO THE SYSTEM MAXIMUM SETTING OR THE VFD IS AT ITS MAXIMUM SETTING.
5.3. WHEN ALL VAV AIR DAMPERS ARE LESS THAN 85% (ADJ) OPEN, THEN THE ASSOCIATED SUPPLY AIR DUCT STATIC PRESSURE SET POINT SHALL BE RESET DOWNWARD
BY 5% (ADJ) OF THE CURRENT SYSTEM STATIC PRESSURE SET POINT AT A FREQUENCY OF 10 MINUTES (ADJ) UNTIL ANY DAMPER IS MORE THAN 85% OPEN OR THE STATIC PRESSURE SET POINT HAS RESET DOWNWARD TO THE SYSTEM MINIMUM SETTING OR THE VFD IS AT ITS MINIMUM SETTING.
5.4. THE CONTROL BANDS, SET POINT INCREMENT VALUES, SET POINT DECREMENT VALUES AND ADJUSTMENT FREQUENCIES SHALL BE ADJUSTED TO MAINTAIN STATIC PRESSURE OPTIMIZATION SETPOINT WITH STABLE SYSTEM CONTROL AND MAXIMUM COMFORT CONTROL.
6. EXHAUST AIR DUCT STATIC PRESSURE SET POINT:
6.1. THE BAS SHALL CONTINUOUSLY MONITOR THE DAMPER POSITION OF ALL VAV TERMINAL UNITS FLOOR BY FLOOR. THE EXHAUST AIR DUCT STATIC PRESSURES SHALL BE SENSED BY STATIC PRESSURE SENSORS LOCATED 3/4 DISTANCE DOWN EACH FLOOR RUN. SPECIFIC LOCATIONS OF DIFFERENTIAL SENSORS SHALL BE RECORDED ON AS-BUILTS AND SHOW ON BAS GRAPHICS. RECORD AND CLEARLY LABEL THE STATIC PRESSURE SET POINTS, FROM THE TAB PROCEDURE, FOR
FUTURE REFERENCE. INITIAL STATIC PRESSURE SET POINT SHALL BE 1.5" (ADJ).
6.2. WHEN ANY VAV TERMINAL UNIT IS MORE THAN 95% (ADJ) OPEN, THE ASSOCIATED EXHAUST AIR DUCT STATIC PRESSURE SET POINT SHALL BE RESET UPWARD BY 5% (ADJ) OF THE CURRENT SYSTEM STATIC PRESSURE SET POINT AT A FREQUENCY OF 10 MINUTES (ADJ) UNTIL NO DAMPER IS MORE THAN 95% OPEN OR THE STATIC PRESSURE SET POINT HAS RESET UPWARD TO THE SYSTEM MAXIMUM SETTING OR THE VFD IS AT ITS MAXIMUM SETTING.
6.3. WHEN ALL VAV AIR DAMPERS ARE LESS THAN 85% (ADJ) OPEN, THE THE ASSOCIATED EXHAUST AIR DUCT STATIC PRESSURE SET POINT SHALL BE RESET DOWNWARD BY 5% (ADJ) OF THE CURRENT SYSTEM STATIC PRESSURE SET POINT AT A FREQUENCY OF 10 MINUTES (ADJ) UNTIL ANY DAMPER IS MORE THAN 85% OPEN OR THE STATIC PRESSURE SET POINT HAS RESET DOWNWARD TO THE SYSTEM MINIMUM SETTING OR THE VFD IS AT ITS MINIMUM SETTING.
6.4. THE CONTROL BANDS, SET POINT INCREMENT VALUES, SET POINT DECREMENT VALUES AND ADJUSTMENT FREQUENCIES SHALL BE ADJUSTED TO MAINTAIN STATIC PRESSURE OPTIMIZATION SETPOINT WITH STABLE SYSTEM CONTROL AND MAXIMUM COMFORT CONTROL.
7. FREEZE PROTECTION:
7.1. A HARDWIRED, LOW LIMIT TEMPERATURE SWITCH SHALL BE ELECTRICALLY INTERLOCKED WITH THE VARIABLE SPEED DRIVE. IF THE LOW LIMIT TEMPERATURE SWITCH IS TRIPPED 38.0 DEG. F (ADJ.), THE OUTSIDE AIR DAMPER SHALL CLOSE, ALL VALVES SHALL OPEN TO 100% AND AN ALARM SHALL BE ANNUNCIATED AT THE BAS. A MANUAL RESET OF THE LOW LIMIT TEMPERATURE SWITCH SHALL BE REQUIRED TO RESTART THE FAN.
8. ALARMS:
8.1. FREEZE PROTECTION: THE FREEZE PROTECTION SEQUENCE SHALL BE INITIATED AND AN AN ALARM SHALL BE GENERATED UPON RECEIVING A FREEZESTAT STATUS.
8.2. HIGH STATIC PRESSURE SHUTDOWN: THE UNIT SHALL SHUT DOWN AND GENERATE AN ALARM WHEN THE SUPPY AIR STATIC PRESSURE IS ABOVE MAXIMUM STATIC
PRESSURE.
8.3. SMOKE DETECTION: THE UNIT SHALL SHUT DOWN AND GENERATE AN ALARM UPON RECEIVING A AIR SMOKE STATUS AND ISSUE AN ALARM TO THE BUILDING FIRE
ALARM SYSTEM.
8.4. SUPPLY FAN FAILURE: COMMANDED ON BUT THE STATUS IS OFF.
8.5. HIGH SUPPLY AIR STATIC PRESSURE: IF THE SUPPLY AIR STATIC PRESSURE IS 25% (ADJ) GREATER THAN SET POINT.
8.6. LOW SUPPLY AIR STATIC PRESSURE: IF THE SUPPLY AIR STATIC PRESSURE IS 25% (ADJ) LESS THAN SET POINT.
8.7. .EXHAUST FAN FAILURE: COMMANDED ON BUT THE STATUS IS OFF.
8.8. SUPPLY FAN VFD FAULT.
8.9. HIGH SUPPLY AIR TEMPERATURE: IF THE SUPPLY AIR TEMPERATURE IS 5°F (ADJ) GREATER THAN SET POINT.
8.10. LOW SUPPLY AIR TEMPERATURE: IF THE SUPPLY AIR TEMPERATURE IS LESS THAN 45°F (ADJ).
8.11. HIGH RETURN AIR HUMIDITY: IF THE RETURN AIR HUMIDITY IS GREATER THAN 70% (ADJ).
8.12. LOW RETURN AIR HUMIDITY: IF THE RETURN AIR HUMIDITY IS LESS THAN 30% (ADJ).
8.13. ALL FILTERS: FILTER DIFFERENTIAL PRESSURE EXCEEDS A USER DEFINABLE LIMIT (ADJ).
8.14. HIGH PRESSURE WATER HUMIDIFICATION SYSTEM PUMP VFD VAULT.
8.15. GENERAL ALARM FROM HIGH PRESSURE WATER HUMIDIFICATION SYSTEM CONTROL PANEL.
FAN COIL UNIT SEQUENCE OF OPERATION:
THE OPERATION MODE SHALL BE DETERMINED THROUGH BAS WITH MANUAL OVERRIDE.
A. OPERATION MODE:
1. THE UNIT FAN SHALL BE ENERGIZED.
2. THE HEATING COIL VALVE SHALL MODULATE IN SEQUENCE TO MAINTAIN A 70°F SPACE HEATING SET-POINT.
3. THE COOLING COIL VALVE SHALL MODULATE IN SEQUENCE TO MAINTAIN A 75°F SPACE COOLING SET-POINT.
4. THE CONTROLLER SHALL PREVENT:
a. THE HEATING SET-POINT FROM EXCEEDING THE COOLING SET-POINT MINUS 5°F (I.E. THE MINIMUM DEAD-BAND
SHALL BE 5°F).
DDC CONTROLLER INPUT/OUTPUT SUMMARY
DDC CONTROLLER INPUT/OUTPUT LEGEND ANALOG IN ANALOG OUT BINARY IN BINARY OUT TRENDING GENERAL
CA
RB
ON
DI
OX
ID
E
CA
RB
ON
MO
NO
XI
DE
CU
RR
EN
T
FL
OW
HU
MI
DI
TY
MA
SS
-A
IR
F
LO
W
PO
SI
TI
VE
FE
ED
BA
CK
PR
ES
SU
RE
TE
MP
ER
AT
UR
E
VA
LV
E
MO
DU
LA
TI
ON
VA
RI
AB
LE
SP
EE
D
CO
NT
RO
L
CO
NT
RO
L P
OI
NT
AD
JU
ST
ME
NT
PE
RC
EN
T
OP
EN
SP
EE
D/
LE
VE
L/F
L
OW
FL
OW
S W
IT
CH
EN
D
SW
IT
CH
ST
AT
US
/P
RO
OF
AU
XI
LIA
RY
CO
NT
AC
TS
OP
EN
/C
LO
SE
ON
/O
FF
ST
AR
T/
ST
OP
HI
GH
/LO
W
MI
SC
EL
LA
NE
OU
S
TR
EN
D
EV
ER
Y
MI
NU
TE
S
TR
EN
D
EV
ER
Y
HO
UR
TR
EN
D
BY
EX
CE
PT
IO
N
AL
L P
OI
NT
LO
G
AL
AR
M
SU
MM
AR
Y
LO
G
ST
AT
US
SU
MM
AR
Y
LO
G
TI
ME
E
VE
NT
LO
G
AU
DI
BL
E
AL
AR
M
GR
AP
HI
C
DI
SP
LA
Y
EM
AI
L + T
EX
T
ME
SS
AG
E
CONTROL DEVICE
TAG ID DESCRIPTION
AFMS-1 OUTDOOR AIR FLOW MONITORING STATION
DA-1 OUTDOOR AIR DAMPER
VFD-1 VARIABLE FREQUENCY DRIVE 1
DP-1 DIFFERENTIAL PRESSURE 1
DP-2 DIFFERENTIAL PRESSURE 2
FS-1 AIR FREEZE STAT
HS-1 HUMIDITY SENSOR 1
HS-2 HUMIDITY SENSOR 2
HS-3 HUMIDITY SENSOR 3
MP-1 AHU MICROPROCESSOR
SD-1 OUTSIDE AIR SMOKE DETECTOR
SD-2 SUPPLY AIR SMOKE DETECTOR
SP-1 SUPPLY AIR DUCT STATIC PRESSURE
HS-1 HIGH STATIC SAFETY SENSOR
DSP-1 DOWN DUCT STATIC PRESSURE
TS-1 TEMPERATURE SENSOR 1
TS-2 TEMPERATURE SENSOR 2
TS-3 TEMPERATURE SENSOR 3
TS-4 TEMPERATURE SENSOR 4
V-1 VALVE MODULATION 1
V-2 VALVE MODULATION 2
FUME HOOD
PT-1 SUPPLY AIR DUCT STATIC PRESSURE
VFD-1 VARIABLE FREQUENCY DRIVE 1
VFD-2 VARIABLE FREQUENCY DRIVE 2
VFD-3 VARIABLE FREQUENCY DRIVE 3
AFMS-1 EXHAUST AIR FLOW MONITORING STATION 1
AFMS-2 EXHAUST AIR FLOW MONITORING STATION 2
AFMS-3 EXHAUST AIR FLOW MONITORING STATION 3
DA-1 EXHAUST AIR DAMPER 1
DA-2 EXHAUST AIR DAMPER 2
DA-3 EXHAUST AIR DAMPER 3
DA-4 OUTSIDE AIR DAMPER 4
NOTE:
1. LOCKOUT ALARM WHEN UNIT IS DE-ENERGIZED. PROVIDE 15-MINUTE STARTUP DELAY PRIOR TO ENABLING ALARM.
2. NOT ALL VIRTUAL POINTS ARE SHOWN. PROVIDE ALL POINTS REQUIRED FOR SOFTWARE OPERATION.
VAV AHU 100% OUTSIDE AIR WITH FUME HOODS
DDC CONTROLLER INPUT/OUTPUT SUMMARY
DDC CONTROLLER INPUT/OUTPUT LEGEND ANALOG IN ANALOG OUT BINARY IN BINARY OUT TRENDING GENERAL
CA
RB
ON
DI
OX
ID
E
CA
RB
ON
MO
NO
XI
DE
CU
RR
EN
T
FL
OW
HU
MI
DI
TY
MA
SS
-A
IR
F
LO
W
PO
SI
TI
VE
FE
ED
BA
CK
PR
ES
SU
RE
TE
MP
ER
AT
UR
E
VA
LV
E
MO
DU
LA
TI
ON
VA
RI
AB
LE
SP
EE
D
CO
NT
RO
L
CO
NT
RO
L P
OI
NT
AD
JU
ST
ME
NT
PE
RC
EN
T
OP
EN
SP
EE
D/
LE
VE
L/F
L
OW
FL
OW
S W
IT
CH
EN
D
SW
IT
CH
ST
AT
US
/P
RO
OF
AU
XI
LIA
RY
CO
NT
AC
TS
OP
EN
/C
LO
SE
ON
/O
FF
ST
AR
T/
ST
OP
HI
GH
/LO
W
MI
SC
EL
LA
NE
OU
S
TR
EN
D
EV
ER
Y
MI
NU
TE
S
TR
EN
D
EV
ER
Y
HO
UR
TR
EN
D
BY
EX
CE
PT
IO
N
AL
L P
OI
NT
LO
G
AL
AR
M
SU
MM
AR
Y
LO
G
ST
AT
US
SU
MM
AR
Y
LO
G
TI
ME
E
VE
NT
LO
G
AU
DI
BL
E
AL
AR
M
GR
AP
HI
C
DI
SP
LA
Y
EM
AI
L + T
EX
T
ME
SS
AG
E
CONTROL DEVICE
TAG ID DESCRIPTION
VFD-1 VARIABLE FREQUENCY DRIVE 1
VFD-2 VARIABLE FREQUENCY DRIVE 2
SP-1 STATIC PRESSURE SENSOR
VS-1 EXHAUST VALVE 1
VS-2 EXHAUST VALVE 2
NOTE:
1. LOCKOUT ALARM WHEN UNIT IS DE-ENERGIZED. PROVIDE 15-MINUTE STARTUP DELAY PRIOR TO ENABLING ALARM.
2. NOT ALL VIRTUAL POINTS ARE SHOWN. PROVIDE ALL POINTS REQUIRED FOR SOFTWARE OPERATION.
AFMS-1
DA-1
V-1 V-2
DA-1
VS-1
VS-2
VFD-2
VFD-1
EXHAUST
AIR
BASED ON
AHU (LAB)
DA-1
BASED ON
AHU (LAB)
SP-1
DDC CONTROLLER INPUT/OUTPUT SUMMARY
DDC CONTROLLER INPUT/OUTPUT LEGEND ANALOG IN ANALOG OUT BINARY IN BINARY OUT TRENDING GENERAL
CA
RB
ON
DI
OX
ID
E
CA
RB
ON
MO
NO
XI
DE
CU
RR
EN
T
FL
OW
HU
MI
DI
TY
MA
SS
-A
IR
F
LO
W
PO
SI
TI
VE
FE
ED
BA
CK
PR
ES
SU
RE
TE
MP
ER
AT
UR
E
VA
LV
E
MO
DU
LA
TI
ON
VA
RI
AB
LE
SP
EE
D
CO
NT
RO
L
CO
NT
RO
L P
OI
NT
AD
JU
ST
ME
NT
PE
RC
EN
T
OP
EN
SP
EE
D/
LE
VE
L/F
L
OW
FL
OW
S W
IT
CH
EN
D
SW
IT
CH
ST
AT
US
/P
RO
OF
AU
XI
LIA
RY
CO
NT
AC
TS
OP
EN
/C
LO
SE
ON
/O
FF
ST
AR
T/
ST
OP
HI
GH
/LO
W
MI
SC
EL
LA
NE
OU
S
TR
EN
D
EV
ER
Y
MI
NU
TE
S
TR
EN
D
EV
ER
Y
HO
UR
TR
EN
D
BY
EX
CE
PT
IO
N
AL
L P
OI
NT
LO
G
AL
AR
M
SU
MM
AR
Y
LO
G
ST
AT
US
SU
MM
AR
Y
LO
G
TI
ME
E
VE
NT
LO
G
AU
DI
BL
E
AL
AR
M
GR
AP
HI
C
DI
SP
LA
Y
EM
AI
L + T
EX
T
ME
SS
AG
E
CONTROL DEVICE
TAG ID DESCRIPTION
VFD-1 VARIABLE FREQUENCY DRIVE 1
VFD-2 VARIABLE FREQUENCY DRIVE 2
SP-1 STATIC PRESSURE SENSOR
VS-1 EXHAUST VALVE 1
VS-2 EXHAUST VALVE 2
NOTE:
1. LOCKOUT ALARM WHEN UNIT IS DE-ENERGIZED. PROVIDE 15-MINUTE STARTUP DELAY PRIOR TO ENABLING ALARM.
2. NOT ALL VIRTUAL POINTS ARE SHOWN. PROVIDE ALL POINTS REQUIRED FOR SOFTWARE OPERATION.
Plotted By: ALAN TIU Plot Date: 9/28/2018 12:49:34 PM Saved By: ALAN.TIU File: B:\SAG\2016\SAG16056.01\23-SAG16056.01_M\redone drawings\18759M-804 & 805.dwg Save Date: 09/28/2018 12:18 PM
M-804
NC
RELIEF AIR
C
NO
HEATINGFILTER
TS-1
NO
MIN. OA
MAX. OA
NC
NC
DP-1
H W
S H
W R
COOLING
VFD-1
S C
W S
S C
W
R TS-4
NC
FS-1
TS-2
C
C
C
OUTSIDE AIR
W/WIND SCREENSUPPLY
AIR
DSP-1
SP-1
SD-2
NC
ES
SP-2
HS-2
SD-1
TS-5
SILENCER
DP-2
RETURN
FAN
SUPPLY
FANDP-3
SILENCER
VFD
AIR FLOW RATE
SENSOR(TYP.)
TS-6
HS-1
ADMINISTRATION AIR HANDLING UNITS - AHU-3 & 6
TO BUILDING
AUTOMATION
SYSTEM
LOW AIR FLOW ALARM
BY HOOD SUPPLIER
FUME HOOD AND BIO SAFETY
CABINET ALARM
FUME HOOD AND BIO SAFETY CABINET
SUPPLY AIR
C
NO
H W
R H
W S
T
SPACE
TEMEPERATURE
ROOM EXHAUST
AIR DUCT BRANCH
ROOM RETURN
AIR REGISTER
NO
RA
EXHAUST AIR
DUCT MAIN
VARIABLE VOLUME AIR TERMINAL UNITS
SERVING ROOMS WITH LABS
NO SCALE
VARIABLE VOLUME AIR TERMINAL UNITS CONSTANT
VOLUME AIR TERMINAL UNITS - OFFICES
NO SCALE
H W
R H
W S
T
SPACE
TEMEPERATURE
SUPPLY AIR
CT
RELIEF
AIR
RELIEF
AIR
M
M
M
M
OUTSIDE
AIR
OUTSIDE
AIR
STAIR VENTILATION
NO SCALE
T
SPACE
TEMEPERATURE
H W
R
H W
S
LOW TEMPERATURE
THERMOSTAT
UNIT HEATER
NO SCALE
RELIEF
AIR
SPACE
TEMPERATURE
T
SUPPLY FAN
WHERE SHOWN
M M
MECHANICAL ROOM EXHAUST
NO SCALE
OUTSIDE
AIR
AIR HANDLING UNIT SEQUENCE OF OPERATIONS:
THE AIR HANDLING UNIT SHALL HAVE ITS OWN FACTORY-INSTALLED CONTROL SYSTEM WITH INDEPENDENT DDC CONTROLS AND ASSOCIATED CONTROLLER CONTAINED IN A UNIT-MOUNTED CONTROL PANEL. ALL PROGRAMS AND LOGIC REQUIRED FOR THE FUNCTION AND SEQUENCE OF OPERATION DESCRIBED IN THE CONTRACT DOCUMENT SHALL RESIDE IN THE UNIT-MOUNTED CONTROLLER. THE CONTROLLERS AND ASSOCIATED PROGRAMS SHALL BE CAPABLE OF OPERATING COMPLETELY INDEPENDENT. CONTRACTOR SHALL PROVIDE ALL NECESSARY CONTROL DEVICES, CONTROLLERS AND PROGRAMMING AS REQUIRED TO ACCOMPLISH THE FOLLOWING SEQUENCE OF OPERATIONS:
THE AIR HANDLING UNIT SHALL OPERATE IN OCCUPIED AND UNOCCUPIED MODE ACCORDING TO THE BMS SCHEDULE.
1. MORNING WARM UP/PRE-COOL:
ON A TRANSITION FROM UNOCCUPIED OPERATION TO OCCUPIED OPERATION THE UNIT SHALL BRING ZONES TO OCCUPIED SET POINTS. THE OUTSIDE AIR & EXHAUST AIR DAMPERS SHALL BE CLOSED. THE RE-CIRCULATION DAMPER SHALL MODULATE OPEN. THE HEATING AND CHILLED WATER VALVES SHALL MODULATE TO MAINTAIN THE SET POINT. THE SUPPLY FAN SHALL ENABLE.
DURING MORNING WARM-UP, IF DEHUMIDIFICATION SET POINT HAS NOT BEEN SATISFIED, UNIT SHALL CONTINUE MORNING WARM-UP CYCLE.
2. OPTIMAL START:
THE UNIT SHALL USE AN OPTIMAL START ALGORITHM FOR MORNING WARM-UP/PRE-COOL. THIS ALGORITHM SHALL MINIMIZE THE UNOCCUPIED WARM-UP PERIOD WHILE STILL ACHIEVING COMFORT CONDITIONS BY THE START OF SCHEDULED OCCUPIED PERIOD THROUGH SPACE TEMPERATURE SENSOR (TS). THE BMS SHALL STAGGER THE START UP OF EQUIPMENT TO AVOID UNNECESSARY ELECTRICAL SPIKES.
3. OPTIMAL STOP:
THE UNIT SHALL USE AN OPTIMAL STOP ALGORITHM FOR SHUTTING DOWN THE UNIT BEFORE SCHEDULED UNOCCUPIED OPERATION TO
ALLOW ZONES FOR UNOCCUPIED OPERATION WITHOUT AFFECTING THE OCCUPIED SET POINTS.
4. TIMED OVERRIDE:
A TIMED LOCAL OVERRIDE CONTROL SHALL ALLOW AN OCCUPANT TO OVERRIDE THE SCHEDULE AT A TERMINAL UNIT SENSOR WITHIN THE SPACES SERVED BY THE ASSOCIATED UNIT ON THE THERMOSTAT AND PLACE THE UNIT INTO AN OCCUPIED MODE FOR AN ADJUSTABLE PERIOD OF TIME TO BE COORDINATED WITH THE FACILITIES MANAGEMENT AT THE EXPIRATION OF THIS TIME, CONTROL OF THE UNIT SHALL
AUTOMATICALLY RETURN TO THE SCHEDULE.
5. OCCUPIED OPERATIONS:
5.1. WHEN ONE OR MORE OF THE ASSOCIATED VAV TERMINAL UNITS ARE IN OCCUPIED OPERATION. THE VAV TERMINAL UNIT SHALL BE
ENABLED.
5.2. THE SUPPLY AND RETURN FAN SHALL START, AND THE OUTSIDE AIR, RETURN AIR & EXHAUST AIR DAMPER SHALL OPEN. ALL
FUNCTIONS SHALL BE ENABLED.
6. SUPPLY DUCT STATIC PRESSURE CONTROL:
6.1. THE BAS SHALL CONTINUOUSLY MONITOR THE DAMPER POSITION OF ALL VAV TERMINAL UNITS ASSOCIATED WITH THE UNIT.
6.2. WHEN ANY VAV TERMINAL UNIT DAMPERS IS MORE THAN 95% (ADJ.) OPEN, THE SUPPLY FAN DUCT STATIC PRESSURE SET POINT SHALL BE RESET UPWARD BY 0.2 IN.W.C. (ADJ.) UNTIL NO DAMPER IS MORE THAN 95% OPEN. THE SYSTEM MAXIMUM DUCT PRESSURE SET POINT IS AT THE MAXIMUM SETTING OR THE SUPPLY FAN VFD IS AT THE MAXIMUM SETTING.
6.3. WHEN ALL VAV TERMINAL DAMPERS ARE LESS THAN 75% (ADJ.) OPEN, THE SUPPLY FAN DUCT STATIC PRESSURE SET POINT SHALL BE RESET DOWNWARD BY 0.1 IN.W.C. (ADJ.) AT A FREQUENCY OF 15 (ADJ.) MINUTES. UNTIL AT LEAST 1 DAMPER IS MORE THAN 75% OPEN. THE SYSTEM MINIMUM DUCT PRESSURE SET POINT IS AT THE MINIMUM SETTING OR THE SUPPLY FAN VFD IS AT THE MINIMUM
SETTING TO BE DETERMINED BY TAB CONTRACTOR.
6.4. THE BAS SHALL HAVE THE CAPABILITY TO ALLOW THE OPERATOR TO EASILY EXCLUDE 'NON CRITICAL' ZONES THAT SHOULD NOT BE
CONSIDERED WHEN DETERMINING THE STATIC PRESSURE SET POINT.
7. SYSTEM VENTILATION OPTIMIZATION:
7.1. THE BAS SHALL CALCULATE AND SEND THE UNIT CONTROLLER THE OUTSIDE AIR VENTILATION FLOW SET POINT. THE SET POINT SHALL BE DETERMINED BY THE ASHRAE 62.1 EQUATION TO CALCULATE THE OUTSIDE AIR REQUIRED TO BE BROUGHT INTO THE UNIT
TO PROPERLY VENTILATE ALL ZONES IN THE SYSTEM.
7.2. THE BAS SHALL NOT REQUEST A HIGHER PERCENTAGE OF OUTSIDE AIR THAN THE UNIT IS ABLE TO CONDITION. THIS VENTILATION RATIO LIMIT OF THE UNIT SHALL AUTOMATICALLY ADJUST TO ENSURE THE SUPPLY AIR SET POINT IS MAINTAINED AND SHALL BE DEPENDENT ON THE UNIT LOAD AND CURRENT OUTSIDE AIR TEMPERATURE & HUMIDITY CONDITIONS. REFER TO AHU SCHEDULE FOR
CAPACITY.
8. PRE-HEATING MODE:
THE HOT WATER VALVE SHALL MODULATE TO MAINTAIN HEATING DRY BULB DISCHARGE AIR SET POINT AS SCHEDULED AND THE CHILLED WATER COIL VALVE SHALL BE FULLY CLOSED. PRE HEATING SHALL BE ENABLED WHEN THE MIXED AIR TEMPERATURE BELOW 55°F (ADJ.)
9. COOLING MODE:
THE CHILLED WATER VALVE SHALL MODULATE TO MAINTAIN THE COOLING DRY BULB DISCHARGE AIR SET POINT, AS SCHEDULED AND THE
PREHEATING VALVE SHALL BE FULLY CLOSED.
10. UNOCCUPIED OPERATION:
10.1. WHEN THE BMS INITIATES UNOCCUPIED OPERATION, THE UNIT SHALL TURN OFF AND CLOSE IT'S OUTSIDE AND EXHAUST AIR
DAMPERS.
10.2. THE AHU SHALL CYCLE ON, AS DIRECTED BY THE BMS, TO MAINTAIN UNOCCUPIED SPACE'S HEATING AND COOLING SET POINTS. THE SUPPLY & RETURN FAN VFD SHALL OPERATE AND MODULATE TO MAINTAIN DUCT STATIC PRESSURE SET POINT. THE HOT WATER VALVE OR CHILLED WATER VALVE SHALL MODULATE TO MAINTAIN DISCHARGE AIR TEMPERATURE SET POINT (ADJ.). THE OA & EA
DAMPERS SHALL REMAIN CLOSED, THE RA DAMPER SHALL REMAIN OPEN.
11. RETURN FAN CONTROL:
THE RETURN FAN SHALL MODULATE TO MAINTAIN A POSITIVE BUILDING PRESSURE OF 0.05 (ADJ.)WC.
12. AIR MONITORING STATION :
THE DDC CONTROL SYSTEM SHALL MONITOR THE CFM OF OUTDOOR AIR, AS SENSED BY AIR FLOW MONITORING STATION. IF OUTDOOR AIR
CFM DROP MORE THAN 10% BELOW THE REQUIRED MINIMUM CFM, ALARM SHALL BE GENERATED.
13. FREEZE PROTECTION:
A HARDWIRED, FREEZSTAT SHALL BE ELECTRICALLY INTERLOCKED WITH THE UNIT OPERATION. UPON SENSING A POTENTIAL FOR FREEZING CONDITIONS OF 35°F (ADJ), AS SENSED BY MIXED AIR TEMPERATURE SENSOR (TS-2), ALL FANS SHALL DISABLE., ALL DAMPERS SHALL CLOSE, ALL VALVES SHALL OPEN TO 100% AND AN AUDIBLE ALARM SHALL BE ISSUED AT THE BMS AND AN AUDIBLE ALARM WITH TEXT MESSAGE INDICATING FREEZE CONDITIONS SHALL BE ISSUED AT THE CONTROLS WORKSTATION. A MANUAL RESET OF THE LOW LIMIT SWITCH SHALL BE
REQUIRED TO RESTART THE UNIT.
14. SMOKE DETECTION (SD-1):
THE UNIT SHALL SHUT DOWN AND AN ALARM SHALL GENERATE AT THE BMS AND FIRE ALARM CONTROL PANEL.
15. ALARMS SHALL BE PROVIDED AS FOLLOWS:
15.1. SUPPLY/RETRUN FAN FAILURE: COMMANDED ON, BUT THE STATUS IS OFF.
15.2. SUPPLY/RETURN FAN IN HAND: COMMANDED OFF, BUT THE STATUS IS ON.
15.3. FILTER REQUIRED: FILTER DIFFERENTIAL PRESSURE EXCEEDS A USER DEFINABLE LIMIT (ADJ.).
15.4. HIGH AIR CARBON DIOXIDE CONCENTRATION: WHEN IN OCCUPIED MODE, IF THE RETURN AIR CO2 CONCENTRATION IS GREATER BY
700PPM COMPARED TO OUTSIDE AIR CO2 CONCENTRATION.
15.5. LOW RETURN AIR HUMIDITY: IF THE RETURN AIR HUMIDITY IS LESS THAN 35% (ADJ.).
15.6. LOW MIXED AIR TEMPERATURE OF 35°F (ADJ.) AND BELOW.
15.7. SMOKE DETECTION.
REHEAT VAV TERMINAL UNITS SEQUENCE OF OPERATION:
EACH VAV TERMINAL UNIT SHALL BE INDIVIDUALLY CONTROLLED BY AN APPLICATION SPECIFIC VAV CONTROLLER, WHICH SHALL BE INTERFACED WITH THE BAS FOR CENTRALIZED MONITORING AND CONTROL. EACH DDC VAV UNIT CONTROLLER SHALL INTERFACE AND BE INTEROPERABLE WITH AHU/RTU CONTROLLER TO FACILITATE DEMAND CONTROL OF COOLING OR HEATING AS INDICATED IN VAV AHU/RTU AND HEATING WATER SYSTEM
SEQUENCES OF OPERATION.
CONTROLS SHALL BE FURNISHED BY THIS CONTRACTOR. VAV TERMINAL UNIT MANUFACTURER SHALL FURNISH TRANSFORMER AND SHALL MOUNT DDC CONTROLLER AND DAMPER OPERATOR AS FURNISHED TO THE
MANUFACTURER BY THIS ATC CONTRACTOR.
OCCUPIED CYCLE:
AS THE SPACE TEMPERATURE RISES ABOVE THE COOLING SET POINT, AS SENSED BY SPACE MOUNTED TEMPERATURE SENSORS, TS, THE REHEATING CONTROL VALVE SHALL CLOSE AND THE TERMINAL UNIT AIR FLOW CONTROLLER SHALL MODULATE TOWARD ITS MAXIMUM CFM. AS THE SPACE TEMPERATURE FALLS BELOW COOLING SET POINT, THE TERMINAL UNIT SHALL MODULATE TO ITS MINIMUM COOLING CFM. UPON A CONTINUED DROP IN SPACE TEMPERATURE, THE TERMINAL UNIT SHALL MODULATE THE VOLUME CONTROLLER TO ITS HEATING MINIMUM CFM AND THE HOT WATER VALVE SHALL BE MODULATED AS REQUIRED TO MAINTAIN THE
ACTIVE HEATING SET POINT. DURING COOLING CYCLE SHALL BE CLOSED.
UNOCCUPIED CYCLE:
DURING THE UNOCCUPIED CYCLE, THE TERMINAL UNIT AIR VALVE SHALL MODULATE TO ITS MINIMUM CLOSED POSITION AND THE HOT WATER VALVE SHALL CLOSE. WHEN SPACE TEMPERATURE FALLS BELOW REDUCED NIGHT-SETBACK TEMPERATURE (55°F), AHU/RTU SHALL ENERGIZE ACCORDING TO AHU/RTU SEQUENCE, AND TERMINAL UNIT HOT WATER VALVE SHALL MODULATE TO MAINTAIN REDUCED NIGHT-SETBACK TEMPERATURE
(ADJ).
MORNING WARM-UP:
DURING MORNING WARM-UP CYCLE, TERMINAL UNIT AIR VALVE SHALL DRIVE OPEN TO MAXIMUM POSITION AND HOT WATER VALVE SHALL BE PERMITTED TO OPEN FULLY. THE HEATING HOT WATER SUPPLY TEMPERATURE SHALL BE SET AT MAXIMUM FOR QUICK WARM-UP. WHEN OCCUPIED SPACE TEMPERATURE SETPOINT IS REACHED, TERMINAL UNIT CONTROL SHALL SWITCH TO AUTOMATIC FOR OCCUPIED CYCLE CONTROL, INCLUDING THE HOT WATER SUPPLY TEMPERATURE CONTROL.
VENTILATION CONTROL:
THE CONTROLS SHALL BE ARRANGED TO PERMIT THE ECONOMIZED DAMPERS TO BE CONTROLLED TO MAINTAIN AN OCCUPANCY SETPOINT OF 72 DEGREES F (ADJ) WITH OUTSIDE AIR VENTILATION ONLY, UTILIZING THE ECONOMIZER DAMPERS WITH BOTH THE HEATING AND COOLING COIL VALVES CLOSED. THAT PROVIDES A COOLING SETPOINT OF 75 DEG F, A HEATING SETPOINT OF 68 DEG F AND A VENTILATION SETPOINT OF 72 DEG F, FOR MAXIMUM COMFORT AND OPTIMIZED ENERGY CONSUMPTION.
UNIT HEATER (UH) SEQUENCE OF OPERATION:
HEATING MODE:
WHEN THE TEMPERATURE FALLS BELOW THE THERMOSTAT SET POINT OF 60°F (ADJ). THE
THERMOSTAT SHALL OPEN WATER SUPPLY VALVE AND START THE FAN. ONCE SPACE
THERMOSTAT IS SATISFIED VALVE SHALL CLOSE AND UNIT HEATER SHALL STOP.
SEQUENCE OF OPERATION:
THE SPACE TEMPERATURE SHALL START/STOP EXHAUST FAN. DAMPER SHALL OPEN WHEN FAN
IS ENERGIZED AND CLOSED WHEN FAN IS DE-ENERGIZED. DAMPER SHALL PROVE OPEN BEFORE
EXHAUST FAN SHALL ENERGIZE.
REHEAT VAV TERMINAL UNITS SEQUENCE OF OPERATION:
1. GENERAL:
1.1. THE AIR TERMINAL UNIT SHALL HAVE ITS OWN FACTORY-INSTALLED CONTROL SYSTEM WITH
INDEPENDENT DDC AND ASSOCIATED CONTROLLER CONTAINED IN A FACTORY INSTALLED
UNIT-MOUNTED CONTROL PANEL. ALL PROGRAMS AND LOGIC REQUIRED FOR THE FUNCTIONS
AND SEQUENCES OF OPERATION DESCRIBED IN THE CONTRACT DOCUMENTS SHALL RESIDE IN
THE UNIT-MOUNTED CONTROLLER. THE CONTROLLERS AND ASSOCIATED PROGRAMS SHALL BE
CAPABLE OF OPERATING COMPLETELY INDEPENDENTLY AND SHALL BE CONNECTED TO AND
INTEROPERABLE WITH THE BUILDING AUTOMATION SYSTEM (BAS) USING DDC.
1.2. ALL SENSORS, CONTROLLER SETTINGS, AND CONTROL MODULE SETTINGS SHALL BE TESTED
AND CALIBRATED IN ACCORDANCE WITH THE SEQUENCE OF OPERATION AS INDICATED.
1.3. ALL SET POINTS SHALL BE FIELD ADJUSTED DURING THE COMMISSIONING PROCESS TO MEET
THE REQUIREMENTS OF ACTUAL FIELD CONDITIONS.
1.4. ALL SET POINTS SHALL BE ADJUSTABLE (ADJ).
1.5. THE BAS SHALL MONITOR AND TREND ALL ANALOG VALUES EVERY 15 MINUTES. ALL STATUSES SHALL BE TRENDED ON AN CHANGE OF VALUE. THE SYSTEM SHALL ARCHIVE THIS INFORMATION
FOR A MINIMUM OF 60 DAYS.
1.6. ALL POINTS SHALL BE PROVIDED WITH DYNAMIC COLOR DISPLAY.
2. OCCUPIED MODE:
2.1. THE UNIT SHALL MAINTAIN 75° F (ADJ)COOLING SET POINT AND 70° F (ADJ) HEATING SET POINT.
THE DAMPER SHALL MODULATE TO…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.