Performance_Work_Statement_Photographs_&_Drawings.pdf

PDF 11 MB Posted

Attached to
Pump Lab Well System Rehabilitation Federal contract opportunity
Solicitation number
12318719Q0264
Issued by
Department of Agriculture Forest Service Washington Office Acquisitions

About this file

Performance Work Statement Photographs & Drawings

View the file

Other files for this federal contract opportunity

Other files attached to Pump Lab Well System Rehabilitation, newest first.
File Type Posted
Performance_Work_Statement.pdf PDF
COMBINED_SYNOPSIS-SOLICITATION.pdf PDF
Wage_Determinations.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sprayer

Sump

Pump

Underground

Pipe Underground

Pipe

From City Water

Pneumatic Red Valve

Pinch Valve

Air Supply

National Technology and Development Program

San Dimas, Ca

Figure 2. Layout of Reservoir and Wells

Ground Level c==>

Image 1

Ductile Iron flange is 4-bolt to 8-bolt PVC interface flange leaks Replace with approriate adapter/flange

4" Diameter Schedule 80 PVC

Image 2-7

Pump Alignment

I

Viclaulic Like Fillings Rubber Hose Hose Clamp lmage8-9

10" Butterfly Valve

NOT TO SCALE

30.5 feet

Circled Numbers reference findings in the 12/12/18 report

I I I I 1 0" Diameter Ductile Iron

� I I Image 10

Image 11

(!)C?}J� 10" Red Valve Pinch Valve Type A with Pneumatic Tank

Bolt stand Ji::,i Floor of Well

Figure 3 Side View of Walls and schematic for referencing images and inspection report findings.

Pumpside

Image 2. View looking up from bottom of well, lower flange 4"- PVC pipe.

Image 1. View looking down from top of well to pumphead.

aisanchez Sticky Note Accepted set by aisanchez aisanchez Sticky Note None set by aisanchez

Image 3. View of flexible hose connection between pump and vertical PVC.

Image 4. View of connection between pump and vertical PVC.

Image 6. Close up view of connection between rubber hose and vertical PVC.

Image 5. View of connection between rubber hose and vertical PVC.

Image 7. Closeup view of pumphead.

Image 9. Closeup view of flanges and butterfly valve

Image 8. View of flanges and butterfly valve.

Returnside

Image 10. View of upper corroded bracket.

Image 11. View of lower corroded bracket.

Image 12. View of Corroded bottom of Red Valve Pinch Valve with single stand bolt.

Detail of Red Valve

Image 13. Air bubbles are streaming from the bottom of the pneumatic pinch valve

Image 14. Pinch Valve and Pneumatic tank.c pinch valve .

Image 15. Pneumatic airline to the Red Valve Pinch Valve.

Image 16. View from opposite side of Red Valve Pinch Valve.

pumplab_flow_diagram_wells_only.pdf
Binder1.pdf
pumplab_flow_diagram_wells_only.pdf
Illustrations for Well Rehab.pdf
PumpLabPlumbing.pdf
Well _ developing SOW _ final_v1.pdf
Well _ developing SOW _ images_rev3

Blank Page

File details come from the government source that posted it.