This document is a set of Questions and Answers related to an Emergency Well Replacement solicitation for the USDA Agricultural Research Service facility in Chatsworth, NJ. The key details are:
The solicitation is for the replacement of an emergency well at the USDA facility. The scope includes a new submersible pump that can function off a VFD, and the installation of a pitless adapter. Drilling cuttings and mud can be disposed of on-site. The solicitation is issued as a Request for Proposals (RFP) with a firm-fixed price contract. This is a Total Small Business Set-Aside under NAICS code 237110 with a $45 million size standard. The Period of Performance is 14 days after award. A site visit is required on September 9, 2024, and all questions must be submitted by September 10, 2024, with answers posted as an amendment.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Question 1: Will there be a sufficient water source for drilling/abandoning?
Answer 1: Yes.
Question 2: Are the electric/irrigation controls damaged?
Answer 2: No, damaged controls have been replaced.
Question 3: Does the scope include a new VFD? Or just a submersible pump that can function off a VFD?
Answer 3: As the damaged controls have been replaced, a new VFD is not required at this time.
Submersible pump should be able to function off a VFD.
Question 4: Will there be a pitless adapter installed? If not, what above ground discharge/ well head is needed?
Answer 4: A pitless adapter will be required, not a ground discharge.
Question 5: Can drilling cuttings/mud be disposed on-site?
Answer 5: Yes.