Self Performed Work worksheet.docx

DOCX document 18 KB Posted

Attached to
Magnesium Hydroxide System
Solicitation number
12305B24R0031
Issued by

About this file

The provided document is a Self Performed Work worksheet for a federal contract opportunity. The worksheet requires offerors to provide a breakdown of material and personnel costs by specification division, and to identify the personnel costs that will be self-performed versus subcontracted to small business concerns. This is a requirement for offerors under NAICS codes 236xxx, 237xxx, and 238xxx, who must perform at least 15-25% of the contract work with their own employees or other small business concerns.

The related federal contract opportunity is for a Magnesium Hydroxide System at the Beltsville Agriculture Research Center (BARC) in Beltsville, MD. This is a Request for Proposals (RFP) issued by the United States Department of Agriculture (USDA), Agricultural Research Service (ARS), with a Firm Fixed Price (FFP) award. The NAICS code is 237110 Water and Sewer Line and Related Structures Construction, with a small business size standard of $45.0 million. The magnitude of construction is between $500,000 and $1,000,000, and the period of performance is 373 days. This opportunity is set aside for small business concerns.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CALCULATION OF SELF-PERFORMED/SUBCONTRACTED WORK

Offerors for NAICS 236xxx must provide 15%, NAICS 237xxx and 238xxx 25% of the cost of the contract performance incurred for personnel will be spent on the concern's employees or the employees of other small business concerns. Provide a breakdown of material and personnel costs, by specification division listed for the project. Home Office overhead, profit/fee and bond costs shall be added after a subtotal of personnel and material/Equipment costs has been calculated. Clearly identify the personnel costs you will be performing, and the personnel costs of other eligible small business concerns. Below is a suggested format.

Specification Division
SB Vendor (Y or N)
Personnel Cost
Material/Equipment Costs

Division 01

$
$

Division 02

$
$

Division 03

$
$

(Add additional lines as necessary for each Division applicable to this project)

$
$
$
$

Sub Total (Personnel Costs, Material/Equipment Costs)

Profit
$
Home Office Overhead
$
Bond
$
Grand Total
$

Calculation of self-performed personnel costs:

1. Total personnel costs * both prime and all subcontractors: $

2. Subtract all subcontractor personnel costs* that are not SB companies that will perform work on this contract: $

3. Remainder is ‘Total amount of work to be self-performed under the

Contract’:$
4. Self-performed work = Line 3/Line 1 x 100 =%

*personnel costs include labors, mechanics, other tradesmen, and office personnel directly charged to the project (includes project manager, job superintendent, administrative, estimators, etc.)

I certify the above representations are true and correct to the best of my knowledge.

(Signature and Typed Name of Authorized Representative) Date

(Title of Authorized Representative)

File details come from the government source that posted it. Updated .