This document contains an attachment registry and related federal contract opportunity solicitation. The attachment registry provides a log of submittals required for the Install Compressed Air System project located at 711 Washington St. in Boston, MA. Submittals include OSHA training records, a construction schedule, daily reports, safety and security plans, fire safety plans, and shop drawings for the air compressor and accessories, piping, air filter, water separator, and air dryer.
The related federal contract opportunity is solicitation number 12305B24R0016 seeking bids to install a compressed air system at the same location. The solicitation is a request for proposals issued by the USDA Agricultural Research Service for a small business set-aside between $25,000 to $100,000 to be completed within 30 days of notice to proceed. Interested vendors should monitor the website for amendments and submit any questions by March 12, 2024 to the contracting specialist.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 12305B24R0016.pdf | ||
| Attachment 2 - DIV 1 USDA GEN REQUIREMENTS - 03AUG2023.pdf | ||
| Attachment 4 - USDA Forms - 02AUG2023.pdf | ||
| Attachment 1 - SOW - Install Compressed Air System - 07FEB2024.pdf | ||
| Attachment 5 - WD Suffolk County MA Building MA20240001 - 01MAR2024.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| SUBMITTAL LOG | Status |
| Pending |
| Project Name | Install Compressed Air System | Award Date | 9-Feb-24 | |||||
| Address | 711 Washington St. | Project Number | ||||||
| City | Boston | State | MA | Zip | 02111 | Contract Number |
| Line Item Number | Submittal Number | Submittal Date | Specification Number Dwg Number | Specification Name | Item Description | Type Of Submittal | Status | Date Approved/Rejected | Resubmittal Due Date | Remarks | |||||||||||
| P | I | C | |||||||||||||||||||
| R | N | E | O | I | |||||||||||||||||
| O | S | S | R | & | N | ||||||||||||||||
| D | T | S | T | T | M | F | |||||||||||||||
| U | D | R | C | A | I | O | |||||||||||||||
| C | R | U | H | T | R | F | S | R | M | R | |||||||||||
| T | A | C | E | E | E | I | A | E | A | M | |||||||||||
| W | T | D | M | P | C | M | C | N | A | ||||||||||||
| D | I | I | U | E | O | A | P | O | U | T | |||||||||||
| A | N | O | L | N | R | T | L | R | A | I | |||||||||||
| T | G | N | E | T | T | E | E | D | L | O | |||||||||||
| A | S | S | S | S | S | S | S | S | S | N | |||||||||||
| 1 | Division 1 | GENERAL REQUIREMENTS | |||||||||||||||||||
| 1 | 1.1 GENERAL INTENTION | D. Training Records of 10-hour OSHA courses for all project employees; 30-hour OSHA Training for supervisors. | X | ||||||||||||||||||
| 2 | 1.2 PROJECT COORDINATION | A. Construction Project Schedule | X | ||||||||||||||||||
| 3 | 1.2 PROJECT COORDINATION | B. Contract Inspector's Daily Report | X | ||||||||||||||||||
| 4 | 1.4 SAFETY SUBMITTALS | A. | "Site Specific" Safety Plan | X | |||||||||||||||||
| 5 | 1.4 SAFETY SUBMITTALS | A.1 Pandemic Specific Requirements for Access to ARS Locations/Worksites (Can be incorporated into Safety Plan) | X | ||||||||||||||||||
| 6 | 1.4 SAFETY SUBMITTALS | C. DAILY INSPECTION FORM | X | ||||||||||||||||||
| 8 | 1.4 SAFETY SUBMITTALS | E. Written notice for High Risk Work (If applicable) | X | ||||||||||||||||||
| 9 | 1.4 SAFETY SUBMITTALS | F. Material Safety Data Sheets (MSDS) | X | ||||||||||||||||||
| 12 | 1.5 CONSTRUCTION SECURITY REQUIREMENTS | A. Security Plan (May be incorporated into Safety Plan) | X | ||||||||||||||||||
| 13 | 1.6 FIRE SAFETY | B. Fire Safety Plan (May be incorporated into Safety Plan) | X | ||||||||||||||||||
| 13 | SOW | MATERIAL SUBMITTALS | |||||||||||||||||||
| 14 | SOW | AIR COMPRESSOR AND ACCESSORIES | X | ||||||||||||||||||
| 15 | PIPING | X | |||||||||||||||||||
| 16 | SHOP DRAWINGS | X | |||||||||||||||||||
| 17 | AIR FILTER | X | |||||||||||||||||||
| 18 | WATER SEPARATOR | X | |||||||||||||||||||
| 19 | AIR DRYER | X | |||||||||||||||||||
| 20 | O&M MANUALS | X | |||||||||||||||||||
| 21 | TRAINING | X | |||||||||||||||||||
| 22 | WARRANTY | X | |||||||||||||||||||
| 23 | |||||||||||||||||||||
| 24 | |||||||||||||||||||||
| 25 | |||||||||||||||||||||
| 26 | |||||||||||||||||||||
| 27 | |||||||||||||||||||||
| 28 | |||||||||||||||||||||
| 29 | |||||||||||||||||||||
| 30 | |||||||||||||||||||||
| 31 | |||||||||||||||||||||
| 32 | |||||||||||||||||||||
| 33 | |||||||||||||||||||||
| 34 | |||||||||||||||||||||
| 35 | |||||||||||||||||||||
| 36 | |||||||||||||||||||||
| 37 | |||||||||||||||||||||
| 38 | |||||||||||||||||||||
| 39 | |||||||||||||||||||||
| 40 | |||||||||||||||||||||
| 41 | |||||||||||||||||||||
| 42 | |||||||||||||||||||||
| 43 | |||||||||||||||||||||
| 44 | |||||||||||||||||||||
| 45 | |||||||||||||||||||||
| 46 | |||||||||||||||||||||
| 47 | |||||||||||||||||||||
| 48 | |||||||||||||||||||||
| 49 | |||||||||||||||||||||
| 50 | |||||||||||||||||||||
| 51 | |||||||||||||||||||||
| 52 | |||||||||||||||||||||
| 53 | |||||||||||||||||||||
| 54 | |||||||||||||||||||||
| 55 |