USDA

Preliminary System Layout June 14, 2022

USDA | Confidential | June 14, 2022

Blender

(3) Silos

Hopper to Bagger (bagger not shown)

Pellet Mill

Auger w/ Discharge Diverter

Inclined Conveyer

Bi-Directional Conveyer

Conveyer

Crumbler

(3) Augers

45° Elbows

All components will need to be set in place, bolted together, supported, and lagged. Silos will need supporting concrete pads for each. Silos to be assembled on site.

Three belt conveyors will come with support legs that need to be lagged to the floor.

Support in this area needs to come from the ground up.

Auger motor drives will need to be suspended from the ceiling via cable or chain.

Stand to be fabricated on site to support crumbler over conveyor.

Stand to be fabricated on site to raise mixer / blender for auger access.

Silo Concrete example (exact specs to follow):

Motors HP

Auger 1 3 Auger 2 3 Auger 3 3 Blender 5 Auger 4 3 Pelletizer 10 Cooling belt 3 Reversing belt 5 Crumbler 3 Crumbler discharge 3

There will be one central control panel provided by Automated Extractions. This control panel can be fed with either 480V 3-P or 208V 3-P. All motors and sensors will wire to this one control panel. The motor list is below:

Sensor and E-stop connections:

2ea. E-stops. One located at the mixer/pellet mill and one located at the crumbler 3ea. Load sensor 0-10VDC signals from each silo to the main control panel 2ea. Position signals from the diverter gate on the pellet mill feed.

Possible control panel location. To be confirmed by USDA

Pneumatics: Diverter gate and pneumatic vibrators will be used. Supply air (1/2”) to be fed to the main control panel. Pneumatic tube connections from the control panel need to be run per the below:

Vibrator pneumatic tube connections 3/8”

Diverter valve 2-way tube connections (one for open and one for closed) ¼”

Slide Number 1
Slide Number 2
Slide Number 3
Slide Number 4
Slide Number 5
Slide Number 6
Slide Number 7
Slide Number 8
Slide Number 9
Slide Number 10
Slide Number 11

File details come from the government source that posted it. Updated .