AMEND 1_05262020.pdf
PDF 227 KB Posted
- Solicitation number
- 1224H820R0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMEND 4_06162020.pdf | ||
| AMEND 3_06152020.pdf | ||
| AMEND 2_06092020.pdf | ||
| 1224H820R0001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
Questions and Answers
North East Acquisition Team 4 Farm Colony Drive Warren PA 16365
1224H820R0001
1 3
05/27/2020
05/15/2020
Solicitation: 1224H820R0001
Date: 26 May 2020
AMENDMENT 01:
QUESTIONS AND ANSWERS:
1. QUESTION: I saw there was a guy working from the beginning of 508 off route 219. How will this affect the job we are bidding?
RESPONSE: The work is in conjunction with a Forest Service Timber Sale, and will not impact this project’s construction. The work being completed for the sale will be completed prior to this requirement’s start date.
2. QUESTION: I see there is no E&S plan. Is that something we have to submit and provide?
RESPONSE: Yes, an E+S plan needs to be submitted for roadwork, culvert replacements, and dewatering for the stream crossing.
3. QUESTION: Does the ANF hold the GP-11 permit for the stream crossing at camp run?
RESPONSE: The Forest Service has applied for the permit, and will provide the permit upon award.
4. QUESTION: As far as surveying the site, do we need to hire a firm to have it staked out or can we measure it ourselves?
RESPONSE: The survey and staking is the responsibility of the contractor, and can be completed by a surveyor or the contractor. The contractor will be responsible for any errors or additional work based on incorrect staking prior to Forest Service acceptance.
5. QUESTION: Are we able to stockpile gravel onsite?
RESPONSE: Gravel may be stockpiled under certain circumstances as approved by Forest Service. The amount of stone required restrict it, and stockpile locations are limited. Stockpiling is not allowed for Limestone DSA surfacing. Stockpiling will be allowed under limited circumstances, and would require additional contractor quality control requirements based on individual stone specifications.
6. QUESTION: 20404 Roadway excavation and Embankment, and 20417 Embankment Construction. Could you please clarify where this is on the job?
RESPONSE: The 20404/20417 Items are the excavation and embankment Construction required for the removal and replacement of the stream crossing.
(End of Amendment 1)