121091 OR AWARDED BID TAB FINAL.xlsx
XLSX spreadsheet 29 KB Posted
- Attached to
- Liquid Asphaltic Materials
- Solicitation number
- 121091 OR
- Issued by
- Buffalo County, Nebraska
About this file
This document is a bid tabulation spreadsheet for Liquid Asphaltic Materials issued by the Nebraska Department of Transportation for procurement across eight districts. The solicitation covers multiple material types including CRS-2P, CSS-1H, HFE-300, and other liquid asphaltic materials to be delivered to various highway locations and mixing sites throughout Nebraska. The bid opening date is March 4, 2025, with quantities ranging from 5 to 969.56 tons per line item across different highway segments and districts. The bid includes plant pickup locations and provisions for returned load fees and demurrage charges.
Four vendors submitted pricing: ERGON ASPHALT & EMULSION, INC., Flint Hills Resources, LP, Jebro, Inc., and Martin Resource Management Corp. Most districts saw limited bidding, with Jebro, Inc. and Martin Resource Management Corp. providing the most comprehensive pricing responses. Pricing varied significantly by district and material type, with unit prices ranging from $423.63 to $1,195.85 per ton. The total bid values for the four vendors ranged from $388,478.00 to $18,566,887.37, indicating substantial variability in bid completeness and pricing strategy. The spreadsheet includes detailed location-specific pricing for liquid asphaltic materials across Nebraska's highway infrastructure.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 121091 OR Liquid Asphaltic Material FINAL.docx | DOCX document | |
| Ergon_2025 NDOT Liquid Asphaltic Materials.pdf | ||
| Intent to award.docx | DOCX document | |
| 121091 OR SOLICITATION ADDENDUM ONE Questions.docx | DOCX document | |
| 121091 OR, Flint Hills Resources, LP.pdf | ||
| Jebro Bid #121091 OR.pdf | ||
| 121091 OR Attachment A Cost Sheet FINAL.docx | DOCX document | |
| 121091 OR Martin Resource DBA Monarch Oil File 1 of 1.pdf | ||
| 121091 OR Liquid Asphaltic Material FINAL.docx | DOCX document | |
| 121091 OR Attachment A Cost Sheet FINAL.docx | DOCX document | |
| 121091 OR SOLICITATION ADDENDUM ONE Questions.docx | DOCX document | |
| 121091 OR Liquid Asphaltic Material FINAL.docx | DOCX document | |
| 121091 OR Attachment A Cost Sheet FINAL.docx | DOCX document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Liquid Asphaltic Materials | ERGON ASPHALT & EMULSION, INC. | Flint Hills Resources, LP | Jebro, Inc | Martin Resource Management Corp. DBA Monarch Oil | ||||
| LINE # | DESCRIPTION | UOM | QTY | UNIT | ||||
| PRICE | EXTENDED PRICE | UNIT | ||||||
| PRICE | EXTENDED PRICE | UNIT | ||||||
| PRICE | EXTENDED PRICE | UNIT | ||||||
| PRICE | EXTENDED PRICE | |||||||
| DISTRICT 1 | ||||||||
| 1 | DAVID CITY YARD |
235 IOWA ST (68632)
| MATERIAL TYPE: CRS-2P | TN | 139 | No BID | No BID | No Bid | No Bid | $ 710.39 | $ 98,744.21 |
| 2 | EMERALD |
JUNCTION HWY 6/S55A
| MATERIAL TYPE: CRS-2P | TN | 131.28 | No BID | No BID | No Bid | No Bid | $ 710.39 | $ 93,260.00 |
| 3 | FREMONT |
1 MI SOUTH ON HWY 77
| MATERIAL TYPE: CRS-2P | TN | 128.71 | No BID | No BID | No Bid | No Bid | $ 710.39 | $ 91,434.30 |
| 4 | SOUTH BEND |
JUNCTION HWY 66/COUNTY RD 358
| MATERIAL TYPE: CRS-2P | TN | 120.98 | No BID | No BID | No Bid | No Bid | $ 710.39 | $ 85,942.98 |
| 5 | FAIRBURY |
HWY 15, MM 24
| MATERIAL TYPE: CRS-2P | TN | 929 | No BID | No BID | No Bid | No Bid | $ 710.39 | $ 659,952.31 |
| 6 | PAWNEE CITY |
HWY 8, MM 126
| MATERIAL TYPE: CRS-2P | TN | 249 | No BID | No BID | No Bid | No Bid | $ 710.39 | $ 176,887.11 |
| 7 | BEATRICE |
HWY 136, MM 172
| MATERIAL TYPE: CRS-2P | TN | 241 | No BID | No BID | No Bid | No Bid | $ 710.39 | $ 171,203.99 |
| DISTRICT 3 | ||||||||
| 8 | LEIGH |
JUNCTION HWY 91/57
| MATERIAL TYPE: CRS-2P | TN | 168.72 | No BID | No BID | No Bid | No Bid | $ 686.27 | $ 115,787.47 |
| 9 | HUMPHREY |
JUNCTION HWY 81/91
| MATERIAL TYPE: CRS-2P | TN | 571.73 | No BID | No BID | No Bid | No Bid | $ 686.27 | $ 392,361.15 |
| 10 | MADISON |
JUNCTION HWY 81/32
| MATERIAL TYPE: CRS-2P | TN | 237.05 | No BID | No BID | No Bid | No Bid | $ 686.27 | $ 162,680.30 |
| 11 | NEWMAN GROVE |
JUNCTION HWY 45/32
| MATERIAL TYPE: CRS-2P | TN | 334.9 | No BID | No BID | No Bid | No Bid | $ 686.27 | $ 229,831.82 |
| 12 | PIERCE |
JUNCTION HWY 98/13
| MATERIAL TYPE: CRS-2P | TN | 122.32 | No BID | No BID | No Bid | No Bid | $ 686.27 | $ 83,944.55 |
| 13 | PIERCE |
HWY 98, MM 98
| MATERIAL TYPE: CRS-2P | TN | 105.45 | No BID | No BID | No Bid | No Bid | $ 686.27 | $ 72,367.17 |
| 14 | NORFOLK |
HWY 35, MM 30.7
HWY 35 SHOULDERS
| MATERIAL TYPE: CRS-2P | TN | 249.7 | No BID | No BID | No Bid | No Bid | $ 686.27 | $ 171,361.62 |
| 15 | CEDAR RAPIDS |
HWY 52, MM 13
| MATERIAL TYPE: CRS-2P | TN | 471.69 | No BID | No BID | No Bid | No Bid | $ 686.27 | $ 323,706.70 |
| 16 | CREIGHTON |
HWY 59, MM 7
| MATERIAL TYPE: CRS-2P | TN | 506.16 | No BID | No BID | No Bid | No Bid | $ 686.27 | $ 347,362.42 |
| 17 | WATERBURY |
HWY 20, MM 410
| MATERIAL TYPE: CRS-2P | TN | 274.17 | No BID | No BID | No Bid | No Bid | $ 686.27 | $ 188,154.65 |
| 18 | UEHLING |
HWY 77, MM 135.2
| MATERIAL TYPE: CRS-2P | TN | 147.63 | No BID | No BID | No Bid | No Bid | $ 686.27 | $ 101,314.04 |
| 19 | OAKLAND |
HWY 32, MM 87.55
| MATERIAL TYPE: CRS-2P | TN | 286.82 | No BID | No BID | No Bid | No Bid | $ 686.27 | $ 196,835.96 |
| 20 | TEKAMAH |
HWY 75, MM 135.9
| MATERIAL TYPE: CRS-2P | TN | 189.81 | No BID | No BID | No Bid | No Bid | $ 686.27 | $ 130,260.91 |
| 21 | WAYNE |
HWY 35, MM 30.7
| MATERIAL TYPE: CRS-2P | TN | 147.63 | No BID | No BID | No Bid | No Bid | $ 686.27 | $ 101,314.04 |
| 22 | HARTINGTON |
HWY 84, MM 343.2
| MATERIAL TYPE: CRS-2P | TN | 342.97 | No BID | No BID | No Bid | No Bid | $ 686.27 | $ 235,370.02 |
| 23 | ST. HELENA |
HWY S14H, MM 5.2
| MATERIAL TYPE: CRS-2P | TN | 112.24 | No BID | No BID | No Bid | No Bid | $ 686.27 | $ 77,026.94 |
| 24 | WAKEFIELD |
HWY 9, MM 37.3
| MATERIAL TYPE: CRS-2P | TN | 143.41 | No BID | No BID | No Bid | No Bid | $ 686.27 | $ 98,417.98 |
| DISTRICT 4 | ||||||||
| 25 | GRAND ISLAND -CAIRO |
HWY 2, MM 344-355
| MATERIAL TYPE: CRS-2P | TN | 432 | No BID | No BID | $ 637.00 | $ 275,184.00 | $ 736.61 | $ 318,215.52 |
| 26 | RED CLOUD |
HWY 281, MM 12-26
| MATERIAL TYPE: CRS-2P | TN | 525 | No BID | No BID | $ 637.00 | $ 334,425.00 | $ 736.61 | $ 386,720.25 |
| 27 | AURORA |
HWY 34, MM 237-250
| MATERIAL TYPE: CRS-2P | TN | 500 | No BID | No BID | $ 637.00 | $ 318,500.00 | $ 736.61 | $ 368,305.00 |
| 28 | HASTINGS |
HWY S18-A, MM 0-5
| MATERIAL TYPE: CRS-2P | TN | 125 | No BID | No BID | $ 637.00 | $ 79,625.00 | $ 736.61 | $ 92,076.25 |
| 29 | HASTINGS |
HWY S1-D, MM 0-2
| MATERIAL TYPE: CRS-2P | TN | 50 | No BID | No BID | $ 637.00 | $ 31,850.00 | $ 736.61 | $ 36,830.50 |
| 30 | CHESTER -HARDY |
HWY 8, MM 13-24
| MATERIAL TYPE: CRS-2P | TN | 235 | No BID | No BID | $ 637.00 | $ 149,695.00 | $ 736.61 | $ 173,103.35 |
| 31 | POLK |
HWY 66- HWY 81, MM 11-21
| MATERIAL TYPE: CRS-2P | TN | 196 | No BID | No BID | $ 637.00 | $ 124,852.00 | $ 736.61 | $ 144,375.56 |
| 32 | GRESHAM |
HWY 69 NORTH/SOUTH, MM 55-76
| MATERIAL TYPE: CRS-2P | TN | 413 | No BID | No BID | $ 637.00 | $ 263,081.00 | $ 736.61 | $ 304,219.93 |
| 33 | GREELEY |
HWY 91, MM 3-7
| MATERIAL TYPE: CRS-2P | TN | 127 | No BID | No BID | $ 637.00 | $ 80,899.00 | $ 736.61 | $ 93,549.47 |
| 34 | ORD NORTH |
Hwy 11, MM 80-83
| MATERIAL TYPE: CRS-2P | TN | 25 | No BID | No BID | $ 637.00 | $ 15,925.00 | $ 736.61 | $ 18,415.25 |
| 35 | BOELUS - LOUP CITY |
HWY 58, MM 21-39
| MATERIAL TYPE: CRS-2P | TN | 63 | No BID | No BID | $ 637.00 | $ 40,131.00 | $ 736.61 | $ 46,406.43 |
| 36 | LOUP CITY |
HWY 92 WEST, MM 309-320
| MATERIAL TYPE: CRS-2P | TN | 38 | No BID | No BID | $ 637.00 | $ 24,206.00 | $ 736.61 | $ 27,991.18 |
| 37 | MARQUETTE |
HWY 14 & S41C, MM 73-81
| MATERIAL TYPE: CRS-2P | TN | 275 | No BID | No BID | $ 637.00 | $ 175,175.00 | $ 736.61 | $ 202,567.75 |
| 38 | RAVENNA MIXING SITE 405 | |||||||
| MATERIAL TYPE: HFE-300 | TN | 50 | No BID | No BID | No Bid | No Bid | $ 795.47 | $ 39,773.50 |
| 39 | ORD MIXING SITE 435 |
HWY 11, MM 68
| MATERIAL TYPE: HFE-300 | TN | 49.93 | No BID | No BID | No Bid | No Bid | $ 795.47 | $ 39,717.82 |
| 40 | GREELEY MIXING SITE 404 |
HWY 281, MM 120
| MATERIAL TYPE: HFE-300 | TN | 75 | No BID | No BID | No Bid | No Bid | $ 795.47 | $ 59,660.25 |
| 41 | GREELEY MIXING SITE 420 |
Hwy 281, MM 125
| MATERIAL TYPE: HFE-300 | TN | 75 | No BID | No BID | No Bid | No Bid | $ 795.47 | $ 59,660.25 |
| 42 | LOUP CITY MIXING SITE 403 |
Hwy 58, MM 29
| MATERIAL TYPE: HFE-300 | TN | 75 | No BID | No BID | No Bid | No Bid | $ 795.47 | $ 59,660.25 |
| 43 | LOUP CITY MIXING SITE 418 |
HWY 92, MM 320
| MATERIAL TYPE: HFE-300 | TN | 75 | No BID | No BID | No Bid | No Bid | $ 795.47 | $ 59,660.25 |
| 44 | ST. PAUL MIXING SITE 401 |
HWY 281, MM 95
| MATERIAL TYPE: HFE-300 | TN | 135 | No BID | No BID | No Bid | No Bid | $ 795.47 | $ 107,388.45 |
| 45 | ST. PAUL MIXING SITE 402 |
Hwy 281, MM 89
| MATERIAL TYPE: HFE-300 | TN | 270.47 | No BID | No BID | No Bid | No Bid | $ 795.47 | $ 215,150.77 |
| DISTRICT 5 | ||||||||
| 46 | SCOTTBLUFF |
Hwy 71, MM 64-71
| MATERIAL TYPE: CRS-2P | TN | 199.36 | $ 667.34 | $ 133,040.90 | No Bid | No Bid | $ 820.57 | $ 163,588.84 |
| 47 | MITCHELL |
HWY 29, MM 30-36
| MATERIAL TYPE: CRS-2P | TN | 124.78 | $ 667.34 | $ 83,270.69 | No Bid | No Bid | $ 820.57 | $ 102,390.72 |
| 48 | BRIDGEPORT |
HWY 88, MP 40-58
| MATERIAL TYPE: CRS-2P | TN | 374.33 | $ 667.34 | $ 249,805.38 | No Bid | No Bid | $ 820.57 | $ 307,163.97 |
| 49 | ALLIANCE |
HWY 385, MM 99-100
| MATERIAL TYPE: CRS-2P | TN | 65.85 | $ 667.34 | $ 43,944.34 | No Bid | No Bid | $ 820.57 | $ 54,034.53 |
| 50 | ALLIANCE |
HWY 385, MM 102-104
| MATERIAL TYPE: CRS-2P | TN | 52.68 | $ 667.34 | $ 35,155.47 | No Bid | No Bid | $ 820.57 | $ 43,227.63 |
| 51 | ALLIANCE |
Hwy 385, MM 105.4-107
| MATERIAL TYPE: CRS-2P | TN | 42.15 | $ 667.34 | $ 28,128.38 | No Bid | No Bid | $ 820.57 | $ 34,587.03 |
| 52 | DALTON |
HWY 385, MM 52.4-54.4
| MATERIAL TYPE: CRS-2P | TN | 51.99 | $ 667.34 | $ 34,695.01 | No Bid | No Bid | $ 820.57 | $ 42,661.43 |
| 53 | RUSHVILLE |
HWY 250, MM 31-48
| MATERIAL TYPE: CRS-2P | TN | 234.21 | $ 667.34 | $ 156,297.70 | No Bid | No Bid | $ 820.57 | $ 192,185.70 |
| 54 | CRAWFORD/HEMINGFORD |
HWY 71, MM 110-125
| MATERIAL TYPE: CRS-2P | TN | 291.18 | $ 667.34 | $ 194,316.06 | No Bid | No Bid | $ 820.57 | $ 238,933.57 |
| 55 | KIMBALL |
HWY 71, MM 20-29
| MATERIAL TYPE: CRS-2P | TN | 187.17 | $ 667.34 | $ 124,906.03 | No Bid | No Bid | $ 820.57 | $ 153,586.09 |
| 56 | CHAPPELL |
HWY 385, MM 0-8
| MATERIAL TYPE: CRS-2P | TN | 167.95 | $ 667.34 | $ 112,079.75 | No Bid | No Bid | $ 820.57 | $ 137,814.73 |
| 57 | SIDNEY |
HWY 19, MM 0-10
| MATERIAL TYPE: CRS-2P | TN | 209.93 | $ 667.34 | $ 140,094.69 | No Bid | No Bid | $ 820.57 | $ 172,262.26 |
| 58 | RUSHVILLE |
HWY 250, MM 31-48
| MATERIAL TYPE: CSS-1H 50/50 | TN | 55.23 | $ 443.92 | $ 24,517.70 | No Bid | No Bid | $ 494.90 | $ 27,333.33 |
| 59 | SCOTTSBLUFF |
HWY 71, MM 64-71
| MATERIAL TYPE: CSS-1H 50/50 | TN | 24.49 | $ 443.92 | $ 10,871.60 | No Bid | No Bid | $ 494.90 | $ 12,120.10 |
| 60 | BRIDGEPORT |
HWY 88, MM 40-58
| MATERIAL TYPE: CSS-1H 50/50 | TN | 62.98 | $ 443.92 | $ 27,958.08 | No Bid | No Bid | $ 494.90 | $ 31,168.80 |
| 61 | KIMBALL |
HWY 71, MM 20-29
| MATERIAL TYPE: CSS-1H 50/50 | TN | 62.98 | $ 443.92 | $ 27,958.08 | No Bid | No Bid | $ 494.90 | $ 31,168.80 |
| DISTRICT 6 | ||||||||
| 62 | GOTHENBURG/COZAD |
HWY 30, MM 213-222
| MATERIAL TYPE: CRS-2P | TN | 213.82 | No BID | No BID | $ 644.00 | $ 137,700.08 | $ 764.38 | $ 163,439.73 |
| 63 | GOTHENBURG |
HWY 21, MM 29-51
| MATERIAL TYPE: CRS-2P | TN | 969.56 | No BID | No BID | $ 644.00 | $ 624,396.64 | $ 764.38 | $ 741,112.27 |
| 64 | NORTH PLATTE |
HWY 97, MM 11-0
| MATERIAL TYPE: CRS-2P | TN | 213 | No BID | No BID | $ 644.00 | $ 137,172.00 | $ 764.38 | $ 162,812.94 |
| 65 | WALLACE |
HWY 25, MM 48-63
| MATERIAL TYPE: CRS-2P | TN | 209.28 | No BID | No BID | $ 644.00 | $ 134,776.32 | $ 764.38 | $ 159,969.45 |
| 66 | EDDYVILLE/MILLER |
Hwy 40, MM 51-65
| MATERIAL TYPE: CRS-2P | TN | 356.32 | No BID | No BID | $ 644.00 | $ 229,470.08 | $ 764.38 | $ 272,363.88 |
| 67 | OCONTO |
HWY 21 NORTH, MM 52-65
| MATERIAL TYPE: CRS-2P | YN | 212.72 | No BID | No BID | $ 644.00 | $ 136,991.68 | $ 764.38 | $ 162,598.91 |
| 68 | WESTERVILLE |
HWY 70, MM 13-20
| MATERIAL TYPE: CRS-2P | TN | 210.91 | No BID | No BID | $ 644.00 | $ 135,826.04 | $ 764.38 | $ 161,215.39 |
| 69 | MERNA |
HWY 2, MM 269
| MATERIAL TYPE: CRS-2P | TN | 211.65 | No BID | No BID | $ 644.00 | $ 136,302.60 | $ 764.38 | $ 161,781.03 |
| 70 | MASON CITY |
HWY 2, MM 301
| MATERIAL TYPE: CRS-2P | TN | 160.97 | No BID | No BID | $ 644.00 | $ 103,664.68 | $ 764.38 | $ 123,042.25 |
| 71 | MULLEN |
HWY 97 NORTH, MM 85-94
| MATERIAL TYPE: CRS-2P | TN | 309.72 | No BID | No BID | $ 644.00 | $ 199,459.68 | $ 764.38 | $ 236,743.77 |
| 72 | MULLEN |
HWY 97 SOUTH, MM 44-57
| MATERIAL TYPE: CRS-2P | TN | 433.12 | No BID | No BID | $ 644.00 | $ 278,929.28 | $ 764.38 | $ 331,068.27 |
| 73 | ARTHUR |
HWY 92, MM 185-192
| MATERIAL TYPE: CRS-2P | TN | 237.19 | No BID | No BID | $ 644.00 | $ 152,750.36 | $ 764.38 | $ 181,303.29 |
| 74 | THEDFORD |
HWY 83 NORTH, MM 148-156.5
| MATERIAL TYPE: CRS-2P | TN | 293.18 | No BID | No BID | $ 644.00 | $ 188,807.92 | $ 764.38 | $ 224,100.93 |
| 75 | THEDFORD |
HWY 83 SOUTH, MM 137-147.5
| MATERIAL TYPE: CRS-2P | TN | 367.38 | No BID | No BID | $ 644.00 | $ 236,592.72 | $ 764.38 | $ 280,817.92 |
| 76 | THEDFORD |
HWY 2, MM 221-228
| MATERIAL TYPE: CRS-2P | TN | 247.79 | No BID | No BID | $ 644.00 | $ 159,576.76 | $ 764.38 | $ 189,405.72 |
| 77 | OGALLALA |
HWY 61 COUNTY LINE SOUTH
MM 103-112
| MATERIAL TYPE: CRS-2P | TN | 477.59 | No BID | No BID | $ 644.00 | $ 307,567.96 | $ 764.38 | $ 365,060.24 |
| 78 | OGALLALA |
HWY 26, MM 126
| MATERIAL TYPE: CRS-2P | TN | 346.97 | No BID | No BID | $ 644.00 | $ 223,448.68 | $ 764.38 | $ 265,216.93 |
| 79 | HWY 47 NORTH, MM 74-62 | |||||||
| MATERIAL TYPE: CSS-1H 50/50 | TN | 273.61 | $ 423.63 | $ 115,909.40 | No Bid | No Bid | $ 455.10 | $ 124,519.91 |
| 80 | HWY 47 SOUTH, MM 46-60 | |||||||
| MATERIAL TYPE: CSS-1H 50/50 | TN | 163.63 | $ 423.63 | $ 69,318.58 | No Bid | No Bid | $ 455.10 | $ 74,468.01 |
| 81 | NORTH PLATTE |
HWY 97, MM 0-10
| MATERIAL TYPE: CSS-1H 50/50 | TN | 50.54 | $ 423.63 | $ 21,410.26 | No Bid | No Bid | $ 455.10 | $ 23,000.75 |
| 82 | WALLACE |
HWY 25, MM 48-63
| MATERIAL TYPE: CSS-1H 50/50 | TN | 25.18 | $ 423.63 | $ 10,667.00 | No Bid | No Bid | $ 455.10 | $ 11,459.42 |
| 83 | OCONTO |
HWY 40 EAST, MM 39-51
| MATERIAL TYPE: CSS-1H 50/50 | TN | 119.52 | $ 423.63 | $ 50,632.26 | No Bid | No Bid | $ 455.10 | $ 54,393.55 |
| 84 | OGALLALA - NORTH OF LAKE MAC |
HWY 61 COUNTY LINE SOUTH
MM 103-112
| MATERIAL TYPE: CSS-1H 75/25 | TN | 194.93 | $ 507.80 | $ 98,985.45 | No Bid | No Bid | $ 609.95 | $ 118,897.55 |
| 85 | OGALLALA |
HWY 26, MM 126
| MATERIAL TYPE: CSS-1H 75/25 | TN | 142.95 | $ 507.80 | $ 72,590.01 | No Bid | No Bid | $ 609.95 | $ 87,192.35 |
| 86 | MULLEN |
HWY 97, North, MM 85-94
| MATERIAL TYPE: CSS-1H 75/25 | TN | 94.46 | $ 507.80 | $ 47,966.79 | No Bid | No Bid | $ 609.95 | $ 57,615.88 |
| 87 | MULLEN |
HWY 97 SOUTH, MM 44-57
| MATERIAL TYPE: CSS-1H 75/25 | TN | 136.45 | $ 507.80 | $ 69,289.31 | No Bid | No Bid | $ 609.95 | $ 83,227.68 |
| 88 | ARTHUR |
HWY 92, MM 185-192
| MATERIAL TYPE: CSS-1H 75/25 | TN | 73.47 | $ 507.80 | $ 37,308.07 | No Bid | No Bid | $ 609.95 | $ 44,813.03 |
| 89 | THEDFORD |
HWY 83 NORTH, MM 148-15
| MATERIAL TYPE: CSS-1H 75/25 | TN | 127.45 | $ 507.80 | $ 64,719.11 | No Bid | No Bid | $ 609.95 | $ 77,738.13 |
| 90 | THEDFORD |
HWY 83 SOUTH, MM 137-14
| MATERIAL TYPE: CSS-1H 75/25 | TN | 157.44 | $ 507.80 | $ 79,948.03 | No Bid | No Bid | $ 609.95 | $ 96,030.53 |
| 91 | THEDFORD |
HWY 2, MM 221-228
| MATERIAL TYPE: CSS-1H 75/25 | TN | 104.96 | $ 507.80 | $ 53,298.69 | No Bid | No Bid | $ 609.95 | $ 64,020.35 |
| 92 | HERSHEY |
N-2, MM 164
| MATERIAL TYPE: CSS-1H 75/25 | TN | 73.47 | $ 507.80 | $ 37,308.07 | No Bid | No Bid | $ 609.95 | $ 44,813.03 |
| 93 |
HWY 97, MM 9
| MATERIAL TYPE: HFE-300 | TN | 99.86 | No BID | No BID | No Bid | No Bid | $ 833.46 | $ 83,229.32 |
| 94 | DICKENS |
HWY 25 NORTH, MM 58
| MATERIAL TYPE: HFE-300 | TN | 150.3 | No BID | No BID | No Bid | No Bid | $ 833.46 | $ 125,269.04 |
| 95 | SUTHERLAND |
HWY 25 NORTH, MM 86
| MATERIAL TYPE: HFE-300 | TN | 73.48 | No BID | No BID | No Bid | No Bid | $ 833.46 | $ 61,242.64 |
| 96 | MULLEN MIXING SITE SITE 604 |
HWY 2, MM 176
| MATERIAL TYPE: HFE-300 | TN | 149.8 | No BID | No BID | No Bid | No Bid | $ 833.46 | $ 124,852.31 |
| 97 | ARTHUR MIXING SITE Site 619 |
HWY 61, MM 126
| MATERIAL TYPE: HFE-300 | TN | 49.93 | No BID | No BID | No Bid | No Bid | $ 833.46 | $ 41,614.66 |
| 98 | ARTHUR MIXING SITE 621 |
HWY 92, MM 175
| MATERIAL TYPE: HFE-300 | TN | 49.93 | No BID | No BID | No Bid | No Bid | $ 833.46 | $ 41,614.66 |
| 99 | TRYON MIXING SITE 603 |
HWY 92, MM 205
| MATERIAL TYPE: HFE-300 | TN | 49.93 | No BID | No BID | No Bid | No Bid | $ 833.46 | $ 41,614.66 |
| 100 | NORTH PLATTE NORTH YARD |
HWY 83, MM 87
| MATERIAL TYPE: MC-250 | TN | 24.34 | No BID | No BID | No Bid | No Bid | $ 1,195.85 | $ 29,106.99 |
| 101 | MULLEN YARD |
402 SOUTHEAST 1ST STREET
NORTH SIDE OF EAST HWY 2
| MATERIAL TYPE: MC-250 | TN | 24.34 | No BID | No BID | No Bid | No Bid | $ 1,195.85 | $ 29,106.99 |
| DISTRICT 7 | ||||||||
| 102 | ORLEANS |
HWY 89, MM 67.5
| MATERIAL TYPE: CRS-2P | TN | 109 | No BID | No BID | $ 663.00 | $ 72,267.00 | $ 786.56 | $ 85,735.04 |
| 103 | FFRANKLIN |
HWY 10, MM 7.3
| MATERIAL TYPE: CRS-2P | TN | 362 | No BID | No BID | $ 663.00 | $ 240,006.00 | $ 786.56 | $ 284,734.72 |
| 104 | OXFORD |
HWY 136, MM 9
| MATERIAL TYPE: CRS-2P | TN | 178 | No BID | No BID | $ 663.00 | $ 118,014.00 | $ 786.56 | $ 140,007.68 |
| 105 | MINDEN |
HWY 10, MM 20.3
| MATERIAL TYPE: CRS-2P | TN | 368 | No BID | No BID | $ 663.00 | $ 243,984.00 | $ 786.56 | $ 289,454.08 |
| 106 | ELWOOD |
HWY 283, MM 41.2
| MATERIAL TYPE: CRS-2P | TN | 388 | No BID | No BID | $ 663.00 | $ 257,244.00 | $ 786.56 | $ 305,185.28 |
| 107 | BARTLEY |
HWY 6, MM 98.58
| MATERIAL TYPE: CRS-2P | TN | 341.9 | No BID | No BID | $ 663.00 | $ 226,679.70 | $ 786.56 | $ 268,924.86 |
| 108 | BRANDON |
HWY 23, MM 8.3
| MATERIAL TYPE: CRS-2P | TN | 188.53 | No BID | No BID | $ 663.00 | $ 124,995.39 | $ 786.56 | $ 148,290.16 |
| 109 | HAYES CENTER |
HWY 25, MM 37.5
| MATERIAL TYPE: CRS-2P | TN | 186.27 | No BID | No BID | $ 663.00 | $ 123,497.01 | $ 786.56 | $ 146,512.53 |
| 110 | MAYWOOD |
HWY 83, MM 35
| MATERIAL TYPE: CRS-2P | TN | 302.53 | No BID | No BID | $ 663.00 | $ 200,577.39 | $ 786.56 | $ 237,958.00 |
| 111 | HOLDREGE |
1013 WEST 4TH AVE
HWY 6, MM 157.5
| MATERIAL TYPE: CSS-1H-STRAIGHT | TN | 13 | $ 669.01 | 8697.13 | No Bid | No Bid | $ 786.56 | $ 10,225.28 |
| 112 | IMPERIAL |
101 SOUTH STREET
HWY 15A, MM 0.45
| MATERIAL TYPE: CSS-1H-STRAIGHT | TN | 25.56 | $ 669.01 | 17099.8956 | No Bid | No Bid | $ 786.56 | $ 20,104.47 |
| DISTRICT 8 | ||||||||
| 113 | SPRINGVIEW |
HWY 12, MM 56-66
| MATERIAL TYPE: CRS-2P | TN | 210 | No BID | No BID | No Bid | No Bid | $ 720.67 | $ 151,340.70 |
| 114 | AINSWORTH |
Hwy 20, MM 249-253
| MATERIAL TYPE: CRS-2P | TN | 152 | No BID | No BID | No Bid | No Bid | $ 720.67 | $ 109,541.84 |
| 115 | AINSWORTH 9A SPUR | |||||||
| MATERIAL TYPE: CRS-2P | TN | 11 | No BID | No BID | No Bid | No Bid | $ 720.67 | $ 7,927.37 |
| 116 | TAYLOR |
HWY 183, MM 143-155
| MATERIAL TYPE: CRS-2P | TN | 280 | No BID | No BID | No Bid | No Bid | $ 720.67 | $ 201,787.60 |
| 117 | O’NEILL |
Hwy 281, MM 183-197
| MATERIAL TYPE: CRS-2P | TN | 275 | No BID | No BID | No Bid | No Bid | $ 720.67 | $ 198,184.25 |
| 118 | MERRIMAN |
HWY 61, MM 219-226
| MATERIAL TYPE: CRS-2P | TN | 126 | No BID | No BID | No Bid | No Bid | $ 720.67 | $ 90,804.42 |
| 119 | CODY |
HWY 20, MM 155-167
| MATERIAL TYPE: CRS-2P | TN | 241 | No BID | No BID | No Bid | No Bid | $ 720.67 | $ 173,681.47 |
| 120 | VALENTINE |
HWY 83, MM 156-161
| MATERIAL TYPE: CRS-2P | TN | 224 | No BID | No BID | No Bid | No Bid | $ 720.67 | $ 161,430.08 |
| 121 | VALENTINE |
HWY 83, MM 186-197
| MATERIAL TYPE: CRS-2P | TN | 203 | No BID | No BID | No Bid | No Bid | $ 720.67 | $ 146,296.01 |
| 122 | NAPER |
JUNCTION HWY 12/137, MM 81-86
| MATERIAL TYPE: CRS-2P | TN | 185 | No BID | No BID | No Bid | No Bid | $ 720.67 | $ 133,323.95 |
| 123 | SPRINGVIEW |
HWY 12, MM 56-66
| MATERIAL TYPE: CSS-1H 75/25 | TN | 80 | No BID | No BID | No Bid | No Bid | $ 545.21 | $ 43,616.80 | $ 475.00 | $ 38,000.00 |
| 124 | AINSWORTH |
HWY 20, MM 242-253
| MATERIAL TYPE: CSS-1H 75/25 | TN | 52 | No BID | No BID | No Bid | No Bid | $ 545.21 | $ 28,350.92 | $ 475.00 | $ 24,700.00 |
| 125 | AINSWORTH 9A SPUR | |||||||||
| MATERIAL TYPE: CSS-1H 75/25 | TN | 5 | No BID | No BID | No Bid | No Bid | $ 545.21 | $ 2,726.05 | $ 735.60 | $ 3,678.00 |
| 126 | TAYLOR |
HWY 183, MM 143-155
| MATERIAL TYPE: CSS-1H 75/25 | TN | 100 | No BID | No BID | No Bid | No Bid | $ 545.21 | $ 54,521.00 | $ 465.00 | $ 46,500.00 |
| 127 | O’NEILL |
HWY 281, MM 183-197
| MATERIAL TYPE: CSS-1H 75/25 | TN | 160 | No BID | No BID | No Bid | No Bid | $ 545.21 | $ 87,233.60 | $ 460.00 | $ 73,600.00 |
| 128 | MERRIMAN |
HWY 61, MM 219-226
| MATERIAL TYPE: CSS-1H 75/25 | TN | 48 | No BID | No BID | No Bid | No Bid | $ 545.21 | $ 26,170.08 | $ 555.00 | $ 26,640.00 |
| 129 | MERRIMAN |
HWY 20, MM 242-253
| MATERIAL TYPE: CSS-1H 75/25 | TN | 115 | No BID | No BID | No Bid | No Bid | $ 545.21 | $ 62,699.15 | $ 555.00 | $ 63,825.00 |
| 130 | VALENTINE |
HWY 83, MP 156-161
| MATERIAL TYPE: CSS-1H 75/25 | TN | 85 | No BID | No BID | No Bid | No Bid | $ 545.21 | $ 46,342.85 | $ 475.00 | $ 40,375.00 |
| 131 | VALENTINE |
HWY 83, MM 186-197
| MATERIAL TYPE: CSS-1H 75/25 | TN | 77 | No BID | No BID | No Bid | No Bid | $ 545.21 | $ 41,981.17 | $ 480.00 | $ 36,960.00 |
| 132 | NAPER |
JUNCTION HWY 12/137, MM 81-86
| MATERIAL TYPE: CSS-1H 75/25 | TN | 72 | No BID | No BID | No Bid | No Bid | $ 545.21 | $ 39,255.12 | $ 475.00 | $ 34,200.00 |
| 133 | AINSWORTH YARD #80100 | |||||||||
| MATERIAL TYPE: HFE-150 | TN | 19 | No BID | No BID | No Bid | No Bid | $ 781.82 | $ 14,854.58 | ||
| 134 | HWY 2, 5 MI SOUTHEAST OF VALENTINE | |||||||||
| MATERIAL TYPE: HFE-300 | TN | 50 | No BID | No BID | No Bid | No Bid | $ 813.53 | $ 40,676.50 | ||
| 135 | HWY 20, 1 MI WEST OF MERRIMAN | |||||||||
| MATERIAL TYPE: HFE-300 | TN | 25 | No BID | No BID | No Bid | No Bid | $ 813.53 | $ 20,338.25 | ||
| 136 | HWY 2, 5 MI SOUTHEAST OF VALENTINE | |||||||||
| MATERIAL TYPE: HFE-1000 | TN | 25 | No BID | No BID | No Bid | No Bid | $ 863.16 | $ 21,579.00 | ||
| PLANT PICK UP LOCATIONS | ||||||||||
| 137 | DISTRICTS 1 THROUGH 8 | |||||||||
| MATERIAL TYPE - CRS-2L | 5 | No BID | No BID | No Bid | No Bid | no bid | ||||
| 138 | DISTRICTS 1 THROUGH 8 | |||||||||
| MATERIAL TYPE - CRS-2 STRAIGHT | 25 | No BID | No BID | No Bid | No Bid | $ 655.00 | ||||
| 139 | DISTRICTS 1 THROUGH 8 | |||||||||
| MATERIAL TYPE CRS-2P | 10 | $ 750.00 | No Bid | No Bid | $ 675.00 | |||||
| 140 | DISTRICTS 1 THROUGH 8 | |||||||||
| CRS-2P 80/20 | 5 | No BID | No BID | No Bid | No Bid | no bid | ||||
| 141 | DISTRICTS 1 THROUGH 8 | |||||||||
| CRS-2VHL | 5 | $ 750.00 | No Bid | No Bid | no bid | |||||
| 142 | DISTRICTS 1 THROUGH 8 | |||||||||
| CSS-1H STRAIGHT | 45 | $ 700.00 | No Bid | No Bid | $ 625.00 | $ 660.00 | ||||
| 143 | DISTRICTS 1 THROUGH 8 |
CSS-1H 75/25
| 5 | $ 535.00 | No Bid | No Bid | no bid | $ 520.00 | ||
| 144 | DISTRICTS 1 THROUGH 8 | ||||||
| CSS-1H 50/50 | 35 | $ 425.00 | No Bid | No Bid | $ 400.00 | $ 480.00 | |
| 145 | DISTRICTS 1 THROUGH 8 |
SS-1H
| 5 | No BID | No BID | No Bid | No Bid | no bid | ||
| 146 | DISTRICTS 1 THROUGH 8 | ||||||
| CSS-1H 75/25 | 5 | No BID | No BID | No Bid | No Bid | no bid | |
| 147 | DISTRICTS 1 THROUGH 8 | ||||||
| CSS-1H 50/50 | 5 | No BID | No BID | No Bid | No Bid | no bid | |
| 148 | DISTRICTS 1 THROUGH 8 | ||||||
| HFE-150 | 5 | No BID | No BID | No Bid | No Bid | $ 715.00 | |
| 149 | DISTRICTS 1 THROUGH 8 | ||||||
| HFE-300 | 5 | No BID | No BID | No Bid | No Bid | no bid | |
| 150 | DISTRICTS 1 THROUGH 8 | ||||||
| HFE-500 | 5 | No BID | No BID | No Bid | No Bid | no bid | |
| 151 | DISTRICTS 1 THROUGH 8 | ||||||
| HFE-1000 | 5 | No BID | No BID | No Bid | No Bid | no bid | |
| 152 | DISTRICTS 1 THROUGH 8 | ||||||
| MC-250 | 5 | No BID | No BID | No Bid | No Bid | no bid | |
| 153 | DISTRICTS 1 THROUGH 8 | ||||||
| CMS-1 | 5 | No BID | No BID | No Bid | No Bid | no bid | |
| 154 | DISTRICTS 1 THROUGH 8 | ||||||
| CMS-1W | 5 | No BID | No BID | No Bid | No Bid | no bid | |
| 155 | DISTRICTS 1 THROUGH 8 | ||||||
| HFMS-2L | 5 | No BID | No BID | No Bid | No Bid | no bid | |
| 156 | DISTRICTS 1 THROUGH 8 | ||||||
| HFMS-2P | 5 | No BID | No BID | No Bid | No Bid | no bid | |
| 157 | DISTRICTS 1 THROUGH 8 | ||||||
| CFS/FS-1 | 5 | No BID | No BID | No Bid | No Bid | no bid |
| 158 | Rerurned Load Fee -Price Per Mile | |||||
| (Billed per Hwy Mile from the point the transfer truck is notified back to the shipping point orgin.) | $ 14.00 | $ - 0 | $ 15.00 | $ 15.00 |
159 Demurrage Charge - Price Per Hour $ 350.00 $ - 0 $ 360.00 $ 375.00
| TOTAL: | $ 2,282,187.91 | $ 7,044,245.97 | $ 18,566,887.37 | $ 388,478.00 |
| PAYMENT TERMS: | ||||
| DELIVERY DAYS ARO: | ||||
| COMMENTS: |
PROCUREMENT CONTRACTS OFFICER:
| BRENDA SENSIBAUGH | &K000000121091 OR&K01+000 |
| NEBRASKA DEPARTMENT OF TRANSPORTATION | OPENING DATE: MARCH 4, 2025 |
&P OF &N
File details come from the government source that posted it. Updated .