This document is a cost sheet for the Nebraska Department of Transportation's Liquid Asphaltic Materials procurement, covering eight districts across the state. The solicitation seeks a qualified bidder to provide various liquid asphaltic materials, including CRS-2P, HFE-300, CSS-1H, and other specialized asphalt emulsions, to be delivered to multiple highway locations and mixing sites. The estimated total quantity ranges across districts, with District 6 having the highest estimated tonnage at 5,471.17 tons of CRS-2P, and quantities varying by material type and specific highway segment.

Pricing is structured per ton for delivered materials, FOB Destination, with detailed pricing breakdowns for each district and location. The cost sheet includes plant pick-up location pricing for multiple material types across all districts, and additional line items such as returned load fees and demurrage charges. Bidders are required to provide pricing for various material types with different specifications (e.g., CRS-2P, CSS-1H at different mixture ratios), and the document emphasizes that estimates should not be considered minimum or maximum quantities, but rather best estimates for reference and bidding purposes.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

121091 OR

ATTACHMENT A - COST SHEET

Nebraska Department of Transportation Liquid Asphaltic Materials

Proposal pricing shall be the price per ton for delivered Liquid Asphaltic Materials, FOB Destination. All costs associated to satisfy the requirements in accordance with the general provisions and specifications written in the Invitation to Bid must be included in the prices bid on this form. Estimates shall not be considered a minimum or maximum, but to be used as best estimate for reference and bidding.

DISTRICT 1

Location
Material Type
Est. Tons
Price per Ton
Extended Price

David City Yard 235 Iowa St (68632)

CRS-2P
139
$
$

Emerald Junction Hwy 6/S55A

CRS-2P
131.28
$
$

Fremont 1 mi South on Hwy 77

CRS-2P
128.71
$
$

South Bend Junction Hwy 66/County Rd 358

CRS-2P
120.98
$
$

Fairbury Hwy 15, MM 24

CRS-2P
929
$
$

Pawnee City Hwy 8, MM 126

CRS-2P
249
$
$

Beatrice Hwy 136, MM 172

CRS-2P
241
$
$
Total
1,938.97
Total
$

DISTRICT 3

Location
Material Type
Est. Tons
Price per Ton
Extended Price

Leigh Junction Hwy 91/57

CRS-2P
168.72
$
$

Humphrey Junction Hwy 81/91

CRS-2P
571.53
$
$

Madison Junction Hwy 81/32

CRS-2P
237.05
$
$

Newman Grove Junction Hwy 45/32

CRS-2P
334.90
$
$

Pierce Junction Hwy 98/13 Hwy 13 Shoulders

CRS-2P
122.32
$
$

Pierce Hwy 98, MM 98

CRS-2P
105.45
$
$

Norfolk Hwy 35, MM 30.7 Hwy 35 Shoulders

CRS-2P
249.70
$
$

Cedar Rapids Hwy 52, MM 13

CRS-2P
471.69
$
$

Creighton Hwy 59, MM 7

CRS-2P
506.16
$
$

Waterbury Hwy 20, MM 410

CRS-2P
274.17
$
$

Uehling Hwy 77, MM 135.2

CRS-2P
147.63
$
$

Oakland Hwy 32, MM 87.55

CRS-2P
286.82
$
$

Tekamah Hwy 75, MM 135.9

CRS-2P
189.81
$
$

Wayne Hwy 35, MM 30.7

CRS-2P
147.63
$
$

Hartington Hwy 84, MM 343.2

CRS-2P
342.97
$
$

St. Helena Hwy S14H, MM 5.2

CRS-2P
112.24
$
$

Wakefield Hwy 9, MM 37.3

CRS-2P
143.41
$
$
Total
4,412.20
Total
$

DISTRICT 4

Location
Material Type
Est. Tons
Price per Ton
Extended Price

Grand Island – Cairo Hwy 2, MM 344-355

CRS-2P
432
$
$

Red Cloud Hwy 281, MM 12-26

CRS-2P
525
$
$

Aurora Hwy 34, MM 237-250

CRS-2P
500
$
$

Hastings Hwy S18-A, MM 0-5

CRS-2P
125
$
$

Hastings Hwy S1-D, MM 0-2

CRS-2P
50
$
$

Chester – Hardy Hwy 8, MM 13-24

CRS-2P
235
$
$

Polk Hwy 66- Hwy 81, MM 11-21

CRS-2P
196
$
$

Gresham Hwy 69 North/South, MM 55-76

CRS-2P
413
$
$

Greeley Hwy 91, MM 3-7

CRS-2P
127
$
$

Ord North Hwy 11, MM 80-83

CRS-2P
25
$
$

Boelus – Loup City Hwy 58, MM 21-39

CRS-2P
63
$
$

Loup City Hwy 92 West, MM 309-320

CRS-2P
38
$
$

Marquette Hwy 14 & S41C, MM 73-81

CRS-2P
275
$
$
Total
3,004
Total
$
Ravenna Mixing Site 405
HFE-300
50
$
$

Ord Mixing Site 435 Hwy 11, MM 68

HFE-300
49.93
$
$

Greeley Mixing Site 404 Hwy 281, MM 120

HFE-300
75
$
$

Greeley Mixing Site 420 Hwy 281, MM 125

HFE-300
75
$
$

Loup City Mixing Site 403 Hwy 58, MM 29

HFE-300
75
$
$

Loup City Mixing Site 418 Hwy 92, MM 320

HFE-300
75
$
$

St. Paul Mixing Site 401 Hwy 281, MM 95

HFE-300
135
$
$

St. Paul Mixing Site 402 Hwy 281, MM 89

HFE-300
270.47
$
$
Total
805.40
Total
$

DISTRICT 5

Location
Material Type
Est. Tons
Price per Ton
Extended Price

Scottsbluff Hwy 71, MM 64-71

CRS-2P
199.36
$
$

Mitchell Hwy 29, MM 30-36

CRS-2P
124.78
$
$

Bridgeport Hwy 88, MP 40-58

CRS-2P
374.33
$
$

Alliance Hwy 385, MM 99-100

CRS-2P
65.85
$
$

Alliance Hwy 385, MM 102-104

CRS-2P
52.68
$
$

Alliance Hwy 385, MM 105.4-107

CRS-2P
42.15
$
$

Dalton Hwy 385, MM 52.4-54.4

CRS-2P
51.99
$
$

Rushville Hwy 250, MM 31-48

CRS-2P
234.21
$
$

Crawford/Hemingford Hwy 71, MM 110-125

CRS-2P
291.18
$
$

Kimball Hwy 71, MM 20-29

CRS-2P
187.17
$
$

Chappell Hwy 385, MM 0-8

CRS-2P
167.95
$
$

Sidney Hwy 19, MM 0-10

CRS-2P
209.93
$
$
Total
2,001.58
Total
$

Rushville Hwy 250, MM 31-48

CSS-1H 50/50
55.23
$
$

Scottsbluff Hwy 71, MM 64-71

CSS-1H 50/50
24.49
$
$

Bridgeport Hwy 88, MM 40-58

CSS-1H 50/50
62.98
$
$

Kimball Hwy 71, MM 20-29

CSS-1H 50/50
62.98
$
$
Total
205.68
Total
$

DISTRICT 6

Location
Material Type
Est. Tons
Price per Ton
Extended Price

Gothenburg/Cozad Hwy 30, MM 213-222

CRS-2P
213.82
$
$

Gothenburg Hwy 21, MM 29-51

CRS-2P
969.56
$
$

North Platte Hwy 97, MM 11-0

CRS-2P
213
$
$

Wallace Hwy 25, MM 48-63

CRS-2P
209.28
$
$

Eddyville/Miller Hwy 40, MM 51-65

CRS-2P
356.32
$
$

Oconto Hwy 21 North, MM 52-65

CRS-2P
212.72
$
$

Westerville Hwy 70, MM 13-20

CRS-2P
210.91
$
$

Merna Hwy 2, MM 269

CRS-2P
211.65
$
$

Mason City Hwy 2, MM 301

CRS-2P
160.97
$
$

Mullen Hwy 97 North, MM 85-94

CRS-2P
309.72
$
$

Mullen Hwy 97 South, MM 44-57

CRS-2P
433.12
$
$

Arthur Hwy 92, MM 185-192

CRS-2P
237.19
$
$

Thedford Hwy 83 North, MM 148-156.5

CRS-2P
293.18
$
$

Thedford Hwy 83 South, MM 137-147.5

CRS-2P
367.38
$
$

Thedford Hwy 2, MM 221-228

CRS-2P
247.79
$
$

Ogallala Hwy 61 County Line South

MM 103-112

CRS-2P
477.59
$
$

Ogallala Hwy 26, MM 126

CRS-2P
346.97
$
$
Total
5,471.17
Total
$
Hwy 47 North, MM 74-62
CSS-1H 50/50
273.61
$
$
Hwy 47 South, MM 46-60
CSS-1H 50/50
163.63
$
$

North Platte Hwy 97, MM 0-10

CSS-1H 50/50
50.54
$
$

Wallace Hwy 25, MM 48-63

CSS-1H 50/50
25.18
$
$

Oconto Hwy 40 East, MM 39-51

CSS-1H 50/50
119.52
$
$
Total
632.48
Total
$

Ogallala – North of Lake Mac Hwy 61 County Line South

MM 103-112

CSS-1H 75/25
194.93
$
$

Ogallala Hwy 26, MM 126

CSS-1H 75/25
142.95
$
$

Mullen Hwy 97 North, MM 85-94

CSS-1H 75/25
94.46
$
$

Mullen Hwy 97 South, MM 44-57

CSS-1H 75/25
136.45
$
$

Arthur Hwy 92, MM 185-192

CSS-1H 75/25
73.47
$
$

Thedford Hwy 83 North, MM 148-15

CSS-1H 75/25
127.45
$
$

Thedford Hwy 83 South, MM 137-14

CSS-1H 75/25
157.44
$
$

Thedford Hwy 2, MM 221-228

CSS-1H 75/25
104.96
$
$

Hershey

N-2, MM 164

CSS-1H 75/25
73.47
$
$
Total
1,105.58
Total
$
Hwy 97, MM 9
HFE-300
99.86
$
$

Dickens Hwy 25 North, MM 58

HFE-300
150.30
$
$

Sutherland Hwy 25 North, MM 86

HFE-300
73.48
$
$

Mullen Mixing Site 604 Hwy 2, MM 176

HFE-300
149.80
$
$

Arthur Mixing Site 619 Hwy 61, MM 126

HFE-300
49.93
$
$

Arthur Mixing Site 621 Hwy 92, MM 175

HFE-300
49.93
$
$

Tryon Mixing Site 603 Hwy 92, MM 205

HFE-300
49.93
$
$
Total
623.23
Total
$

North Platte North Yard Hwy 83, MM 87

MC-250
24.34
$
$

Mullen Yard 402 Southeast 1st Street North Side of East Hwy 2

MC-250
24.34
$
$
Total
48.68
Total
$

DISTRICT 7

Location
Material Type
Est. Tons
Price per Ton
Extended Price

Orleans Hwy 89, MM 67.5

CRS-2P
109
$
$

Franklin Hwy 10, MM 7.3

CRS-2P
362
$
$

Oxford Hwy 136, MM 9

CRS-2P
178
$
$

Minden Hwy 10, MM 20.3

CRS-2P
368
$
$

Elwood Hwy 283, MM 41.2

CRS-2P
388
$
$

Bartley Hwy 6, MM 98.58

CRS-2P
341.90
$
$

Brandon Hwy 23, MM 8.3

CRS-2P
188.53
$
$

Hayes Center Hwy 25, MM 37.5

CRS-2P
186.27
$
$

Maywood Hwy 83, MM 35

CRS-2P
302.53
$
$
Total
2,424.23
Total
$

Holdrege 1013 West 4th Ave Hwy 6, MM 157.5

CSS-1H Straight
13
$
$

Imperial 101 South Street Hwy 15A, MM 0.45

CSS-1H Straight
25.56
$
$
Total
38.56
Total
$

DISTRICT 8

Location
Material Type
Est. Tons
Price per Ton
Extended Price

Springview Hwy 12, MM 56-66

CRS-2P
210
$
$

Ainsworth Hwy 20, MM 249-253

CRS-2P
152
$
$
Ainsworth 9A Spur
CRS-2P
11
$
$

Taylor Hwy 183, MM 143-155

CRS-2P
280
$
$

O’Neill Hwy 281, MM 183-197

CRS-2P
275
$
$

Merriman Hwy 61, MM 219-226

CRS-2P
126
$
$

Cody Hwy 20, MM 155-167

CRS-2P
241
$
$

Valentine Hwy 83, MM 156-161

CRS-2P
224
$
$

Valentine Hwy 83, MM 186-197

CRS-2P
203
$
$

Naper Junction Hwy 12/137, MM 81-86

CRS-2P
185
$
$
Total
1,907
Total
$

Springview Hwy 12, MM 56-66

CSS-1H 75/25
80
$
$

Ainsworth Hwy 20, MM 242-253

CSS-1H 75/25
52
$
$
Ainsworth 9A Spur
CSS-1H 75/25
5
$
$

Taylor Hwy 183, MM 143-155

CSS-1H 75/25
100
$
$

O’Neill Hwy 281, MM 183-197

CSS-1H 75/25
160
$
$

Merriman Hwy 61, MM 219-226

CSS-1H 75/25
48
$
$

Merriman Hwy 20, MM 242-253

CSS-1H 75/25
115
$
$

Valentine Hwy 83, MP 156-161

CSS-1H 75/25
85
$
$

Valentine Hwy 83, MM 186-197

CSS-1H 75/25
77
$
$

Naper Junction Hwy 12/137, MM 81-86

CSS-1H 75/25
72
$
$
Total
794
Total
$
Ainsworth Yard #80100
HFE-150
19
$
$
Total
19
Total
$
Hwy 2, 5 mi Southeast of Valentine
HFE-300
50
$
$
Hwy 20, 1 mi West of Merriman
HFE-300
25
$
$
Total
75
Total
$
Hwy 2, 5 mi Southeast of Valentine
HFE-1000
25
$
$
Total
25
Total
$

PLANT PICK-UP LOCATIONS

Bidder shall include a price per ton for plant pick-up.

Location
Material Type
Est. Tons
Price per Ton
Districts 1 through 8
CRS-2L
5
$
Districts 1 through 8
CRS-2 STRAIGHT
25
$
Districts 1 through 8
CRS-2P
10
$
Districts 1 through 8
CRS-2P 80/20
5
$
Districts 1 through 8
CRS-2VHL
5
$
Districts 1 through 8
CSS-1H STRAIGHT
45
$
Districts 1 through 8
CSS-1H 75/25
5
$
Districts 1 through 8
CSS-1H 50/50
35
$
Districts 1 through 8
SS-1H
5
$
Districts 1 through 8
SS-1H 75/25
5
$
Districts 1 through 8
SS-1H 50/50
5
$
Districts 1 through 8
HFE-150
5
$
Districts 1 through 8
HFE-300
5
$
Districts 1 through 8
HFE-500
5
$
Districts 1 through 8
HFE-1000
5
$
Districts 1 through 8
MC-250
5
$
Districts 1 through 8
CMS-1
5
$
Districts 1 through 8
CMS-1W
5
$
Districts 1 through 8
HFMS-2L
5
$
Districts 1 through 8
HFMS-2P
5
$
Districts 1 through 8
CFS/FS-1
5
$
Additional Line Items
Price

Returned Load Fee – Price Per Mile Billed per Hwy Mile from the point the transfer truck is notified back to the shipping point origin.

Demurrage Charge – Price Per Hour
$

File details come from the government source that posted it. Updated .