121-101426JA.pdf

PDF 774 KB Posted

Attached to
Automotive Building Design Commissioning Services
Solicitation number
121-101426JA
Issued by
Rockingham County, North Carolina

About this file

This is a Request for Proposals (RFP) document issued by Rowan-Cabarrus Community College (RCCC) for commissioning agent services related to the design and construction of a $25,000,000 Automotive Building on the college's North Campus in Salisbury, North Carolina. The college seeks an independent third-party commissioning agent to provide services spanning four phases: design, construction, acceptance, and post-acceptance. The project involves a 45,000-square-foot, single-story building designed to house automotive classrooms, labs, offices, and support spaces, including twelve automotive bays, an autobody shop with paint booth, and spaces for a new Heavy Diesel Technology program. The building will feature high-performance design elements including a pre-engineered metal structure with masonry facade, ground source heat pump HVAC systems, rooftop and parking lot solar installations, and building envelope commissioning with air pressure testing. The RFP was published on October 13, 2026, with proposals due by November 12, 2026, at 2:00 PM via electronic submission only to collegeenvironment@rccc.edu. The project assumes design funding in FY 2025 and construction funding in FY 2026.

The total project budget of $25,000,000 is funded through Rowan County Bond Approved OC-25. Proposing firms must be properly licensed to practice engineering in North Carolina and should include their Engineering License Number, E-Procure number, and SCO Vendor Number with their submission. Proposal evaluation criteria include expertise in commissioning high-efficiency educational facilities (30%), demonstrated understanding of Rowan-Cabarrus Community College's facilities requirements and State Construction Office procedures (20%), experience with energy-efficient and sustainable building design emphasizing Passive House (PHIUS) and WELL Building standards (20%), qualifications of proposed staff (15%), proposal quality and completeness (10%), and familiarity with and proximity to the college (5%). Submissions must include a one-page letter of interest, commissioning approach with organizational chart, three to six examples of similar SCO-administered projects, three letters of recommendation from higher education clients, resumes of key staff, and signed copies of any addendums. Electronic submissions are limited to 20MB in Adobe PDF format.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

121-101426JA

Commission Department/Agency Rowan-Cabarrus Community College Project Title Automotive Building Design Design Services Commissioning Services

Scope

This request for proposals is for commissioning services for the design and construction of the $25,000,000 Automotive Building at Rowan-Cabarrus Community College’s (RCCC) North Campus in Salisbury, NC. The project is envisioned to include the design and construction of one (1) new building.

This new building will house Classrooms, Labs, Offices, and Support Spaces necessary to support the growth of automotive programs allowing them to support the local automotive industry's workforce needs with state-of-the-art educational opportunities located on North Campus adjacent to the planned Technology Building. The plan calls for existing Automotive programs to relocate into spaces configured to support the latest in automotive technologies. Space Program includes expansion space to allow for expected increased enrollment resulting from dual enrollment with Rowan-Salisbury Schools planned CTE High School, new auto-body and paint booth capabilities, and a new Heavy Diesel Technology program. The building is envisioned to be a 45,000-square-foot, single-story building with high bay spaces with large access doors, adequate power, cooling, ventilation, and compressed air to facilitate the frequent upgrade of the evolving automotive industry. The building is planned to be located on an undeveloped parcel on North Campus in Salisbury, NC. It is envisioned to be a pre-engineered metal building with a front facade enhanced with metal and brick to integrate into the design aesthetic of North Campus. It will be a high-performing building. The project assumes the extension of all utilities (power, data, water, sewer) to the site from the Technology Building. It will have a large concrete paved working yard, and an associated 30-vehicle fenced storage area. This estimate assumes Planning funding in FY 2025 and Construction Funding in FY 2026.

Specific goals for the project are addressed in the Automotive Building Owners Project Requirements dated August 26, 2024 (Attachment A) and the Commissioning Agent Services Scope of Work dated 7/27/2022 (Attachment B). The scope of work for this selection will include providing commissioning services starting with conceptual design, schematic, design development, construction documents, construction administration, and project close-out. The project will be designed and administered under State Construction Office requirements. The commissioning agent will be required to work closely with the design team, the CMR contractor, the sustainability consultant, and the Owner.

Contact Ronda Holland Telephone 704-216-3455 Email ronda.holland@rccc.edu Total Project Budget $25,000,000 Total Project Budget (inclusive of all soft costs) Source of Funds Rowan County Bond Approved OC-25 # Publish Date October 13, 2026 Closing Date November 12, 2026 @ 2:00 PM

Submittal Packages should be transmitted to:

Electronic submissions only (Read Receipt Requested) to:

Email: collegeenvironment@rccc.edu

NC Licensing Statement

In order to offer commissioning or engineering services in response to this solicitation, the proposing firm must be properly licensed to practice Engineering in the State of North Carolina. More information on the North Carolina state boards may be found at the following websites:

NC Board of Architecture: (http://www.ncbarch.org) NC Board of Examiners for Engineers & Surveyors: (http://www.ncbels.org) NC Board of Landscape Architects: (http://www.ncbola.org) mailto:ronda.holland@rccc.edu mailto:collegeenvironment@rccc.edu http://www.ncbarch.org/ http://www.ncbels.org/ http://www.ncbola.org/

121-101426JA

It is the intent of Rowan-Cabarrus Community College to select a Commissioning firm for the project. In selecting the Commissioning Agent, the College’s Selection Committee will take into consideration qualifying factors such as:

SELECTING CRITERIA

In selecting the Commissioning Agent, the College’s Selection Committee will take into consideration qualifying factors addressed below with their relative weighting:

1. Expertise and previous experience in the commissioning of innovative, high-efficiency educational/institutional facilities (both Higher Education and K-12) within the State of North Carolina. 30%

2. Demonstrated understanding of requirements under which Rowan-Cabarrus Community College must execute its capital projects, including the Rowan-Cabarrus Community College Facilities Design Manual, the State Construction Manual and associated forms, NCCCS Capital Improvement Guide, and the State Construction Office (SCO) project administration, and plan review. 20%

3. Experience in the design, construction, and commissioning of energy efficient and sustainable buildings, with a particular emphasis on Passive House (PHIUS) and WELL Building design principles. 20%

4. Qualifications and experience of proposed staff and consultant team. 15%

5. Quality of the proposal, including the inclusion of all the Submittal Requirements addressed below. 10%

6. Familiarity with and the proximity to the College. 5%

SUBMITTAL REQUIREMENTS

Submit one (1) electronic copy of the submittal package in Adobe.pdf format, 20Mg Max file size. Electronic submissions only (Read Receipt Requested). Each package shall include in the following order:

1. A Letter of Interest – no more than one (1) page. Letter of interest should include Engineering License Number, E-Procure number, and SCO Vendor Number.

2. A commissioning approach for the project including the Owner/Commissioning Team organizational chart.

3. A minimum of three (3) (but no more than six (6)) single page (front and back) examples of similar projects with N.C. State

Construction Office (SCO) administered projects.

4. Three (3) letters of recommendation from prior Higher Education clients, on their letterhead, for similar projects.

5. Resumes of key staff proposed to support the commissioning effort, including an indication of other projects on which that individual will be concurrently assigned, and those anticipated project completion dates.

6. Signed copy of all addendums issued to this advertisement.

Electronic submissions only (Read Receipt Requested).

Rowan-Cabarrus Community College

Automotive Building

Owner’s Project Requirements August 26, 2024

Automotive Center Owner’s Project Requirements

8/26/2024

Table of Contents

Introduction.....................………………………………………………………………………………….………………….Pages 2 - 3

General Requirements…...........................................................................................................Pages 4 - 12

Technologies Building……………..……………….45,000 SF…………………………………………………..………Pages 13 - 19

Supporting Documents Facility Design Manual, Version 1.1, February 2024 Rowan-Cabarrus Community College North Campus Facility Master Plan, 2022

College Environment Division Department of Planning and Capital Projects

Owner’s Project Requirements

8/26/2024

1. Introduction

This Draft RCCC Owner’s Project Requirements document captures in writing the initial concept for the Automotive Building for Rowan-Cabarrus Community College’s North Campus in Salisbury, NC. This project is estimated to cost $25,000,000, however only funding for the design and preconstruction efforts has currently been allocated. These Owner’s Project Requirements shall inform prospective Architects, Construction Managers at Risk (CMR), Commissioning Agents (Cx), Sustainability Consultants, etc. of the goals and requirements the Owner has created for the project. They should use this document to evaluate their interest in the project, select their proposed teams, and guide the writing of their proposals in response to the Request for Proposals (RFP) to show their alignment with the Owner’s stated goals.

2. Vision

The Project is envisioned as:

A new building housing Classrooms, Labs, Offices, and Support Spaces necessary to support the growth of automotive programs allowing them to support the local automotive industry's workforce needs with state-of-the-art educational opportunities located on North Campus adjacent to the planned Technology Building. The plan calls for existing Automotive programs to relocate into spaces configured to support the latest in automotive technologies. Space Program includes expansion space to allow for expected increased enrollment resulting from dual enrollment with Rowan-Salisbury Schools planned CTE High School, new auto-body capabilities, and a new Heavy Diesel Technology program. The building is envisioned to be a 45,000-square-foot, single-story building with high bay spaces with large access doors, and adequate power, cooling, ventilation, and compressed air to facilitate the frequent upgrade of the evolving automotive industry. The building is planned to be on an undeveloped parcel on North Campus in Salisbury, NC. It is envisioned to be a pre-engineered metal building with a front facade enhanced with metal and brick to integrate into the design aesthetic of North Campus. It will be a high-performing building. The project assumes the extension of all utilities (power, data, water, sewer) to the site from the Technology Building. It will have a large concrete paved working yard, and an associated 30-vehicle fenced storage area. This estimate assumes Planning funding in FY 2025 and Construction Funding in FY 2026.

Specific goals for the project and individual buildings are addressed in this document.

3. Designer/CMR/CX/Sustainability Scopes of Work

The project will include site development, building construction, and fit-out yielding fully functional facilities. The Architect shall seek all required approvals, handle bidding, and administer the construction under a CM at Risk delivery model. The project will be designed and administered as a formal project and under State Construction Office requirements. The funding allocated to this project necessitates splitting the scopes of work of the Designer, Construction Manager at Risk, Commissioning Agent, and the Sustainability Consultant into phases.

3.1. Phase I (Design):

Owner’s Project Requirements

8/26/2024

3.1.1. The Designer’s initial effort will include conceptual design, schematic design, design development, and construction documents up to the approval to bid by the State Construction Office.

3.1.2. The Construction Manager’s pre-construction effort includes cost estimating, constructability reviews, materials and finishes selections, value-engineering, and construction bid package development.

3.1.3. The Commissioning Agent’s first effort includes systems design review and energy modeling.

3.1.4. Sustainability Consultant(s) (PHUIS and Well Building) efforts will include developing requirements for each phase of design as outlined in the owner’s goals.

3.2. Phase II (Construction):

3.2.1. The Designer’s subsequent scope of work after the full funding for construction is approved then includes bidding assistance, construction administration, project close-out, assistance with warranty period management (1 year), and performance verification.

3.2.2. The Construction Manager’s follow-on scope of work includes bidding, contracting, construction management, project close-out, warranty period management (1 year), and assistance with performance verification.

3.2.3. The Commissioning Agent’s work in this phase includes shop drawing review, field inspections, system start-up verification, project close-out review, supervision of systems training by the CM and Vendors, and performance verification (1 year).

3.2.4. Sustainability Consultant(s) (PHUIS and Well Building) includes monitoring adherence to requirements as established during the design phases.

Owner’s Project Requirements

8/26/2024

4. General Project Requirements

4.1. General Requirements

4.1.1. Owner Directives and Goals

4.1.1.1. Directives

4.1.1.1.1. All aspects of the project design shall comply with the College’s February 2024 Facilities Design Manual.

4.1.1.1.2. Ensure CO2 levels in classroom, lab, office, and meeting spaces do not exceed 750ppm through the prescriptive application goal of no less than 15 CFM per person in each discrete space.

4.1.1.1.3. The project will be conceptualized and designed in a highly integrated approach, with the Owner, Tenant, Architect, Construction Manager, and Commissioning Agent as equal partners in the effort.

4.1.1.1.4. As a formal project and over $2,000,000 the project will be administered under State Construction Office (SCO) requirements, and the Standard SCO Design Contract will be utilized for Design, Construction Administration, and Closeout Phases, with scope requirements of the Owner, beyond those of SCO, carried as Additional Services.

4.1.1.1.5. Full 3rd party enhanced commissioning will be required, including the building envelope commissioning with air pressure test.

4.1.1.1.6. The construction of the project will be accomplished by the Construction Manager at Risk delivery method.

4.1.1.1.7. The design, construction, commissioning, and performance verification of the buildings will follow two specific sustainable design programs, key components of which will be determined during the planning phase of design. They are:

4.1.1.1.7.1. WELL Building v2 from which the project will be

required to address particular areas of concern, which are:

4.1.1.1.7.1.1. Air

4.1.1.1.7.1.2. Water

4.1.1.1.7.1.3. Light

4.1.1.1.7.1.4. Movement

4.1.1.1.7.1.5. Thermal Comfort

4.1.1.1.7.1.6. Sound

4.1.1.1.7.1.7. Materials

4.1.1.1.7.2. The 2021 PHIUS Passive Building Standard will guide the design of all buildings, but without the intent of

Owner’s Project Requirements

8/26/2024 seeking Certification under that standard. This will include meeting the following:

4.1.1.1.7.2.1. Passive Conservation Requirements;

4.1.1.1.7.2.2. Airtightness Requirements;

4.1.1.1.7.2.3. Active Conservation Requirements;

4.1.1.1.7.2.4. Renewable Energy Requirements;

4.1.1.1.7.2.5. Moisture Design Criteria.

4.1.1.2. FEMA P-361, Safe Rooms for Tornadoes and Hurricanes: Guidance for Community and Residential Safe Rooms, Third Edition (2015) shall guide the design of certain multi-use spaces within each building, capable of providing shelter space for the number of occupants of the building, and shall be labeled in the documents as such and shall have appropriate signage. The intent is only that the structure and envelope are to be designed to this standard, without seeking certification that all criteria are met.

4.1.1.3. Goals:

4.1.1.3.1. The facility achieves total (including site) energy utilization of less than 30 EUI, which, with onsite generated PV electricity should yield a net zero facility.

4.1.1.3.2. The building will be an integral part of the new south-side campus expansion and will fit into the design esthetics of the Technology Education Complex and Career & College Promise Building.

4.1.1.3.3. The building will house the College’s Automotive program, including twelve (12) automotive bays, an autobody shop with a paint booth, and spaces to support a new, heavy diesel program.

4.1.1.3.4. Construct the building envelope to achieve an air tightness of

0.060 CFM50/per SF or less.

4.1.1.3.5. The drives and select parking areas will be a to a standard that will accommodate frequent trips of heavy vehicles.

4.1.1.3.6. The vehicle storage areas will be shielded from the view of passers-by through grade changes and landscaping.

4.1.1.3.7. The project will have full rooftop solar and some solar parking canopies for electrical generation.

4.1.1.3.8. The project HVAC system will be a ground source heat pump system.

4.1.1.3.9. The building will have central battery/UPS backup for emergency lighting and life-safety systems instead of a traditional generator.

4.1.2. Approvals

4.1.2.1. The project is located within the City Limits of the City of Salisbury, NC, and will require the city’s development approval. Design elements of the

Owner’s Project Requirements

8/26/2024 project may necessitate an amendment to the Conditional Overlay District Zoning which covers the North Campus.

4.1.2.2. Rowan County is the Authority Having Jurisdiction (AHJ) and will issue Building Permits and perform building inspections.

4.1.2.3. Other Permits as required by AHJ.

4.1.2.4. SCO will perform plan review in addition to that performed by the local

AHJ.

4.1.3. Drawing Requirements: RCCC will require AutoCAD/vector-based editable copies of drawing files as well as PDF copies of all stages of project development from schematic design through project closeout.

4.1.4. Basis of Design

4.1.4.1. Door hardware to use Allegion family of products (Schlage, Von Duprin, LCN, etc.) as the basis of design and as the Owner’s Preferred Alternate in Bid Documents. Keying system to be Schlage Everest “R” Small Format.

Coordinate with Scott Adamczak with Allegion at (704.894.0728) to develop the door hardware schedule.

4.1.4.2. The Electronic Access Control system shall be Avigilon, with installation by an authorized integrator. All associated hardware will be approved by Avigilon for integration into their system.

4.1.4.3. The Video Surveillance system will be IP Configure, and all cameras and associated hardware will be approved by IP Configure for integration into that system.

4.1.4.4. Fire Alarm and Mass Notification system will be an expansion of the North Campus Notifier voice-annunciated fire alarm system, with installation by an authorized Notifier integrator.

4.1.4.5. Interior and exterior Wayfinding and Directional Signage will use the College Standard APCO Signs as the basis of design and as the Owner’s Preferred Alternate in Bid Documents.

4.1.4.6. Site furnishings (benches, trash cans, bollards, etc.) will use the College Standard of North Carolina-based LeisureCraft Holding, LLC. “High Point Series” as the basis of design and as the Owner’s Preferred Alternate in Bid Documents.

4.1.4.7. Emergency Phone/Camera Poles will use Talk-A-Phone Interior Emergency Phone and Exterior Emergency Phone/Camera Poles as the basis of design and as the Owner’s Preferred Alternate in Bid Documents.

Owner’s Project Requirements

8/26/2024

4.2. Project Specific Elements – Space Program

4.2.1. Labs

Owner’s Project Requirements

8/26/2024

4.2.2. Classrooms

4.2.3. Student Support

Owner’s Project Requirements

8/26/2024

4.2.4. Faculty Support

Owner’s Project Requirements

8/26/2024

4.2.5. Building Core

Owner’s Project Requirements

8/26/2024

4.2.6. Total Facility Summary

4.3. General Building Requirements

4.3.1. Building Aesthetic

4.3.1.1. The building will all be constructed in the design aesthetic, significantly coordinating with the existing buildings on campus utilizing rectangular block form, flat roofs, and three colors of brick.

4.3.2. Structure

4.3.2.1. Vertical Structure

4.3.2.1.1. Structural steel.

4.3.2.2. Slabs

4.3.2.2.1. Slab on Grade: Cast in place concrete over moisture/vapor barrier membrane.

4.3.2.2.2. Elevated: Concrete fill on metal pan, hollow core concrete plank (w/ topping), or precast double “T” (w/ topping).

4.3.2.3. Roofs

4.3.2.3.1. Preferred low-slope metal roof decks. Concrete fill on metal pan, hollow core concrete plank (w/ topping), or precast double “T” (w/ topping) should be considered for storm shelter areas.

4.3.2.3.2. Highly sloped roof areas, which are to be utilized only in building entry elements to assist in wayfinding, may be metal deck.

4.3.3. Envelope

4.3.3.1. Walls:

4.3.3.1.1. Insulated metal panel; or,

4.3.3.1.2. Masonry, preferably in a natural (unpainted) finish with architectural enhancement to blend with the North Campus aesthetic, specifically the Advanced Manufacturing Building.

Owner’s Project Requirements

8/26/2024

4.3.3.2. Highly insulated and sealed at the perimeter to control the movement of heat, vapor, air, and free water.

4.3.3.3. Fenestration:

4.3.3.3.1. Curtainwall/Windows – Thermally broken aluminum system with insulated, low E glass.

4.3.3.3.2. Storefront – Thermally broken, insulated, Low E glass

4.3.3.3.3. Storefront Doors – Wide Stile, Insulated, Low E

Glass, configured for electric hardware, piano hinges, power transfer, and stainless-steel hardware.

4.3.3.3.4. Intrusion-resistant glass at or similar to standard Env1627 Class 3. in areas where forceful entry is considered a risk.

4.3.3.3.5. Steel Doors – Insulated, galvanized, morticed hardware, configured for electric hardware, anti-tamper hardware

4.3.3.4. Roofs

4.3.3.4.1. Highly insulated and sealed to control the movement of heat, vapor, air, and free water.

4.3.3.4.2. PVC membrane with a 20-year material warranty.

4.3.3.5. Factor passive bird deterrent into the design of all potential nuisance areas.

4.3.4. Interior

4.3.4.1. Walls

4.3.4.1.1. CMU Walls for lab spaces. Sealed and Painted

4.3.4.1.2. GWB walls in general classrooms, offices, and corridors.

Painted

4.3.4.1.3. Glazed Ceramic Tile on restroom walls to the ceiling. These walls should be patterned with cost effective solution including no less than two colors of tiles.

4.3.4.2. Ceilings – Shall be appropriate for the use of the space and shall consider:

4.3.4.2.1. Sound Control

4.3.4.2.2. Maintainability

4.3.4.2.3. Cost Efficiency

4.3.4.2.4. Aesthetics

4.3.4.2.5. Security – Restroom ceilings will have suspended gypsum ceilings to prevent access to the above-ceiling plenum.

4.3.4.3. Stairs

4.3.4.3.1. A stair will extend up to the roof level to provide access to the roof. Access to the stair leading to the roof level will be via a normally secured door at the highest publicly accessible stair landing.

4.3.4.4. Floors

Owner’s Project Requirements

8/26/2024

4.3.4.4.1. Terrazzo –Shall be the standard for high-traffic public spaces.

This system shall be designed by an expert in these systems.

4.3.4.4.2. Carpet Tiles - Office Space, Conference Rooms, Seminar Rooms, Computer Classrooms,

4.3.4.4.3. Porcelain Tile - Restrooms with an appropriate underlayment to avoid cracking shall be considered for all restrooms.

4.3.4.4.4. Resilient Flooring – Classrooms, clean Labs, Break Rooms, consider a sustainable resilient flooring material such as linoleum, or limestone dust-based tiles. VCT is not acceptable.

4.3.4.4.5. Sealed Concrete – shall be used in dirty or wet Labs, and back-of-house spaces such as Custodial Closets, Storage Rooms, Mechanical Rooms, Electrical Rooms, Data Facilities, etc.

4.3.4.5. Interior Fenestration

4.3.4.5.1. Doors: Shall be solid wood in lobby area and hollow metal doors in other areas.

1.1.1.1.1. Extra heavy-duty performance.

1.1.1.1.2. Doors to labs and associated storage rooms shall be a minimum of 40” wide.

1.1.1.1.3. Door Frames: Shall be hollow metal

1.1.1.1.4. Minimum extra heavy-duty (Level 2) frames.

1.1.1.1.5. To include sidelights on all Classroom, Lab, Conference, and Office Spaces. Sidelights shall be no more than 12” in width and should have panes no larger than 200 square inches. Panes located such that they could be broken out to open the door should be intrusion-resistant at or similar to standard EN356 P2A.

1.1.1.1.6. Where appropriate doorsways should have transom

lights to move natural daylight from the perimeter into interior spaces.

1.1.1.1.7. Interior Windows: Interior Windows are to have hollow metal frames. Where appropriate to mitigate sound, double-paned glass shall be utilized.

1.1.1.1.8. Window Shading systems: Windows between classrooms, conference rooms, etc., and labs will be provided with window blinds.

4.3.4.6. Fit Out

4.3.4.6.1. All classrooms and conference rooms to receive chair rail.

4.3.4.6.2. All countertops are to be a solid surface material.

4.3.4.6.3. Window Shading systems

Owner’s Project Requirements

8/26/2024

4.3.4.6.3.1. Classrooms and Conference Rooms will be

provided with roll-down, duel translucent and black-out shades.

4.3.4.6.3.2. Other spaces will be provided with roll-down

translucent shades.

4.3.5. Systems

4.3.5.1. General:

4.3.5.1.1. Install individual metering into all utilities servicing each building. Meters should tie into the Campus BAS.

4.3.5.2. Lighting

4.3.5.2.1. Consider lighting temperatures that are appropriate to the needs of the application.

4.3.5.3. Electric:

4.3.5.3.1. A percentage of electrical receptacles in public spaces shall include USB charging.

4.3.5.3.2. Rooftop Solar:

4.3.5.3.3. Parking Lot Solar

4.3.5.4. Chill and Hot Water Plant

4.3.5.4.1. An individual geothermal system with heat pumps to serve the chill and hot water needs of the building.

4.3.5.4.2. Geothermal well fields will be located under paved parking areas. These fields will be designed such that they can be expanded if the system needs to be enlarged.

4.3.5.4.3. The Mechanical Room(s) will be designed to facilitate the maintenance and replacement of equipment.

4.3.5.5. Ventilation

4.3.5.5.1. Provide a zoned hydronic 4-pipe HVAC System.

4.3.5.5.2. Mechanical Room(s) will be designed to facilitate the maintenance and replacement of equipment.

4.3.5.5.3. Controls to be Tridium Niagara integrated into the existing

North Campus Building Management System.

4.3.5.5.4. Classrooms, Conference Rooms, and Office Spaces should be serviced by a displacement method ventilation designed to ensure CO2 levels in classroom, lab, office, and meeting spaces do not exceed 750ppm through the prescriptive application goal of no less than 15 CFM per person in each discrete space.

4.3.5.5.5. High Volume Low-Speed Fans will be considered for efficient movement of air in large-volume lab spaces. These shall be equipped with occupancy sensors and other controls to ensure they only operate when needed.

Owner’s Project Requirements

8/26/2024

4.3.5.5.6. Chill beams may be considered for use in the large-volume lab spaces together with the high-volume low-speed fans as appropriate.

4.3.5.5.7. Ensure the differing exhaust ventilation requirements for all lab spaces are addressed very carefully.

4.3.5.6. Plumbing

4.3.5.6.1. Provide hose bibs at strategic locations on the exterior of each building.

4.3.5.6.2. Provide interior hose bibs in Lab and other spaces where appropriate.

4.3.5.6.3. Eye wash stations shall be installed in Lab spaces, where appropriate. Sloped flooring drains shall be installed to support eye wash stations.

4.3.5.7. Life Safety:

4.3.5.7.1. Fire Alarm: Provide a fully functional (all points and sensors) voice annunciated Fire Alarm System with Mass Notification.

System to comply with State Construction Office Requirements.

The system shall integrate into the existing campus-wide system.

4.3.5.7.2. Mass Notification: Provide a fully functioning Emergency Mass Notification System integrated into the existing campus-wide system. Mass notification shall be ADA-compliant (audible and visual), with strategically placed digital message boards. Include one central dispatch/control station to be located at the Owner’s direction.

4.3.5.7.3. Fire Sprinkling: All buildings will be fire-sprinkled. Systems to comply with State Construction Office Requirements.

4.3.5.8. Data/Telecommunications:

4.3.5.8.1. Data Network: Provide extension from the nearest existing main (not branch) fiber-optic data trunk into a Main Distribution Facility (MDF) strategically located within the building.

4.3.5.8.2. Provide all data conduit, cabling, terminations, racks, and associated permanently installed equipment (UPS, etc.).

4.3.5.8.3. Provide fully functioning Electronic Access Control integrated into the existing campus-wide system.

4.3.5.8.4. Provide fully functioning Video Surveillance integrated into the existing campus-wide system.

4.4. Site Requirements (General)

4.4.1. Landscaping: Include a diverse, native-focused, landscaping package around the site, including parking lot islands. The landscaping package should blend with existing campus landscaping.

Owner’s Project Requirements

8/26/2024

4.4.2. Provide Emergency Phone/Camera/Speaker Poles: Strategically locate these in an ADA accessible curbed island in each parking lot adjacent to each facility.

Infrastructure should include power and data from the nearest building, ideally within 300 feet of the MDF inside the facility so that standard copper data cable may be used.

4.4.3. Electric Vehicle Charging Stations: One duel, Level 2 (220V) Electric Vehicle Charging Stations shall be installed close to the building with infrastructure to support future additional stations.

4.4.4. Site furnishings: Benches, tables, chairs, trash cans, bollards, etc. shall be located strategically on the Site Plan, and shall be furnished and installed by the Contractor.

All to be secured to a slab/foundation.

4.4.5. Sidewalks: Sidewalks will connect the building and parking lot to the network of campus sidewalks.

4.4.6. Fencing: Will be provided around the vehicle storage parking area.

4.5. Roadways, Drives, and Parking Lots

4.5.1. Roadways

4.5.1.1. Roadway extensions shall be connected to the existing roads to provide a logical, efficient flow of traffic through and around the campus while minimizing pedestrian crossings.

4.5.1.2. Carefully consider the use of heavy-duty pavement to support the traffic through the campus.

4.5.1.3. Sidewalks will be constructed along every roadway connecting to the sidewalk/path network on the campus.

4.5.2. Driveways: Drives serving buses, deliveries, and waste removal will be constructed from heavy-duty pavement designed for the appropriate number of daily trips.

4.5.3. Parking

4.5.3.1. Parking space count shall follow the local development ordinance.

Consideration should be given to consolidating the majority of these spaces into centralized lots serving the needs of the campus.

4.5.3.2. Parking shall be divided into Standard, Handicapped, and Electric Vehicle Parking.

4.5.3.3. Parking lot lighting shall be served and controlled from the adjacent building.

4.5.3.4. A minimum of five, but not less than 10% of the total parking space count (up to a maximum of 10) parking spaces will be covered with solar canopies.

4.5.3.5. Permeable paving will be considered where appropriate.

4.6. Utility Extensions: Utility extensions shall be located to minimize the impact on future roadways and structures, while providing necessary access points and pull boxes for shutoffs, maintenance, and new installations.

4.6.1. Electrical Power: Solar will be tied in behind the meter of the building.

Owner’s Project Requirements

8/26/2024

4.6.2. Potable Water: No specific requirements

4.6.3. Fire Main: No specific requirements

4.6.4. Irrigation Water

4.6.4.1. The use of irrigation should minimize through the thoughtful selection of planting and turf, swales, etc.

4.6.5. Storm Water

4.6.5.1. Necessary stormwater detention/retention ponds will be carefully designed to become campus amenities that protect and enhance the groundwater, natural wetlands, and streams on campus.

4.6.6. Sewer: No specific requirements

4.6.7. Gas

4.6.7.1. Prefer electric water heating offset by solar PV installations.

4.6.8. Data: Each facility will be served by a branch line from the College network fiber optic data backbone into MDF.

4.6.9. Solar: Each facility shall have rooftop and parking lot canopy solar installations as part of the project design. Ideally, these will be sized to completely offset the electrical power requirements of the buildings.

ATTACHMENT B

Commissioning Agent Services

Scope of Services/Work

Automotive Building

07/27/2022

Perform Commissioning Agent Services (CxA) for new construction and remodels/renovation projects.

1.1. College’s Facility Design Manual Requirements: Commissioning will be provided by an independent, third-party consulting agency. The commissioning agent will be responsible for ensuring that the building and its systems perform in accordance with the design intent and the College’s operational needs. The College considers the following elements as a minimum requirement for building acceptance:

1.1.2. Installation Verification

1.1.3. Startup and Checkout

1.1.4. Measurement and Verification

1.1.5. Performance Testing and Demonstration

1.2. Perform commissioning agent services to satisfy the requirements of the enhanced commissioning required by the State Construction Office.

1.3. Services shall be provided in four (4) phases: Design, Construction, Acceptance, and Post- Acceptance.

1.4. The CxA shall coordinate participation of the Owner’s Representative in all commissioning process activities. Schedule the commissioning process activities and integrate them into the master project schedule as prepared and maintained by the General Contractor.

1.5. Design Phase: During the Design Phase the CxA shall complete the following scope of work:

1.4.1.Perform Peer Reviews of each submission of the Design Team’s plans (Schematic Design, Design Development, Construction Documents, Final “For Construction” Permitted Plans) to ensure compliance with the College’s Facilities Design M, the Project Goals, Owner’s Project Requirements, and any other required criteria, acting as the Owner’s Plan Reviewer. Peer reviews will include review of Mechanical and Electrical plans by individuals licensed by the State of North Carolina to perform design in those areas. Peer Review will occur in addition to State Construction Office Design Review. Complete a thorough review of the construction documents. Submit written comments to the Owner, the Owner’s Representative, and the AE design team. With each subsequent submission incorporation of previous comments will be tracked and documented.

1.5.2. Review the A/E Design Team’s and the Owner’s Design Intent, Design Criteria and Commissioning Requirements to develop the Project Objectives Document.

1.5.3. Develop a Commissioning Plan encompassing the four (4) phases outlined above in 1.3.

1.4.4.Review commissioning specifications for all commissioned equipment. Coordinate this with the A/E design team and Owner. The specifications shall follow the intent of ASHRAE Guideline 0-2019, The Commissioning Process, and its Addendums, and ANSI/ASHRAE/IES Standard 202 Commissioning Process for Buildings and Systems. The commissioning specifications shall include definitions of key terms; a detailed description of the responsibilities of all parties; details of the commissioning process; reporting and documentation requirements (including formats), alerts to coordination issues, deficiency resolution, construction checklist and startup requirements, the functional testing process, and specific functional test requirements including testing conditions and acceptance criteria for all equipment to be commissioned.

1.4.5. Ensure design correctly represents compliance with NC Energy Efficiency Code.

1.6. Construction Phase: During the construction phase the CxA shall complete the following scope of work:

1.5.1. Organize the commissioning process components and participate in the pre-bid meeting where the commissioning process requirements are reviewed with the bidders.

1.5.2. Coordinate, direct, and document commissioning activities in a logical, sequential and efficient manner using consistent protocols, clear and regular communications and consultations with all necessary parties, updated timelines or schedules, and technical expertise. Conduct a pre-construction commissioning process meeting.

1.5.3. Perform site visits, as necessary, to observe and document component and system installations. Accomplish a statistical review of construction focusing on the Owner’s design intent and quality requirements. Attend selected construction progress and pre-installation job-site meetings to obtain information on construction progress. Review construction progress meeting minutes for revisions/substitutions related to the Owner’s design intent.

Assist in resolving any discrepancies.

1.5.4. With necessary assistance and review from the installing contractors, develop and write construction checklists. Submit to the contractors, Owner, and Owner’s Representative for review and approval.

1.5.5. Organize, conduct, and document periodic commissioning team meetings to plan, develop the scope, coordinate, schedule activities, and resolve problems.

1.5.6. Review submittals of systems to be commissioned, concurrent with the A/E design professional’s review. CxA’s reviewed shop drawing submittals must be submitted to A/E consultants before the date set for the consultant’s final approval of shop drawings.

1.5.7. Work with contractors to complete construction checklists and track completions.

1.5.8. Statistically sample completion of construction checklists on a periodic basis to verify that contractors’ quality processes achieve the Owner’s project requirements.

1.5.9. Approve systems startup by reviewing start-up reports and by selected site observations.

1.5.10. With necessary assistance and review from installing contractors, write the test procedures. Submit to the contractors, the Owner, and the Owner’s Representative for review and approval.

1.5.11. Direct the execution of the tests by the contractors.

1.5.12. Coordinate witness and recommend approval of manual functional performance tests performed by installing contractors. Coordinate retesting as necessary until satisfactory performance is achieved.

1.5.13. Recommend approval of air and water systems balancing through a statistical sampling of the report and separate field verification.

1.5.14. Maintain a master issues log and a separate testing record. Provide the contractor, the A/E design team, the Owner, and the Owner’s Representative with written progress reports and test results with recommended actions.

1.5.15. Document corrections and retesting of non-compliance items by the contractors.

1.5.16. Develop and review the Systems Manual for compliance with the Owner’s project requirements.

1.5.17. Review, recommend pre-approve, and verify the training proposed by the contractors for compliance with the project requirements.

1.5.18. Verify delivery of the final, approved Systems Manual to the Owner.

1.7. Acceptance Phase: During the acceptance phase the CxA shall complete the following scope of work:

1.6.1. Review and inspect, on a sample basis, the testing, adjusting, and balancing work that has been carried out by another agency.

1.6.2. Conduct functional performance testing of sub-systems, systems, and interactions between systems, leading to acceptance of the completed work. Document results of all tests witnessed.

1.6.3. Conduct functional performance testing of seasonally deferred equipment test. Document results of all tests witnessed.

1.6.4. Coordinate and organize the training of the Owner’s personnel.

1.6.5. Videotape the Owner’s personnel training sessions. Provide record disks to the Owner.

1.8. Post Acceptance Phase: During the post-acceptance phase the CxA shall complete the following scope of work:

1.7.1. Conduct functional performance testing of sub-systems, systems, and interactions between systems that could not be carried out prior to acceptance due to unsuitable weather or load conditions, or Owner occupancy requirements.

1.7.2. Prepare and submit a final Commissioning Process Report to the Owner.

1.7.3. Return to the site 10 months after the final Substantial Completion date. Review with Owner facilities staff the current building operation and the condition of outstanding issues related to the original and seasonal commissioning. Also interview Owner’s facilities staff and identify problems or concerns they have with operating the building as originally intended.

Make suggestions for improvements and for recording these changes in the Systems Manual. Identify areas that may come under warranty or under the original construction contract. Assist Owner’s facilities staff to develop reports and requests for services to remedy outstanding problems.

1.9. Equipment/Systems: During the scope of work as described in the Articles above, provide commissioning for the following building equipment and systems.

Equipment Equipment or Systems

Sampling Rate Notes

Building Envelope Roof 100% Flashings 100% Wall Sandwich 100% Windows/Doors/Storefront 25% Water Testing in accordance with AAMA 502 Building Envelope Air Tightness

100% Air Door Blower Test in accordance with ANSI 380-

HVAC Systems Heat Exchangers 100% Water Treatment System 100% Heating Water Converter 100%

Fin Tube Radiation and Unit Heaters

100%

Pumps 100%

Air Handling Units 100% Including coils, filters, energy recovery, air flow stations.

Exhaust Fan Systems 100% Transfer Fans 100% Ventilation Fans 100% VAV Air Terminal Units 50% DX Fan Coils 100% DX Condensing Units 100% Ductwork 50% HVAC System Piping 25% Hot Water Reheat Coils 100% Steam Humidifiers 100%

Building Automation System System Controls 100% Ensure the system functions properly and addresses all intended systems.

Temperature Sensors 100% Pressure Sensors and Controllers

100%

Lighting Sensors 100% CO2 Sensors 100% Airflow Stations 100% Air Handling Unit Dampers/Valve Actuators

100%

Lab Air Controls Systems – Air Control Valves

100%

Temperature and Air Controls 100% Plumbing and Fire Protection Systems

Plumbing Equipment 100% Plumbing Piping Systems 25% Lab Gas Piping Systems 100%

Fire Protection Sprinkler System

100%

Hot Water Heaters 100% Include solar thermal systems

Security & Access Systems Intrusion Detections Systems and Sensors

100%

Electric Locks 100% Card Key Access Sensors 100% Mechanical Locksets 50%

Door Opening Devices 100% Check ADA Compliance of Doors

Door Closers 100% Check ADA Compliance of Doors

ADA Accessibility Ramps 100% Confirm compliance of all slopes, textures, etc.

Parking Areas 25% Confirm compliance of slopes, striping, accessible pathways.

Accessible Paths 50% Confirm compliance between public amenities.

Electrical Systems Normal Power Electrical 50%

Lighting Controls 100% Including occupancy sensors, photometric sensors, timed switches

Emergency Power Systems 100%

EV Charging Stations 100% Confirm enrollment and payment processing

Fire Alarm and Life Safety Systems

100% Including Mass Notification

Automotive Building Design
Project Title
Design Services
This request for proposals is for commissioning services for the design and construction of the $25,000,000 Automotive Building at Rowan-Cabarrus Community College’s (RCCC) North Campus in Salisbury, NC. The project is envisioned to include the design and construction of one (1) new building.
This new building will house Classrooms, Labs, Offices, and Support Spaces necessary to support the growth of automotive programs allowing them to support the local automotive industry's workforce needs with state-of-the-art educational opportunities located on North Campus adjacent to the planned Technology Building. The plan calls for existing Automotive programs to relocate into spaces configured to support the latest in automotive technologies. Space Program includes expansion space to allow for expected increased enrollment resulting from dual enrollment with Rowan-Salisbury Schools planned CTE High School, new auto-body and paint booth capabilities, and a new Heavy Diesel Technology program. The building is envisioned to be a 45,000-square-foot, single-story building with high bay spaces with large access doors, adequate power, cooling, ventilation, and compressed air to facilitate the frequent upgrade of the evolving automotive industry. The building is planned to be located on an undeveloped parcel on North Campus in Salisbury, NC. It is envisioned to be a pre-engineered metal building with a front facade enhanced with metal and brick to integrate into the design aesthetic of North Campus. It will be a high-performing building. The project assumes the extension of all utilities (power, data, water, sewer) to the site from the Technology Building. It will have a large concrete paved working yard, and an associated 30-vehicle fenced storage area. This estimate assumes Planning funding in FY 2025 and Construction Funding in FY 2026.
Scope
Specific goals for the project are addressed in the Automotive Building Owners Project Requirements dated August 26, 2024 (Attachment A) and the Commissioning Agent Services Scope of Work dated 7/27/2022 (Attachment B). The scope of work for this selection will include providing commissioning services starting with conceptual design, schematic, design development, construction documents, construction administration, and project close-out. The project will be designed and administered under State Construction Office requirements. The commissioning agent will be required to work closely with the design team, the CMR contractor, the sustainability consultant, and the Owner.
Ronda Holland
Contact
704-216-3455
Telephone
ronda.holland@rccc.edu
Email
$25,000,000 Total Project Budget (inclusive of all soft costs)
Total Project Budget
Rowan County Bond
Source of Funds
Approved OC-25 #
Publish Date
Closing Date
Submittal Packages should be transmitted to:
NC Licensing Statement
2022.07.27_Attachment-B_CRx_Scope.pdf
Perform Commissioning Agent Services (CxA) for new construction and remodels/renovation projects.

File details come from the government source that posted it. Updated .