Amendment__01_1205M619Q0004_Toilet_Cleaning_CERD(2).doc.pdf
PDF 776 KB Posted
- Solicitation number
- 1205M619Q0004
About this file
Amendment #01
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Copy_to_Submit_1205M619Q0004_Toilet_Cleaning_CERD.pdf | ||
| 1205M619Q0004_Toilet_Cleaning_CERD.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION
NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
Amendment #1
OKANOGAN WENATCHEE NATIONAL FOREST
CLE ELUM RANGER 2019 SCHEDULE OF ITEMS
Item No Description Unit of Measure
Estimated Quantity Unit Price Total Price
Base Item 01 Base Item 01 - Lower Cle Elum Valley. Items A through E, May 17, 2019 through June 7, 2019 and May 26th, 2019. Items A through C additionally September 13th through September 27, 2019. Empty outside trash can(s) at Fee Trailheads.
A Speeyli (2 seats) (Fridays) Seat 16
B Salmon La Sac Fee Trail Head (1 seat) (Fridays) Seat 8
C Salmon La Sac Guard Station (1 seat) (Fridays) Seat 8
D Pete Lake Horse Fee Trail Head (1 seat) (Fridays) Seat 5
E Pete Lake Hiker Fee Trail Head (1 seat) (Fridays) Seat 5
Total for Base Item 01, A through E Seat 42 $ $
Item No Description Unit of Measure
Estimated Quantity Unit Price Total Price
Option Item 01a
Option Item 1a – Dependent on Funding Lower Cle Elum Valley Items F through H, May 17, 2019 through June 7, 2019 and May 26th, 2019.
Items F through H additionally September 13th through September 27, 2019
F Red Mountain Campground (1 seat) (Fridays) Seat 8
G Owhi Campground (2 seats) (Fridays) Seat 16
H Cayuse Campground (2 seats) (Friday)s Seat 16
Total for Option Item 01a, F through H Seat 40 $ $
Item No Description Unit of Measure
Estimated Quantity Unit Price Total Price
Option Item 01b
Option Item 1b- Dependent on Funding Lower Cle Elum Valley Items I, May 17, 2019 through June 7, 2019 and May 26th, 2019. Items I additionally September 13th through September 27, 2019.
I French Cabin (1 seat) (Fridays) Seat 8
Total for Option Item 01b - I Seat 8 $ $
Amendment #01
Base Item 02 Base Item 02 - Entire Cle Elum Valley Items A through E June 13, 2019 through September 5th, 2019;
Empty outside trash can(s) at Fee Trailheads, Sunday and/Thursdays (C and D Thursday Only)
A Speeyli (2 seats) (Sundays and Thursdays) Seat 50
B Salmon La Sac Fee Trail Head (1 seat) (Sundays and Thursdays)
Seat 25
C Salmon La Sac Guard Station (1 seat) (Sundays and Thursdays)
Seat 25
D Pete Lake Horse Fee Trail Head (1 seat) (Sundays and Thursdays)
Seat 25
IE
Pete Lake Hiker Fee Trail Head (1 seat) (Sundays and Thursdays)
Seat 25
Total for Base Item 02 , A through E Seat 150 $ $
Option Item 2a
Option Item 2a – Dependent on Funding, Entire Cle Elum Valley Items F through G, June 13, 2019 through September 5th, 2019
F Red Mountain Campground (1 seat) (Sundays and Thursday) Seat 25
G Owhi Campground (2 seats) (Sundays and Thursday) Seat 50
H Cayuse Campground (2 seats) (Sundays and Thursday) Seat 50
Total for Option Item 02a, F through H Seat 125 $ $
Option Item 2b
Option Item 2b, Dependent on Funding, Entire Cle Elum Valley Items June 13, 2019 through September 5th, 2019; Empty outside trash can(s) at Fee Trailheads. Sunday/Thursdays (J and K Thursdays only)
I French Cabin (1 seat) (Sundays and Thursdays) Seat 25
J Scatter Creek Trail Head (1 seat)(Thursday only) Seat 13
K Cathedral Fee Trail Head (2 seat) separate toilet bldgs.
(Thursday only)
Seat 13
Total for Option Item 02b, I through K Seat 51 $ $
Base Item
Teanaway Valley (A-E), Estimated Dates: June 14, 2019-Sept 13, 2019. Empty outside trash can(s) at Fee Trailheads. (Fridays)
A Beverly Campground (2 seat) in same toilet building (Friday)
Seat 28
B Esmeralda Fee Trail Head (1 seat) (Friday) Seat 14
C DeRoux Fee Trail Head (1 seat) (Friday) Seat 14
D Stafford Creek Fee Trail Heads (1 seat) (Friday) Seat 14
E Bear-Miller Fee Trail Head (1 seat) (Friday) Seat 14
Total for Base Items 03, A through E Seat 84 $ $
Option Item 03a
Option Item 3a, Dependent on funding, Teanaway Valley (A-E) and Highway 97(F-H): Estimated Dates: June 14, 2019-Sept 13, 2019.
F Mineral Springs Campground (2 seats) (Friday) Seat 28
G Swauk Campground (2 seats)
(Fridays) Seat 28
Total for Option Items 03a, F and G Seat 56 $ $
03b
Option Item 3a, Dependent on funding, Teanaway Valley (A-E) and Highway 97(F-H): Estimated Dates: June 14, 2019-Sept 13, 2019. Empty outside trash can(s) at Fee Trailheads. (Fridays)
H Swauk Discovery Fee Trail Head (1 seat) (Fridays) Seat 14
Total for Option Items 03b, H Seat 14 $ $
Manastash/Taneum Area:Estimated Dates: June 14, 2019-Sept 13, 2019. Empty outside trash can(s) at Fee Trailheads. (Fridays)
A Rider’s Camp Fee Trail Head(1 seat) (Friday) Seat 14
Manastash Campground Fee Trail Head (4 seats) separate toilet bldgs. (Friday)
Seat 56
C Manastash Fee Trail Head (1 seat) (Friday) Seat 14
D Taneum Juction Fee Trail Head (1 seat) (Friday) Seat 14
Total for Base Item 04, A through D Seat 98 $ $
Option Item 04a
Option Item 4a, Dependent on Funding, Manastash/Taneum Area:Estimated Dates: June 14, 2019- Sept 13, 2019. (Fridays)
E Taneum Campground (2 seats) (Friday) Seat 28
F Icewater Campground (2
Total for Option Item 04a, E through F Seat 56 $ $
05:
Option Item 5; Dependent on Funding Teanaway/Manastash/Taneum Estimated Dates: Sept 20, 2019 through Oct 18, 2019. Empty outside trash can(s) at Fee Trail Heads. (Fridays)
Head(1 seat) (Friday) Seat 5
Area (first 2 seats – not all 4) separate toilet bldgs. (Friday)
Seat 10
C Icewater Campground (2 seats) (Friday) Seat 10
D Taneum Juction Fee Trail Head (1 seat) (Friday) Seat 5
E Esmeralda Fee Trail Head (1 seat) (Saturday) Seat 5
F Beverly Campground (2 seat) in same toilet building (Saturday)
Seat 10
G DeRoux Fee Trail Head (1 seat) (Saturday) Seat 5
Total for Option Item, 05 A through G Seat 50 $ $
TOTAL FOR ALL ITEMS FOR BASE ITEM 01 $
TOTAL FOR ALL ITEMS FOR OPTION ITEM 01a $
TOTAL FOR ALL ITEMS FOR OPTION ITEM 01b $
TOTAL FOR ALL ITEMS FOR BASE PERIOD 02 $
TOTAL FOR ALL ITEMS FOR OPTION ITEM 02a $
TOTAL FOR ALL ITEMS FOR OPTION ITEM 02b $
TOTAL FOR ALL ITEMS FOR BASE PERIOD 03 $
TOTAL FOR ALL ITEMS FOR OPTION PERIOD 03a $
TOTAL FOR ALL ITEMS FOR OPTION PERIOD 03b $
TOTAL FOR ALL ITEMS FOR BASE ITEM 04 $
TOTAL FOR ALL ITEMS FOR OPTION ITEM 04a $
TOTAL FOR ALL ITEMS FOR OPTION ITEM 05 $
All Items include emptying outside trash cans during each cleaning. Item #5 is an optional item pending funding availability. It may or may not be awarded. See page 22 for the cleaning schedule by date.
CLE ELUM RANGER 2020 SCHEDULE OF ITEMS
Estimated Quantity Unit Price Total Price
Base Item 01 Base Item 01 - Lower Cle Elum Valley. Items A through E, May 15, 2020 through June 5, 2020, additionally, May 24th, 2019. Items A through C additionally September 11thth through September 25th, 2020. Empty outside trash can(s) at Fee Trailheads.
C Salmon La Sac Guard Station (1 seat) (Fridays) Seat 8
D Pete Lake Horse Fee Trail Head (1 seat) (Fridays) Seat 5
E Pete Lake Hiker Fee Trail Head (1 seat) (Fridays) Seat 5
Total for Base Item 01, A through E Seat 42 $ $
Item No Description Unit of Measure
Estimated Quantity Unit Price Total Price
Option Item 01a
Option Item 1a – Dependent on Funding Lower Cle Elum Valley Items F through H, May 15, 2020 through June 5, 2020, additionally, May 24th, 2020. Items F through H, additionally September 11thth through September 25th, 2020.
F Red Mountain Campground (1 seat) (Fridays) Seat 8
G Owhi Campground (2 seats) (Fridays) Seat 16
H Cayuse Campground (2 seats) (Friday)s Seat 16
Total for Option Item 01a, F through H Seat 40 $ $
Item No Description Unit of Measure
Estimated Quantity Unit Price Total Price
Option Item 01b
Option Item 1b- Dependent on Funding Lower Cle Elum Valley Items I, May 15, 2020 through June 5, 2020, additionally, May 24th, 2020. Item I additionally September 11thth through September 25th, 2020.
Base Item 02 Base Item 02 - Entire Cle Elum Valley Items A through E, June 11, 2020 through September 3rd, 2020;
Empty outside trash can(s) at Fee Trailheads. Sunday/Thursdays (C and D Thursday Only)
(1 seat) (Sundays and Thursdays)
Seat 25
C Salmon La Sac Guard Station (1 seat) (Sundays and Thursdays)
Seat 25
D Pete Lake Horse Fee Trail Head (1 seat) (Sundays and Thursdays)
Seat 25
IE
Pete Lake Hiker Fee Trail Head (1 seat) (Sundays and Thursdays)
Seat 25
Total for Base Item 02 , A through E Seat 150 $ $
Option Item 2a
Option Item 2a – Dependent on Funding, Entire Cle Elum Valley Items F through H, June 11, 2020 through September 3rd, 2020;
Sunday/Thursdays
G Owhi Campground (2 seats) (Sundays and Thursday) Seat 50
H Cayuse Campground (2 seats) (Sundays and Thursday) Seat 50
Total for Option Item 02a, F through H Seat 125 $ $
Option Item 2b
Option Item 2b, Dependent on Funding, Entire Cle Elum Valley , June 11, 2020 through September 3rd, 2020; Empty outside trash can(s) at Fee Trailheads. Sunday/Thursdays (J and K Thursdays only)
J Scatter Creek Trail Head (1 seat)(Thursday only) Seat 13
K Cathedral Fee Trail Head (2 seat) separate toilet bldgs.
(Thursday only)
Teanaway Valley, Estimated Dates: June 12, 2020-Sept 11, 2020. Empty outside trash can(s) at Fee Trailheads. (Fridays)
A Beverly Campground (2 seat) in same toilet building
C DeRoux Fee Trail Head (1 seat) (Friday) Seat 14
D Stafford Creek Fee Trail Heads (1 seat) (Friday) Seat 14
E Bear-Miller Fee Trail Head (1 seat) (Friday) Seat 14
Total for Base Items 03, A through E Seat 84 $ $
Option Item 03a
Option Item 3a, Dependent on funding, Highway 97, Estimated Dates: June 12, 2020-Sept 11, 2020.
(Fridays)
Total for Option Items 03a, F and G Seat 56 $ $
Option Item 03b
Option Item 3b, Highway 97(; Estimated Dates: June 14, 2020-Sept 13, 20120 Empty outside trash can(s) at Fee Trailheads. (Fridays)
H Swauk Discovery Fee Trail Head (1 seat) (Fridays) Seat 14
Total for Option Items 03b, H Seat 14 $ $
Base Item
Manastash/Taneum Area: Estimated Dates: June 12, 2020-Sept 11, 2020. Empty outside trash can(s) at Fee Trailheads. (Fridays)
Trail Head (4 seats) separate toilet bldgs. (Friday)
Seat 56
C Manastash Fee Trail Head (1 seat) (Friday) Seat 14
D Taneum Juction Fee Trail Head (1 seat) (Friday) Seat 14
Total for Base Item 04, A through D Seat 98 $ $
Option Item 04a
Option Item 4a, Dependent on Funding, Manastash/Taneum Area: Estimated Dates: June 12, 2020- Sept 11, 2020. (Fridays)
Option Item 5; Dependent on Funding Teanaway/Manastash/Taneum Estimated Dates: Sept 18, 2020 through Oct 16, 2020. Empty outside trash can(s) at Fee Trailheads.
Area (first 2 seats – not all 4) separate toilet bldgs. (Friday)
Seat 10
C Taneum Juction Fee Trail Head (1 seat) (Friday) Seat 5
D Esmeralda Fee Trail Head (1 seat) (Saturday) Seat 5
E Beverly Campground (2 seat) in same toilet building (Saturday)
Seat 10
F DeRoux Fee Trail Head (1 seat) (Saturday) Seat 5
Total for Option Item, 05 A through F Seat 40 $ $
05a Option Item 5; Dependent on Funding Taneum. Estimated Dates: Sept 18, 2020 through Oct 16, 2020.
C Icewater Campground (2 seats) (Friday) Seat 10
Total for Option Item, 05a, C Seat 10 $ $
TOTAL FOR ALL ITEMS FOR BASE ITEM 01 $
TOTAL FOR ALL ITEMS FOR OPTIONI TEM 01a $
TOTAL FOR ALL ITEMS FOR OPTION ITEM 01b $
TOTAL FOR ALL ITEMS FOR BASE PERIOD 02 $
TOTAL FOR ALL ITEMS FOR OPTION ITEM 02a $
TOTAL FOR ALL ITEMS FOR OPTION ITEM 02b $
TOTAL FOR ALL ITEMS FOR BASE PERIOD 03 $
TOTAL FOR ALL ITEMS FOR OPTION PERIOD 03a $
TOTAL FOR ALL ITEMS FOR OPTION PERIOD 03b $
TOTAL FOR ALL ITEMS FOR BASE ITEM 04 $
TOTAL FOR ALL ITEMS FOR OPTION ITEM 04a $
TOTAL FOR ALL ITEMS FOR OPTION ITEM 05a $
All Items include emptying outside trash cans during each cleaning. Item #5 is an optional item pending funding availability. It may or may not be awarded. See page 22 for the cleaning
CLE ELUM RANGER 2021 SCHEDULE OF ITEMS
Estimated Quantity Unit Price Total Price
Base Item 01 Base Item 01 - Lower Cle Elum Valley. Items A through E, May 14, 2021 through June 4, 2021, additionally May 30, 2021. Items A through C additionally September 10 through September 24, 2021.
Empty outside trash can(s) at Fee Trail Heads.
C Salmon La Sac Guard Station (1 seat) (Fridays) Seat 8
D Pete Lake Horse Fee Trail Head (1 seat) (Fridays) Seat 5
E Pete Lake Hiker Fee Trail Head (1 seat) (Fridays) Seat 5
Total for Base Item 01, A through E Seat 42 $ $
Item No Description Unit of Measure
Estimated Quantity Unit Price Total Price
Option Item 01a
Option Item 1a – Dependent on Funding Lower Cle Elum Valley Items F through H, May 14, 2021 through June 4, 2021, additionally May 30, 2021. Items F through H additionally September 10 through September 24, 2021.
F Red Mountain Campground (1 seat) (Fridays) Seat 8
G Owhi Campground (2 seats) (Fridays) Seat 16
H Cayuse Campground (2 seats) (Friday)s Seat 16
Total for Option Item 01a, F through H Seat 40 $ $
Item No Description Unit of Measure
Estimated Quantity Unit Price Total Price
Option Item 01b
Option Item 1b- Dependent on Funding Lower Cle Elum Valley Items I May 14, 2021 through June 4, 2021, additionally May 30, 2021. Item I additionally September 10 through September 24, 2021.
Base Item 02 Base Item 02 - Entire Cle Elum Valley Items A through E, June 10, 2021 through September 2, 2021;;
Empty outside trash can(s) at Fee Trailheads. Sunday/Thursdays (C and D Thursday Only)
(1 seat) (Sundays and Thursdays)
Seat 25
C Salmon La Sac Guard Station (1 seat) (Sundays and Thursdays)
Seat 25
D Pete Lake Horse Fee Trail Head (1 seat) (Sundays and Thursdays)
Seat 25
IE
Pete Lake Hiker Fee Trail Head (1 seat) (Sundays and Thursdays)
Seat 25
Total for Base Item 02 , A through E Seat 150 $ $
Option Item 2a
Option Item 2a – Dependent on Funding, Entire Cle Elum Valley Items F through H, June 10, 2021 through September 2, 2021 Sunday/Thursdays
G Owhi Campground (2 seats) (Sundays and Thursday) Seat 50
H Cayuse Campground (2 seats) (Sundays and Thursday) Seat 50
Total for Option Item 02a, F through H Seat 125 $ $
Option Item 2b
Option Item 2b, Dependent on Funding, Entire Cle Elum Valley, June 10, 2021 through September 2, 2021; Empty outside trash can(s) at Fee Trailheads. Sunday/Thursdays Sunday/Thursdays (J and K Thursdays only)
J Scatter Creek Trail Head (1 seat)(Thursday only) Seat 13
K Cathedral Fee Trail Head (2 seat) separate toilet bldgs.
(Thursday only)
Teanaway Valley, Estimated Dates: June 11, 2021-Sept 10, 2021. Empty outside trash can(s) at Fee Trailheads. (Fridays)
A Beverly Campground (2 seat) in same toilet building
C DeRoux Fee Trail Head (1 seat) (Friday) Seat 14
D Stafford Creek Fee Trail Heads (1 seat) (Friday) Seat 14
E Bear-Miller Fee Trail Head (1 seat) (Friday) Seat 14
Total for Base Items 03, A through E Seat 84 $ $
Option Item 03a
Option Item 3a, Dependent on funding, Highway 97, Estimated Dates: June 11, 2021-Sept 10, 2021.
(Fridays)
Total for Option Items 03a, F and G Seat 56 $ $
Option Item 03b
Option Item 3b, Highway 97(; Estimated Dates: June 11, 2021-Sept 10, 2021. Empty outside trash can(s) at Fee Trailheads. (Fridays)
H Swauk Discovery Fee Trail Head (1 seat) (Fridays) Seat 14
Total for Option Items 03b, H Seat 14 $ $
Base Item
Manastash/Taneum Area: Estimated Dates: June 11, 2021-Sept 10, 2021. Empty outside trash can(s) at Fee Trailheads. (Fridays)
Trail Head (4 seats) separate toilet bldgs. (Friday)
Seat 56
C Manastash Fee Trail Head (1 seat) (Friday) Seat 14
D Taneum Juction Fee Trail Head (1 seat) (Friday) Seat 14
Total for Base Item 04, A through D Seat 98 $ $
Option Item 04a
Option Item 4a, Dependent on Funding, Taneum Area: Estimated Dates: June 11, 2021-Sept 10, 2021.
(Fridays)
Option Item 5; Dependent on Funding Teanaway/Manastash/Taneum Estimated Dates: Sept 17, 2021 through Oct 15, 2021. Empty outside trash can(s) at Fee Trailheads.
Area (first 2 seats – not all 4) separate toilet bldgs. (Friday)
Seat 10
C Taneum Juction Fee Trail Head (1 seat) (Friday) Seat 5
D Esmeralda Fee Trail Head (1 seat) (Saturday) Seat 5
E Beverly Campground (2 seat) in same toilet building (Saturday)
Seat 10
F DeRoux Fee Trail Head (1 seat) (Saturday) Seat 5
Total for Option Item, 05 A through G Seat 40 $ $
Option Item 05a
Option Item 5a; Dependent on Funding Taneum, Estimated Dates: Sept 17, 2021 through Oct 15, 2021.
G Icewater Campground (2 seats) (Friday) Seat 10
Total for Option Item, 05a A through G Seat 10 $ $
TOTAL FOR ALL ITEMS FOR BASE ITEM 01 $
TOTAL FOR ALL ITEMS FOR OPTIONI TEM 01a $
TOTAL FOR ALL ITEMS FOR OPTION ITEM 01b $
TOTAL FOR ALL ITEMS FOR BASE PERIOD 02 $
TOTAL FOR ALL ITEMS FOR OPTION ITEM 02a $
TOTAL FOR ALL ITEMS FOR OPTION ITEM 02b $
TOTAL FOR ALL ITEMS FOR BASE PERIOD 03 $
TOTAL FOR ALL ITEMS FOR OPTION PERIOD 03a $
TOTAL FOR ALL ITEMS FOR OPTION PERIOD 03b $
TOTAL FOR ALL ITEMS FOR BASE ITEM 04 $
TOTAL FOR ALL ITEMS FOR OPTION ITEM 04a $
CLE ELUM RANGER 2022 SCHEDULE OF ITEMS
Estimated Quantity Unit Price Total Price
Base Item 01 Base Item 01 - Lower Cle Elum Valley. Items A through E, May 20, 2022 through June 10, 2022 and May 29, 2022. Items A through G additionally September 9 through September 23, 2022. Empty outside trash can(s) at Fee Trail Heads.
C Salmon La Sac Guard Station (1 seat) (Fridays) Seat 8
D Pete Lake Horse Fee Trail Head (1 seat) (Fridays) Seat 5
E Pete Lake Hiker Fee Trail Head (1 seat) (Fridays) Seat 5
Total for Base Item 01, A through E Seat 42 $ $
Item No Description Unit of Measure
Estimated Quantity Unit Price Total Price
Option Item 01a
Option Item 1a – Dependent on Funding Lower Cle Elum Valley Items F through H, May 20, 2022 through June 10, 2022 and May 29, 2022.
Items A through G additionally September 9 through September 23, 2022.
F Red Mountain Campground (1 seat) (Fridays) Seat 8
G Owhi Campground (2 seats) (Fridays) Seat 16
H Cayuse Campground (2 seats) (Friday)s Seat 16
Total for Option Item 01a, F through H Seat 40 $ $
Item No Description Unit of Measure
Estimated Quantity Unit Price Total Price
Option Item 01b
Option Item 1b- Dependent on Funding Lower Cle Elum Valley Items I May 20, 2022 through June 10, 2022 and May 29, 2022. Items A through G additionally September 9 through September 23, 2022. .
Base Item 02 Base Item 02 - Entire Cle Elum Valley Items A through E, June 12, 2022 through September 4, 2022;
Empty outside trash can(s) at Fee Trail Heads. Sunday/Thursdays (C and D Thursday Only)
(1 seat) (Sundays and Thursdays)
Seat 25
C Salmon La Sac Guard Station (1 seat) (Sundays and Thursdays)
Seat 25
D Pete Lake Horse Fee Trail Head (1 seat) (Sundays and Thursdays)
Seat 25
IE
Pete Lake Hiker Fee Trail Head (1 seat) (Sundays and Thursdays)
Seat 25
Total for Base Item 02 , A through E Seat 150 $ $
Option Item 2a
Option Item 2a – Dependent on Funding, Entire Cle Elum Valley Items F through H, June 12, 2022 through September 4, 2022; Empty outside trash can(s) at Fee Trail Heads Sunday/Thursdays
G Owhi Campground (2 seats) (Sundays and Thursday) Seat 50
H Cayuse Campground (2 seats) (Sundays and Thursday) Seat 50
Total for Option Item 02a, F through H Seat 125 $ $
Option Item 2b
Option Item 2b, Dependent on Funding, Entire Cle Elum Valley, June 12, 2022 through September 4, 2022; Empty outside trash can(s) at Fee Trail Heads. Sunday/Thursdays Sunday/Thursdays (J and K
J Scatter Creek Trail Head (1 seat)(Thursday only) Seat 13
K Cathedral Fee Trail Head (2 seat) separate toilet bldgs.
(Thursday only)
Teanaway Valley, Estimated Dates: June 10, 2022-Sept 9, 2022. Empty outside trash can(s) at Fee Trailheads. (Fridays)
A Beverly Campground (2 seat) in same toilet building
C DeRoux Fee Trail Head (1 seat) (Friday) Seat 14
D Stafford Creek Fee Trail Heads (1 seat) (Friday) Seat 14
E Bear-Miller Fee Trail Head (1 seat) (Friday) Seat 14
Total for Base Items 03, A through E Seat 84 $ $
Option Item 03a
Option Item 3a, Dependent on funding, Highway 97, Estimated Dates: June 10, 2022-Sept 9, 2022.
(Fridays)
Total for Option Items 03a, F and G Seat 56 $ $
Option Item 03b
Option Item 3b, Highway 97(; Estimated Dates: June 10, 2022-Sept 9, 2022. Empty outside trash can(s) at Fee Trailheads. (Fridays)
H Swauk Discovery Fee Trail Head (1 seat) (Fridays) Seat 14
Total for Option Items 03b, H Seat 14 $ $
Base Item
Manastash/Taneum Area: Estimated Dates: June 10, 2022-Sept 9, 2022. Empty outside trash can(s) at Fee Trailheads. (Fridays)
Trail Head (4 seats) separate toilet bldgs. (Friday)
Seat 56
C Manastash Fee Trail Head (1 seat) (Friday) Seat 14
D Taneum Juction Fee Trail Head (1 seat) (Friday) Seat 14
Total for Base Item 04, A through D Seat 98 $ $
Option Item 04a
Option Item 4a, Dependent on Funding, Taneum Area: Estimated Dates: June 10, 2022-Sept 9, 2022.
(Fridays)
Option Item 5; Dependent on Funding Teanaway/Manastash/Taneum Estimated Dates: Sept 16, 2022 through Oct 14, 2022. Empty outside trash can(s) at Fee Trailheads.
Area (first 2 seats – not all 4) separate toilet bldgs. (Friday)
Seat 10
C Taneum Juction Fee Trail Head (1 seat) (Friday) Seat 5
D Esmeralda Fee Trail Head (1 seat) (Saturday) Seat 5
E Beverly Campground (2 seat) in same toilet building (Saturday)
Seat 10
F DeRoux Fee Trail Head (1 seat) (Saturday) Seat 5
Total for Option Item, 05 A through G Seat 40 $ $
Option Item 05a
Option Item 5a; Dependent on Funding Taneum, Estimated Dates: Sept 16, 2022 through Oct 14, 2022.
G Icewater Campground (2 seats) (Friday) Seat 10
Total for Option Item, 05a A through G Seat 10 $ $
TOTAL FOR ALL ITEMS FOR BASE ITEM 01 $
TOTAL FOR ALL ITEMS FOR OPTIONI TEM 01a $
TOTAL FOR ALL ITEMS FOR OPTION ITEM 01b $
TOTAL FOR ALL ITEMS FOR BASE PERIOD 02 $
TOTAL FOR ALL ITEMS FOR OPTION ITEM 02a $
TOTAL FOR ALL ITEMS FOR OPTION ITEM 02b $
TOTAL FOR ALL ITEMS FOR BASE PERIOD 03 $
TOTAL FOR ALL ITEMS FOR OPTION PERIOD 03a $
TOTAL FOR ALL ITEMS FOR OPTION PERIOD 03b $
TOTAL FOR ALL ITEMS FOR BASE ITEM 04 $
TOTAL FOR ALL ITEMS FOR OPTION ITEM 04a $
CLE ELUM RANGER 2023 SCHEDULE OF ITEMS
Estimated Quantity Unit Price Total Price
Base Item 01 Base Item 01 - Lower Cle Elum Valley. Items A through E, May 19, 2023 through June 9, 2023 and May 28, 2023. Items A through G additionally September 8 through September 22, 2023. Empty outside trash can(s) at Fee Trail Heads.
C Salmon La Sac Guard Station (1 seat) (Fridays) Seat 8
D Pete Lake Horse Fee Trail Head (1 seat) (Fridays) Seat 5
E Pete Lake Hiker Fee Trail Head (1 seat) (Fridays) Seat 5
Total for Base Item 01, A through E Seat 42 $ $
Item No Description Unit of Measure
Estimated Quantity Unit Price Total Price
Option Item 01a
Option Item 1a – Dependent on Funding Lower Cle Elum Valley Items F through H, May 19, 2023 through June 9, 2023 and May 28, 2023. Items A through G additionally September 8 through September 22, 2023.
F Red Mountain Campground (1 seat) (Fridays) Seat 8
G Owhi Campground (2 seats) (Fridays) Seat 16
H Cayuse Campground (2 seats) (Friday)s Seat 16
Total for Option Item 01a, F through H Seat 40 $ $
Item No Description Unit of Measure
Estimated Quantity Unit Price Total Price
Option Item 01b
Option Item 1b- Dependent on Funding Lower Cle Elum Valley Items I May 19, 2023 through June 9, 2023 and May 28, 2023. Items A through G additionally September 8 through September 22, 2023.
Base Item 02 Base Item 02 - Entire Cle Elum Valley Items A through E, June 11, 2023 through September 3, 2023;
Empty outside trash can(s) at Fee Trail Heads. Sunday/Thursdays (C and D Thursday Only)
(1 seat) (Sundays and Thursdays)
Seat 25
C Salmon La Sac Guard Station (1 seat) (Sundays and Thursdays)
Seat 25
D Pete Lake Horse Fee Trail Head (1 seat) (Sundays and Thursdays)
Seat 25
IE
Pete Lake Hiker Fee Trail Head (1 seat) (Sundays and Thursdays)
Seat 25
Total for Base Item 02 , A through E Seat 150 $ $
Option Item 2a
Option Item 2a – Dependent on Funding, Entire Cle Elum Valley Items F through H, June 11, 2023 through September 3, 2023;; Empty outside trash can(s) at Fee Trail Heads Sunday/Thursdays
G Owhi Campground (2 seats) (Sundays and Thursday) Seat 50
H Cayuse Campground (2 seats) (Sundays and Thursday) Seat 50
Total for Option Item 02a, F through H Seat 125 $ $
Option Item 2b
Option Item 2b, Dependent on Funding, Entire Cle Elum Valley, June 11, 2023 through September 3, 2023;; Empty outside trash can(s) at Fee Trail Heads. Sunday/Thursdays Sunday/Thursdays (J and K
J Scatter Creek Trail Head (1 seat)(Thursday only) Seat 13
K Cathedral Fee Trail Head (2 seat) separate toilet bldgs.
(Thursday only)
Teanaway Valley, Estimated Dates: June 9, 2023-Sept 8, 2023. . Empty outside trash can(s) at Fee Trailheads. (Fridays)
A Beverly Campground (2 seat) in same toilet building
C DeRoux Fee Trail Head (1 seat) (Friday) Seat 14
D Stafford Creek Fee Trail Heads (1 seat) (Friday) Seat 14
E Bear-Miller Fee Trail Head (1 seat) (Friday) Seat 14
Total for Base Items 03, A through E Seat 84 $ $
Option Item 03a
Option Item 3a, Dependent on funding, Highway 97, Estimated Dates: June 9, 2023-Sept 8, 2023.
(Fridays)
Total for Option Items 03a, F and G Seat 56 $ $
Option Item 03b
Option Item 3b, Highway 97(; Estimated Dates: June 9, 2023-Sept 8, 2023. . Empty outside trash can(s) at Fee Trailheads. (Fridays)
H Swauk Discovery Fee Trail Head (1 seat) (Fridays) Seat 14
Total for Option Items 03b, H Seat 14 $ $
Base Item
Manastash/Taneum Area: Estimated Dates: June 9, 2023-Sept 8, 2023. Empty outside trash can(s) at Fee Trailheads. (Fridays)
Trail Head (4 seats) separate toilet bldgs. (Friday)
Seat 56
C Manastash Fee Trail Head (1 seat) (Friday) Seat 14
D Taneum Juction Fee Trail Head (1 seat) (Friday) Seat 14
Total for Base Item 04, A through D Seat 98 $ $
Option Item 04a
Option Item 4a, Dependent on Funding, Taneum Area: Estimated Dates: June 9, 2023-Sept 8, 2023.
(Fridays)
Option Item 5; Dependent on Funding Teanaway/Manastash/Taneum Estimated Dates: Sept 15, 2023 through Oct 13, 2023. Empty outside trash can(s) at Fee Trailheads.
Area (first 2 seats – not all 4) separate toilet bldgs. (Friday)
Seat 10
C Taneum Juction Fee Trail Head (1 seat) (Friday) Seat 5
D Esmeralda Fee Trail Head (1 seat) (Saturday) Seat 5
E Beverly Campground (2 seat) in same toilet building (Saturday)
Seat 10
F DeRoux Fee Trail Head (1 seat) (Saturday) Seat 5
Total for Option Item, 05 A through G Seat 40 $ $
Option Item 05a
Option Item 5a; Dependent on Funding Taneum, Estimated Dates: Sept 15, 2023 through Oct 13, G Icewater Campground (2 seats) (Friday) Seat 10
Total for Option Item, 05a A through G Seat 10 $ $
TOTAL FOR ALL ITEMS FOR BASE ITEM 01 $
TOTAL FOR ALL ITEMS FOR OPTIONI TEM 01a $
TOTAL FOR ALL ITEMS FOR OPTION ITEM 01b $
TOTAL FOR ALL ITEMS FOR BASE PERIOD 02 $
TOTAL FOR ALL ITEMS FOR OPTION ITEM 02a $
TOTAL FOR ALL ITEMS FOR OPTION ITEM 02b $
TOTAL FOR ALL ITEMS FOR BASE PERIOD 03 $
TOTAL FOR ALL ITEMS FOR OPTION PERIOD 03a $
TOTAL FOR ALL ITEMS FOR OPTION PERIOD 03b $
TOTAL FOR ALL ITEMS FOR BASE ITEM 04 $
TOTAL FOR ALL ITEMS FOR OPTION ITEM 04a $
SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C.1 SCOPE OF CONTRACT
The Contractor shall provide any and all labor, equipment, supplies, services, permits, transportation, and licenses necessary to perform toilet cleaning at several recreation sites for the Cle Elum Ranger District. The Contractor shall at all times provide adequate supervision of employees ensuring all work is accomplished in accordance with the terms and conditions of the contract in a manner that will maintain satisfactory facility condition and present a clean, neat and professional appearance. The contract includes Base Items, along with Option Items.
C.2 LOCATION AND DESCRIPTION
Services are performed at recreational several sites within the Cle Elum Ranger District, Okanogan-Wenatchee National Forest.
Cle Elum Valley—10 sites. Map attached.
Teanaway Valley and Hwy 97—8 sites. Map attached.
Manastash Area—6 sites. Map attached.
C.3 TECHNICAL SPECIFICATIONS
Work under this contract shall be accomplished according to the following schedule. TOILETS SHALL BE CLEANED BY 2 PM on the scheduled day, otherwise, the COR shall be notified by the contractor the day of with a phone call or email.
• Option Items are dependent on funding.
• Option Item 5 if exercised, the Manastash Campground, 2 of the 4 toilets shall be cleaned.
• Scatter Creek and Cathedral toilets are only cleaned once a week on Thursdays.
• Until the 2 bridges are repaired in the Cle Elum Valley, 4 toilets will not be accessible
(French Cabin, Cathedral and Scatter Creek toilets).
• Some sites may not be accessible at beginning of each season due to snow conditions.
C.4 CLEANING SERVICES
Toilet Building/Area around Toilet Building
(a) Cleaning Vault Toilets Interior: Toilet riser and seat shall be sanitized with antibacterial cleaner and all solids on the inside and outside of the riser will be cleaned off. All surfaces shall be free of deposits.
(b) Cleaning Walls Interior: Cobwebs will be swept off the walls and ceilings. Dirt and other solids on the walls will be removed with a scrub brush, mop and pressure washer. All surfaces shall be free of deposits. Take care that the pressure from the washer does not take paint off of walls.
(c) Cleaning Walls Exterior: Cobwebs, dirt and debris will be swept off and removed from outer walls. Twice a year debris will be swept of roofs.
(d) Cleaning Floors: Floors shall be free of dirt and other solids. Dirt and other solids on the floor shall be removed with a scrub brush, mop and/or pressure washer. Squeezie or sweep away excess water from floors.
(e) Cleaning Doors: Doors shall be cleaned inside and out, remove any dirt or debris.
(f) Trash Containers: Garbage can liners will be replaced when the garbage is least ½ full.
Garbage may be deposited at the Cle Elum Office during office hours, or properly disposed of off National Forest Land.
(g) Toilet Paper: MUST BE White, Length: around 2,200" a roll, two-ply. Toilet tissue consists of 4” x 4" perforated sheets wound around a core. One-ply may be accepted. Check all toilet paper holders every service day to insure that each roller has at least 1/4 roll on it and will move freely. All glued ends of new toilet paper rolls shall be loosened prior to installing in dispensers. Three rolls of toilet paper per dispenser. Toilet paper must be clean and dry when placed on holder.
(h) Pick-up Around Toilets: Check area (15 foot radius surrounding each toilet building) thoroughly for debris, litter or other foreign matter over an inch in size, and properly dispose of
it. Do not leave bits of toilet paper on ground.
(i) Pests: Extinguish wasps, hornets, and ants from buildings. Spray to extinguish all insects from recreation facilities immediately upon detecting any pests.
(j) Graffiti: Remove with graffiti remover. Notify the Contracting Officer’s Representative if graffiti cannot be easily removed.
(k) Minor Toilet Maintenance: check often and tighten any loose bolts holding toilet seat to riser, replace bolts if missing
Notification of Damage to Toilet Units
The Contractor shall notify the Contracting Officer’s Representative of any leaks, damage or breakage to any of the units being serviced. Notification shall be given as soon as possible and in no cases longer than 24 hours after discovery so that repair arrangements can be made. If damage poses a hazardous or unsafe condition, the Contractor shall, when possible, lock the unit, (i.e. vandalism, graffiti damaged screens, toilet seats, toilet risers, vent pipes, hinges, door handles).
The contractor shall be liable for any damage to Government property other than normal wear and tear which occurs during time on the job.
Toilet Dispenser Lock Control.
The Contractor shall be issued the lock combination to toilet paper dispensers and/or a Yale key.
Hazardous/Suspicious Materials
Immediately report all hazardous or suspicious looking material to the Contracting Officer’s Representative. Do not attempt to remove.
Contractor's Vehicle
The Contractor's vehicle shall be pulled off the road enough to allow traffic to pass. Maximum speed limit in parking lots/recreation areas is Ten (10) miles per hour and is to be observed by the Contractor and his employees.
Conduct of Personnel
The Contractor and his/her employees shall make every reasonable effort to prevent interference with the normal use and occupancy of parking lots/recreation areas while engaged in the performance of the contract.
Due to the nature of the duties under the contract, the Contractor and his employees will be expected to keep themselves and equipment presentable at all times. The Contracting Officer may, in writing require the Contractor to remove from work any employee the Contracting Officer deems incompetent, careless, and otherwise objectionable or for theft, possession and or removal of materials, supplies, equipment or any Government-owned property.
Tact, diplomacy and courtesy shall be exercised at all times when dealing with the public.
Personal cleanliness and presentable appearance are required of all contract personnel when dealing with the public. Contractor or assigned personnel shall not use or be under the influence of alcohol and/or drugs at anytime while performing obligations under this contract. Contractor shall not carry firearms in the recreation areas. Contractor’s onsite representative must be able to read, write, speak and understand English.
It is the responsibility of the Contractor to ensure that all articles of possible personal or monetary value found by the Contractor’s employees are turned into the Contracting Officer’s Representative.
No children or pet animals will be allowed to accompany any employees during the performance of job duties.
Estimation of Supplies
Below are some estimates on amount of supplies used in a typical season. This information is from generally reliable sources, but no warranty as to its accuracy is made. Each applicant is expected to make his/her own assessment of the business opportunity offered in this solicitation.
The amount of supplies varies and is dependent on many variables, such as: weather, seasons (June, July and August receives more visitors), gas prices, and holiday weekends.
Below is an example list of the minimum types of supplies used to maintain toilets buildings:
Toilet paper: at a minimum, on every trip, expect that each toilet paper dispenser will need two to three new rolls of toilet paper.
Garbage Bags: 55-60 Gallon Bags. Expect on every trip that each garbage can bag, at the fee trail heads, will be replaced.
C.5 AGAR 452.211-72 STATEMENT OF WORK/SPECIFICATIONS (FEB 1988)
The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.
C.6 AGAR 452.211-73 ATTACHMENTS TO STATEMENT OF WORK/SPECIFICATIONS
(FEB 1988)
The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.
C.7 BIOBASED PRODUCTS
The Contractor must comply with Section 9002 of the Farm Security and Rural Investment Act of 2002 (FSRIA), Executive Order (EO) 13423, “Strengthening Federal Environmental, Energy, and Transportation Management,” and the Federal Acquisition Regulation to provide biobased products.
The Contractor shall utilize products and material made from biobased materials (e.g., biobased greases, biobased hydraulic fluids, biobased absorbents) to the maximum extent possible without jeopardizing the intended end use or detracting from the overall quality delivered to the end user. All supplies and materials shall be of a type and quality that conform to applicable Federal specifications and standards. All supplies and materials to be used in the performance of work described herein are subject to the approval of the Contracting Officer Representative (COR).
The following is an example list of products that may be used in this contract for custodial services for which biobased products are available. The list is not all inclusive.
It is desirable that vendors be able to supply the greatest number of biobased products listed meeting the health and environmental specifications.
All purpose cleaner Degreaser/cleaner Heavy duty cleaner Deodorizer Carpet shampoo Floor finish Gum remover Floor finish restorer Disinfectant sanitizer Floor sealer Extraction fluid Furniture polish Floor stripper Glass cleaner Neutral cleaner (liquid) Grout sealer Stain remover Stainless steel polish Air freshener including dispenser Toilet bowl cleaner Bathroom cleaner White board cleaner
Brass polish/cleaner Wood floor cleaner Chrome polish/cleaner Laundry detergent Liquid hand soap including dispenser Cream cleaner Lime and scale remover (tub and tile cleaner) Solvent
Biobased products that are designated for preferred procurement under USDA’s BioPreferred program must meet the required minimum biobased content as stated in the USDA Final Rule available at www.biopreferred.gov. The Contractor should provide data for their biobased products such as biobased content.
In addition to the biobased products designated by the U.S. Department of Agriculture in the BioPreferred Program, the Contractor is encouraged to use other biobased products.
The Contractor shall comply with the provision at FAR 52.223-1, Biobased Product Certification.
The Contractor shall comply with the clause at FAR 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts.
| Amendment #01 1205M619Q0004 Toilet Cleaning CERD.pdf |
| C.1 SCOPE OF CONTRACT |
| C.2 LOCATION AND DESCRIPTION |
| C.3 TECHNICAL SPECIFICATIONS |
| topmostSubform[0]: |
| Page1[0]: |
| AmendmentNo[0]: Amendment #01 |
| Code[0]: |
| Code[1]: |
| AccountingData[0]: |
| A13[0]: |
| C13[0]: |
| D13[0]: |
| NameandTitleSigner[0]: |
| NameandTitleOfficer[0]: JORGE SOMOZA CONTRACTING OFFICER |
| Description[0]: This Amendment extend the Solicitation closing date to 11 April 2019 by 2:00 PM DST. |
This Amendment changes the Schedule of Items to less Base Items and more Optional Items due to budget constrains.
All else remains the same. Please sign and submit this Amendment page with your quote.
| FacilityCode[0]: |
| Code[2]: |
| IssuedBy[0]: Mt. Baker-Snoqualmie National Forest |
2930 Wetmore Avenue, Suite 3A Everett, WA 98201
| NameandAddress[0]: |
| AdministeredBy[0]: |
| ContractIDCode[0]: |
| ReqNumber[0]: |
| AmendmentNo[1]: 1205M619Q0004 |
| ModificationNo[0]: |
| ProjectNo[0]: |
| Page[0]: 1 |
| Pages[0]: 26 |
| EffectiveDate[0]: 04/01/2019 |
| Dated9B[0]: 12/11/2018 |
| Dated10B[0]: |
| CheckBox9[0]: 1 |
| CheckBox10[0]: Off |
| CheckBox11[0]: 1 |
| CheckBox13A[0]: Off |
| CheckBox13B[0]: Off |
| CheckBox13C[0]: Off |
| CheckBox13D[0]: Off |
| IsNot[0]: Off |
| Is[0]: Off |
| Extended[0]: 1 |
| NotExtended[0]: Off |
| Signature1[0]: |
| Signature2[0]: |
| DateSigned[0]: |
| DateSigned[1]: 04/01/2019 |
| Copies[0]: 1 |
| CopiesReturned[0]: |
File details come from the government source that posted it.