RFP_No_1205M618R0006.pdf
PDF 3 MB Posted
- Solicitation number
- 1205M618R0006
About this file
RFP No 1205M618R0006
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_02.pdf | ||
| Amendment_01.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
1. REQUISITION NUMBER
904020
PAGE OF
2. CONTRACT NO. 3.AWARD/EFFECTIVE DATE 4. ORDER NUMBER 5. SOLICITATION NUMBER
1205M618R0006
6. SOLICITATION ISSUE
DATE
6-5-2018
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME Brian A. Johnson, CO
b. TELEPHONE NUMBER (No collect calls)
(425) 783-6056
8. OFFER DUE DATE/
LOCAL TIME
7-5-2018 at 1530
9. ISSUED BY CODE 10. THIS ACQUISITION IS UNRESTRICTED SET ASIDE 100 % FOR
USDA Forest Service Mt. Baker-Snoqualmie National Forest Attn: Brian A. Johnson 2930 Wetmore Ave., Suite 3A Everett, WA 98201-4067
SMALL BUSINESS WOMAN –OWNED SMALL BUSINESS (WOSB)
HUBZONE SMALL BUSINESS ELIGIBLE UNDER THE WOMEN OWNED SMALL
BUSINESS PROGRAM
SERVICE DISABLE VETERAN- EDWOSB
VETERAN-OWNED SMALL
BUSINESS 8(A)
NAICS Code 115310 Size Standard $19.0 million
11. DELIVERY FOR FOB
DESTINATION UNLESS
BLOCK IS MARKED
SEE SCHEDULE
12. DISCOUNT TERMS 13A. THIS CONTRACT IS RATED
ORDER UNDER DPAS (15 CFR 700
13B. RATING
Not Rated
14. METHOD OF SOLICATION
RFQ IFB RFP
15. DELIVER TO CODE 16. ADMINISTERED BY CODE
See Block 9
17a. CONTRACTOR/ OFFERER
TELEPHONE NO. DUNS #____________________
FAX NO. TIN #_____________________
E-Mail Address: ________________________
18a. PAYMENT WILL BE MADE BY
Invoice Office: Invoice Processing Platform (IPP). All invoices must be submitted electronically through the Invoice Processing Platform (IPP) via www.ipp.gov.
Payment Office is: USDA, OCFO, COD, APB.
P.O. Box 60075, New Orleans, LA 70160
17b CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH
ADDRESS IN OFFER
18b. SUMBIT INVOICES TO ADDRESS SHOWN IN BLOCK 18A UNLESS
BLOCK BELOW IS CHECKED SEE ADDENDUM
19.
ITEM NO
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
2018-2019 PCT, LFR, Pullback, Lop, Scatter, and Handpile
Naches Ranger District Okanogan-Wenatchee National Forest
Washington State (Yakima County)
Insert prices on Schedule of Items
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5. ARE ARE NOT ATTACHED.
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN ONE
COPY TO ISSUING OFFICE, CONTRACTOR AGREES TO FURNISH AND DELIVER
ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED
HEREIN
29. AWARD OF CONTRACT: REFERENCE _____________ OFFER
DATED . YOUR OFFER ON SOLICITATION (BLOCK 5),
INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH
HEREIN , IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (Signature Of Contracting Officer)
30b. NAME AND TITLE OF SIGNER (Type or Print) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or Print) Brian A. Johnson, Contracting Officer
31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (Rev. 2/2012) Prescribed by GSA-FAR (48CFR 53.212
RFP No. 1205M618R0006 2018-2019 PCT, LFR, Pullback, Lop, Scatter, and Handpile Page 1 of 100
E-mail: bajohnson03@fs.fed.us
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
2018-2019 PCT, LFR, Pullback, Lop, Scatter and Handpile
Enter your prices on Page 3.
See Section L, Paragraph L.3, for the required documents / information to be submitted with your proposal. Return to the address in Block 9. On your sealed envelope, e-mail, or facsimile include “RFP No. 1205M618R0006, Attn: Brian A.
Johnson, CO.”
Proposal submission via e-mail to bajohnson03@fs.fed.us is the preferred method of transmission.
Proposals submitted are considered to be confidential. The name of the successful offeror and the award amount will be disclosed only after contract award.
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ________________________________________
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELPHONE NUMBER OF AUTHORZED GOVERNMENT REPRESENTATIVE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED
CORRECTFOR
36. PAYMENT
COMPLETE PARTIAL
FINAL
37. CHECK NUMBER
PARTIAL
FINAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER
FOR PAYMENT
42a. RECEIVED BY (Print)
41 b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41 c. DATE 42b. RECEIVED AT (Location)
42c. DATE RECD (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV.2/2012) BACK
RFP No. 1205M618R0006 2018-2019 PCT, LFR, Pullback, Lop, Scatter, and Handpile Page 2 of 100 bajohnson03 Highlight
PART I – THE SCHEDULE
SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS
2018-2019 PCT, LFR, PULLBACK, LOP, SCATTER AND HANDPILE
NACHES RANGER DISTRICT
OKANOGAN-WENATCHEE NATIONAL FOREST
WASHINGTON STATE
(YAKIMA COUNTY)
B.1 SCHEDULE OF ITEMS
Pre-Commercial Thinning, (PCT), Ladder Fuel Reduction, (LFR), Handpiling, (HP), Lop/ Scatter (LP), Pullback (PB) – Eastside. Review contract unit maps to distinguish unit locations on the Naches Ranger District. See Detailed Unit Information Sheet for unit information. Due to closures of temporary roads or other blocked access, distance, and geographic location of units walk-in access may be required. It is up to the contractor to know the contract areas and bid accordingly to available access. No additional cost will be appraised. Cost per acre shall include walk-in cost.
BASE ITEMS:
ITEM
NO. DESCRIPTION*
QTY
EST.
ACRES
UNIT PRICE
$ / ACRE
TOTAL
PRICE
001 Dry-Nelli 1, 2, 3, 6, 9 244 $ $
OPTION A:
ITEM
NO. DESCRIPTION*
QTY
EST.
ACRES
UNIT PRICE
$ / ACRE
TOTAL
PRICE
002 Dry-Nelli 4, 5, 7, 8 256 $ $
*Refer to Attachment 2 – Detailed Unit Information Sheet
Total Price (Base+Option A): $________________
B.2 FAR 52.217-4 EVALUATION OF OPTIONS EXERCISED AT TIME OF CONTRACT AWARD
(JUN 1988)
Except when it is determined in accordance with FAR 17.206(b) not to be in the Government’s best interests, the Government will evaluate the total price for the basic requirement together with any option(s) exercised at the time of award.
B.3 OPTION A NOTE
Offerors must submit a unit price for ALL line items (Base+Option A) to be considered responsive. The unit prices will be used in exercising any of the option items. Depending on funding available, not all sub-units for a
RFP No. 1205M618R0006 2018-2019 PCT, LFR, Pullback, Lop, Scatter, and Handpile Page 3 of 100 https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%2017_2.html#wp1078150 certain option item may be exercised. The Government may elect to exercise some of the sub-items in the unit.
The quantity of the Option Items may be vary up to the total quantity listed on the schedule for the option item and will depend on funding availability.
B.4 SITE ACCESS
For site information or access questions, please contact David Lucas at (509) 653-1458 or via e-mail at dlucas@fs.fed.us.
B.5 TECHNICAL PROPOSAL
The Contractor’s technical proposal will become part of this contract (Refer to Section M).
RFP No. 1205M618R0006 2018-2019 PCT, LFR, Pullback, Lop, Scatter, and Handpile Page 4 of 100 mailto:dlucas@fs.fed.us
SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C.1 SCOPE OF WORK
Work shall include sapling thinning, ladder fuel reduction by hand (typically chainsaw), handpiling pullback, lop/scatter, and associated treatments in compliance with the terms, specifications, and provisions of this contract. This includes furnishing labor, equipment, supervision, transportation, operating supplies and incidentals except those items, if any, listed as Government furnished property (GFP).
C.2 PERIOD OF PERFORMANCE
The period of performance is sixty-seven (67) calendar days from date of Notice to Proceed for all items listed. This performance time does not include the seasonal restrictions listed below. Performance time will cease during the seasonal restriciton and commence after those timeframes.
C.3 SEASONAL RESTRICTIONS
• Activities are prohibited between May 15 and June 30 for elk calving and deer fawning restriction.
C.4 PROJECT LOCATION
The project location is on the Naches Ranger District of the Okanogan-Wenatchee National Forest. Due to closures of temporary roads or other blocked access, distance, and geographic location of units walk-in access may be required. It is the contractor’s responsibility to know the contract areas and propose accordingly to available access. Cost per acre shall include walk-in cost.
C.5 OBLIGATIONS OF THE CONTRACTOR
The following acres for work are applicable to the 2018-2019 work seasons. The work to be accomplished for the seasons will be dependent upon the availability of funding.
• An estimate of 500 acres of east side pre-commercial thinning, handpiling, and lop/scatter
Units listed on the detailed unit information sheet may be substituted for other units deleted and additional units may be added. Work orders will be issued for units ordered, with item descriptions of the work to be done and the agreed upon unit costs. The Contractor shall furnish all equipment, supplies, personnel, quality control and supervision to accomplish sapling thinning by hand (typically chainsaw), and associated treatments as provided in the text of this document, Stailed Unit Information Sheets and Project Area Maps on the Naches Ranger District.
At all times during performance of this contract and until the work is completed and accepted, the contractor shall directly superintend the work or assign and have on the project site a foreman who is conversant in the English language, who is satisfactory to the Contracting Officer and who has authority to act for the contractor.
Contractor must have a non-working foreman on site at all times to oversee contract work. The Government may at its option, suspend work with full count of contract time continuing if the contractor fails to provide a non-working foreman who is conversant in the English language and who is able to read and understand the contract.
RFP No. 1205M618R0006 2018-2019 PCT, LFR, Pullback, Lop, Scatter, and Handpile Page 5 of 100
Sawyers and other workers employed by the contractor shall have sufficient skill and experience to properly perform the work to specifications. Any operator or other worker who, in the opinion of the Contracting Officer, does not perform their work to specifications or does not perform in a skillful manner, shall be removed by the Contractor upon written request from the Contracting Officer.
The contractor shall be responsible for any damage to existing structural improvements such as water developments, fences, monumented corners, bearing trees, road surfaces and/or drainage structures as a result of contract activities. The Contractor shall restore any damage, immediately, back to its existing condition prior to the damage.
The Contractor shall be responsible for excessive damage to natural resources, for example, damage to residual trees or streams. The Contractor shall be required to repair restorable damage and may be held monetarily responsible for unrestorable damage.
At all times when work is being performed under this contract; a copy of the contract must be on the work site and must be readily available to the Contractor, its representative, and the individuals performing the work.
C.6 SALVAGEABLE MATERIAL
No salvage is offered under the terms of this contract.
C.7 DEFINITIONS
1. Average Spacing - The average of the distance between all crop trees necessary to provide the desired number of crop trees per acre.
2. Bucking - Cutting thinning slash left in place into lengths as indicated by technical specifications and project map(s).
3. Chipping - Mechanically chipping and blowing chips back into thinned units as indicated by technical specifications and project map(s).
4. Conifer - A cone-bearing tree with needles or leaf scales (e.g., pine, fir, larch).
5. Created Slash - Debris created from work under this contract, including all cut trees and shrubs (tops, trunks, branches).
6. Crooked Trees - Trees with a sharp crook on the main bole, offset more than 6 inches from the longitudinal axis.
7. Crop Tree - Any tree that is selected or required to be left standing as provided in the specifications.
8. Cull Tree - Any severely damaged, deformed, or diseased tree (trees with broken tops, conks, any mistletoe and root rot infections, insect damage, and severe wounds).
9. Cut Tree - Trees designated to be removed from the stand.
10. Damage - Includes any defect or deformity of a tree resulting from agents such as wind, snow, animals, insects, disease, and equipment, and evidenced by such things as dead, forked or broken top or trunks, crooks, and deep scars.
RFP No. 1205M618R0006 2018-2019 PCT, LFR, Pullback, Lop, Scatter, and Handpile Page 6 of 100
11. DBH (Diameter breast height) - Diameter of the trunk measured at a point 4-1/2 feet above the ground level on the uphill side of tree.
12. Deficient Trees - Those crop trees cut which should have been left to maintain average spacing requirements; or trees not selected according to the technical specifications requirements; or trees that are excessively damaged by the thinning operation.
13. Excess Tree - A tree or live limb left uncut by the Contractor, which is designated within technical specifications to be cut; and, any cull tree not cut or girdled, as required in the technical specifications.
14. Existing Slash - Debris created prior to work under this contract. (Both natural and as a result of previous operations.)
15. Forked Tree - Tree with one or more forks in the live crown.
16. Fuel Break - An area within a thinned unit where thinning slash is removed or treated to reduce spread of fire to adjacent areas.
17. Girdling - A cut through the bark and cambium tissue completely encircling the tree trunk for the purpose of killing the tree.
18. Hang-up Tree - Any cut tree suspended more than 3 feet off the ground by a crop tree.
19. Hardwood - A tree with broad leaves rather than needles (e.g., willow)
20. Ladder Fuel Reduction (LFR) - To eliminate undesirable trees in the lower canopy layer that are a ladder fuel which would allow surface fires to transition into crown fires.
21. Leave Strip - An area within a thinned unit in which no cutting will be done to create a fuel break.
22. Live Limb - A woody stem with green needles growing from the trunk or main stem of a tree that exceeds 2 inches in length.
23. Lopping and Scattering - Cutting limbs from trunks of cut trees and moving and rearranging of slash concentrations to reduce the fuel bed height as specified.
24. Machine - Rotary type mowers, chippers or chain saws.
25. Minor Damage - Crooks in the trunk, which are, offset less than 6 inches from the long axis. Top or bark damage extending less than 1/4 the circumference of the tree.
26. Piling - Gathering and stacking of thinning slash by hand methods into piles constructed and located as incdicated by technical specifications and project maps.
27. Pullback - Pulling thinning slash by hand methods back into thinned unit to clear roadway, and ditch lines or into unit away from private land boundaries.
28. Pull-In - Pulling thinning slash by hand methods to edge of road with butt end of slash pointing toward road as indicated by technical specifications and project maps.
RFP No. 1205M618R0006 2018-2019 PCT, LFR, Pullback, Lop, Scatter, and Handpile Page 7 of 100
29. Pruning – Limbing branches back to the bole of the tree, severing the limb with ¼ inch of limb uncut outside the branch collar.
30. Roadway - The area between the outside edges of the fill slope and the back slope.
31. Shrub - A woody plant with no main stem, which does not usually grow higher than seven feet (brush). For example: buck brush.
32. Slash - Any vegetation that was cut by the Contractor.
33. Spacing - The horizontal distance from the trunk of one crop tree to the trunk of the next nearest crop tree.
34. Thinning - The cutting of trees in excess of those to be left for management.
35. Whip - A tree with less than 30 percent crown ratio.
C.8 GENERAL PERFORMANCE INFORMATION
The boundaries are breaks in timber type or major roads. Portions not following timber types are marked with pink flagging and orange boundary tags. It is the contractor’s responsibility to ask the government for boundary clarification. Maps illustrate approximate unit locations.
Inaccessibility due to snow, fallen trees, slides or washouts on roads may or may not be corrected at the option of the Government. If road access is blocked, the Government may, under the changes clause, (1) provide an alternate access route; (2) delete the inaccessible unit(s) or (3) substitute similar unit(s).
Unit map road symbols are only to indicate access to units and not to suggest the roads are open within units or for any further travel. Access to some units may require a walk-in.
Use of motorized equipment other than hand held equipment such as power saws and brush cutters will not be permitted off designated roads in the project area without approval of the Contracting Officer or as hereinafter provided.
C.9 SPECIFICATIONS
The following specifications are applicable on the Naches Ranger District to build stand diversity through Release/Weeding Treatments which promote the growth of earlier and mid-seral species, and also promote foraging habitat for elk and deer. As a general rule, Traditional spacing patterns will not be utilized in order to promote spatial variation within the stand. Instead a combination of thinning from below, and “release” of early/mid seral species to keep in the stand will be done.
Stump Height - Removal of Live Limbs All cut trees are to be cut below the lowest live limbs. All limbs shall be removed from the stump. if live limbs are attached to the stump it will be considered an excess tree. Hand loppers, hand operated "weed eater" machines or chain saws will be accepted to thin units. Pulling by physically and completely uprooting the excess tree is an acceptable means of thinning. A pulled tree shall be completely detached from the ground. Stump heights shall not exceed 5 inches above ground level or 4 inches above natural obstacles.
RFP No. 1205M618R0006 2018-2019 PCT, LFR, Pullback, Lop, Scatter, and Handpile Page 8 of 100
Felling Cut trees shall be felled away from unit boundaries, roads, 4X4 jeep trail #696, stock driveways, fence lines, established land corners, and streams. Any trees falling on such areas shall be removed as specified elsewhere herein.
Hang-Ups All thinning slash shall be placed on or near the ground surface, so that it will not lean against or be suspended by a crop tree.
Live limbs Cut trees with live limbs attached to the stump shall be considered excess trees.
Ladder Fuels Reduction Procedures The falling of trees in the 0”-7.0” inches DBH class. Work must be accomplished manually or manually with chainsaws. Work will take place within the units identified on the Detailed Unit Information Sheet. Ladder fuel reduction slash will be handpiled and covered.
Species exemption: 0”-7” western larch must be retained in ladder fuels reduction treatment areas.
The end result will be a stand with reduced ladder fuels in the 0”-7.” depending on class felled and cut up into sizes that will allow for hand piling (see hand piling specs). Ladder fuels slash will be bucked into pieces suitable for hand piling.
Technical Specifications
Ladder Fuels Reduction
The objectives of this treatment is to eliminate undesirable trees in the lower canopy layer that are a ladder fuel which would allow surface fires to transition into crown fires.
• Not to exceed 5-inch stump height.
• Flat topped reproduction due to suppression.
• Heavy crowned shade tolerant trees with branches close to the ground.
• Cut trees with poor vigor (live crown ratios < 40%).
• Cut unhealthy trees. Unhealthy trees display evidence of disease including dwarf mistletoe (brooms or sprouts) on ponderosa pine, lodgepole pine, Douglas fir or gall rust bole cankers on lodgepole pine, Douglas-fir or true firs > 40% defoliated.
• Retain all seedling and sapling western larch.
• Cut out all ladder fuels except where there is greater than (>50’) distance from residual stand thinned trees, so that at a minimum, after treatment there is a residual commercial thin tree or retained ladder fuel tree every 50’, where available.
Genetically Select Trees shall not be felled regardless of any diseases or damage that they may have.
Conifers which exceed 7.0 inches DBH shall not be felled. The exception is Ponderosa Pine, which will not exceed 9.0 inches DBH.
No hardwoods shall be felled.
No snags (dead trees) shall be felled.
RFP No. 1205M618R0006 2018-2019 PCT, LFR, Pullback, Lop, Scatter, and Handpile Page 9 of 100
Specific piling / lop and scatter task information
Contractor shall be required to perform the following tasks:
*Pile slash greater than 2” diameter *Refer to Detailed Unit Information Sheet(s) for Lop and scatter specifications for each unit.
Generally, the contractor shall lop and scatter in openings with few trees where possible.
* See Detailed Unit Information Sheet for priority selection of leave trees by species:
1. Douglas-fir (DF)
2. Englemann Spruce (ES)
3. Grand Fir (GF)
4. Lodgepole Pine (LPP)
5. Ponderosa Pine (PP)
6. Sub Alpine Fir (SAF)
7. Western Larch (WL)
8. White Pine (WWP)
9. Western Red Cedar (WRC)
10. Mountain Hemlock (MH)
11. Whitebark Pine (WBP)
Slash Treatment (See Attachment 3 – Exhibits A, B and C)
Daily Slash Treatment, All Items - Slash generated from each day’s work shall be removed from roadways, trails, ditches, and from the top of cut banks along all roads in the project area, even if not shown on project maps. This slash shall be pulled back by the end of each workday.
All slash between ¼” and 8” diameter and over 2 feet in length that is created from contract operations shall be piled. All existing slash between ¼” and 8” diameter and over 2 feet in length shall be piled.
Construction and Covering of Slash Piles
Construction of Piles - Piles shall be constructed as compactly as possible and placed with its long access up and down the hill slope. All material shall be bucked into pieces less than 5 feet in length. Piles shall be constructed with vertical sides and a base wide enough to keep them from toppling. Piles shall be constructed so the lower 25% of the pile consists of fuels 2 inches and smaller in diameter and sufficient fine fuels to act as kindling when piles are burned.
Location of Slash Piles - No piles shall be made in stream channels, roads, on private property boundaries/section lines or drainage ditches. Piles shall be a minimum of 5 feet away from the drip line of any leave tree. Slash piles shall be constructed a minimum of 5 feet from any stump or log greater than 20 inches in diameter, measured on the horizontal plane.
Special Piling Specifications - Unit 9 – all thinning and felling slash created within 66 feet of the east boundary shall be hand piled, with piles being located within the unit, and at least 66 feet from the east unit boundary.
Size of Piles – Standard pile size is 4 1/2 feet wide by 4 1/2 feet long by 4 1/2 feet tall. Pile size may increase by 1/2 a foot for each additional foot the pile is away from any crop tree. No pile size shall be greater than stated below. Minimum pile size is 4 feet wide by 4 feet long and 4 feet tall. The height of piles may increase without increasing the width and length of the piles.
RFP No. 1205M618R0006 2018-2019 PCT, LFR, Pullback, Lop, Scatter, and Handpile Page 10 of 100
Maximum Pile Size
Examples:
Distance from a crop tree drip line Adjusted pile size
5 feet 4 1/2 by 4 1/2 by 4 1/2 6 feet 5 by 5 by 5
8 feet 6 by 6 by 6 10 feet 7 by 7 by 7
Covering of Piles
The contractor shall cover all hand piles with waterproof material care shall be taken not to puncture the covering material. Two sheets of waterproof material shall be placed on the uphill side of the pile and no more than 1 foot from the top of the pile. Waterproof material shall be placed during construction when the pile is approximately 75 percent completed. The waterproof material shall then be secured with slash material when the remaining 25 percent of the pile is completed. This will assure that it the waterproof material is not affected by wind and will protect the majority of the pile from rain and snow. The width of the covering shall be at least 4 feet.
C.10 MEASUREMENT/ QUALITY CONTROL/SELF INSPECTION
Measurements
1. All linear and area measurements under this contract shall be on the horizontal plane.
2. Remeasurement
a. The contractor may at any time after award request remeasurement of any treatment area. The request for remeasurement must be in writing within 10 days after thinning has been completed on the sub-item. Remeasurement will be made within the established boundaries.
b. If remeasurement indicates a variance of five (5) percent or less from the original measurement, the Contractor shall pay for the actual cost of remeasurement and no adjustment will be made in the acreage.
c. If remeasurement indicates a variance greater than five (5) percent, payment will be based on the remeasured acreage and the Government will pay for the remeasurement. No adjustments will be made for a difference of 1 acre or less.
Contractor Quality Control Plan
The Contractor shall provide a Quality Control Plan as part of the proposal. The Quality Control Plan must demonstrate how the Contractor shall assure that quality of performance meets the objectives and requirements of the contract. The quality Control Plan shall specify:
(a) How quality will be monitored and reported to the Contracting Officer to assure the performance standards are met.
(b) How the work will be supervised.
(c) How results of the monitoring will result in quality performance.
(d) Who will be responsible for performing quality control.. How quality will be monitored and reported to the Contracting Officer to assure the performance standards are met.
(e) How work will be inspected.
(f) What type of equipment the Inspector will use to do the inspection.
(g) The supervision of the work.
RFP No. 1205M618R0006 2018-2019 PCT, LFR, Pullback, Lop, Scatter, and Handpile Page 11 of 100
(h) Personnel who will be performing the quality control. Indicate whether persons who will conduct inspections will have other responsibilities (supervision, production work, etc.).
Contractor Certification – Contractor Inspection of Pre-commercial Thinning
For each completed unit, the contractor must furnish a certification of quality assurance. By his or her signature on the inspection report, the contractor certifies that all of the treatments outlined for the specific unit listed in the Schedule of Items have been completed, and that all work complies with the technical specifications set forth in Section C. Only after receiving written certification will the Government performs the final inspection of a work item.
The contractor may opt for a self-inspection process that involves a taking plot data along a systematic grid.
Should the contractor wish more information about this method, details will be offered by the Contracting Officer upon request.
C.11 GOVERNMENT VERIFICATION/PAYMENT
Government Quality Assurance - Government Inspection
The Government has the right to inspect and test all services called for by the contract, to the extent practicable at all times and places during the term of the contract. The Government shall perform inspections and tests in a manner that will not unduly delay the work. The contractor or a designated representative is encouraged to be on hand when Government inspections are being made.
Final acceptance will be determined by a 100 percent visual inspection of the areas requiring treatment and will be based on adherence to the requirements stated in the Detailed Unit Information Sheet. Nonconformance with any of the specifications will classify the treatment as unsatisfactory and rework will be required to bring the treatment up to specifications standards at no increase in contract amount.
When the defects in services cannot be corrected by re-performance, the Government may--
(1) Require the Contractor to take necessary action to ensure that future performance conforms to contract requirements; and
(2) Reduce the contract price to reflect the reduced value of the services performed.
If the Contractor fails to promptly perform the services again or to take the necessary action to ensure future performance in conformity with contract requirements, the Government may—
(1) By contract or otherwise, perform the services and charge to the Contractor any cost incurred by the Government that is directly related to the performance of such service; or
(2) Terminate the contract for default.
Acceptance - Acceptance of the work under this contract will be made when the Contracting Officer has made the determination of satisfactory compliance with the specifications and the Contracting Officer approves contract payment(s).
RFP No. 1205M618R0006 2018-2019 PCT, LFR, Pullback, Lop, Scatter, and Handpile Page 12 of 100
Government Furnished Property and Services
The Government will provide the following item(s) of Government property to the Contractor for use in the performance of this contract. This property shall be used and maintained by the Contractor in accordance with the provisions of the “Government Property” FAR clause contained elsewhere in the contract, if applicable.
Item Description Where, When, How
Project Maps Maps of unit areas with access roads. 1 Fireman’s Map. Located in Section J.
Access Roads
Most access roads are accessible by 2 wheel drive vehicle. 4-wheel drive may be needed. The Contractor is responsible for clearing down trees from access roads.
Access Behind Locked Gates
Some areas are behind Forest road closures (locked gates).
Contractor will provide locks for gated roads, unless walk-ins are required.
Lock provided by the Contractor.
Contractor Furnished Critical Items and Services
A. The Contractor shall furnish everything required to perform this Performance Work Statement. The Contractor shall furnish all labor, equipment, supervision, transportation, supplies and incidentals except those specifically listed as Government-furnished property. Examples of supplies include the following, but are not limited to:
1. Chainsaws
2. Diameter Tape
3. Azimuth Compass
4. Logger’s tape.
5. Pruning Shear or Loppers
6. Lock for Gated Roads
B. The Contractor shall provide tools, transportation and sufficient workforce to complete the contract in the specified time. The Contractor shall also have, at all times of contract performance, a properly designated representative that understands and speaks fluent English. Contractor shall also provide proof of a Washington State Farm Forest Labor license and proof of Migrant and Seasonal Agricultural Worker Protection Act Registration.
C. The Contractor shall provide a Quality Control Plan (QCP) in their proposal as described in this solicitation/task order. The Quality Control plan must demonstrate how the Contractor will assure quality meets the requirements and specifications of the contract. It shall describe: how quality will be monitored to assure the performance standards are met; the supervision of crew and work; and personnel that will be performing the quality control. Quality control shall include monitoring quality while work is in progress, tree care, and other associated tasks, and using an unbiased sample of work and determining actual quality percentage.
RFP No. 1205M618R0006 2018-2019 PCT, LFR, Pullback, Lop, Scatter, and Handpile Page 13 of 100
D. Contractor shall have in his/her employ, inspectors with at least one year of experience in thinning Forest Service trees and who are adequately trained in the required inspection procedures.
Payments, Incentives and Deductions
A. Request for Payment
Contractor may request payment when Quality Assurance (QA) results indicate a pay item has been satisfactorily completed.
B. Payment
1. When Contractor's inspection (QA) percentage and the Government's verification inspection (V-I) are both above ninety percent, or, when the Contractor's QA is greater than ninety percent and Government's V-I is +/- five percent, payment will be made at 100% of the sub-item unit bid price.
2. When the Contractor's QA inspection is less than 90 percent and the Government's VI is +/- five (5) percent, including incidental work, payment will be made at the Contractor's QA inspection percentage. Note:
Minimum acceptable quality is 80 percent.
3. When the Government's V-I differs by more than +/- five percentage points of the Contractor's QA, the Government may take more V-I plots up to the number taken by the Contractor, and payment will be made at the Government's V-I percentage unless re-thin or re-prune, reverification, or both occur.
4. If reverification yields a result within +/- five percent of Contractor's QA results, payment will be based upon Contractor's QA results.
5. If reverification results are more than +/- five percent of Contractor QA results, payment will be based upon the Government's reverification percentage, less re-inspection costs.
6. Reverification of any re-thin or re-prune shall be at the expense of the Contractor.
7. Pull back, bucking, lopping and scattering, girdling and fence repairs shall be considered incidental to thinning and no separate payment will be made at the unit price.
Contractor’s Quality Control Plan and Government Verification and Quality Assurance Surveillance Plan
Contractor Quality Control Plan
A. Quality Control Plan. The Contractor shall provide a Quality Control Plan (QCP) as part of this Technical Proposal. The Contractor shall supplement the QCP within 10 days of contract award or start work, based on items awarded to the Contractor and Government comments. The Plan must demonstrate how the Contractor will assure that quality of performance meets the objectives and requirements of the contract. The QCP shall specify:
1. How quality will be monitored to assure performance standards are met.
2. How the work will be supervised.
3. How results of the monitoring will result in quality performance.
4. Identify the personnel responsible for performing quality control.
RFP No. 1205M618R0006 2018-2019 PCT, LFR, Pullback, Lop, Scatter, and Handpile Page 14 of 100
B. Contractor Quality Control Inspection. The Contractor shall assure themselves that performance meets contract specifications, in accordance with Inspection/Acceptance (FAR 52.212.4) paragraph (a), prior to requesting the Government to inspect for payment or acceptance. Upon completion of plot cards, the Contractor shall contact the Contracting Officer to set a mutually agreed upon date for inspection of completed work. The Contracting Officer may observe the Contractor’s inspection at any time and shall otherwise have unlimited access to the inspection data.
C. Standards for Contractor Inspection
1. Contractor shall inspect all work performed, concurrently with each day's work.
2. A daily written record shall be prepared and, upon request, shall be made available to the Government.
3. As a minimum, Contractor record shall show rate of progress compared to required rate of progress as required.
D. Quality Assurance (QA) Requirements - Contractor Inspection
The Contractor’s Quality Control Plan must address the Contractor’s Plot Inspection Procedures. Below is a guideline for the Contractor Plot Inspection Procedure. If the Contract’s Plot Inspection procedures vary from these procedures, the Contractor must state the revision in their Quality Control Plan submitted with their quote and these maybe modified.
Government Quality Assurance Surveillance Plan and Acceptance Requirements
The objective of this plan is to provide a quality surveillance plan for tree thinning treatment performed on the Cle Elum and Naches Ranger Districts, Okanagan Wenatchee National Forest. This plan provides a basis for Contracting Officer to evaluate the quality of the Contractor’s performance. The oversight provided for in the contract and in this plan will help ensure that quality levels reach the required levels of performance.
A. Government Quality Assurance Inspection. The Government will, at its convenience, make periodic visual inspections of the work to assure itself of contract compliance and to perform Quality Assurance Inspections to determine or confirm that the Contractor is performing quality control in accordance with its QCP and that Contractor monitoring results in quality performance of contract objectives.
B. Government Verification Inspection (V-I).
1. The Government will conduct verification inspections of thinning to determine compliance with specifications. Each sub-item will be verified separately and inspection results on one sub-item will not be averaged with those of other sub-items. Determination of the acceptability of the work performed will be based on V-I and will be considered conclusive. The Contractor or a designated representative is encouraged to observe V-I being made.
2. Inspection of Pre-commercial Thinning, Ladder Fuel Reduction, Handpiling, Lop and Scatter and Pullback treatment is 100% visual inspection.
Acceptance will be determined by a 100 percent visual inspection of the areas requiring treatment and will be based on adherence to the requirements stated in the Technical Specifications and Detailed Unit Information Sheet (also referred to as the Performance Requirement Summary Sheet) of each task order. Nonconformance with any of the Specifications will classify the treatment as unsatisfactory and rework will be required to bring the treatment up to Specifications standards.
RFP No. 1205M618R0006 2018-2019 PCT, LFR, Pullback, Lop, Scatter, and Handpile Page 15 of 100
3. Government V-I will be completed within 72 hours, not including Saturday, Sunday, or holidays, after Contractor inspection is completed, and completed plot cards are submitted to the Contracting Officer for the sub-item.
4. Contractor Requested Reinspection:
1. The Contractor may accompany the Government inspector during the reinspection.
2. The results of this reinspection will supersede the original inspection for determining acceptability and payment.
3. If reinspection does not result in an additional payment for the Contractor, the Contractor must pay for the reinspection.
Re-thin, re-Ladder Fuel Reduction, re-handpile, re-Lop and Scatter and re-pullback the sub-item:
1. Re-thin may be allowed if excess trees exist.
2. Re-thin shall require re-inspection by the Contractor and reverification by the Government in the same manner as the first inspection.
C. Minimum Acceptable Quality
The minimum acceptable quality for thinning is 80 percent whether it be Contractor QA or Government VI.
Repeated failure to achieve 80 percent quality or above shall be grounds for Termination for Cause.
D. Rework and Reinspection after Rework
When inspection results are below 90 percent and excess trees constitute any part of the deficiency, payment shall not be made until the excess tree deficiency has been corrected (see definition of Excess Tree in section C, Technical Definitions) and the Contractor has assured his/her Quality Control measures have corrected the deficiencies. Re-inspections after rework shall be made in the same manner as the first inspection for both the Contractor and the Government, but on different plot lines. The Contractor shall pay for Government verification of inspection necessitated by the rework.
E. Acceptance
Acceptance of the work under this contract will be made when the Contracting Officer has made the determination of satisfactory compliance with the specifications and the Contracting Officer approves contract payment(s).
RFP No. 1205M618R0006 2018-2019 PCT, LFR, Pullback, Lop, Scatter, and Handpile Page 16 of 100
SECTION D – PACKAGING AND MARKING
D.1 MARKING REQUIRED ON OFFICIAL CORRESPONDENCE
The government singularly identifies each project with a contract number at time of award. The contract number is a unique identifier to purposely and permanently represent an awarded project. The government issued contract number shall be be referenced by the contractor on all official communications to the government, e.g.
letters, certified payrolls, e-mails, submittals, etc., starting upon notice of award.
RFP No. 1205M618R0006 2018-2019 PCT, LFR, Pullback, Lop, Scatter, and Handpile Page 17 of 100
SECTION E – INSPECTION & ACCEPTANCE
E.1 GOVERNMENT QUALITY ASSURANCE
The government will, at its convenience, make periodic inspections of the work to assure itself of contract compliance and to perform quality assurance inspections to confirm that the contractor is performing quality control in accordance with its Quality Control Plan (QCP) and that contractor monitoring results in performance of contract objectives.
RFP No. 1205M618R0006 2018-2019 PCT, LFR, Pullback, Lop, Scatter, and Handpile Page 18 of 100
SECTION F – DELIVERIES OR PERFORMANCE
F.1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
https://www.acquisition.gov/?q=browsefar
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.211-18 Variation in Estimated Quantity (APR 1984) 52.242-17 Government Delay of Work (APR 1984)
F.2 FAR 52.211-8 TIME OF DELIVERY (JUN 1997), ALTERNATE I (APR 1984)
(a) The Government requires delivery to be made according to the following schedule:
REQUIRED DELIVERY SCHEDULE
ITEM NO. QUANTITY WITHIN DAYS AFTER DATE OF CONTRACT
All 001 --- Line and Sixty-Seven (67) Calendar Days Items Option A ---
The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required delivery period specified above, will be considered nonresponsive and rejected. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an offeror offers an earlier delivery schedule than required above. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.
OFFEROR’S PROPOSED DELIVERY SCHEDULE
ITEM NO. QUANTITY WITHIN DAYS AFTER DATE OF CONTRACT
All 001 ---
Line and
Items Option A ---
(b) The delivery dates or specific periods above are based on the assumption that the Government will make award by July 16, 2018. Each delivery date in the delivery schedule above will be extended by the number of calendar days after the above date that the contract is in fact awarded. Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed or otherwise furnished to the successful offeror results in a binding contract. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the Contracting Officer through the ordinary mails.
RFP No. 1205M618R0006 2018-2019 PCT, LFR, Pullback, Lop, Scatter, and Handpile Page 19 of 100
F.3 FAR 52.242-15 STOP-WORK ORDER (AUG 1989)
(a) The Contracting Officer may, at any time, by written order to the Contractor, require the Contractor to stop all, or any part, of the work called for by this contract for a period of 90 days after the order is delivered to the Contractor, and for any further period to which the parties may agree. The order shall be specifically identified as a stop-work order issued under this clause. Upon receipt of the order, the Contractor shall immediately comply with its terms and take all reasonable steps to minimize the incurrence of costs allocable to the work covered by the order during the period of work stoppage. Within a period of 90 days after a stop-work is delivered to the Contractor, or within any extension of that period to which the parties shall have agreed, the Contracting Officer shall either—
(1) Cancel the stop-work order; or
(2) Terminate the work covered by the order as provided in the Default, or the Termination for
Convenience of the Government, clause of this contract.
(b) If a stop-work order issued under this clause is canceled or the period of the order or any extension thereof expires, the Contractor shall resume work. The Contracting Officer shall make an equitable adjustment in the delivery schedule or contract price, or both, and the contract shall be modified, in writing, accordingly, if—
(1) The stop-work order results in an increase in the time required for, or in the Contractor’s cost properly allocable to, the performance of any part of this contract; and
(2) The Contractor asserts its right to the adjustment within 30 days after the end of the period of work stoppage; provided, that, if the Contracting Officer decides the facts justify the action, the Contracting Officer may receive and act upon the claim submitted at any time before final payment under this contract.
(c) If a stop-work order is not canceled and the work covered by the order is terminated for the convenience of the Government, the Contracting Officer shall allow reasonable costs resulting from the stop-work order in arriving at the termination settlement.
(d) If a stop-work order is not canceled and the work covered by the order is terminated for default, the Contracting Officer shall allow, by equitable adjustment or otherwise, reasonable costs resulting from the stop-work order.
RFP No. 1205M618R0006 2018-2019 PCT, LFR, Pullback, Lop, Scatter, and Handpile Page 20 of 100
SECTION G – CONTRACT ADMINISTRATION DATA
G.1 INVOICE PROCESSING PLATFORM (IPP)
The "Submit Invoice-to" address for USDA contracts is the Department of Treasury's Invoice Processing Platform (IPP). The contractor must follow the instructions on how to register and submit invoices via IPP. All invoices are to be submitted via the electronic Invoice Processing Platform. This is a mandatory requirement initiated by the U.S. Department of Treasury and you can find more information at this website https://www.ipp.gov/index.htm. Please make sure that your company has registered at https://www.ipp.gov/vendors/enrollment-vendors.htm to establish your account. Failure to do so will prevent the Forest Service from processing your invoices for payment. If you require assistance with the IPP website, please contact the IPP Customer Support at (866) 973-3131.
G.2 SYSTEM OF AWARD MANAGEMENT (SAM) REQUIREMENT
Contract award cannot be made to a Contractor not registered in the System of Award Management (SAM). In addition, the Contractor’s Representations and Certifications must be listed in the SAM database. Reference https://www.sam.gov/portal/public/SAM/. Note: There is no fee to register and use this site. The Contractor must maintain an active account in SAM during the life of this contract. Invoices will be paid using the financial information provided in the Contractor’s SAM profile and failure to keep an active status may result in payment / administrative delays.
G.3 AGAR 452.215-73 POST AWARD CONFERENCE (NOV 1996)
A post award conference with the successful offeror is required. It will be scheduled after the date of contract award. The conference will be held at a mutually agreeable location determined by the Forest Service and the Contractor.
G.4 POST AWARD CONFERENCE NOTES
During the post award conference, the Contractor shall meet with the Government to discuss contract terms and work performance requirements, Work Progress Schedule, and Fire Prevention and Suppression plans. The Contractor-designated representative or foreman and the Contractor’s inspector (whomever the Contractor will have on the site) must be present at the post award conference.
G.5 DESIGNATION OF CONTRACTING OFFICER'S REPRESENTATIVE (COR)
a. The Contracting Officer will designate a representative (or representatives), hereinafter referred to as the Contracting Officer’s Representative (COR) who will provide on-the-ground administration for the Government. The COR will be designated in writing and a copy of the designations will be furnished to the Contractor before or at the post award conference. The Contractor is cautioned to read the COR designation(s) because certain authority under the contract is reserved solely for the Contracting Officer. The term “Contracting Officer” as used through the Specifications, shall be interpreted in include the Contracting Officer’s designated representative (s) acting within the limits of their delegations of authority.
b. The COR does not have authority to make any commitments or changes that affect price, quality, quantity, delivery or other terms and conditions of the contract nor in any way direct the contractor or its subcontractors to operate in conflict with the contract terms and conditions. The COR cannot redelegate their authority to another person.
RFP No. 1205M618R0006 2018-2019 PCT, LFR, Pullback, Lop, Scatter, and Handpile Page 21 of 100 https://www.ipp.gov/index.htm https://www.ipp.gov/vendors/enrollment-vendors.htm https://www.sam.gov/portal/public/SAM/
Any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the Government unless formalized by a proper contractual documents executed by the Contracting Officer prior to completion of the contract.
c. The Contracting Officer should be informed as soon as possible of any actions or inactions by the Contractor or the Government which will change the required delivery or completion times…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.