Amendment_02.pdf

PDF 3 MB Posted

Attached to
2018-2019 Naches Ranger District PCT, LFR, HP, LP, and PB
Solicitation number
1205M618R0006
Issued by

About this file

Add Georeferenced Map

View the file

Other files

File Type Posted
Amendment_01.pdf PDF
RFP_No_1205M618R0006.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OMB Control No. 2120-0595 (SF-30) FAA Template No. 11 (Reverse) (8/97)

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

1 2

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

02 6/11/2018

6. ISSUED BY 7. ADMINISTRATED BY (If other than Item 6)

USDA Forest Service Mt. Baker-Snoqualmie National Forest Attn: Brian A. Johnson, CO 2930 Wetmore Ave., Suite 3A Everett, WA 98201

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NO.

1205M618R0006

9B. DATED (SEE ITEM 11)

6-5-2018

10A. MODIFICATION OF CONTRACT/ORDER NO.

*TO BE COMPLETED BY VENDOR IF NOT COMPLETE 10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended is not extended.

NOTE: If offers are handcarried, additional time should be allowed to access the depository facility due to heightened security requirements.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Item 8 and 15, and returning 1 copies of the amendment; (b) acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hours and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required) N/A

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS, IT MODIFIES THE CONTRACT/ORDER NO.

AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT/ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return ___ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

1. The purpose of Amendment 02 is to include the georeferenced map under Section J, Attachment 1, Project Maps.

2. All other terms and conditions of the solicitation remains unchanged.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Brian A. Johnson 15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY

(Signature of person authorized to sign)

BY

(Signature of Contracting Officer) 6-11-2018

PART III – SECTION J

CONTRACT EXHIBITS AND ATTACHMENTS

J.1 LIST OF ATTACHED DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following attachments are made a part of this solicitation and any resultant contract:

Attachment Number / Description Total Pages

1. Project Maps 2

2. Detailed Unit Information Sheet 1

3. Exhibits A, B and C 3

4. Units 1-9 Prescriptions 28

5. Fire Protection and Suppression (Eastside) Form R6-FS-6300-52 (5/97) 6

6. Wage Determination – Service Contract Act (SCA) 4

RFP No. 1205M618R0006 2018-2019 PCT, LFR, Pullback, Lop, Scatter, and Handpile Page 38 of 100

(Amendment 02 - Add Georeferenced Map) bajohnson03 Highlight bajohnson03 Highlight bajohnson03 Highlight

PROPERTY BOUNDARY

1601232

1600645

1603000

1605000

1600220

1600281

1600217

1601242

1601243

1600216

1600214

1603635

1631670

1600650

1603260

1603255

1603637

1600620

1603645

1603267

1600625

1615645

1631248

1600283

(13 1 a cre s)

(24 ac res

Dr y-N ell i P

CT

C on tra ct Ar ea

Le ge nd Dr yN ell iPC

T_ Un its

FS

_S ys tem Rd s_ Na ch es

Na ch es

RD

Ü

Amendment 02 (Add this page to Section J - List of Attachments, Attachment 1 - Project Maps (2 Pages) bajohnson03 Highlight

2018-06-11T14:33:46-0700
BRIAN JOHNSON

File details come from the government source that posted it.