1205K320R0006_MSHNVM Foundation Prep_Amendment01_SF30.pdf
PDF 407 KB Posted
- Attached to
- MSHNVM Foundation Preparation and Backfiling Federal contract opportunity
- Solicitation number
- 1205K320R0006
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 1205K320R0006_MSHNVM Foundation Prep_Amendment02_SF30.pdf | ||
| 1205K320R0006_MSHNVM Foundation Prep_.pdf | ||
| General Decision Number WA2020_HEAVY.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
1205K320R0006 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
05K3
VANCOUVER WA 98661
501 E 5TH STREET 404
GIFFORDPINCHOT NATIONAL FOREST
USDA FOREST SERVICE
101512309/18/2020
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
09/15/2020
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
STEVONNE FULLER
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
MSHNVM Foundation Preparation - Amendment 01 to provide answers to Contractor questions.
Solicitation closing date remains September 25, 2020 1230 PT.
Delivery Location Code: 0E22
MOUNT ST HELENS NATIONAL VOLCANIC
42218 NE YALE BRIDGE ROAD
AMBOY WA 98601 US
FOB: Destination
Period of Performance: 10/19/2020 to 05/26/2021
Continued ...
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
TEL: EMAIL: 360-891-5085 stevonne.fuller@usda.gov
1205K320R0006 - MSHNVM Foundation Preparation Amendment 01 - Questions and Answers:
• Q1: If the optional item (Lava Beds) is selected, would the 11/6/20 hold true for all three stations?
o Answer 1: Yes. All toilets will be installed at the same time/day/trip for CXT and the truck haulers. It may take two days, but they plan on the actual crane being on site for one day total for all of the sites. Note, this is in reference to all site: BASE (Kalama and Marble Mountain) and OPTIONAL (Lava Canyon).
• Q2: Will the stations be installed simultaneously, or will we be able to sequence them with a single crew?
o Answer 2: The crane will go to one place, install, and then move to another place. It should all take place in one day. The worst case it that it will take CXT two days. This contract required all foundations to be prepared and approved by 11/6.
• Q3: For the FS installation of the vault and station, will the contractor be required to backfill after the vault installation but prior to installation of the station, and if so, what are the time requirements?
o Answer 3: CXT will not backfill. The contract that you are bidding on is responsible for preparing the foundations and also backfilling once CXT has placed the vaults and the toilets. CXT will place the vaults and then immediately place the toilet structure on the vaults. The contract that you are bidding on will NOT be required to backfill the vault prior to the placement of the toilet structure on the vaults.
• Q4: After setting of the comfort stations, how long will the contractor be required to maintain temp port‐a‐potties until they are open to the public?
o Answer 4: Once the new CXT toilets have been installed, and the FS has approved the structures (typically within a few days), and the backfilling has been accomplished and approved for this contract, then the public can begin to use the CXT toilets. The porta‐ potties can be removed from the site during the winter months, and returned if necessary, during the months of April/May (depending on snow levels and access to the sites). Some sites will require asphalt paving, which if not paved until April/May, may require the contractor to provide safe access to the CXT toilets by placement of gravel along saw cuts or other edges where tripping can occur. Note, porta‐potties are not items that are directly paid for.
• Q5: Can this bid be emailed?
o Answer 5: Yes, Email offers are accepted. Email offers to stevonne.fuller@usda.gov.
Note: It is the responsibility of the Contractor to confirm offer has been received.
• Q6: Do you require a bid bond?
o Answer 6: Yes. Please refer to page 29 of the solicitation.
• Q7: I have not found an instructions to bidders that confirms all the required documents for a complete bid package, ie. is the 52.204-8 Annual Representatives and Certifications required in addition to the SF 1442, bid schedule, and bid guarantee on SF 42?
o Answer 7: Please refer to section K-4 for FAR 52.204-8, Section L-4 for technical proposal instructions and section M for evaluation criteria.