J-2_Standard_Specification_Index.pdf
PDF 425 KB Posted
- Attached to
- Forest Road 29 MP 15. 7 Culvert Replacement, With Option Items Federal contract opportunity
- Solicitation number
- 1205G219R0001
About this file
J-2 Standard Specifications Index
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| J-7_DOL_Wage_Determination_WA190001_02152019_abbr..pdf | ||
| J-4_Rd_29_MP_15.7_Plans.pdf | ||
| J-9_Bid_Bond_SF24.pdf | ||
| J-10_Payment_Bond_SF_25a.pdf | ||
| J-6_WDFW__USFS_MOU_2012_Combined_Executed.pdf | ||
| J-3_Supplemental_Specifications.pdf | ||
| J-1_Definition_and_Acronyms.pdf | ||
| J-8_Fire_Plan.pdf | ||
| J-11_Performance_Bond_SF_25.pdf | ||
| J-5_Rd_29_MP_16_Plans.pdf | ||
| Sol_No_1205G219R0001.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
J.2 Standard Specification Index
STANDARD SPECIFICATIONS
FOR CONSTRUCTION OF
ROADS AND BRIDGES
ON FEDERAL HIGHWAY PROJECTS
FP-03
US CUSTOMARY UNITS
Project
Name:
FSR 29 M.P. 15.7 and 16.0 Culvert
Replacement(s)
Date: 3/14/2019
Title Revised
Date
M.P.
15.7
Preface 03/15/2004 X
100 General Requirements X
101 - Terms, Format, and Definitions X
00 FLH FP-03 Corrections 07/25/2005 X
01 Meaning of Terms 01/22/2009
01 Meaning of Terms 01/22/2009 X
03 Abbreviations and Symbols 06/16/2006 X
04 Symbols 03/29/2007 X
04 Definitions 11/06/2007
102 - Bid, Award, and Execution of Contract X
00 Delete 102 in its entirety 02/16/2005 X
103 - Scope of Work X
00 Intent of Contract 02/16/2005 X
104 - Control of Work X
00 Deletions to 104 06/16/2006 X
03 Specifications and Drawings 02/22/2005
03 Specifications and Drawings 01/22/2009
03 Specifications and Drawings 02/22/2005
06 Use of Roads by Contractor 02/17/2005 X
07 Other Contracts 02/17/2005 X
105 - Control of Material X
02 Material Sources 02/17/2005
02 Material Sources 02/17/2005
02 Material Sources 01/18/2007 X
02 Material Sources 02/17/2005
02 Material Sources 02/17/2005 X
02 Government-provided sources 03/29/2005
02 Contractor-provided material sources 03/08/2007 X
05 Use of Material Found in the Work 05/12/2004 X
106 - Acceptance of Work X
01 Conformity with contract requirements 01/17/2013 X
01 Conformity with contract requirements 07/31/2007
07 Partial and Final Acceptance 05/11/2004 X
107 - Legal Relations and Responsibility To the Public X
02 Protection and Restoration of Property and
Landscape
02/17/2005
05 Responsibility for Damage Claims 05/11/2004 X
06 Contractor Responsibility for Work 06/16/2006 X
08 Sanitation, Health, and Safety 05/11/2004
08 Sanitation, Health & Safety 03/29/2005
09 Legal Relationship of the Parties 06/16/2006 X
10 Environmental Protection 06/16/2006 X
11 Protection of Forests, Parks, and Public Lands 02/17/2005
108 - Prosecution and Progress X
00 Delete Section 108 in entirety 02/16/2005 X
109 - Measurement and Payment X
00 Deletions 02/17/2005 X
02 Measurement Terms and Definitions 06/16/2006 X
03 Weighing Procedures and Devices 02/17/2005
03 Weighing Procedures and Devices 03/29/2005
150 Project Requirements X
151 – Mobilization X
03 Payment 08/05/2005
152 - Construction Survey and Staking X
00 Construction Survey and Staking 08/05/2005 X
153 - Contractor Quality Control X
02 Contractor Quality Control Plan 02/17/2005 X
04 Records 10/24/2007 X
154 - Contractor Sampling and Testing X
01 Description 05/24/2005 X
155 - Schedules for Construction Contracts X
00 Contractor Quality Control Plan, Records 05/11/2004 X
156 - Public Traffic X
00 Complete specification 04/17/2007 X
03 Accommodating Traffic During Work 02/24/2005 X
04 Maintaining Roadways During Work 02/24/2005
08 Traffic and Safety Supervisor 02/24/2005
157 - Soil Erosion Control X
03 General 02/24/2005 X
170 - Develop Water Supply and Watering
00 Complete Specification 03/30/2005
171 - Weed and Disease Prevention X
00 Complete Specification 03/30/2005 X
183 - P Line Survey
00 Complete Specification 03/30/2005
185 - Low Volume Road Design
00 Complete Specification 02/24/2005
200 Earthwork X
201 - Clearing and Grubbing X
00 Deletions 08/05/2009 X
01 Description 02/18/2005 X
04 Clearing 02/18/2005
04 Clearing 02/22/2005 X
04 Clearing 03/03/2005
06 Disposal 02/18/2005
06 Disposal 02/23/2005
06 Disposal 02/23/2005
06 Disposal 11/04/2004
06 Disposal 05/12/2004
06 Disposal 11/09/2005 X
203 - Removal of Structures and Obstructions X
01 Description 02/25/2005 X
02 Material 02/18/2005
04 Removing Material 02/18/2005 X
05 Disposing of Material 02/24/2005
05 Disposing of Material 02/18/2005 X
05 Disposing of Material 02/18/2005
08 Payment 02/24/2005 X
204 - Excavation and Embankment X
00 Complete Specification 03/26/2009 X
05 Conservation of Topsoil 02/18/2005
06 Roadway Excavation 03/02/2005
06 Roadway Excavation 03/02/2005
06 Roadway Excavation 03/02/2005
09 Preparing Foundation for Embankment
Construction
03/02/2005
10 Embankment Construction 03/02/2005
11 Compaction 04/11/2005
13 Sloping, Shaping, and Finishing 03/02/2005
13 Sloping, Shaping, and Finishing 03/02/2005
14 Disposal of Unsuitable or Excess Material 03/02/2005
15 Acceptance 02/07/2007
205 - Rock Blasting
02 Regulations 05/13/2004
06 Preblast condition survey and vibration monitoring and control
05/12/2004
07 Test Blasting 05/12/2004
08 Controls 05/12/2004
209 - Structure Excavation and Backfill X
00 Complete Spec. 209A; Exc & Backfill for selected Minor Structures. NOT a Replacement for 209.
03/24/2008
10 Backfill 10/23/2007 X
11 Compacting 02/24/2005 X
211 – Roadway Obliteration
01 Description 03/30/2005
01 Description 03/30/2005
02 Construction Requirements 02/25/2005
212 – Linear Grading
00 Complete Specification (composite road construction)
05/19/2005
213 – Subgrade Stabilization
02 FLH FP-03 Correction metric 09/06/2005
250 Structural Embankments X
251 – Riprap X
03 General 06/18/2007 X
252 – Special Rock Embankment and Rock Buttress
02 Material – Placing Rock 05/13/2004
255 – Mechanically Stabilized Earth Walls
02 Material – Acceptance 02/25/2005
262 – Reinforced Soil Embankment
00 Complete Specification 05/14/2004
01 Table 262-1 Sampling & Testing
Requirements
05/14/2004
300 Aggregate Courses X
301 – Untreated Aggregate Courses
00 Title Change 03/03/2005
01 Work 03/03/2005
02 Material 05/16/2005
03 General 09/14/2005
04 Mixing and Spreading 03/03/2005
05 Compacting 05/17/2005
06 Surface Tolerance 03/03/2005
08 Acceptance 03/03/2005
08 Acceptance 03/03/2005
08 Acceptance 03/30/2005
09 Measurement 07/07/2005
10 Payment 03/03/2005
302 - Treated Aggregate Courses
00 Deletes 302 in its entirety 02/16/2005
03 FLH FP-03 Corrections metric 08/12/2004
303 - Road Reconditioning
01 Description 03/02/2005
06 Aggregate Surface Reconditioning 05/17/2005
07 Roadway Reconditioning 03/02/2005
11 Measurement 03/29/2005
306 - Dust Palliative
03 General 03/02/2005
04 Preparation and Application 03/02/2005
06 Acceptance 03/02/2005
10 Table 306-1 Sampling & Testing 03/02/2005
320 - Stockpiled Aggregates
00 Complete Specification 03/02/2005
321 - Major Aggregate Courses
00 Complete Specification 12/19/2005
322 - Minor Aggregate Courses
00 Complete Specification 10/14/2011
324 – Minor Aggregate, Commercial Source
00 Complete Specification 08/28/2008 X
400 Asphalt Pavements and Surface Treatments
401 - Superpave Hot Asphalt Concrete Pavement
01 FLH FP-03 Correction metric uscu 08/12/2004
04 FLH FP-03 Correction uscu 08/12/2004
402 - Hot Asphalt Concrete Pavement by Hveem or Marshall Mix
Design Method
03 FLH FP-03 Correction metric uscu 08/12/2004
403 - Hot Asphalt Concrete Pavement
06 Surface Preparation 05/17/2005
16 Pavement Smoothness & Testing 03/02/2005
17 Acceptance 03/02/2005
17 Acceptance 03/02/2005
404 - Minor Hot Asphalt Concrete
02 Composition of Mix (Job-Mix Formula) 03/02/2005
04 Weather Limitations 03/02/2005
06 Placing 03/02/2005
07 Compacting (a) 03/02/2005
07 Compacting (b) 03/02/2005
09 Acceptance 03/02/2005
409 - Asphalt Surface Treatment
02 Material 05/12/2004
06 Weather, date, time 05/12/2004
08 Application 06/21/2005
10 FLH FP-03 Corrections uscu 08/12/2004
11 table409-2 12/18/2004
12 FLH FP-03 Correction uscu 08/12/2004
13 Acceptance & Testing 05/13/2004
411 - Asphalt Prime Coat
06 Application 05/12/2004
414 - Asphalt Pavement Crack and Joint Sealing
02 Material 05/12/2004
05 Cleaning & Sealing 05/12/2004
430 - Asphalt Pavement Patching
00 Complete Specification 05/12/2004
550 Bridge Construction
552 - Structural Concrete
13 FLH FP-03 Correction metric uscs 08/12/2004
571 - Prefabricated Bridges
00 Complete Specification 03/15/2005
572 - Log Stringer Bridges
00 Complete Specification 05/12/2004
573 - Bridge Repair
00 Complete Specification 05/12/2004
600 Incidental Construction
601 - Minor Concrete
00 Replace Specification 05/14/2004
02 Table 601-2 Sampling & Testing 03/02/2005
602 - Culverts and Drains X
03 General 09/06/2005 X
06 Laying Plastic Pipe 08/05/2009 X
603 - Structural Plate Structures X
03 General 03/02/2005
04 Erecting 03/02/2005
607 - Cleaning, Reconditioning, and Repairing Existing Drainage
04 Cleaning Culverts in Place 03/02/2005
625 - Turf Establishment X
03 General 02/25/2005
03 General 07/02/2007 X
04 Preparing Seedbed 02/25/2005
05 Watering 03/30/2005
05 Watering 03/02/2005
07 Seeding 02/25/2005
633 - Permanent Traffic Control
02 Material 03/03/2005
03 General 03/03/2005
05 Panels 03/03/2005
634 - Permanent Pavement Marking
03 General 03/03/2005
635 - Temporary Traffic Control X
03 General 05/13/2004 X
648 - Stream Simulation
00 Complete Specification 03/15/2005
650 - Road Closure Devices
00 Complete Specification 06/28/2007
651 - Development of Pits & Quarries X
00 Complete Specification 03/02/2005 X
700 Material X
703 – Aggregate X
05 Subbase, Base, & Surface Course Aggregate 08/14/2009 X
06 Flakiness Index and Adherent Coatings 03/02/2005
07 FLH FP-03 Correction metric uscu 03/02/2005
10 FLH FP-03 Correction 03/02/2005
704 - Soil
02 FLH FP-03 Correction Bedding Material 03/02/2005
02 FLH FP-03 Modification - Bedding Material metric uscu
03/02/2005
705 – Rock X
02 Riprap Rock 08/05/2009 X
08 Channel Rock 04/17/2008 X
712 - Joint Material
01 Sealants, Fillers, Seals, and Sleeves 03/02/2005
713 - Roadside Improvement Material X
05 Mulch 03/02/2005 X
714 - Geotextile and Geocomposite Drain Material X
03 Geogrids 02/25/2005
718 - Traffic Signing and Marking Material X
02 Protective Overlay Film and Edge Film 03/02/2005
05 Aluminum Panels 02/25/2008 X
08 FLH FP-03 Correction metric 03/27/2007
14 FLH FP-03 Correction metric uscu 03/02/2005
15 FLH FP-03 Corrections metric 03/27/2007
15 FLH FP-03 Correction metric 03/27/2007
725 - Miscellaneous Material X
02 Calcium Chloride, Calcium Chloride Flakes and Magnesium Chloride
03/02/2005