J_2_Standard_Specifications.pdf

PDF 422 KB Posted

Attached to
Forest Road 29 MP 15. 5, Culvert Replacement Federal contract opportunity
Solicitation number
1205G218R0002
Issued by
Department of Agriculture Forest Service R6-Pacific Northwest Region

About this file

J.2 Standard Specifications

View the file

Other files for this federal contract opportunity

Other files attached to Forest Road 29 MP 15. 5, Culvert Replacement, newest first.
File Type Posted
Amend_No_001_Sheets_3_and_8.pdf PDF
Amendment_No_001.pdf PDF
J_7-Experience_and_Past_Performance_Questionnaire.pdf PDF
Solicitation_No_1205G218R0002.pdf PDF
J_1_Plans_and_Acronyms.pdf PDF
J_8-Bid_Bond_SF24.pdf PDF
J-4-Plans_and_Drawings.pdf PDF
J_6-Fire_Plan.pdf PDF
J_3_Supplemental_Specifications.pdf PDF
J_5-WD_WA180001_abbr.pdf PDF
Preliminary_Plans.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

J.2 STANDARD SPECIFICAIONS FOR CONSTRUCTION OF

ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS

FP-03 US CUSTOMARY UNITS

Project

Name:

FSR 29 M.P. 9.2 Culvert

Replacement

Date: 4/10/2013

Title Revised

Date

M.P.

9.2

Preface 03/15/2004 X

100 General Requirements X

101 - Terms, Format, and Definitions X

00 FLH FP-03 Corrections 07/25/2005 X

01 Meaning of Terms 01/22/2009

01 Meaning of Terms 01/22/2009 X

03 Abbreviations and Symbols 06/16/2006 X

04 Symbols 03/29/2007 X

04 Definitions 11/06/2007

102 - Bid, Award, and Execution of Contract X

00 Delete 102 in its entirety 02/16/2005 X

103 - Scope of Work X

00 Intent of Contract 02/16/2005 X

104 - Control of Work X

00 Deletions to 104 06/16/2006 X

03 Specifications and Drawings 02/22/2005

03 Specifications and Drawings 01/22/2009

03 Specifications and Drawings 02/22/2005

06 Use of Roads by Contractor 02/17/2005 X

07 Other Contracts 02/17/2005 X

105 - Control of Material X

02 Material Sources 02/17/2005

02 Material Sources 02/17/2005

02 Material Sources 01/18/2007 X

02 Material Sources 02/17/2005

02 Material Sources 02/17/2005 X

02 Government-provided sources 03/29/2005

02 Contractor-provided material sources 03/08/2007 X

05 Use of Material Found in the Work 05/12/2004 X

106 - Acceptance of Work X

01 Conformity with contract requirements 01/17/2013 X

01 Conformity with contract requirements 07/31/2007

07 Partial and Final Acceptance 05/11/2004 X

107 - Legal Relations and Responsibility To the Public X

02 Protection and Restoration of Property and

Landscape

02/17/2005

05 Responsibility for Damage Claims 05/11/2004 X

06 Contractor Responsibility for Work 06/16/2006 X

08 Sanitation, Health, and Safety 05/11/2004

08 Sanitation, Health & Safety 03/29/2005

09 Legal Relationship of the Parties 06/16/2006 X

10 Environmental Protection 06/16/2006 X

11 Protection of Forests, Parks, and Public Lands 02/17/2005

108 - Prosecution and Progress X

00 Delete Section 108 in entirety 02/16/2005 X

109 - Measurement and Payment X

00 Deletions 02/17/2005 X

02 Measurement Terms and Definitions 06/16/2006 X

03 Weighing Procedures and Devices 02/17/2005

03 Weighing Procedures and Devices 03/29/2005

150 Project Requirements X

151 – Mobilization X

03 Payment 08/05/2005

152 - Construction Survey and Staking X

00 Construction Survey and Staking 08/05/2005 X

153 - Contractor Quality Control X

02 Contractor Quality Control Plan 02/17/2005 X

04 Records 10/24/2007 X

154 - Contractor Sampling and Testing X

01 Description 05/24/2005 X

155 - Schedules for Construction Contracts X

00 Contractor Quality Control Plan, Records 05/11/2004 X

156 - Public Traffic X

00 Complete specification 04/17/2007 X

03 Accommodating Traffic During Work 02/24/2005 X

04 Maintaining Roadways During Work 02/24/2005

08 Traffic and Safety Supervisor 02/24/2005

157 - Soil Erosion Control X

03 General 02/24/2005 X

170 - Develop Water Supply and Watering

00 Complete Specification 03/30/2005

171 - Weed and Disease Prevention X

00 Complete Specification 03/30/2005 X

183 - P Line Survey

00 Complete Specification 03/30/2005

185 - Low Volume Road Design

00 Complete Specification 02/24/2005

200 Earthwork X

201 - Clearing and Grubbing X

00 Deletions 08/05/2009 X

01 Description 02/18/2005 X

04 Clearing 02/18/2005

04 Clearing 02/22/2005 X

04 Clearing 03/03/2005

06 Disposal 02/18/2005

06 Disposal 02/23/2005

06 Disposal 02/23/2005

06 Disposal 11/04/2004

06 Disposal 05/12/2004

06 Disposal 11/09/2005 X

203 - Removal of Structures and Obstructions X

01 Description 02/25/2005 X

02 Material 02/18/2005

04 Removing Material 02/18/2005 X

05 Disposing of Material 02/24/2005

05 Disposing of Material 02/18/2005 X

05 Disposing of Material 02/18/2005

08 Payment 02/24/2005 X

204 - Excavation and Embankment X

00 Complete Specification 03/26/2009 X

05 Conservation of Topsoil 02/18/2005

06 Roadway Excavation 03/02/2005

06 Roadway Excavation 03/02/2005

06 Roadway Excavation 03/02/2005

09 Preparing Foundation for Embankment

Construction

03/02/2005

10 Embankment Construction 03/02/2005

11 Compaction 04/11/2005

13 Sloping, Shaping, and Finishing 03/02/2005

13 Sloping, Shaping, and Finishing 03/02/2005

14 Disposal of Unsuitable or Excess Material 03/02/2005

15 Acceptance 02/07/2007

205 - Rock Blasting

02 Regulations 05/13/2004

06 Preblast condition survey and vibration monitoring and control

05/12/2004

07 Test Blasting 05/12/2004

08 Controls 05/12/2004

209 - Structure Excavation and Backfill X

00 Complete Spec. 209A; Exc & Backfill for selected Minor Structures. NOT a Replacement for 209.

03/24/2008

10 Backfill 10/23/2007 X

11 Compacting 02/24/2005 X

211 – Roadway Obliteration

01 Description 03/30/2005

01 Description 03/30/2005

02 Construction Requirements 02/25/2005

212 – Linear Grading

00 Complete Specification (composite road construction)

05/19/2005

213 – Subgrade Stabilization

02 FLH FP-03 Correction metric 09/06/2005

250 Structural Embankments X

251 – Riprap X

03 General 06/18/2007 X

252 – Special Rock Embankment and Rock Buttress

02 Material – Placing Rock 05/13/2004

255 – Mechanically Stabilized Earth Walls

02 Material – Acceptance 02/25/2005

262 – Reinforced Soil Embankment

00 Complete Specification 05/14/2004

01 Table 262-1 Sampling & Testing

Requirements

05/14/2004

300 Aggregate Courses X

301 – Untreated Aggregate Courses X

00 Title Change 03/03/2005 X

01 Work 03/03/2005 X

02 Material 05/16/2005 X

03 General 09/14/2005 X

04 Mixing and Spreading 03/03/2005 X

05 Compacting 05/17/2005 X

06 Surface Tolerance 03/03/2005 X

08 Acceptance 03/03/2005 X

08 Acceptance 03/03/2005 X

08 Acceptance 03/30/2005 X

09 Measurement 07/07/2005 X

10 Payment 03/03/2005 X

302 - Treated Aggregate Courses

00 Deletes 302 in its entirety 02/16/2005

03 FLH FP-03 Corrections metric 08/12/2004

303 - Road Reconditioning

01 Description 03/02/2005

06 Aggregate Surface Reconditioning 05/17/2005

07 Roadway Reconditioning 03/02/2005

11 Measurement 03/29/2005

306 - Dust Palliative

03 General 03/02/2005

04 Preparation and Application 03/02/2005

06 Acceptance 03/02/2005

10 Table 306-1 Sampling & Testing 03/02/2005

320 - Stockpiled Aggregates

00 Complete Specification 03/02/2005

321 - Major Aggregate Courses

00 Complete Specification 12/19/2005

322 - Minor Aggregate Courses

00 Complete Specification 10/14/2011

400 Asphalt Pavements and Surface Treatments

401 - Superpave Hot Asphalt Concrete Pavement

01 FLH FP-03 Correction metric uscu 08/12/2004

04 FLH FP-03 Correction uscu 08/12/2004

402 - Hot Asphalt Concrete Pavement by Hveem or Marshall Mix

Design Method

03 FLH FP-03 Correction metric uscu 08/12/2004

403 - Hot Asphalt Concrete Pavement

06 Surface Preparation 05/17/2005

16 Pavement Smoothness & Testing 03/02/2005

17 Acceptance 03/02/2005

17 Acceptance 03/02/2005

404 - Minor Hot Asphalt Concrete

02 Composition of Mix (Job-Mix Formula) 03/02/2005

04 Weather Limitations 03/02/2005

06 Placing 03/02/2005

07 Compacting (a) 03/02/2005

07 Compacting (b) 03/02/2005

09 Acceptance 03/02/2005

409 - Asphalt Surface Treatment

02 Material 05/12/2004

06 Weather, date, time 05/12/2004

08 Application 06/21/2005

10 FLH FP-03 Corrections uscu 08/12/2004

11 table409-2 12/18/2004

12 FLH FP-03 Correction uscu 08/12/2004

13 Acceptance & Testing 05/13/2004

411 - Asphalt Prime Coat

06 Application 05/12/2004

414 - Asphalt Pavement Crack and Joint Sealing

02 Material 05/12/2004

05 Cleaning & Sealing 05/12/2004

430 - Asphalt Pavement Patching

00 Complete Specification 05/12/2004

550 Bridge Construction

552 - Structural Concrete

13 FLH FP-03 Correction metric uscs 08/12/2004

571 - Prefabricated Bridges

00 Complete Specification 03/15/2005

572 - Log Stringer Bridges

00 Complete Specification 05/12/2004

573 - Bridge Repair

00 Complete Specification 05/12/2004

600 Incidental Construction

601 - Minor Concrete

00 Replace Specification 05/14/2004

02 Table 601-2 Sampling & Testing 03/02/2005

602 - Culverts and Drains X

03 General 09/06/2005 X

06 Laying Plastic Pipe 08/05/2009 X

603 - Structural Plate Structures X

03 General 03/02/2005 X

04 Erecting 03/02/2005 X

607 - Cleaning, Reconditioning, and Repairing Existing Drainage

04 Cleaning Culverts in Place 03/02/2005

625 - Turf Establishment X

03 General 02/25/2005

03 General 07/02/2007 X

04 Preparing Seedbed 02/25/2005

05 Watering 03/30/2005

05 Watering 03/02/2005

07 Seeding 02/25/2005

633 - Permanent Traffic Control

02 Material 03/03/2005

03 General 03/03/2005

05 Panels 03/03/2005

634 - Permanent Pavement Marking

03 General 03/03/2005

635 - Temporary Traffic Control X

03 General 05/13/2004 X

648 - Stream Simulation

00 Complete Specification 03/15/2005

650 - Road Closure Devices

00 Complete Specification 06/28/2007

651 - Development of Pits & Quarries X

00 Complete Specification 03/02/2005 X

700 Material X

703 – Aggregate X

05 Subbase, Base, & Surface Course Aggregate 08/14/2009 X

06 Flakiness Index and Adherent Coatings 03/02/2005 X

07 FLH FP-03 Correction metric uscu 03/02/2005

10 FLH FP-03 Correction 03/02/2005

704 - Soil

02 FLH FP-03 Correction Bedding Material 03/02/2005

02 FLH FP-03 Modification - Bedding Material metric uscu

03/02/2005

705 – Rock X

02 Riprap Rock 08/05/2009 X

08 Channel Rock 04/17/2008 X

712 - Joint Material

01 Sealants, Fillers, Seals, and Sleeves 03/02/2005

713 - Roadside Improvement Material X

05 Mulch 03/02/2005 X

714 - Geotextile and Geocomposite Drain Material X

03 Geogrids 02/25/2005 X

718 - Traffic Signing and Marking Material X

02 Protective Overlay Film and Edge Film 03/02/2005

05 Aluminum Panels 02/25/2008 X

08 FLH FP-03 Correction metric 03/27/2007

14 FLH FP-03 Correction metric uscu 03/02/2005

15 FLH FP-03 Corrections metric 03/27/2007

15 FLH FP-03 Correction metric 03/27/2007

725 - Miscellaneous Material X

02 Calcium Chloride, Calcium Chloride Flakes and Magnesium Chloride

03/02/2005 X

File details come from the government source that posted it.