1204T019R0005 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

04T0

CORVALLIS OR 97331

3200 SW JEFFERSON WAY

SIUSLAW NATIONAL FOREST

USDA FOREST SERVICE

07/02/20190001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

05/25/2019

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

FSR 1376 Chetco paving and deep patch repair

Supplemental Specification 403 - Hot Asphalt Concrete Pavement is replaced with the attached.

Revised proposals are due 9 July 2019 by 1600 Pacific Time.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

DARCY J. RAPOZA

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

2 July 2019

403 - Hot Asphalt Concrete Pavement 403.06_nat_us_05_17_2005

403.06 Surface Preparation.

Add the following:

Prelevel dips, depressions, sags, excessive or nonexistent crown, or other surface irregularities with hot asphalt concrete according to Section 404. Spread and compact the hot asphalt concrete in layers parallel to the grade line not exceeding 2 inches in compacted depth.

403.16_nat_us_03_02_2005

403.16 Pavement Smoothness.

Delete the heading and replace with the following:

Pavement Smoothness and Surface Tolerance Add the following:

The maximum variation from the compacted width is 3 inches and the average width of 4 or measurements for any ½ mile of road segment is the specified width.

The maximum variation from the compacted specified thickness is ¼ inch and the average thickness of 4 measurements for any ½ mile of road segment is the specified thickness.

1204T019R0005 Amendment 1

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

SCHEDULE OF ITEMS

PART I - SCHEDULE OF ITEMS

SECTION B – SERVICES AND PRICES

FSR 1376 CHETCO PAVING AND DEEP PATCH REPAIR

Gold Beach Ranger District Rogue River – Siskiyou National Forest

Curry County, Oregon

B- 1 - SCHEDULE OF ITEMS

BASE ITEMS

ITEM NO. DESCRIPTION

PAY

UNIT

EST.

QUANT. UNIT PRICE TOTAL PRICE

15101 Mobilization Lump

Sum All n/a $________

15201 Construction Survey Staking

Lump Sum All n/a $________

15713 Soil erosion and pollution control

Lump Sum All n/a $________

20105 Clearing and Grubbing

Lump Sum All n/a $________

20304 Removal of asphalt concrete, disposal method (a)

Lump Sum All n/a $________

20401 Roadway excavation

*Cubic Yard 1078 $________ $________

26201 Earthwork geogrid, category 4

*Square Yard 597 $________ $________

30306 Road reconditioning, ditch

Mile 0.26

30801

Roadway aggregate (commercial source)

*Cubic Yard 714

40301A Hot Asphalt Concrete Pavement

(HMAC)

Ton 11440

40301B

Leveling Course, Hot Asphalt Concrete Pavement

(HMAC)

Ton 300

41301 Asphalt pavement milling, 2-inch depth

Square Yard 747

60201

24-inch aluminized steel, type 2 corrugated steel pipe, 14 Gauge

Linear Foot 40

60601B HDPE Spillway Assembly, 24-inch Each 1

60604 Pipe Anchor Assembly Each 2

63401 Pavement Markings, Type B, Solid White

Linear Foot 164736

63501 Temporary traffic control

Lump Sum All n/a $________

TOTAL BASE

ITEMS

1204T019R0005

Option Item

1-MP 2.66

ITEM

NO. DESCRIPTION

PAY

UNIT

EST.

QUANT. UNIT PRICE

TOTAL

PRICE

15101 Mobilization Lump Sum All n/a $

15201 Construction Survey Staking

Lump Sum All n/a $

15713 Soil erosion and pollution control

Lump Sum All n/a $

20105 Clearing and Grubbing

Lump Sum All n/a $

20304 Removal of asphalt concrete, disposal method (a)

Lump Sum All n/a $ 20401 Roadway excavation *Cubic Yard 478 $ $

20404 Unclassified Borrow, Pit Run 6" Minus Commercial Source

Cubic Yard 96

25501 Mechanically

Stabilized Wall Square

Foot 500 $ $ 30306 Road reconditioning, ditch Mile 0.04 $ $ 30801 Roadway aggregate

(commercial source) *Cubic Yard 76 $ $

40301A Hot Asphalt Concrete Pavement

(HMAC)

Ton 55

63501 Temporary traffic control

Lump Sum All n/a $

Total Option 1 Items $____________

Option Item 2 MP 3.03

NO. DESCRIPTION PAY UNIT EST. QUANT.

UNIT

PRICE

TOTAL

PRICE

15101 Mobilization Lump Sum All n/a $

15201 Construction Survey Staking Lump Sum All n/a $

15713 Soil erosion and pollution control Lump Sum All n/a $

20105 Clearing and Grubbing Lump Sum All n/a $

20304 Removal of asphalt concrete, disposal method (a) Lump Sum All n/a $

20401 Roadway excavation *Cubic Yard 871 $ $

20404 Unclassified Borrow, Pit Run 6" Minus Commercial Source Cubic Yard 174 $ $

26201 Earthwork geogrid, category 4 *Square Yard 1220 $ $

30306 Road reconditioning, ditch Mile 0.06 $ $

30801 Roadway aggregate (commercial source) *Cubic Yard 151 $ $

40301A Hot Asphalt Concrete Pavement (HMAC) Ton 156 $ $

63501 Temporary traffic control Lump Sum All n/a $

Total Option 2 Items $__________

Option Item 3 MP 3.42

NO. DESCRIPTION PAY UNIT EST. QUANT.

UNIT

PRICE

TOTAL

PRICE

15101 Mobilization Lump Sum All n/a $ 15201 Construction Survey Staking Lump Sum All n/a $ 15713 Soil erosion and pollution control Lump Sum All n/a $

20105 Clearing and Grubbing Lump Sum All n/a $

20304 Removal of asphalt concrete, disposal method (a) Lump Sum All n/a $

20401 Roadway excavation *Cubic Yard 477 $

20404 Unclassified Borrow, Pit Run 6" Minus Commercial Source Cubic Yard 95 $

25501 Mechanically Stabilized Wall Square Foot 300 $

30306 Road reconditioning, ditch Mile 0.04 $

30801 Roadway aggregate (commercial source) *Cubic Yard 113 $

40301A Hot Asphalt Concrete Pavement (HMAC) Ton 83 $

60201 24-inch aluminized steel, type 2 corrugated steel pipe, 14 Gauge Linear Foot 44 $

60601A Spillway Assembly, 24-inch Each 1 $

60602 Downdrain assembly, 24-inch corrugated aluminized steel Linear Foot 30 $

60604 Pipe Anchor Assembly Each 5 $

Total Option 3 Items $__________

Option Item 4 MP 3.94

NO. DESCRIPTION

PAY UNIT

* Contract Quantity

ESTIMATE

QUANTITIES

UNIT

PRICE TOTALS

15101 Mobilization Lump Sum All n/a $ 15201 Construction Survey Staking Lump Sum All n/a $ 15713 Soil erosion and pollution control Lump Sum All n/a $

20105 Clearing and Grubbing Lump Sum All n/a $

20304 Removal of asphalt concrete, disposal method (a) Lump Sum All n/a $

20401 Roadway excavation *Cubic Yard 445 $ $ 20404 Unclassified Borrow, Pit Run 6" Minus

Commercial Source Cubic Yard 89 $ $ 26201 Earthwork geogrid, category 4 *Square Yard 704 $ $ 30306 Road reconditioning, ditch Mile 0.04 $ $ 30801 Roadway aggregate (commercial source) *Cubic Yard 78 $ $ 40301A Hot Asphalt Concrete Pavement

(HMAC) Ton 78 $ $

Total Option 4 Items $___________

Option Item 5 MP 4.24

NO. DESCRIPTION

PAY UNIT

* Contract Quantity

ESTIMATE

QUANTITIES

UNIT

PRICE TOTALS

15101 Mobilization Lump Sum All n/a $ 15201 Construction Survey Staking Lump Sum All n/a $ 15713 Soil erosion and pollution control Lump Sum

All n/a $

20105 Clearing and Grubbing Lump Sum All n/a $

20304 Removal of asphalt concrete, disposal method (a) Lump Sum All n/a $

20401 Roadway excavation *Cubic Yard 355 $ $ 20404 Unclassified Borrow, Pit Run 6" Minus

Commercial Source Cubic Yard 71 $ $ 26201 Earthwork geogrid, category 4 *Square Yard 515 $ $ 30306 Road reconditioning, ditch Mile 0.05 $ $ 30801 Roadway aggregate (commercial source) *Cubic Yard 131 $ $ 40301A Hot Asphalt Concrete Pavement

(HMAC) Ton 134 $ $

Total Option 5 Items $___________

Option Item 6 MP 4.38

NO. DESCRIPTION

PAY UNIT

* Contract Quantity

ESTIMATE

QUANTITIES

UNIT

PRICE TOTALS

15101 Mobilization Lump Sum All n/a $ 15201 Construction Survey Staking Lump Sum All n/a $ 15713 Soil erosion and pollution control Lump Sum All n/a $

20105 Clearing and Grubbing Lump Sum All n/a $

20304 Removal of asphalt concrete, disposal method (a) Lump Sum All n/a $

20401 Roadway excavation *Cubic Yard 222 $ $ 20404 Unclassified Borrow, Pit Run 6" Minus

Commercial Source Cubic Yard 44 $ $ 25501 Mechanically Stabilized Wall, Hilfiker or

Equal Square Foot 304 $ $ 30306 Road reconditioning, ditch Mile 0.03 $ $ 30801 Roadway aggregate (commercial source) *Cubic Yard 37 $ $ 40301A Hot Asphalt Concrete Pavement

(HMAC) Ton 24 $ $ 60201 24-inch aluminized steel, type 2 corrugated steel pipe, 14 Gauge Linear Foot 40 $ $ 60601A Spillway Assembly, 24-inch Each 1 $ $

60602 Downdrain assembly, 24-inch corrugated aluminized steel Linear Foot 10 $ $

60604 Pipe Anchor Assembly Each 3 $ $

Total Option 6 Items $___________

Option Item 7 MP 7.28

NO. DESCRIPTION

PAY UNIT

* Contract Quantity

ESTIMATE

QUANTITIES

UNIT

PRICE TOTALS

15101 Mobilization Lump Sum All n/a $ 15201 Construction Survey Staking Lump Sum All n/a $ 15713 Soil erosion and pollution control Lump Sum All n/a $

20105 Clearing and Grubbing Lump Sum All n/a $

20304 Removal of asphalt concrete, disposal method (a) Lump Sum All n/a $

20401 Roadway excavation *Cubic Yard 210 $ $ 20404 Unclassified Borrow, Pit Run 6" Minus

Commercial Source Cubic Yard 42 $ $ 26201 Earthwork geogrid, category 4 *Square Yard 172 $ $ 30306 Road reconditioning, ditch Mile 0.03 $ $ 30801 Roadway aggregate (commercial source) *Cubic Yard 47 $ $ 40301A Hot Asphalt Concrete Pavement

(HMAC) Ton 43 $ $ 63501 Temporary traffic control Lump Sum All $ $

Total Option 7 Items $___________

Total All Item (Base plus Options) $ ___________

*DENOTES CONTRACT QUANTITY

B-2 - NOTE:

Payment will be made on actual work performed as described in FP-03 109.01. All units (other than lump sum) are measured as Actual Quantity unless denoted by an asterisk (*). If denoted by an asterisk, the quantity is measured as a Contract Quantity in accordance with FP-03.

OPTION ITEMS: Offerors must provide pricing for all items (all Base Items and all Option Items). See “OPTION FOR INCREASED QUANTITY-SEPARATELY PRICED LINE ITEMS” in Section I, and “EVALUATION OF OPTIONS” in Section M.

If the government elects to exercise any Option Item it will be for the total quantity of all payment items within any one Option Item.

Exercise of Option Items may be made by the government at any time up to 90 days following base contract award.

Facsimile offers are accepted; see Section L-3, however, Facsimile Bid Guarantee IS NOT acceptable.

Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under Mobilization.

DUNS Number________________________

EMAIL ______________________________

Revised FSSS 403.pdf
403 - Hot Asphalt Concrete Pavement
403.06 Surface Preparation.
403.16 Pavement Smoothness.
ScheduleofItems.pdf
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
SCHEDULE OF ITEMS
PART I - SCHEDULE OF ITEMS
SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
SECTION D - PACKAGING AND MARKING
E-1 CLAUSES INCORPORATED BY REFERENCE (FAR 52.252-2)(FEB 1998)
SECTION F - DELIVERIES OR PERFORMANCE
F-1 CLAUSES INCORPORATED BY REFERENCE (FAR 52.252-2)(FEB 1998)
F-2 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (52.211-10)(APR 1984)
SECTION G - CONTRACT ADMINISTRATION DATA
I-3 SERVICE CONTRACT REPORTING REQUIREMENTS (FAR 52.204-14)(OCT 2016)
I-4 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (FAR 52.204-19) (DEC 2014)
I-7 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION
(FAR 52.219-28)(JUL 2013)
I-8 MINIMUM WAGES UNDER EXECUTIVE ORDER 13658 (FAR 52.222-55)(DEC 2015)
I-9 AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER SERVICE AND CONSTRUCTION CONTRACTS (52.223-2 )(SEP 2013)
I-10 BUY AMERICAN ACT - CONSTRUCTION MATERIALS (FAR 52.225-9)(MAY 2014)
I-11 BID GUARANTEE (52.228-1)(SEP 1996)
K-1 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (FAR 52.204-8)
(OCT 2018)
K-2 (COMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING
(FAR 52.204-16)(JUL 2016)
K-3 PREDECESSOR OF OFFEROR (FAR 52.204-20)(JUL 2016)
K-4 CERTIFICATION REGARDING RESPONSIBILITY MATTERS (FAR 52.209-5)
(APR 2010)
(End of provision)
K-6 REPRESENTATION BY CORPORATIONS REGARDING DELINQUENT TAX LIABILITY OR A FELONY CONVICTION UNDER ANY FEDERAL LAW (FAR 52.209-11)(FEB 2016)
K-7 COMPLIANCE WITH VETERANS' EMPLOYMENT REPORTING REQUIREMENTS (FAR 52.222-38) (FEB 2016)
K-8 BIOBASED PRODUCT CERTIFICATION (FAR 52.223-1)(MAY 2012)
K-9 SIZE STANDARD AND NAICS CODE INFORMATION (AGAR 452.219-70 )(JAN 2005)
L-3 FACSIMILE PROPOSALS (FAR 52.215-5 )(OCT 1997)
L-4 TYPE OF CONTRACT (FAR 52.216-1)(APR 1984)
L-5 CONSTRUCTION WAGE RATE REQUIREMENTS--SECONDARY SITE OF THE WORK (FAR 52.222-5 )(MAY 2014)
L-6 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FAR 52.222-23)
(FEB 1999)
L-7 NOTICE OF BUY AMERICAN ACT REQUIREMENT - CONSTRUCTION MATERIALS (FAR 52.225-10) (MAY 2014)
L-8 SERVICE OF PROTEST (FAR 52.233-2)(SEP 2006)
L-9 SITE VISIT (CONSTRUCTION) (FAR 52.236-27)(FEB 1995)
FSSS Chetco Paving_revised.pdf
Table of Contents
Preface
101 - Terms, Format, and Definitions
101.01 Meaning of Terms
101.03 Abbreviations.
101.04 Definitions.
102 - Bid, Award, and Execution of Contract
103 - Scope of Work
Deletions
104 - Control of Work
Deletions
104.06 Use of Roads by Contractor
104.07 Other Contracts.
105 - Control of Material
105.02 Material Sources.
105.02(a) Government-provided sources.
105.02(b) Contractor-located sources.
105.05 Use of Material Found in the Work.
106 - Acceptance of Work
106.01 Conformity with Contract Requirements.
106.07 Delete
107 - Legal Relations and Responsibility To the Public
107.02 Protection and Restoration of Property and Landscape.
107.05 Responsibility for Damage Claims.
107.06 Contractor’s Responsibility for Work.
107.09 Legal Relationship of the Parties.
107.10 Environmental Protection.
108 - Prosecution and Progress
108 Delete.
109 - Measurement and Payment
109 Deletions
109.02 Measurement Terms and Definitions.
152 - Construction Survey and Staking
152.02 General.
Table 152-1 Tolerances for reestablishing P-line, traverse, and elevations.
Table 152-2 Cross section and slope stake tolerances.
153 - Contractor Quality Control
153.04 Records.
154 - Contractor Sampling and Testing
154.01 Description
155 - Schedules for Construction Contracts
155 Delete.
156 - Public Traffic
157 - Soil Erosion Control
157.03 General
171 - Weed and Disease Prevention
201 - Clearing and Grubbing
201.01 Description
201.02 Material:
201.03 General.
201.04 Clearing.
201.06 Disposal
203 - Removal of Structures and Obstructions
203.01 Description.
203.04 Removing Material.
203.05 Disposing of Material.
204 - Excavation and Embankment
209 - Structure Excavation and Backfill
209.10 Backfill.
Delete the text of this section and substitute the following:
209.11 Compacting.
Table 209-1 Sampling and Testing Requirements
262 - Reinforced Soil Embankment
Table 262-1 Sampling and Testing Requirements
303 - Road Reconditioning
303.01 Work.
303.06 Aggregate Surface Reconditioning.
303.06 Asphalt and Aggregate Surface Reconditioning.
303.07 Roadway Reconditioning.
303.10 Measurement
403 - Hot Asphalt Concrete Pavement
403.06 Surface Preparation.
403.16 Pavement Smoothness.
Table 403-1—Acceptance Sampling and Testing Requirements.
412 - Asphalt Tack Coat
602 - Culverts and Drains
602.03 General. Delete this section and replace with the following:
602.08 Acceptance. Add the following:
625 - Turf Establishment
625.03 General.
625.04 Preparing Seedbed.
625.05 Watering.
625.07 Seeding. (a) Dry method.
625.09 Protecting and Caring for Seeded Areas
625.11 Measurement.
633 - Permanent Traffic Control
633.02 Material.
633.03 General.
633.05 Panels.
634 - Permanent Pavement Marking
634.03 General.
635 - Temporary Traffic Control
635.03 General.
703 - Aggregate
703.05 Subbase, Base, Surface Course, and Screened Aggregate.
703.10(e) Flakiness Index.
703.10(i) Adherent Coating.
Table 703-2 Correction
Table 703-3. Gradation TV ranges for surface courses.
Table 703-3. Gradation ranges for Size Ratio surface courses.
Add Table 703-16:
705 - Rock
705.02 Riprap Rock.
705.07 Streambed Simulation Rock.
705.08 Channel Rock.
713 - Roadside Improvement Material
713.05 Mulch.
714 - Geotextile and Geocomposite Drain Material
Tables 714-1 and 714-4.
714.03 Geogrids.
Table 714-7—Physical strength requirements for geogrids.
718 - Traffic Signing and Marking Material
718.02 Reserved.
718.02 Protective Overlay Film and Edge Film.
718.05 Aluminum Panels
718.08 (b)(2)(c)Signpost - Square tubular steel posts
718.14 (g)Waterborne Traffic Paint - Daylight reflectance
718.15 (a)Epoxy Markings Pigments
718.15 (g)Epoxy Marking - Drying Time
Section 720. — STRUCTURAL WALL AND STABILIZED EMBANKMENT MATERIAL
720.01 Mechanically-Stabilized Earth Wall Material.
drawings.pdf
Sheets and Views
ChetcoPave_4_17_19-Cover Sheet
PLOT
ChetcoPave_4_17_19-Loc Map
PLOT
ChetcoPave_4_17_19-Site Plans
PLOT
ChetcoPave_4_17_19-Site Plans (2)
PLOT
ChetcoPave_4_17_19-Estimate Qts
PLOT
ChetcoPave_4_17_19-Worklist sht1
PLOT
ChetcoPave_4_17_19-Worklist sht2
PLOT
ChetcoPave_4_17_19-Worklist sht3
PLOT
ChetcoPave_4_17_19-Typ Paving
PLOT
ChetcoPave_4_17_19-Typ Intersect & TO
PLOT
ChetcoPave_4_17_19-Typ Method Details
PLOT
ChetcoPave_4_17_19-Sediment Ctrl
PLOT
ChetcoPave_4_17_19-Culvert Bands
PLOT
ChetcoPave_4_17_19-Culvert Install
PLOT
ChetcoPave_4_17_19-Culvert Catch Basin
PLOT
ChetcoPave_4_17_19-Culvert Down Drain
PLOT
ChetcoPave_4_17_19-Temp Traffic Ctrl
PLOT
ChetcoPave_4_17_19-Temp Traffic Ctrl Post
PLOT
ChetcoPave_4_17_19-Temp Traffic Ctrl Plan
PLOT
r6_fs_6300_53-FireProtectionSupressionTankTruck.pdf
Additional Fire Precautionary Measure 1 - Tank Truck
r6_fs_6300_54-FireProtectionSupressionCommunications.pdf
Additional Fire Precautionary Measure 2 - Communications