Amendment01.pdf
PDF 221 KB Posted
- Attached to
- Trail Creek Bridge Federal contract opportunity
- Solicitation number
- 1204M319Q0043
About this file
Amendment01
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Final Design Requirements.docx | DOCX document | |
| Final Trail Creek Bridge.doc | DOC document | |
| Quote Package.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
CONTRACT ID CODE PAGE 1 OF 3 PAGES
2 AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
4/18/2019
4. REQUISITION/PUCHASE REQ. NO. 5. PROJECT NO.(IF APPLICABLE)
6. ISSUE BY CODE 7.ADMINISTERED BY (if other than item 6) CODE
Wallowa-Whitman National Forest 1550 Dewey Ave, Suite A Baker City, OR 97814
8.NAME AND ADDRESS OF CONTRACTOR(No., street, county, State and ZIP Code) 9A.Amend Solicitation. 1204M319Q0043
* 9B.Dated 04/09/2019
* 10A.Mod Contract/Order #
* 10B.Dated (see Item 13) code facility code
11. THIS ITEM APPLIES ONLY TO AMENDMENT OF SOLICITATION
[x] The above numbered solicitation is amended as set forth in the item 14. The hour and date specified for receipt of Offers [ ] is extended [x
] is not extended. Offerors must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15 and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted, or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE
RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegam or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting and Appropriation Data (if required)
13. THIS ITEM APPLIES ONLY TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. This change order is issued pursuant to; (specifiy authority) The changes set forth in item 14 are made in the Contract/Order # in item 10A.
B. The above numbered Contract/Order is modified to reflect the administrative changes (such as changes in paying office, appropriation date, etc.) set forth in item 14, pursuant to the authority of FAR 43.103(b)..
C. This supplemental agreement is entered into pursuant to authority of:
D Other: (Specify type of modification and authority):
E. IMPORTANT: Contractor [ ] is not [ ] is required to sign this document and return _ Original to the issuing office.:
14. DESCRIPTION OF AMENDMENT/MODIFICATION
Project Name and Location: Trail Creek Bridge This amendment addresses the following (see attached addendum)
1. Revisions to Specifications (see attached addendum)
2. Pre-Bid Inquiries (PBI’s) for Contract Bidding (see attached addendum)
3. Revised Bidders Package (attached)
By signature in Block 15B Contractor releases the Government from all claims relating to this modification. This settlement is complete accord and satisfaction. Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A.NAME AND TITLE OF SIGNER (Type or print)
16A.NAME AND TITLE OF CONTRACTING OFFICER
Contracting Officer
15B.CONTRACTOR/OFFEROR
By ______________________________ (Signature of person authorized to sign)
15C.DATE SIGNED 16B.UNITED STATES OF AMERICA
By______________________________ (Signature of Contracting Officer)
16C.DATE SIGNED
Standard Form 30 Prescribed by GSA FAR (48CFR) 53.243
Addendum to Amendment 1
REVISIONS, PRE-BID INQUIRIES, REQUEST FOR INFORMATION TRAIL CREEK BRIDGE
REVISIONS
Revision-001
Add the following to ‘DESIGN SPECIFICATIONS’
BRIDGE SUBERSTRUCTURE: WEATHERING A588 STEEL GIRDERS
Pre-Bid Inquiries (PBI’s) for Contract Bidding
PBI-001
Question: The documents provided are not very clear regarding the bridge steel finish. Is the bridge steel intended to be weathering steel, like the W-Beam rail, or galvanized?
Answer: Both W-Beam and Bridge Girders should be weathering steel not galvanized.
PBI-002
Question: Would a galvanized bridge rail be acceptable?
Answer: No, specifications require weathering steel.
PBI-003
Question: Is installation a responsibility of the contractor?
Answer: No, installation is not part of this contract. Manufacture, delivery, and offloading at the designated location are the included items.
PBI-004
Question: Are concrete sills already designed?
Answer: No, the sill is to be designed and provided by the awardee.
PBI-005
Question: Is wood decking an alternative travel surface?
Answer: No, wood decking is not an approved running surface.
Requests for Information (RFI’s) for Plans and Specifications
None