4a.Road Maintenance Requirements.pdf

PDF 528 KB Posted

Attached to
Green Grouse Stewardship IRSC Federal contract opportunity
Solicitation number
1204H120R4001
Issued by
Department of Agriculture Forest Service R6-Pacific Northwest Region

About this file

This document outlines road maintenance requirements and specifications for a timber harvesting contract on the Green Grouse Stewardship Integrated Resource Service Contract (IRSC) project located on the Mt. Baker-Snoqualmie National Forest in Washington. The contract requires the contractor to maintain approximately 13 miles of forest roads before, during, and after haul on the project. Road maintenance responsibilities include blading, dust abatement, surfacing, ditch cleaning, drainage structure installation and maintenance, vegetation control, and seasonal closure measures. The solicitation for this contract will be issued on or around June 10, 2020 by the Department of Agriculture Forest Service Pacific Northwest Region, with proposals due on or around July 27, 2020. The project objectives include enhancing habitat for late-successional species, maintaining riparian areas and fish habitat, and contributing timber products while managing infrastructure and facilities for multiple uses.

View the file

Other files for this federal contract opportunity

Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Green Grouse Stewardship IRSC Solicitation 1204H120R4001 Page 1 of 4 Appendix C – Road Maintenance Requirements

K-F.3.1# – ROAD MAINTENANCE REQUIREMENTS. (9/04) Contractor shall maintain roads in accordance with the following Contract Road Maintenance Requirements Summary:

Contract Road Maintenance Requirements Summary

Road Termini

Miles Applicable Prehaul Road Maintenance Specifications

From To

P= Contractor Performance Item, D = Deposit to Forest Service, D3 = Deposit to Third Party

Miles

Applicable During Haul Road Maintenance Specifications

From To 811 Blade

Dust

Surf.

Ditch

Haul

Drain

Rd Dr

Proj

Veg

Log

41 0.00 1.90 1.90 P P P P

4110 0.00 4.40 4.40 P P P P P P 4110014 0.00 2.56 2.56 P P P P P P 4110024 0.00 1.02 1.02 P P P P P

P= Contractor Performance Item, D = Deposit to Forest Service, D3 = Deposit to Third Party

Miles

Applicable Post Haul Road Maintenance Specifications From To 811

Blade

Surf.

Ditch Haul

Drain

Rd dr

Use

Log

41 0.00 1.90 1.90 P P P P

4110 0.00 4.40 4.40 P P P P P P P 4110014 0.00 2.56 2.56 P P P P P P P P 4110024 0.00 1.02 1.02 P P P P P P P P P= Contractor Performance Item D = Deposit to Forest Service D3 = Deposit to Third Party

Description of work required by the above T-specs is shown in the following ROAD MAINTENANCE SPECIFICATION table and included in the stewardship contract.

Green Grouse Stewardship IRSC Solicitation 1204H120R4001 Page 2 of 4

ROAD MAINTENANCE REQUIREMENTS SPECIFICATION TABLE PURSUANT TO

K-F.3.1# - ROAD MAINTENANCE REQUIREMENTS(09/2004)

1 2 3 4 5 6 7 8 9 Special Dust Post

Road No.

Project Travel Way Brush *Surf-acing

Abatement Seasonal Haul and Specifi- X And Applic Mainte- Snow Termini cation Width Slope Comp Log Out Product Rate Width nance Removal Block Treat

41 Ex AI

B Refer to Brushing Detail

1 ¼ Minus PR

4110 Ex AI Refer to Brushing Detail

1 ¼ Minus PR

4114014 Ex AI

Refer to

Detail

2 ½ Minus

W B PR

MP0.17

PR

4110024 Ex AI

Refer to

Detail

2 ½ Minus W B PR PR

*Must meet WSDOT standard specifications for aggregate surfacing material.

Green Grouse Stewardship IRSC Solicitation 1204H120R4001 Page 3 of 4

ROAD MAINTENANCE REQUIREMENTS SPECIFICATION CODES TABLE PURSUANT TO

K-F.3.1# - ROAD MAINTENANCE REQUIREMENTS (09/2004)

Column No.

Heading Entry Explanation

Any Blank Except as otherwise described, no entry indicates Contractor is not authorized or required to perform the work item(s).

Any RC This work requirement applies only when haul of project related construction materials occurs.

2 Special Project Specification

Number Entry indicates Special Project Specification which applies.

3 Travel Way EX Contractor shall maintain the traveled way to the width existing upon entry, or at the completion of Specified Road work.

Numbers Contractor shall maintain the traveled way to the standard width indicated by the entry, plus curve widening, in accordance with Section T-811. If required, the road template shall be shaped to this width and to the designated cross slope before haul and during recurring maintenance.

IS, C,

OS, F, or

AI

Cross slopes are designated as:

IS (Inslope), C (Crown), OS (Outslope), F (Flat), AI (As Is).

A or B If compaction is required.

4 Brush and Log Out

Numeric & R and or L

Contractor shall remove brush for specified width on either or both the right (R) side or left (L) side of road.

As Staked Limits of brushing are as staked or marked in the field.

OPT Contractor may use hand or mechanical means of brushing.

H Only hand brushing may be used.

Green Grouse Stewardship IRSC Solicitation 1204H120R4001 Page 4 of 4

ROAD MAINTENANCE REQUIREMENTS SPECIFICATION CODES TABLE PURSUANT TO

K-F.3.1# - ROAD MAINTENANCE REQUIREMENTS (09/2004)

Column No.

Heading Entry Explanation

5 Surfacing Aggregate Grading

Contractor shall place surfacing on roads listed according to the grading indicated.

6 Dust Abatement OPT Product selection is Contractor's choice from those listed in Section T-812.

Product Abbr.

Unless otherwise agreed, Contractor is restricted to product listed corresponding to the abbreviation shown in Section T-812;

(i.e., LigS = Lignon Sulfonate) Application rates are estimated amounts.

EX Contractor shall abate dust on the existing width

Numbers Contractor shall abate dust to the width indicated by entry.

7 Seasonal Maintenance

W Waterbars and/or crossditching shall be required prior to expected seasonal precipitation.

B Entrance barriers shall be installed by Contractor prior to nonuse periods.

8 Snow Removal TS Snowplowing authorized for Contractor's Operations without recreation access being provided per Section T-803 requirements.

JU Snowplowing authorized, but must provide for recreation joint use per Section T-803 requirements.

Blank Snowplowing is not authorized. Forest Service may authorize plowing by permit when not in conflict with other uses.

9 Post Haul P P denotes that work is Contractor's Responsibility to perform.

File details come from the government source that posted it. Updated .