Timberline Lodge Sections that require submittals.

SPECIFICATION SECTION SUBMITTALS REQUIRED IN THIS SECTION

01 10 00 Summary Preliminary design & general electrical submittals.

01 29 00 Schedule of Values Schedule of Values

01 32 00 Construction Progress Documentation Project schedules

01 33 00 Submittal procedures Submittal procedures for all spec sections

01 40 00 Quality Requirements Inspection reports

01 50 00 Temporary facilities & Controls Site plan for temporary utilities

01 74 19 Construction waste management Waste reduction reports

01 77 00 Closeout Procedures List of incomplete items

01 78 39 Project record Documents All project record documents

05 50 00 Metal Fabrications Transformer stand shop drawings

09 91 23 interior painting Paint schedule

26 00 10 General Technical provisions general electrical material submittal requirements.

26 00 50 Basic Method and materials Electric equipment and material submittals multiple items

26 00 60 Electrical Equipment & Maintenance Contractor derived equipment maintenance procedures

26 00 70 15KV Protective Relay Analysis & Replacement Analysis and Design of replacement 15KV relay system

26 05 74 Electrical Arc Flash & Short Circuit analysis Arc flash and short circuit studies for both buildings

26 22 13 Low Voltage Distribution Transformers Transformer for pool service replacement

26 24 16 Panelboards Design of new panelboards preliminary design, shop submittals

26 43 13 Surge Protective Device Surge Protective device shop submittals