Attachment_J2_Drawings_Sheet_3thru5.1.pdf

PDF 9 MB Posted

Attached to
Nez Perce-Clearwater NFs - Crooked River Valley Rehabilitation Phase II
Solicitation number
12034319R0004
Issued by

About this file

Attachment J-2 Drawings, Sheets 3-5.1

View the file

Other files

File Type Posted
Amendment2_Attachment1_J6_CrookedRiverTempBridgePlans7_12_2018.pdf PDF
Amend2.doc DOC document
QuestionsAnswers_5719.docx DOCX document
SiteTourNotes.docx DOCX document
Amend1_SiteVisitTime.doc DOC document
Attachment_J5_AerialPhotos.docx.pdf PDF
RFP.docx DOCX document
Attachment_J2_Drawings_Sheet_6.pdf PDF
Attachment_J2_Drawings_Sheets1_2.pdf PDF
AttachmentJ4_SWPPPTemplate.docx DOCX document
Attachment_J2_Drawings_Sheets_7thru8.4.pdf PDF
Attachment_J2_Drawings_Sheets_6.1.pdf PDF
Attachment_J3_TechSpecs_110518.docx DOCX document
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

80+00

85+00

90+00

95+00

100+00

3.0

N O

D

A T E

B Y

D E S C

R

IP

T

IO

N

PROJECT NUMBER

RDG-15-009

C R

O O

K E D

R

IV

E R

V A

LL

E Y

R E H

A B

IL

IT

A

T

IO

N P

R O

JE

C

T P H

A S E

C H

K

SHEET NUMBER

R E H

A B

IL

IT

A

T

IO

N P

LA

N

PLAN VIEW

0' 400' 800'

LEGEND

FLOODPLAIN SWALES

AND DEPRESSIONS

NEW CHANNEL CONSTRUCTION

SIDE CHANNELS

FLOODPLAIN GRADING AND

ROUGHNESS TREATMENTS

FLOW

SIDE CHANNEL WETLANDS

BYPASS CHANNEL

EXISTING CHANNEL

1. EXCAVATE PLUG AND DIVERT FLOW INTO PREVIOUSLY CONSTRUCTED BYPASS

CHANNEL;

2. PLUG CONNECTION BETWEEN BYPASS CHANNEL AND MAIN CHANNEL;

3. SALVAGE MATERIALS, INCLUDING TREES, SHRUBS, AND VEGETATIVE FILL (TOP SOIL);

4. GRADE APPROXIMATELY 22.5 ACRES OF FLOODPLAIN INCLUDING SWALES,

DEPRESSIONS, WETLANDS AND SIDE CHANNELS;

5. CONSTRUCT MAIN CHANNEL BETWEEN STATION 74+00 AND 106+00;

6. CONSTRUCT RIFFLES IN THE MAIN CHANNEL.

SCOPE

CONSTRUCTION SEQUENCE

QUANTITIES AND MATERIALS

ITEM QUANTITY

PLUG EXCAVATION AND FILL

EXCAVATION, FILL AND GRADE CHANNEL AND FLOODPLAIN

IMPORT, FILL AND GRADE

SALVAGE VEGETATIVE FILL, HAUL AND STOCKPILE

RIFFLES

877 CUBIC YARDS

61,900 CUBIC YARDS

8,100 CUBIC YARDS

2,045 CUBIC YARDS

1,490 LINEAR FEET

1. MOBILIZE EQUIPMENT

2. ESTABLISH STAGING AREAS AND SITE ACCESS.

3. IMPLEMENT RESOURCE MANAGEMENT PLANS INCLUDING WORK AREA ISOLATION,

DEWATERING AND EROSION CONTROL.

4. EXCAVATE REMAINING BYPASS CHANNEL PLUG AND DIVERT FLOW INTO PREVIOUSLY

CONSTRUCTED BYPASS CHANNEL.

5. SALVAGE AND STOCKPILE NATIVE MATERIALS

6. COMPLETE EARTHWORK AND GRADING FOR FLOODPLAIN AND CHANNEL

7. CONSTRUCT RIFFLES IN MAIN CHANNEL

8. REMOVE SEASONAL RESOURCE PROTECTION MEASURES AND SEASONAL STREAM

CROSSINGS.

9. PERFORM SITE RECLAMATION, SITE CLEANUP AND DEMOBILIZATION

CONSTRUCT NEW CHANNEL

PHASE 2 PROJECT EXTENTS

EXISTING TEMPORARY BYPASS CHANNEL

EXISTING TEMPORARY HAUL ROAD

S

W J e ff e rs o n A v e n u e

C o rv a ll is

O

R te l.5

.7

.2 fa x .5

.7

.8

W is co n si n A v e n u e

W h it e fi sh M

T te l.4

.8

.4 fa x .4

-8

-4

EXCAVATE PLUG IN BYPASS CHANNEL

PLUG CONNECTION

TO MAIN CHANNEL

C4

C2

20+

34+00

36+

38+00

40+00

0 46+00

50+00

52+

54+

58+00

62+00

66+00

68+

70+

76+00 78+00

80+00

84+00

86+00

90+00

92+00

94+00 96+00

100+00

102+00

104+00

106+00

114+00

116+00

120+00

C1

4.0

N O

D

A T E

B Y

D E S C

R

IP

T

IO

N

C R

O O

K E D

R

IV

E R

V A

LL

E Y

R E H

A B

IL

IT

A

T

IO

N P

R O

JE

C

T P H

A S E

C H

K

SHEET NUMBER

S

W J e ff e rs o n A v e n u e

C o rv a ll is

O

R te l.5

.7

.2 fa x .5

.7

.8

A C

C E S S S T A

G

IN

G A

N D

S U

R V

E Y

C O

N T R

O L

PLAN VIEW

0' 250' 500'

CROOKED RIVER ROAD

LEGEND

DESIGNATED STAGING AREA

TEMPORARY HAUL ROAD

PHASE 1 NEW CHANNEL

EXISTING TEMPORARY BYPASS CHANNEL

TEMPORARY ACCESS ROADS SHALL BE CONSTRUCTED WITHIN THE

PROJECT AREA OUTSIDE OF THE MEANDER BELT WIDTH FOR THE NEW

CHANNEL.

A1

ACCESS AND STAGING

FLOW

ACCESS TO THE STAGING AREA IS VIA ROAD A1 LOCATED 2.0 MILES UP

CROOKED RIVER ROAD #233. MINOR ACCESS AND STAGING

IMPROVEMENTS MAY BE REQUIRED.

ACCESS TO THE PHASE 2 PROJECT AREA IS VIA PREVIOUSLY CONSTRUCTED

HAUL ROAD. INSTALL A SEASONAL STREAM CROSSING ON AN EXISTING

TEMPORARY ROAD AS SHOWN.

TEMPORARY CROSSING

CONSTRUCTION LIMITS

POINT NUMBER

SURVEY CONTROL POINTS

DESCRIPTION NORTHING EASTING

CP-2 5/8 RDG 16646141.7130 2015305.9980

CP-4 5/8 RDG 16641812.5420 2014723.3530

3886.047'

3922.448'

ELEVATION

W is co n si n A v e n u e

W h it e fi sh M

T te l.4

.8

.4 fa x .4

-8

-4

C2

C4

TEMPORARY STREAM

CROSSING

PROJECT NUMBER

RDG-15-009

EXISTING STOCK PILE

EXISTING TEMPORARY HAUL ROAD

A2

A1 A2

CP-3* 5/8 RDG 16650886.3530 2015854.2520 3834.081'C3

*SURVEY CONTROL POINT C3 IS DOWN RIVER ADJACENT TO THE ACCLIMATION FACILITY.

PHASE 2 EXISTING CHANNEL

A3

EXISTING FLOW IN BYPASS CHANNEL

A3

ONLY EQUIPMENT WITH FISH FRIENDLY FLUID ALLOWED TO OPERATE

IN "LIVE" WATER. MINIMIZE CROSSINGS IN LIVE WATER. NO MORE

THAN 10 CROSSINGS ALLOWED. FISH SALVAGE WILL BE REQUIRED.

NOTIFICATION REQUIRED.

76+

80+00

82+00

84+

86+00

90+00

96+00

100+00

102+00

4.1

N O

D

A T E

B Y

D E S C

R

IP

T

IO

N

C R

O O

K E D

R

IV

E R

V A

LL

E Y

R E H

A B

IL

IT

A

T

IO

N P

R O

JE

C

T P H

A S E

C H

K

SHEET NUMBER

S

W J e ff e rs o n A v e n u e

C o rv a ll is

O

R te l.5

.7

.2 fa x .5

.7

.8

W A

T E R

M A

N A

G E M

E N

T P

LA

N

THE PROJECT WILL BE IMPLEMENTED DURING THE IN-STREAM WORK WINDOW

IDENTIFIED BY THE NATIONAL MARINE FISHERIES SERVICE AND THE U.S. FISH &

WILDLIFE SERVICE DURING THE CONSULTATION PROCESS. THE LOWEST SEASONAL

FLOWS IN THE CROOKED RIVER OCCUR BETWEEN JULY AND SEPTEMBER. MEAN DAILY

FLOW CONDITIONS ARE EXPECTED TO BE 60 CFS IN MID JULY, DROPPING TO 20 CFS BY

SEPTEMBER AND INCREASING TO 30 CFS BY NOVEMBER. DURING THIS TIME, WATER

SURFACE ELEVATIONS ARE EXPECTED TO BE APPROXIMATELY ONE TO TWO FEET

BELOW EXISTING TOP OF CHANNEL BANK ELEVATIONS. FLOW VELOCITIES ARE

EXPECTED TO BE LESS THAN TWO FEET PER SECOND.

FLOW CONDITIONS DURING IN-WATER WORK WINDOW

THE WORK AREA WILL BE ISOLATED FROM FLOWING WATER USING THE PREVIOUSLY

CONSTRUCTED TEMPORARY BYPASS CHANNEL. THE GROUNDWATER TABLE IS HIGH IN

THE CROOKED RIVER VALLEY AND IT IS EXPECTED THAT THERE WILL BE WATER OR

SATURATED GROUND CONDITIONS IN THE WORK AREA. THE CONTRACTOR SHALL

CONSTRUCT TEMPORARY ACCESS ROADS THROUGH THE PROJECT AREA AS NEEDED TO

COMPLETE THE WORK. DITCHES, PUMPS, AND SETTLING BASINS MAY BE USED TO

CONTROL EXCESS WATER. THE CONTRACTOR SHALL ENSURE THAT TURBID WATER

DOES NOT SEEP INTO THE BYPASS CHANNEL OR MAIN RIVER DOWNSTREAM.

METHOD OF WORK AREA ISOLATION

FISH SALVAGE OPERATIONS WILL BE CONDUCTED IN THE CROOKED RIVER BY THE GOVERNMENT, WITH ASSISTANCE FROM THE CONTRACTOR, ONCE THE BYPASS CHANNEL IS COMPLETE. THE CONTRACTOR SHALL GRADUALLY BLOCK THE MAIN RIVER, TRANSFERRING FLOW TO THE BYPASS CHANNEL, USING

METHODS APPROVED BY THE GOVERNMENT, TO ASSIST IN DEWATERING THE MAIN CHANNEL AND

MAINTAINING TURBIDITY STANDARDS IN THE BYPASS CHANNEL. THE CONTRACTOR SHALL PROVIDE, AT A MINIMUM, TWO 6 INCH PUMPS TO DRAW WATER DOWN IN THE POOLS. FISH SALVAGE

OPERATION ARE EXPECTED TO TAKE UP TO 5 DAYS.

FISH SALVAGE OPERATIONS AND WATER DIVERSION SEQUENCE

PLAN VIEW

0'

FLOW

LEGEND

TEMPORARY HAUL ROAD

TEMPORARY STREAM

CROSSING

W is co n si n A v e n u e

W h it e fi sh M

T te l.4

.8

.4 fa x .4

-8

-4

PROJECT NUMBER

RDG-15-009

CROOKED RIVER ROAD

DESIGN CHANNEL ALIGNMENT

CONSTRUCTION LIMITS

EXISTING TEMPORARY BYPASS CHANNEL

200'100'

EXCAVATE PLUG IN BYPASS CHANNEL

PLUG CONNECTION

TO MAIN CHANNEL

76+00

78+00

80+00

84+00

86+00

90+00

92+00

94+00

96+00

100+00

102+00

104+00

106+00

114+00

116+00

120+00

4.2

N O

D

A T E

B Y

D E S C

R

IP

T

IO

N

C R

O O

K E D

R

IV

E R

V A

LL

E Y

R E H

A B

IL

IT

A

T

IO

N P

R O

JE

C

T P H

A S E

C H

K

SHEET NUMBER

S

W J e ff e rs o n A v e n u e

C o rv a ll is

O

R te l.5

.7

.2 fa x .5

.7

.8

V E G

E T A

T

IO

N P

R E S E R

V A

T

IO

N A

N D

S A

LV

A

G E

PLAN VIEW

0' 100' 200'

LEGEND

TEMPORARY HAUL ROAD

FLOW

PRESERVATION AREA

SHRUB SALVAGE

VEGETATIVE FILL SALVAGE

SOD SALVAGE

W is co n si n A v e n u e

W h it e fi sh M

T te l.4

.8

.4 fa x .4

-8

-4

EXISTING CHANNEL ALIGNMENT

PROJECT NUMBER

RDG-15-009

CROOKED RIVER ROAD

CONSTRUCTION LIMITS

TEMPORARY STREAM

CROSSING

0+

1+00

3+

7+

8+00

10+00

73+00

76+00

77+00

80+00

81+00

82+

84+

85+00

86+00

89+00

90+00

91+00

5.0

N O

D

A T E

B Y

D E S C

R

IP

T

IO

N

PROJECT NUMBER

RDG-15-009

C H

K

SHEET NUMBER

C R

O O

K E D

R

IV

E R

V A

LL

E Y

R E H

A B

IL

IT

A

T

IO

N P

R O

JE

C

T P H

A S E

S

IT

E P

LA

N

ACCESS ROAD

PLAN VIEW

0' 50' 100'

CONTOUR INTERVAL = 1 FOOT

CHANNEL GRADING SCHEDULE

STATION TYPICAL XS

*REFER TO SHEET 8.0 FOR DIMENSIONS*

74+30

74+55

74+80

75+15

75+45

75+70

76+45

78+30

78+55

78+80

79+20

79+50

79+75

80+50

82+60

82+80

83+00

83+25

83+45

83+70

83+90

84+15

84+35

RIFFLE

POOL

RUN

RUN

POOL

POOL

RIFFLE

RIFFLE

POOL

RUN

RUN

POOL

POOL

RIFFLE

RIFFLE

POOL

RUN

RUN

POOL

POOL

RUN

RUN

POOL

84+60

85+35

87+00

87+20

87+40

87+65

87+85

88+10

88+30

88+55

88+75

89+00

89+75

92+30

92+55

92+80

93+05

93+30

93+60

93+90

94+20

94+50

POOL

RIFFLE

RIFFLE

POOL

RUN

RUN

POOL

POOL

RUN

RUN

POOL

POOL

RIFFLE

RIFFLE

POOL

RUN

RUN

POOL

POOL

RUN

RUN

POOL

STATION TYPICAL XS

FLOW

CONSTRUCTION EXTENTS

S

W J e ff e rs o n A v e n u e

C o rv a ll is

O

R te l.5

.7

.2 fa x .5

.7

.8

W is co n si n A v e n u e

W h it e fi sh M

T te l.4

.8

.4 fa x .4

-8

-4

RIFFLE SCHEDULE

STATION

START

STATION

END

76+20

80+25

85+10

89+50

78+38

82+67

87+07

92+38

LEGEND

CHANNEL FEATURES

GRADING CRITERIA FOR FLOODPLAIN FEATURES

ALCOVE

FLOODPLAIN DEPRESSION

SWALE

SIDE CHANNEL WETLANDS

FLOODPLAIN FEATURES

CONSTRUCTED RIFFLE

NOTE: OFFSET SIDE CHANNEL CENTERLINE 30 FT.

FIELD-FIT SIDE CHANNEL GRADING BETWEEN

STATION 0+75 AND STATION 7+85.

WIDTH

FLOODPLAIN

DEPRESSIONS SWALES

SIDE CHANNEL

WETLANDS ALCOVE

DEPTH

SIDE SLOPES

0.0 - 1.0 FEET

20 - 30 FEET

10:1

0.0 - 2.0 FEET

15 - 20 FEET

4:1 - 5:1

0.0 - 1.0 FEET

50 FEET

5:1

0.0 - 3.0 FEET

10 - 50 FEET

1:1 - 4:1

NOTE: OFFSET CHANNEL CENTERLINE 30 FEET FROM TOE

OF BERM TO PROTECT RECENTLY CONSTRUCTED

TEMPORARY HAUL ROAD. FIELD-FIT CHANNEL GRADING

AND STRUCTURES BETWEEN STATION 76+60 AND 80+70

*IT IS ANTICIPATED THAT APPROXIMATELY HALF THE

RIFFLES WILL REQUIRE BOULDER PLACEMENT ONLY*

AVG. VOLUME 60 CY 50 CY 60 CY 400 CY

7+

8+00

10+00

0 12+

12+

89+00

90+00

91+00

94+

95+00

96+00

97+

99+

100+00

101+00

102+00

5.1

N O

D

A T E

B Y

D E S C

R

IP

T

IO

N C

H K

SHEET NUMBER

PLAN VIEW

0' 50' 100'

CONTOUR INTERVAL = 1 FOOT

FLOW

CONSTRUCTION EXTENTS

CHANNEL GRADING SCHEDULE

STATION TYPICAL XS

*REFER TO SHEET 8.0 FOR DIMENSIONS*

STATION TYPICAL XS

POOL

RIFFLE

RIFFLE

POOL

RUN

RUN

POOL

POOL

RUN

RUN

POOL

POOL

RIFFLE

RIFFLE

POOL

94+80

95+55

97+50

97+75

98+00

98+25

98+50

98+75

RUN

RUN

POOL

POOL

RUN

RUN

POOL

POOL

RIFFLE

RIFFLE

POOL

RUN

RUN

POOL

POOL

S

W J e ff e rs o n A v e n u e

C o rv a ll is

O

R te l.5

.7

.2 fa x .5

.7

.8

W is co n si n A v e n u e

W h it e fi sh M

T te l.4

.8

.4 fa x .4

-8

-4

ACCESS ROAD

PROJECT NUMBER

RDG-15-009

C R

O O

K E D

R

IV

E R

V A

LL

E Y

R E H

A B

IL

IT

A

T

IO

N P

R O

JE

C

T P H

A S E

S

IT

E P

LA

N

RIFFLE SCHEDULE

STATION

START

STATION

END

LEGEND

FLOODPLAIN FEATURES

ALCOVE

FLOODPLAIN DEPRESSION

SWALE

CHANNEL FEATURES

CONSTRUCTED RIFFLE

SIDE CHANNEL WETLANDS

STATION TYPICAL XS

99+00

99+25

99+50

99+75

100+50

102+50

102+75

103+00

103+30

103+50

103+75

104+50

105+00

105+25

RUN

RUN

POOL

POOL

RIFFLE

RIFFLE

POOL

RUN

RUN

POOL

POOL

RIFFLE

RIFFLE

POOL

95+30

100+25

104+25

97+58

102+58

105+08

*IT IS ANTICIPATED THAT APPROXIMATELY HALF THE

RIFFLES WILL REQUIRE BOULDER PLACEMENT ONLY*

GRADING CRITERIA FOR FLOODPLAIN FEATURES

WIDTH

FLOODPLAIN

DEPRESSIONS SWALES

SIDE CHANNEL

WETLANDS ALCOVE

DEPTH

SIDE SLOPES

0.0 - 1.0 FEET

20 - 30 FEET

10:1

0.0 - 2.0 FEET

15 - 20 FEET

4:1 - 5:1

0.0 - 1.0 FEET

50 FEET

5:1

0.0 - 3.0 FEET

10 - 50 FEET

1:1 - 4:1

AVG. VOLUME 60 CY 50 CY 60 CY 400 CY

4.0 Access, Staging and Survey Control
Sheets and Views
4.0 Access Staging Utlities
5.0 Site Plan
Sheets and Views
5.0
5.1 Site Plan
Sheets and Views
5.0
8.2 Constructed Riffle
Sheets and Views
8.3
Sheet3.5
Sheet3.6
2019-02-11 Crooked River Phase 2 UpdatedDrawings.pdf
1.0 Title Sheet
Sheets and Views
BPC Phase1
2.0 Existing Conditions
Sheets and Views
Layout1
3.0 Rehabilitation Plan
Sheets and Views
3.0 Rehabilitation Plan
4.1 Water Management Plan
Sheets and Views
4.1 Work Area Isolation
4.2 Vegetation Preservation and Salvage
Sheets and Views
4.2 Vegetation Preservation and Salvage
6.0 Grading Plan
6.1 Grading Plan
Sheets and Views
6.0
7.0 Cross Sections
7.1 Cross Sections
7.2 Cross Sections
Sheets and Views
Layout1
8.0 Typical Cross Sections
8.1 Substrate Placement Detail
Sheets and Views
Layout1
8.3 Large Wood Detail
8.4 Large Wood Structure Type 1 Locations
Sheets and Views
8.4 LWD Locations

File details come from the government source that posted it.