Attachment_5-Quality_Assurance_Surveillance_Plan.docx

DOCX document 18 KB Posted

Attached to
Nez Perce-Clearwater NF, Powell RS & Lolo Pass Visitor Center Janitorial Services
Solicitation number
12034319Q0141
Issued by

About this file

Quality Assurance Surveillance Plan

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT NO. ______________________

JANITORIAL SERVICES

NEZ PERCE NATIONAL FOREST

POWELL RANGER DISTRICT & LOLO PASS VISITOR CENTER

QUALITY ASSURANCE SURVEILLANCE PLAN

1. INTRODUCTION:

This quality assurance surveillance plan (QASP) will be used to ensure service levels are received that meet the requirements listed in the contract performance work statement. The plan sets forth the procedures and guidelines the Contracting Officer’s Representative (COR) will use to ensure performance standards are achieved by the contractor.

The Forest Service relies on the Contractor’s existing quality assurance system for commercial services as a substitute for Government inspection and testing before tender for acceptance unless customary market practices for the commercial service being acquired include in-process inspection. Any in-process inspection by the Government shall be conducted in a manner consistent with commercial practice. The Forest Service may conduct quality assurance for its benefit and has the right to refuse acceptance of nonconforming services. Quality issues with services tendered for acceptance or rejected by the Government shall be resolved under Contract Clause FAR 52.212-4(a), “Contract Terms and Conditions-Commercial Items”.

2. METHODOLOGIES:

Simplified surveillance methods will be used by the COR to evaluate contractor performance. The primary methods of surveillance are

· Random monitoring through observations performed by the COR

· Valid Customer Complaint

· Review of Deliverables

· Review of Contractor inspection reports

3. The acceptable quality levels are provided in the contract Performance Requirements Summary Table:

Performance Requirements Summary Table PWS Para #
Required Services
Performance Standards
Acceptable Quality Level

(AQL)

Monitoring Method

1-5
GFP Supply Stock
Two week notice is given to the COR to replenish GFP Stock
Facilities are 100% stocked with supplies.
COR observation

Valid customer complaint

1-9.1 1-10
Facility Cleaning
See Para 1-9
No more than 2 valid customer complaints per month
Valid customer complaint

COR observations

1-9, 1-11
Scheduling Services
Services are coordinated with COR and delivered as scheduled
No more than 1 occurrence per month where services are not delivered on schedule. Services are rescheduled and completed within the week originally scheduled.
COR Observations

Valid customer complaint

4. Documenting Performance: The COR will document surveillances/observations on the attached form.

5. Inspection and Acceptance will be in accordance with FAR 52.212-4(a) – Commercial Terms and Conditions – Commercial Items (Oct 2018) Inspection/Acceptance.

QUALITY ASSURANCE

MONITORING FORM

SERVICE OR STANDARD:

SURVEY PERIOD:

SURVEILLANCE METHOD (Check):

Random Monitoring Report Review Customer Complaint Review of Contractor Inspection Reports LEVEL OF SURVEILLANCE (Check):

WeeklyMonthlyAs Required
PERCENTAGE OF ITEMS SAMPLED DURING SURVEY PERIOD:______ %

ANALYSIS OF RESULTS:

Observed Service Provider Performance Measurement Rate: ______%

Service Provider’s Performance (Check):Meets Standards
Does Not Meet Standards

Narrative of Performance During Survey Period:

PREPARED BY: ___________________________________ DATE: _________________

File details come from the government source that posted it.