J-5_Cattleguard_Drawings.pdf
PDF 175 KB Posted
- Solicitation number
- 12034319B0001
About this file
J-5 Cattleguard Drawings
View the file
Other files
| File | Type | Posted |
|---|---|---|
| J-3_Signed_Project_Cover_Sheet.pdf | ||
| J-6_Roadway_Typical_Section.pdf | ||
| 12034319B0001.pdf | ||
| J-7_SF-24_Bid_Bond_Form.pdf | ||
| J-4_Project_Vicinity_Map.pdf | ||
| Map.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERAL NOTES
DESIGN: FURNISH CATTLEGUARD THAT CONFORMS TO MSHTO HS20-44 LOADIING. MAT ERIAL AND CONSTRUCTION SHALL BE INACCORDANCE WITH THE STANDARD SPECIFICATIONS FOR ROADS AND BRIDGES ON
FEDERAL HIGHWAY PROJECTS (FP-14)
CONCRETE: THE CONCRETE FOUNDATION IS DESIGNED FOR CAST-IN-PLACE CONCRETE CONSTRUCTION USING SECTION 601 OF FP-14. IF THE CONTRACTOR CHOOSES TO USE PRECAST CONSTRUCTION THEY SHALL SUBMIT SHOP DRAWINGS AND CALCULATIONS SHOWING THE LOCATION OF THE LIFT POINTS AND CONTRACTOR SHALL PROVIDE A 3" MINIMUM DEPTH LEVELING COURSE OF COMPACTED CLASS 5 AGGREGATE UPON WHICH THE PRECAST UNIT IS SET.
REINFORCING: REINFORCING STEEL SHALL BE MSHTO M31 GRADE 40 OR 60 AND SHALL HAVE A MINIMUM
COVER NOT LESS THAN 2". CUTTING AND BENDING SHALL ADHERE TO ACI 315
HARDWARE: DRIFT PINS SHALL BE MSHTO M31 GRADE 40 OR 60 WITH CUTTING ADHEREING TO ACI 315.
BOLTS SHALL BE ASTM A:307
1. RAIL SPACING MUST NOT EXCEED 7.5" CENTER TO CENTER AND THE
OPENING BETWEEN RAILS MUST BE SIMILAR TO THOSE SHOWN ON THE DRAWING.
2. ROADWAY WIDTH ANO CAffiEGUARD WIDTH MUST MEET THE REQUESTED
DIMENSIONS.
3. DESIGN CALCULATIONS SHOWING THE PRECAST MEETS THE APPLICABLE MSHTO
SPECIFICATIONS AND MUST BE SUBMITTED BY A REGISTERED PROFESSIONAL
ENGINEER EXPERENCED IN CATTLEGUARD DESIGNS.
4.
5.
ALL MATERIALS MUST BE NEW AND MUST HAVE A MATERIAL CERTIFICATION
FROM A RECOGNIZED NATIONAL ORGANIZATION WHEN COMPLETED CATTLEGUARD
IS DELNERED.
SHOP DRAWINGS MUST BE APPROVED BY THE CONTRACTING OFFICER BEFORE
ANY FABRICATION IS BEGUN.
6. PAINTING: ALL STEEL SHALL HAVE ONE SHOP COAT OF APPROVED PRIMER AND ONE SHOP COAT OF CARLSBAD CANYON.
7. USE TWO 8' CATTLEGUARD SECTIONS BOLTED TOGETHER TO CREATE ONE 16' WIDE CATTLEGUARD
8. INSTALL 2- 6" X 8' TREATED WOOD POSTS AND ATTACH TO CATTLEGUARD WING WITH LAG SCREWS. BURY AND FIRMLY TAMP WOOD POSTS 30" IN THE GROUND. ALL OTHER FENCING WILL BE DONE BY THE FOREST SERVICE.
J/4" ♦ x 10• Anchor Bolts with moll. iron washer .
° Maximum spacing of 6 FEET
The cattl!!(Juard shall be placed 1 • higher than finished rood surface.
7.415'
SECTION A-A
Mcy 17, 2005 - 2:32pm - J:\codd_stds\sheets\usfs\teet\Stondords\USF"S_CIIGd_Fdn_std.dwg
I 48"
18"
I • A • .
I ...
/ 1
[:tl'../�"
I r
No. 4 Bara 1/2"
I 12·
4.
I
I
I
I
I
I
I
I I
I
I
•A .. .
<C-
I I I I I I
I I I I I I
I I I I I I
I I T l I
I I T 11 r r
I I 1 I I
11 I I I
I I I I I
11 I I I
I I I I I
SCALE:NONE
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
4 ..
I I
I I
I I
I I
I I
I I
PLAN
I I
I I
I I
I I
I
I I
I I
A� .
A ..
I I I I I I
I I 11 I I
I I I I I I
I I I I I I
I I I I I I
I
I I I I I I
11 I I I I
11 lT 11
11 lT II I I 7 7 I I
_j
J
ELEVATION
I I I
11 I
I I I
11 I
11 I
I I I
11 I
11 I
I I I
I I I d•
I
I
I
I
I
I
I
I
I
I
• . '!I . . •
I
I
4·
I .. . I io i .. .l s·
• I t. 4·
16"
4_·
619(B) CATTLEGUARD, INSTALL NEW
File details come from the government source that posted it.