FinalPlansCopperCrkCulvert3152015.pdf
PDF 7 MB Posted
- Solicitation number
- 12034318Q0071
About this file
Map and Drawings
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PastPerformanceSurvey.docx | DOCX document | |
| RFQ0071CopperCreekCulvert.docx | DOCX document | |
| GeneralDecisionID88_152018.docx | DOCX document | |
| ExperienceQuestionnaireCopperCrkCulvert.docx | DOCX document | |
| FSSSCopperCreekCulvert.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NO. DATEBYREVISION DESCRIPTION
SHEET NO.
SET NO.
PROJECT:
DATE:
SHEET INDEX
PROJECT LOCATION
SHEET 1 COVER
SHEET 2 TYPICAL ROADWAY SECTION & ESTIMATED QUANTITIES
SHEET 3 ROAD PLAN & PROFILE
SHEET 4 STREAM PLAN & PROFILE
SHEET 5 DIVERSION PLAN
SHEET 6 CULVERT DETAILS
SHEET 7 EROSION CONTROL DETAILS & CUTOFF WALL DETAILS
SHEET 8 TEST PIT LOG #1
SHEET 9 TEST PIT LOG #2
SHEET 10 ROADWAY CROSS SECTIONS
SHEET 11 ROADWAY CROSS SECTIONS
MARCH 15, 2017
1-15258
N
COPPER CREEK CULVERT
ROAD NO. 2517 - M.P. 2.4
CONSTRUCTION PLANS FOR
SECTION 24, TOWNSHIP 65 NORTH, AND RANGE 2 EAST
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
REGION ONE
IDAHO PANHANDLE NATIONAL FORESTS
BONNERS FERRY RANGER DISTRICT
BOUNDARY COUNTY, IDAHO
PLANS PREPARED BY:
JUSTIN EVERTZ, E.I.
VICINITY MAP
QA/QC BY:
KARL YAKAWICH, P.E.
PROJECT LOCATION
FOREST ENGINEER
IDAHO PANHANDLE NATIONAL FORESTS
FOREST SUPERVISOR
IDAHO PANHANDLE NATIONAL FORESTS
DATE
DATE
BONNERS FERRY DISTRICT RANGER
IDAHO PANHANDLE NATIONAL FORESTS
DATE
GOVERNMENT FURNISHED
- WASTE SITE
- RIPRAP SOURCE
- EMBANKMENT SOURCE
- BACKFILL SOURCE
APPROVED:
RECOMMENDED:
APPROVED:
NOTE:
DRAWING SCALE IS ONLY ACCURATE
WHEN PLANS ARE PLOTTED ON 11" X 17"
(TABLOID)-SIZED PAPER.
engineering
2501 BELT VIEW DRIVE
HELENA, MT 59601
(406)449-8627
R
Bonners
Ferry
Sandpoint
Coeur d'Alene
St. Maries
Moscow
Lewiston
Orofino
Pierce
Kamiah
Grangeville
New Meadows
Salmon
Boise
Mountain Home
Twin Falls
Burley
Pocatello
Soda
Springs
Idaho
Falls
Rexburg
Island
Park
W A
S H
I N
G T
O N
O R
E G
O N
UTAH
NEVADA
M
O
N
T
A
N
A
LOCATION MAP
T
O
B
O
N
N
E
R
S
F
E
R
R
Y
THIS PROJECT
EASTPORT
M
O
Y
I
V
E
R
CANADA
UNITED STATES
C
O
P
P
E
R
C
R
E
E
K
GOOD
GRIEF
SPRUCE PIT
RIPRAP SOURCE
EMBANKMENT SOURCE
BACKFILL SOURCE
AutoCAD SHX Text F:\1-15258-IPNF Spruce and Big Creek AOP\Copper Falls Creek 2509\CADD 1-15258 Copper Falls\Sheets\1-15258-Copper Falls-01-Cover.dwg
AutoCAD SHX Text T. 65 N.
AutoCAD SHX Text T. 64 N.
AutoCAD SHX Text R. 3 E.
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text R. 2 E.
AutoCAD SHX Text R. 1 E.
AutoCAD SHX Text D
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text H
AutoCAD SHX Text S
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text 12333
AutoCAD SHX Text K
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text L
AutoCAD SHX Text F
AutoCAD SHX Text
AutoCAD SHX Text Y
AutoCAD SHX Text A
AutoCAD SHX Text K
AutoCAD SHX Text A
AutoCAD SHX Text W
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text H
AutoCAD SHX Text 3/15/17
COPPER CREEK CULVERT
TYPICAL ROADWAY SECTION & ESTIMATED QUANTITIES
ROAD NO. 2517 - M.P. 2.4
IDAHO PANHANDLE NATIONAL FORESTS
1-15258
MARCH 15, 2017
SHEET NO.
JDE
JDE
RME
KFY
engineering
2501 BELT VIEW DRIVE
HELENA, MT 59601
(406)449-8627
R
PREPARED BY:
REGION ONE
PROJECT:
DESIGNED:
DRAWN:
DESIGN CHECKED:
DRAWING CHECKED:
DATE: NO. DATEBYREVISION DESCRIPTION
GENERAL NOTES:
SPECIFICATIONS:
DESIGN SPECIFICATION:
HYDROLOGY & HYDRAULICS:
CLEARING AND GRUBBING:
STRUCTURAL PLATE PIPE-ARCH:
CONCRETE:
REINFORCING STEEL:
HARDWARE AND STRUCTURAL STEEL:
CONTRACTOR QUALITY CONTROL:
SEEDING:
VIEW OF EXISTING CULVERT OUTLET
(JUNE 2016)
VIEW OF EXISTING ROAD APPROACH LOOKING SOUTH
(JUNE 2016)
TYPICAL ROADWAY SECTION
ESTIMATED QUANTITIES*
ITEM NO. DESCRIPTION
METHOD OF
MEASUREMENT
UNIT
QUANTITY
15101 MOBILIZATION LSQ LS 1
15221 CONSTRUCTION SURVEY AND STAKING LSQ LS 1
15713 SOIL EROSION AND POLLUTION CONTROL LSQ LS 1
20304 REMOVAL OF EXISTING CULVERT LSQ LS 1
20806 STRUCTURE EXCAVATION LSQ LS 1
20808
STRUCTURAL BACKFILL (COMMERCIAL SOURCE FOR IMPORTED MATERIAL)
LSQ LS 1
20811
BEDDING MATERIAL (COMMERCIAL SOURCE)
CQ CY 113
25101
PLACED RIPRAP, CLASS 5 (GOVERNMENT FURNISHED MATERIAL SOURCE)
CQ CY 27
30809
CRUSHED AGGREGATE (COMMERCIAL SOURCE)
CQ CY 54
60302 14'-2" SPAN, 9'-10" RISE STRUCTURAL PLATE PIPE-ARCH, 12 GAUGE, 6" X 2" CORRUGATIONS
CQ LF 75
62201a HYDRAULIC EXCAVATOR WITH THUMB AQ HR 8
62201b DUMP TRUCK AQ HR 8
62503
SEEDING & MULCHING, DRY METHOD
LSQ LS 1
67050
SLASH FILTER WINDROW (GOVERNMENT FURNISHED MATERIAL SOURCE)
LSQ LS 1
*INFORMATION ONLY - NOT FOR BIDDING PURPOSES - REFER TO BID SCHEDULE
AutoCAD SHX Text I:\AutoCAD\Template - Civil 3D\Sheet - USFS Plan & Profile - C3D.dwg
AutoCAD SHX Text MATERIALS AND CONSTRUCTION OF THIS STRUCTURE SHALL BE IN ACCORDANCE WITH THE STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS, FP-03 (U.S. CUSTOMARY UNITS). DESIGNS SHALL CONFORM TO HL-93 LOADING IN ACCORDANCE WITH AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS, 7th EDITION WITH CURRENT INTERIMS. ROADWAY DESIGN TO ACCOMMODATE LOW BOY DESIGN VEHICLE. THIS STRUCTURE PROVIDES ADEQUATE CAPACITY FOR THE 100-YEAR FREQUENCY FLOOD WHICH HAS A DESIGN FLOW VOLUME OF 628 CUBIC FEET PER SECOND (CFS). THE 2-YEAR AND THE 10-YEAR EVENTS WERE ESTIMATED AT 155 CFS 628 CUBIC FEET PER SECOND (CFS). THE 2-YEAR AND THE 10-YEAR EVENTS WERE ESTIMATED AT 155 CFS CUBIC FEET PER SECOND (CFS). THE 2-YEAR AND THE 10-YEAR EVENTS WERE ESTIMATED AT 155 CFS 155 CFS CFS AND 337 CFS, RESPECTIVELY. 337 CFS, RESPECTIVELY. CFS, RESPECTIVELY. CLEARING AND GRUBBING SHALL BE INDIRECTLY PAID BY ITEM 67050. CONTRACTOR SHALL DISPOSE OF CLEARING AND GRUBBING MATERIAL PER SUPPLEMENTAL SPECIFICATION 203. THE STRUCTURAL PLATE PIPE-ARCH SHALL BE 14'-2" SPAN, 9'-10" RISE, 6" X 2" CORRUGATIONS WITH GALVANIZED 14'-2" SPAN, 9'-10" RISE, 6" X 2" CORRUGATIONS WITH GALVANIZED SPAN, 9'-10" RISE, 6" X 2" CORRUGATIONS WITH GALVANIZED 9'-10" RISE, 6" X 2" CORRUGATIONS WITH GALVANIZED RISE, 6" X 2" CORRUGATIONS WITH GALVANIZED STEEL OF 0.111" THICKNESS (12 GAGE). STEEL PLATES SHALL BE CONNECTED WITH BOLTS SUPPLIED BY THE 0.111" THICKNESS (12 GAGE). STEEL PLATES SHALL BE CONNECTED WITH BOLTS SUPPLIED BY THE " THICKNESS (12 GAGE). STEEL PLATES SHALL BE CONNECTED WITH BOLTS SUPPLIED BY THE 12 GAGE). STEEL PLATES SHALL BE CONNECTED WITH BOLTS SUPPLIED BY THE GAGE). STEEL PLATES SHALL BE CONNECTED WITH BOLTS SUPPLIED BY THE MANUFACTURER. THE CONTRACTOR SHALL VERIFY ALL FIELD DIMENSIONS AND CONDITIONS PRIOR TO ORDERING MATERIALS. THE STEEL STRUCTURAL PLATE PIPE-ARCH CULVERT SHALL BE ASSEMBLED IN ACCORDANCE WITH THE PLATE LAYOUT DRAWINGS PROVIDED BY THE MANUFACTURER AND PER THE MANUFACTURER'S RECOMMENDATIONS. A CULVERT ALTERNATIVE TO THE STRUCTURAL PLATE PIPE-ARCH MAY BE PROPOSED. THE PIPE-ARCH SHALL CONSIST OF A CORRUGATED STEEL PIPE-ARCH, 14'-3" SPAN BY 9'-2" RISE, 5" X 1" CORRUGATIONS, MIN. 0.168" THICKNESS. LENGTH 14'-3" SPAN BY 9'-2" RISE, 5" X 1" CORRUGATIONS, MIN. 0.168" THICKNESS. LENGTH SPAN BY 9'-2" RISE, 5" X 1" CORRUGATIONS, MIN. 0.168" THICKNESS. LENGTH 9'-2" RISE, 5" X 1" CORRUGATIONS, MIN. 0.168" THICKNESS. LENGTH RISE, 5" X 1" CORRUGATIONS, MIN. 0.168" THICKNESS. LENGTH 0.168" THICKNESS. LENGTH " THICKNESS. LENGTH & ORIENTATION SHALL BE AS SHOWN. USE CLASS A(AE) OR C(AE) CONCRETE, F'C = 4,000 PSI AT 28 DAYS WITH AN ENTRAINED AIR CONTENT OF 5% ± 1%.FINISH CONCRETE WITH A CLASS 1 - ORDINARY SURFACE FINISH. ALL CONCRETE SHALL BE MADE IN ACCORDANCE WITH AN APPROVED MIX DESIGN. CHAMFER ALL EXPOSED EDGES OF CONCRETE AND FILLET ALL RE-ENTRANT ANGLES " UNLESS NOTED OTHERWISE. 34" UNLESS NOTED OTHERWISE. ALL REINFORCING SHALL BE OF THE DEFORMED BAR TYPE CONFORMING TO AASHTO M31 (ASTM A615), GRADE 60. CONCRETE CLEAR COVER SHALL BE 2" UNLESS SHOWN OTHERWISE ON THE PLANS. BENDING AND SPLICING OF REINFORCEMENT SHALL BE IN ACCORDANCE WITH ACI 315. ALL STEEL SHAPES, PLATES AND BARS SHALL CONFORM TO AASHTO M270 (ASTM A36) AND SHALL BE GALVANIZED. HARDWARE SHALL MEET REQUIREMENTS OF ASTM A325 UNLESS SHOWN OTHERWISE ON THE PLANS. ALL WELDING TO BE CONDUCTED BY A CERTIFIED WELDER WITH CREDENTIALS SUBMITTAL REQUIRED. ALL WELDING SHALL BE IN ACCORDANCE WITH AWS D1.5, BRIDGE WELDING CODE. ALL ELECTRODES SHALL BE E70XX. REFER TO FP-03 SECTION 153 AND SUPPLEMENTAL SPECIFICATION 153 FOR TESTING AND SUBMITTAL REQUIREMENTS. CONTRACTOR SHALL SEED AND MULCH ALL DISTURBED AREAS. SEED AND MULCH TO BE CERTIFIED WEED FREE. REFER TO FSSS 625.
AutoCAD SHX Text
CRUSHED AGGREGATE, 4" COMPACTED DEPTH.
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
1.25:1 (TYP.)*
AutoCAD SHX Text
* SEE ROADWAY CROSS-SECTIONS
AutoCAD SHX Text
EXISTING GROUND, (TYP.)
AutoCAD SHX Text
ROADWAY EMBANKMENT, (TYP.)
AutoCAD SHX Text
4% (TYP.)*
AutoCAD SHX Text
ROADWAY
AutoCAD SHX Text
4% (TYP.)*
1.5:1 (TYP.)*
PROFILE VIEW OF ROAD NO. 2517 - STA. 1+50 TO STA. 5+50
Δ
PLAN VIEW OF ROAD NO. 2517 - STA. 1+50 TO STA. 5+50
NORTH
COPPER CREEK CULVERT
ROAD PLAN & PROFILE
ROAD NO. 2517 - M.P. 2.4
IDAHO PANHANDLE NATIONAL FORESTS
1-15258
MARCH 15, 2017
SHEET NO.
JDE
JDE
RME
KFY
engineering
2501 BELT VIEW DRIVE
HELENA, MT 59601
(406)449-8627
R
PREPARED BY:
REGION ONE
PROJECT:
DESIGNED:
DRAWN:
DESIGN CHECKED:
DRAWING CHECKED:
DATE: NO. DATEBYREVISION DESCRIPTION
NOTES:
C
O
P
P
C
E
E
K
R
O
A
D
N
O
CP3
CP1
CP4
CP5
CONTROL POINT
COORDINATE TABLE*
POINT NORTHING EASTING ELEVATION DESCRIPTION
CP1 5000.00 10000.00 1000.00 REBAR W/CAP
CP2 5006.23 10119.06 1019.04 REBAR W/CAP
CP3 5023.37 9870.40 986.10 REBAR W/CAP
CP4 5113.87 9926.95 1007.80 REBAR W/CAP
CP5 4942.33 10074.19 1003.91 REBAR W/CAP
* LOCAL COORDINATE SYSTEM UTILIZED
ROADWAY CENTERLINE
COORDINATE STAKING TABLE
DESCRIPTION NORTHING EASTING ELEVATION
STA. 2+07.98 PC 5115.62 9881.14 N/A
STA. 2+60.00 BEGIN ROADWAY &
GRAVEL SURFACING
5102.16 9931.16 1007.04
STA. 2+75.00 5095.42 9944.55 1006.28
STA. 3+00.00 5081.56 9965.33 1005.19
STA. 3+25.00 5064.70 9983.77 1004.33
STA. 3+52.51 CL CULVERT 5043.18 10000.84 1003.65
STA. 3+60.07 PT 5036.79 10004.88 1003.51
STA. 3+75.00 5023.99 10012.57 1003.29
STA. 4+00.00 5002.56 10025.44 1003.11
STA. 4+25.00 4981.12 10038.31 1003.16
STA. 4+50.00 4959.69 10051.18 1003.44
STA. 4+75.00 4938.11 10063.80 1003.94
STA. 4+80.00 END ROADWAY &
GRAVEL SURFACING
4933.79 10066.31 EXISTING
CP2
TP1
TP2
D
I S
P
E
R
S
S
T
E
A
C
C
E
S
S
AutoCAD SHX Text I:\AutoCAD\Template - Civil 3D\Sheet - USFS Plan & Profile - C3D.dwg
AutoCAD SHX Text
AutoCAD SHX Text
SCALE IN FEET
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
1. CONTRACTOR MAY USE SUITABLE ONSITE MATERIAL FROM STRUCTURE EXCAVATION FOR CONTRACTOR MAY USE SUITABLE ONSITE MATERIAL FROM STRUCTURE EXCAVATION FOR EMBANKMENT CONSTRUCTION. ALL EMBANKMENT MATERIAL SHALL BE APPROVED BY THE C.O. BEFORE PLACEMENT. CONTRACTOR MAY ALSO USE SPRUCE PIT FOR ADDITIONAL EMBANKMENT MATERIAL. ALL EMBANKMENT MATERIAL TO BE APPROVED BY C.O. BEFORE PLACEMENT. ROADWAY EMBANKMENT INCIDENTAL TO 20806. UTILIZE COMPACTION METHOD B (ROLLER) AS SPECIFIED IN FSSS 204. 2. ESTIMATED QUANTITIES ARE PROVIDED FOR INFORMATION ONLY. CONTRACTOR TO VERIFY ESTIMATED QUANTITIES ARE PROVIDED FOR INFORMATION ONLY. CONTRACTOR TO VERIFY QUANTITIES. 3. CONTRACTOR TO DISPOSE OF EXCESS AND/OR UNSUITABLE MATERIAL IN A GOVERNMENT CONTRACTOR TO DISPOSE OF EXCESS AND/OR UNSUITABLE MATERIAL IN A GOVERNMENT FURNISHED WASTE WITHIN 2 MILES OF THE PROJECT SITE (PER THE C.O.) 2 MILES OF THE PROJECT SITE (PER THE C.O.) OF THE PROJECT SITE (PER THE C.O.) 4. REFER TO SHEETS 10-11 FOR ROADWAY CROSS-SECTIONS. REFER TO SHEETS 10-11 FOR ROADWAY CROSS-SECTIONS. 10-11 FOR ROADWAY CROSS-SECTIONS. -11 FOR ROADWAY CROSS-SECTIONS. 11 FOR ROADWAY CROSS-SECTIONS. FOR ROADWAY CROSS-SECTIONS. 5. CONTRACTOR TO PRESERVE ALL LARGE DIAMETER TREES PER THE DIRECTION OF THE C.O. LARGE CONTRACTOR TO PRESERVE ALL LARGE DIAMETER TREES PER THE DIRECTION OF THE C.O. LARGE DIAMETER TREES REQUIRED TO BE REMOVED FOR CONSTRUCTION SHALL BE DISPOSED OF AT THE WASTE SITE OR AS DIRECTED BY THE C.O. THIS WORK IS INDIRECTLY PAID BY ITEM 67050. 6. MATERIALS MAY BE STOCKPILED ADJACENT TO THE EXISTING CULVERT ALONG THE ROADWAY. NO MATERIALS MAY BE STOCKPILED ADJACENT TO THE EXISTING CULVERT ALONG THE ROADWAY. NO MATERIALS OR EQUIPMENT MAY BE STORED BELOW THE ORDINARY HIGH WATER MARK OF THE CREEK.
AutoCAD SHX Text
END PROJECT STA. 4+80.00 (MATCH EXISTING)
AutoCAD SHX Text
BEGIN PROJECT STA. 2+60.00 (MATCH EXISTING)
AutoCAD SHX Text NEW 14'-2" SPAN x 9'-10" RISE x 75' LONG STEEL STRUCTURAL PLATE PIPE-ARCH CULVERT
AutoCAD SHX Text NEW 14'-2" SPAN x 9'-10" RISE x 75' LONG STEEL STRUCTURAL PLATE PIPE-ARCH CULVERT
AutoCAD SHX Text
EXISTING EDGE OF ROAD (TYP.)
AutoCAD SHX Text
CRUSHED AGGREGATE 4" DEPTH (TYP.)
AutoCAD SHX Text
FINNISHED GRADE ALONG OF ROADWAY
AutoCAD SHX Text
SURVEYED EDGE OF WATER (6/14/16)
AutoCAD SHX Text
NEW EDGE OF ROADWAY (TYP.)
AutoCAD SHX Text
CONSTRUCTION LIMITS (TYP.)
AutoCAD SHX Text
PC: 2+07.98
AutoCAD SHX Text
PT: 3+60.07
AutoCAD SHX Text EXISTING 7' x 70'CSP CULVERT TO BE REMOVED & DISPOSED
AutoCAD SHX Text EXISTING 7' x 70'CSP CULVERT TO BE REMOVED & DISPOSED
AutoCAD SHX Text
EXISTING GRADE ALONG OF ROADWAY (TYP.)
AutoCAD SHX Text
STRUCTURAL EXCAVATION AND BACKFILL LIMITS (TYP.)
AutoCAD SHX Text
END TAPER STA. 2+80.00
AutoCAD SHX Text
START TAPER STA. 2+60.00
CLASS 5 RIPRAP (TYP.)
PROFILE VIEW OF COPPER CREEK - STA. 51+60 TO STA. 53+60
PLAN VIEW OF COPPER CREEK - STA. 51+60 TO STA. 53+60
N O
R T
H
COPPER CREEK CULVERT
STREAM PLAN & PROFILE
ROAD NO. 2517 - M.P. 2.4
IDAHO PANHANDLE NATIONAL FORESTS
1-15258
MARCH 15, 2017
SHEET NO.
JDE
JDE
RME
KFY
engineering
2501 BELT VIEW DRIVE
HELENA, MT 59601
(406)449-8627
R
PREPARED BY:
REGION ONE
NOTES:
COPPER CREEK
R
O
PROJECT:
DESIGNED:
DRAWN:
DESIGN CHECKED:
DRAWING CHECKED:
DATE: NO. DATEBYREVISION DESCRIPTION
TYPICAL CHANNEL SECTION
CHANNEL CENTERLINE
COORDINATE STAKING TABLE
DESCRIPTION NORTHING EASTING ELEVATION
STA. 52+00.00 BEGIN CHANNEL WORK 5041.72 9944.19 EXISTING
STA. 52+13.12 D/S INV. ELEV. @ CL OF
CULVERT
5041.31 9957.30 986.06
STA. 52+87.81 U/S INV. ELEV. @ CL OF
CULVERT
5044.53 10031.92 992.90
STA. 53+15.00 END CHANNEL WORK 5040.03 10058.67 EXISTING
AutoCAD SHX Text I:\AutoCAD\Template - Civil 3D\Sheet - USFS Plan & Profile - C3D.dwg
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SCALE IN FEET
AutoCAD SHX Text
1. UTILIZE EXCESS CHANNEL EXCAVATION AND/OR STRUCTURE EXCAVATION MATERIAL TO UTILIZE EXCESS CHANNEL EXCAVATION AND/OR STRUCTURE EXCAVATION MATERIAL TO REGRADE AND SHAPE THE STREAM CHANNEL PER C.O APPROVAL. REGRADE AND SHAPE THE CHANNEL WITHIN THE CULVERT PER DETAILS ON SHEET 6; THIS WORK 6; THIS WORK ; THIS WORK WILL BE INDIRECTLY PAID BY ITEM 20806. REGRADE AND SHAPE THE CHANNEL OUTSIDE THE CULVERT PER THE TYPICAL CHANNEL SECTION DETAIL ON THIS SHEET; THIS WORK WILL BE PAID FOR UNDER ITEMS 20806. REFER TO FSSS 648 FOR 20806. REFER TO FSSS 648 FOR ADDITIONAL REQUIREMENTS. IF SUITABLE STREAMBED MATERIAL CANNOT BE ACQUIRED, . IF SUITABLE STREAMBED MATERIAL CANNOT BE ACQUIRED, IF SUITABLE STREAMBED MATERIAL CANNOT BE ACQUIRED, CONTRACTOR MAY OBTAIN FROM THE SPRUCE PIT AS APPROVED BY THE C.O. & SHALL BE INCIDENTAL TO BID ITEM 20806. 2. CHANNEL EXCAVATION AND EMBANKMENT QUANTITIES ARE FOR INFORMATION ONLY AND CHANNEL EXCAVATION AND EMBANKMENT QUANTITIES ARE FOR INFORMATION ONLY AND ARE CALCULATED TO THE CHANNEL FINISHED GRADE. 3. CONTRACTOR SHALL SALVAGE VEGETATED SOILS MATS, OTHER RIPARIAN VEGETATION, CONTRACTOR SHALL SALVAGE VEGETATED SOILS MATS, OTHER RIPARIAN VEGETATION, AND TOP SOIL PRIOR TO CLEARING AND GRUBBING AS DIRECTED BY THE C.O. VEGETATION WILL BE PLACED ON THE STREAM BANKS ABOVE BANKFULL AS DIRECTED BY THE C.O. PLACING SOIL MATS AND RIPARIAN VEGETATION SHALL BE PAID UNDER ITEM 62201a. PLACING SALVAGED TOPSOIL SHALL BE INCIDENTAL TO ITEM 20806. 4. TO OPTIMIZE TRANSPLANT SUCCESS, OVER-EXACAVATE A DIVOT FOR SOIL MAT OR TO OPTIMIZE TRANSPLANT SUCCESS, OVER-EXACAVATE A DIVOT FOR SOIL MAT OR OTHER RIPARIAN VEGETATION. PLACE FILL MATERIAL IN DIVOT HOLE SURROUNDING PLANT TO NATURAL CONTOUR. COMPACT THOROUGHLY. WATER IMMEDIATELY WITH EXCAVATOR BUCKET. 5. THE TRANSITION FROM THE TYPICAL CULVERT SECTION TO THE TYPICAL CHANNEL THE TRANSITION FROM THE TYPICAL CULVERT SECTION TO THE TYPICAL CHANNEL SECTION IS TO OCCUR OVER A MINIMUM DISTANCE OF 5'. TRANSITION STREAM BANKS SHALL BE CONSTRUCTED WITH LARGER BANK MARGIN ROCK INTERMIXED WITH STREAMBED MATERIAL. TOPSOIL SHALL BE PLACED ON TOP FOR SEEDING AND PLANTING.
AutoCAD SHX Text
END CHANNEL WORK STA. 53+15.00 (MATCH EXISTING CHANNEL ELEV. & WIDTH)
AutoCAD SHX Text
BEGIN CHANNEL WORK STA. 52+00.00 (MATCH EXISTING CHANNEL ELEV. & WIDTH)
AutoCAD SHX Text NEW 14'-2" SPAN x 9'-10" RISE x 75' LONG STEEL STRUCTURAL PLATE PIPE-ARCH CULVERT
AutoCAD SHX Text
EXISTING GRADE ALONG OF CHANNEL
AutoCAD SHX Text
NEW CHANNEL THALWEG
AutoCAD SHX Text
SURVEYED EDGE OF WATER (06/14/16)
AutoCAD SHX Text
FINISHED GRADE ALONG ROADWAY
AutoCAD SHX Text
CLASS 5 RIPRAP, (TYP.)
AutoCAD SHX Text NEW 14'-2" SPAN x 9'-10" RISE x 75' LONG STEEL STRUCTURAL PLATE PIPE-ARCH CULVERT
AutoCAD SHX Text EXISTING 7' x 70'CULVERT TO BE REMOVED & DISPOSED
AutoCAD SHX Text EXISTING 7' x 70'CSP CULVERT TO BE REMOVED & DISPOSED
AutoCAD SHX Text
CONSTRUCTION LIMITS (TYP.)
AutoCAD SHX Text
BOTTOM OF CULV. STA. 52+87.81 ELEV. = 992.90
AutoCAD SHX Text
REGRADE STREAM CHANNEL
AutoCAD SHX Text
REGRADE STREAM CHANNEL
AutoCAD SHX Text
16.37% (EXISTING)
AutoCAD SHX Text B
AutoCAD SHX Text
AutoCAD SHX Text
BEVEL CULVERT ENDS (TYP.) SEE DETAIL
AutoCAD SHX Text
11.44% (EXISTING)
AutoCAD SHX Text 14'-0"
AutoCAD SHX Text 14'-0"
AutoCAD SHX Text 1.5:1
AutoCAD SHX Text 1.5:1
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
PROFILE GRADE
BOTTOM OF CULV. STA. 52+13.12 ELEV. = 986.06
P U
M P
P U
M P
STREAM DIVERSION PLAN
N O
R T
H
COPPER CREEK CULVERT
DIVERSION PLAN
ROAD NO. 2517 - M.P. 2.4
IDAHO PANHANDLE NATIONAL FORESTS
1-15258
MARCH 15, 2017
SHEET NO.
JDE
JDE
RME
KFY
engineering
2501 BELT VIEW DRIVE
HELENA, MT 59601
(406)449-8627
R
PREPARED BY:
REGION ONE
PUMP
NOTE:
DIVERSION DAM DETAIL
C O
P P
E R
C R
E E
K
R
O
PROJECT:
DESIGNED:
DRAWN:
DESIGN CHECKED:
DRAWING CHECKED:
DATE: NO. DATEBYREVISION DESCRIPTION
NOTES:
AutoCAD SHX Text
SCALE: 1" = 20'
AutoCAD SHX Text F:\1-15258-IPNF Spruce and Big Creek AOP\Copper Falls Creek 2509\CADD 1-15258 Copper Falls\Sheets\1-15258-Copper Falls-05-Diversion Plan.dwg
AutoCAD SHX Text
SANDBAG OR OTHER DIVERSION DAM HEIGHT AT LEAST 6" OVER TOP OF PIPE
AutoCAD SHX Text 1.5
AutoCAD SHX Text
AutoCAD SHX Text
STREAMBED
AutoCAD SHX Text DIVERSION DAM LOCATION SHALL BE STAKED BY THE CONTRACTOR AND APPROVED BY THE C.O. ANY RUPTURED SANDBAGS TO BE CLEANED UP BY CONTRACTOR
AutoCAD SHX Text
PUMP STREAMFLOW AS NECESSARY TO CONSTRUCT DAM
AutoCAD SHX Text
DIVERSION PIPE
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
BYPASS DAM. LOCATION STAKED BY CONTRACTOR AND APPROVED BY THE C.O.
AutoCAD SHX Text
PUMP EFFLUENT INTO SURROUNDING LANDSCAPE
AutoCAD SHX Text
PUMP EFFLUENT INTO SURROUNDING LANDSCAPE
AutoCAD SHX Text STREAM BYPASS PIPE AND/OR LINED OPEN CHANNEL. (CONTRACTOR TO SIZE TO CARRY ENTIRE STREAM FLOW)
AutoCAD SHX Text UPSTREAM SUMP PUMP AT DEPTH NEEDED TO BE USED TO INTERCEPT SEEPAGE FROM DIVERSION DAM
AutoCAD SHX Text
SEDIMATS (SEE NOTES 4-5)
AutoCAD SHX Text DOWNSTREAM SUMP PUMP. PLACE IN CUT-OFF TRENCH OR SUMP AT DEPTH NEEDED TO DE-WATER SITE
1. DE-WATER THE EXCAVATION IN ACCORDANCE WITH FP-03 SECTIONS 208, 209 AND 157 AND THE DE-WATER THE EXCAVATION IN ACCORDANCE WITH FP-03 SECTIONS 208, 209 AND 157 AND THE REQUIREMENTS ON THIS SHEET. 2. DE-WATERING IS THE RESPONSIBILITY OF THE CONTRACTOR AND CONTRACTOR SHALL SUBMIT A DE-WATERING IS THE RESPONSIBILITY OF THE CONTRACTOR AND CONTRACTOR SHALL SUBMIT A DE-WATERING PLAN TO THE C.O. FOR APPROVAL ALONG WITH THE EXCAVATION PLAN. THIS SHEET ILLUSTRATES GENERIC DE-WATERING REQUIREMENTS AND POSSIBLE METHODS AND EQUIPMENT AND IS NOT CONSIDERED ADEQUATE FOR THIS PROJECT. CONTRACTOR SHALL DEVELOP THEIR OWN PROJECT SPECIFIC DE-WATERING PLANS AND SHALL INCLUDE DRAWINGS AND A WRITTEN OUTLINE ILLUSTRATING AND DESCRIBING PROPOSED LAYOUT, METHODS, EQUIPMENT, FISH PASSAGE CONSIDERATIONS AND ANTICIPATED STREAM FLOW VOLUMES. APPROVAL OF THE DE-WATERING PLAN BY THE CONTRACTING OFFICER DOES NOT RELIEVE THE CONTRACTOR FROM COMPLETING THE WORK AS SPECIFIED. IF CONTRACTOR'S IDENTIFIED DE-WATERING METHODS ARE NOT PRODUCING DESIRED RESULTS, CONTRACTOR SHALL RE-EVALUATE AND SUBMIT ANOTHER PLAN TO C.O. FOR APPROVAL. NO ADDITIONAL PAYMENT WILL BE MADE FOR THIS WORK. ALL WORK RELATING TO THE STREAM DIVERSION IS PAID UNDER ITEM 15713. 3. CONTRACTOR IS RESPONSIBLE FOR SIZING ALL PUMPS, DAMS, BYPASS PIPES, OPEN CHANNELS, ETC AND CONTRACTOR IS RESPONSIBLE FOR SIZING ALL PUMPS, DAMS, BYPASS PIPES, OPEN CHANNELS, ETC AND WILL NEED TO MAINTAIN PUMPING CAPACITY OF THE INFLOW DURING THE DURATION OF THE PROJECT. PUMPS TO BE PLACED IN LOCATION OR WITHIN SECONDARY CONTAINMENT TO PREVENT FUEL/OIL FROM SPILLING INTO STREAM. CONTRACTOR TO BE RESPONSIBLE FOR CLEANUP OF ANY FUEL/OIL SPILLAGE. 4. SOIL EROSION AND SEDIMENT CONTROL MEASURES SPECIFIC TO THE DE-WATERING PLAN SHALL BE SOIL EROSION AND SEDIMENT CONTROL MEASURES SPECIFIC TO THE DE-WATERING PLAN SHALL BE INCLUDED AND SHALL BE IN CONFORMANCE WITH PROJECT PERMITS. 5. INSTALL A MINIMUM OF 3 SEDIMATS DOWNSTREAM OF STREAM WORK PRIOR TO CONSTRUCTION. SEDIMATS INSTALL A MINIMUM OF 3 SEDIMATS DOWNSTREAM OF STREAM WORK PRIOR TO CONSTRUCTION. SEDIMATS ARE TO BE INSTALLED PER THE MANUFACTURERS RECOMMENDATIONS. SEDIMATS ARE TO BE REMOVED BY CONTRACTOR POST DEWATERING. THIS WORK IS INDIRECTLY PAID BY ITEM 15713. 6. CONTRACTOR SHALL GIVE 2 DAYS NOTICE BEFORE DEWATERING. DEWATERING SHALL TAKE PLACE FIRST CONTRACTOR SHALL GIVE 2 DAYS NOTICE BEFORE DEWATERING. DEWATERING SHALL TAKE PLACE FIRST THING IN THE MORNING AND NO IN-STREAM WORK OR WORK NEARBY SHALL TAKE PLACE FOR THE REST OF THE DAY. REWATERING WILL ALSO BE DONE SLOWLY IN A MANNER TO REDUCE SEDIMENTATION. 7. CLEARING LIMITS WILL VARY DEPENDING ON THE DIVERSION PLAN SUBMITTED BY THE CONTRACTOR. CLEARING LIMITS WILL VARY DEPENDING ON THE DIVERSION PLAN SUBMITTED BY THE CONTRACTOR. CONTRACTOR TO SUBMIT PROPOSED CLEARING LIMITS WITH DIVERSION PLAN.
TYPICAL SECTION - STEEL STRUCTURAL PLATE PIPE-ARCH CULVERT
CULVERT DETAILS
ROAD NO. 2517 - M.P. 2.4
IDAHO PANHANDLE NATIONAL FORESTS
1-15258
MARCH 15, 2017
SHEET NO.
JDE
JDE
RME
KFY
engineering
2501 BELT VIEW DRIVE
HELENA, MT 59601
(406)449-8627
R
PREPARED BY:
REGION ONE
CULVERT END TREATMENT
RIPRAP AT INLET & OUTLET
NOTE:
PROJECT:
DESIGNED:
DRAWN:
DESIGN CHECKED:
DRAWING CHECKED:
DATE: NO. DATEBYREVISION DESCRIPTION
STRUCTURE EXCAVATION NOTES:
DEWATERING AND EROSION CONTROL:
BACKFILL:
ESTIMATED QUANTITIES*
STRUCTURE EXCAVATION
1059 CY
USEABLE STRUCTURE EXCAVATION MATERIAL (50%)
530 CY
ON-SITE (GOV'T FURNISHED) STRUCTURAL BACKFILL
MATERIAL
740 CY
IMPORTED STRUCTURAL BACKFILL MATERIAL
127 CY
TOTAL BEDDING MATERIAL
113 CY
PIPE INFILL MATERIAL
44 CY
REQUIRED ROADWAY EMBANKMENT MATERIAL
55 CY
AutoCAD SHX Text
SCALE: 1" = 8'
AutoCAD SHX Text I:\AutoCAD\Template - Civil 3D\Sheet - USFS Plan & Profile - C3D.dwg
AutoCAD SHX Text
AutoCAD SHX Text 1.5
AutoCAD SHX Text
CULVERT INVERT
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text B
AutoCAD SHX Text
AutoCAD SHX Text
TOP OF CULVERT
AutoCAD SHX Text
ROAD FILL SLOPE
AutoCAD SHX Text
RIPRAP, CLASS 5
AutoCAD SHX Text
AutoCAD SHX Text
VARIES
AutoCAD SHX Text
CHANNEL INVERT
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
BEVEL AT END (ALL CUTS NEED CORROSION RESISTANT COATING)
AutoCAD SHX Text
EXISTING GROUND ALONG ROADWAY
AutoCAD SHX Text
FINISH GRADE ALONG ROADWAY
AutoCAD SHX Text
MINIMUM LIMITS OF STRUCTURE EXCAVATION
AutoCAD SHX Text
ROADWAY STATIONING DIRECTION LEFT TO RIGHT
AutoCAD SHX Text
COMPACTED BEDDING MATERIAL
AutoCAD SHX Text
LOOSE BEDDING MATERIAL
AutoCAD SHX Text
1. STRUCTURE EXCAVATION SHALL BE COMPLETED IN ACCORDANCE WITH FP-03, SECTION 208. STRUCTURE EXCAVATION SHALL BE COMPLETED IN ACCORDANCE WITH FP-03, SECTION 208. 2. LIMITS SHOWN ARE MINIMUM EXCAVATION REQUIREMENTS BASED ON ENGINEERS LIMITS SHOWN ARE MINIMUM EXCAVATION REQUIREMENTS BASED ON ENGINEERS DETERMINATION OF OSHA SOIL TYPE C AND OSHA EXCAVATION REQUIREMENTS. DETERMINATION IS BASED ON LIMITED DATA AND ACTUAL SITE CONDITIONS MAY VARY. 3. STRUCTURE EXCAVATION QUANTITY SHOWN IS FOR INFORMATION ONLY BASED ON THE LIMITS STRUCTURE EXCAVATION QUANTITY SHOWN IS FOR INFORMATION ONLY BASED ON THE LIMITS SHOWN. CONTRACTOR IS RESPONSIBLE FOR DETERMINING ACTUAL QUANTITIES BASED ON THEIR OWN EXCAVATION PLAN. 4. CONTRACTOR SHALL SUBMIT EXCAVATION PLAN TO C.O. FOR APPROVAL. PLAN SHALL INCLUDE CONTRACTOR SHALL SUBMIT EXCAVATION PLAN TO C.O. FOR APPROVAL. PLAN SHALL INCLUDE DRAWINGS AND WRITTEN OUTLINE ILLUSTRATING AND DESCRIBING PROPOSED EXCAVATION LIMITS, METHODS, EQUIPMENT, LOCATION OF STOCKPILES, AND ESTIMATED QUANTITIES AND COMPLY WITH OSHA EXCAVATION SOIL TYPING AND REQUIREMENTS. CHANGES TO THE EXCAVATION LIMITS SHOWN ON THIS SHEET FOR CONTRACTOR'S DEWATERING METHODS OR OTHER CONTRACTOR CONVENIENCE, MUST BE SHOWN ON THE CONTRACTOR'S PLAN AND ARE THE RESPONSIBILITY OF THE CONTRACTOR. THIS WORK IS INDIRECTLY PAID BY ITEM 20806. 5. APPROXIMATELY 50 PERCENT OF THE STRUCTURE EXCAVATION MATERIAL IS ANTICIPATED TO APPROXIMATELY 50 PERCENT OF THE STRUCTURE EXCAVATION MATERIAL IS ANTICIPATED TO BE SUITABLE FOR ROADWAY EMBANKMENT MATERIAL. A. MUST HAVE APPROVAL FROM C.O. PRIOR TO REUSE. MUST HAVE APPROVAL FROM C.O. PRIOR TO REUSE. B. SOME MIXING, SORTING, AND DRYING MAY BE REQUIRED PRIOR TO RE-USE. SOME MIXING, SORTING, AND DRYING MAY BE REQUIRED PRIOR TO RE-USE. C. MUST HAVE APPROVAL FROM THE C.O. PRIOR TO REUSE. MUST HAVE APPROVAL FROM THE C.O. PRIOR TO REUSE. 1. PROTECT AGAINST SOIL EROSION AND SEDIMENTATION DURING CONSTRUCTION IN ACCORDANCE PROTECT AGAINST SOIL EROSION AND SEDIMENTATION DURING CONSTRUCTION IN ACCORDANCE WITH FP-03, SECTION 157 AND THE PROJECT PERMITS. CONTRACTOR SHALL PREPARE AND SUBMIT A SOIL EROSION AND SEDIMENT CONTROL PLAN TO C.O. FOR APPROVAL. PLAN SHALL INCLUDE DRAWINGS AND A WRITTEN OUTLINE ILLUSTRATING AND DESCRIBING PROPOSED LAYOUT, METHODS, AND EQUIPMENT. 2. DEWATER THE EXCAVATION IN ACCORDANCE WITH FP-03 SECTIONS 208, 209, 157 AND THE DEWATER THE EXCAVATION IN ACCORDANCE WITH FP-03 SECTIONS 208, 209, 157 AND THE REQUIREMENTS ON SHEET 5. 5. . 3. CONTRACTOR SHOULD ANTICIPATE WATER INFILTRATING THE EXCAVATIONS. CONTRACTOR SHOULD ANTICIPATE WATER INFILTRATING THE EXCAVATIONS. 4. SUBGRADE EXCAVATION, RIPRAP PLACEMENT, BEDDING PLACEMENT AND BACKFILL ARE TO BE SUBGRADE EXCAVATION, RIPRAP PLACEMENT, BEDDING PLACEMENT AND BACKFILL ARE TO BE COMPLETED PER THE CONTRACT SPECIFICATIONS AND STANDING OR RUNNING WATER IN THE WORK AREA DOES NOT RELIEVE THE CONTRACTOR FROM MEETING THE SPECIFICATIONS.
AutoCAD SHX Text
1. ALL STRUCTURAL BACKFILL MATERIAL SHALL MEET THE MATERIAL REQUIREMENTS IN FP-03 ALL STRUCTURAL BACKFILL MATERIAL SHALL MEET THE MATERIAL REQUIREMENTS IN FP-03 SECTION 704.04 AND BE COMPACTED IN ACCORDANCE WITH FP-03 SECTION 208. PAYMENT FOR ALL STRUCTURAL BACKFILL MATERIAL AND PLACEMENT SHALL BE INCIDENTAL TO ITEM 20808. THE PROCTOR DENSITY FOR BACKFILL MATERIAL(S) SHALL BE OBTAINED IN ACCORDANCE WITH AASHTO T99, METHOD C. SAMPLING AND TESTING IS REQUIRED PER FP-03 TABLE 208-1. 2. BACKFILL LIMITS SHOWN ARE MINIMUM REQUIREMENTS. ANY BACKFILL OUTSIDE THE BACKFILL LIMITS SHOWN ARE MINIMUM REQUIREMENTS. ANY BACKFILL OUTSIDE THE SHOWN LIMITS SHALL BE CONSIDERED ROADWAY EMBANKMENT AND MUST MEET THE REQUIREMENTS OUTLINED IN SUPPLEMENTAL SPECIFICATION 204. 3. PLACE STRUCTURAL BACKFILL IN HORIZONTAL LAYERS THAT DO NOT EXCEED 6 INCHES IN PLACE STRUCTURAL BACKFILL IN HORIZONTAL LAYERS THAT DO NOT EXCEED 6 INCHES IN COMPACTED THICKNESS. 4. COMPACTION TESTING SHALL BE PERFORMED EVERY 500 SQUARE FEET PER LIFT FOR COMPACTION TESTING SHALL BE PERFORMED EVERY 500 SQUARE FEET PER LIFT FOR STRUCTURAL BACKFILL AS DIRECTED BY THE C.O.
AutoCAD SHX Text
ONSITE (GOV'T FURNISHED) STRUCTURAL BACKFILL MATERIAL
AutoCAD SHX Text
IMPORTED STRUCTURAL BACKFILL MATERIAL
AutoCAD SHX Text
AutoCAD SHX Text 1.5
AutoCAD SHX Text
MAXIMUM ALLOWABLE SLOPE
AutoCAD SHX Text
CUTOFF WALL AT BOTH INLET AND OUTLET OF CULVERT (SEE SHEET 7)
AutoCAD SHX Text INFILL MATERIAL INSIDE OF CULVERT WITH A BLENDED MIXTURE OF 2-PARTS EXCESS EXCAVATION MATERIAL & 1-PART CLASS 2 RIPRAP (GOV'T SOURCE). MIN TOTAL DEPTH OF 1'. INCIDENTAL TO ITEM 20806.
REMOVE & DISPOSE EXISTING CULVERT
EROSION CONTROL DETAILS & CUTOFF WALL DETAILS
ROAD NO. 2517 - M.P. 2.4
IDAHO PANHANDLE NATIONAL FORESTS
1-15258
MARCH 15, 2017
SHEET NO.
JDE
JDE
RME
KFY
engineering
2501 BELT VIEW DRIVE
HELENA, MT 59601
(406)449-8627
R
PREPARED BY:
REGION ONE
WINDROW DIMENSIONS
TYPICAL INSTALLATION
SLASH FILTER WINDROW DETAIL
SLASH FILTER WINDROW NOTES:
PROJECT:
DESIGNED:
DRAWN:
DESIGN CHECKED:
DRAWING CHECKED:
DATE: NO. DATEBYREVISION DESCRIPTION
ANCHOR BOLT DETAIL
CUTOFF WALL DETAIL
CUTOFF WALL SECTION
CUTOFF WALLS NOTES:
AutoCAD SHX Text I:\AutoCAD\Template - Civil 3D\Sheet - USFS Plan & Profile - C3D.dwg
AutoCAD SHX Text
EDGE OF ROAD
AutoCAD SHX Text
TOE OF FILL
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
1. CONTRACTOR SHALL UTILIZE CLEARING AND GRUBBING MATERIAL TO ERECT THE CONTRACTOR SHALL UTILIZE CLEARING AND GRUBBING MATERIAL TO ERECT THE SLASH FILTER WINDROW. IF ADDITIONAL MATERIAL IS NEEDED FOR SLASH FILTER WINDROW CONSTRUCTION, UTILIZE MATERIALS ALONG ROADSIDE WITHIN 1 MILE OF THE PROJECT SITE (C.O. TO APPROVE MATERIALS). 2. SLASH, LIMBS AND TOPS MUST BE SMALLER THAN 12 FEET LONG AND 3 SLASH, LIMBS AND TOPS MUST BE SMALLER THAN 12 FEET LONG AND 3 INCHES IN DIAMETER. DO NOT USE STUMPS AND ROOT WADS. 3. PLACE SLASH AT THE TOE OF THE NEW FILL SLOPE WITH A BACKHOE AND PLACE SLASH AT THE TOE OF THE NEW FILL SLOPE WITH A BACKHOE AND TAMP INTO PLACE WITH THE BUCKET. SLASH SHOULD BE TAMPED SO IT IS EMBEDDED APPROXIMATELY 6 INCHES INTO THE SURFACE TO PREVENT WATER FROM RUNNING UNDER THE WINDROW. 4. DO NOT INTERFERE WITH THE FUNCTIONING OF DRAINAGE STRUCTURES OR DO NOT INTERFERE WITH THE FUNCTIONING OF DRAINAGE STRUCTURES OR BLOCK STREAM CHANNELS WITH WINDROWS. ALL LOCATIONS WILL BE STAKED OR FLAGGED BY THE C.O. 5. PLACE STUMPS ON DOWNHILL SIDE OF WINDROW AND PLACED IN A POSITION PLACE STUMPS ON DOWNHILL SIDE OF WINDROW AND PLACED IN A POSITION TO PREVENT ROLLING, AS DIRECTED BY THE C.O. 6. INSTALL A 20 FOOT BREAK IN WINDROW EVERY 200 FEET.INSTALL A 20 FOOT BREAK IN WINDROW EVERY 200 FEET.
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text B
AutoCAD SHX Text
AutoCAD SHX Text 6" x 6" x W2.9 WIRE MESH
AutoCAD SHX Text
STRUCTURAL STEEL PLATE PIPE ARCH CULVERT
AutoCAD SHX Text C
AutoCAD SHX Text
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text C
AutoCAD SHX Text
AutoCAD SHX Text
3/4" DIA. GALV. ANCHOR BOLT
AutoCAD SHX Text ANCHOR BOLT SPACING: MIN. OF FIVE " DIA. GALV. ANCHOR BOLTS 34" DIA. GALV. ANCHOR BOLTS IN WALL. USE MAX. SPACING OF 1"-6".
AutoCAD SHX Text
1. CUTOFF WALLS SHALL BE PRECAST OR CUTOFF WALLS SHALL BE PRECAST OR CAST-IN-PLACE. IF PRECAST, CONTRACTOR SHALL SUBMIT CONNECTION DETAIL FOR APPROVAL. CONCRETE SHALL BE AS INDICATED IN GENERAL NOTES. 2. CUTOFF WALLS INDIRECTLY PAID BY ITEM 60302. CUTOFF WALLS INDIRECTLY PAID BY ITEM 60302.
AutoCAD SHX Text
ANCHOR BOLTS SEE
AutoCAD SHX Text D
TEST PIT LOG #1
TEST PIT LOG #1
ROAD NO. 2517 - M.P. 2.4
IDAHO PANHANDLE NATIONAL FORESTS
1-15258
MARCH 15, 2017
SHEET NO.
JDE
JDE
RME
KFY
engineering
2501 BELT VIEW DRIVE
HELENA, MT 59601
(406)449-8627
R
PREPARED BY:
REGION ONE
PROJECT:
DESIGNED:
DRAWN:
DESIGN CHECKED:
DRAWING CHECKED:
DATE: NO. DATEBYREVISION DESCRIPTION
I:\AutoCAD\Template - Civil 3D\Sheet - USFS Plan & Profile - C3D.dwg
TEST PIT LOG #2
TEST PIT LOG #2
ROAD NO. 2517 - M.P. 2.4
IDAHO PANHANDLE NATIONAL FORESTS
1-15258
MARCH 15, 2017
SHEET NO.
JDE
JDE
RME
KFY
engineering
2501 BELT VIEW DRIVE
HELENA, MT 59601
(406)449-8627
R
PREPARED BY:
REGION ONE
PROJECT:
DESIGNED:
DRAWN:
DESIGN CHECKED:
DRAWING CHECKED:
DATE: NO. DATEBYREVISION DESCRIPTION
ROADWAY CROSS-SECTIONS
ROADWAY CROSS SECTIONS
ROAD NO. 2517 - M.P. 2.4
IDAHO PANHANDLE NATIONAL FORESTS
1-15258
MARCH 15, 2017
SHEET NO.
JDE
JDE
RME
KFY
engineering
2501 BELT VIEW DRIVE
HELENA, MT 59601
(406)449-8627
R
PREPARED BY:
REGION ONE
PROJECT:
DESIGNED:
DRAWN:
DESIGN CHECKED:
DRAWING CHECKED:
DATE: NO. DATEBYREVISION DESCRIPTION
AutoCAD SHX Text
MATCH EXISTING ELEV. & WIDTH
AutoCAD SHX Text
MATCH EXISTING
AutoCAD SHX Text
MATCH EXISTING
AutoCAD SHX Text
CENTERLINE CULVERT (ALONG SKEW)
AutoCAD SHX Text NEW 14'-2" SPAN x 9'-10" RISE x 75' LONG STEEL STRUCTURAL PLATE PIPE-ARCH CULVERT
AutoCAD SHX Text
HORIZONTAL SCALE: 1" = 20'
AutoCAD SHX Text
VERTICAL SCALE: 1" = 20'
ROADWAY CROSS-SECTIONS
ROADWAY CROSS SECTIONS
ROAD NO. 2517 - M.P. 2.4
IDAHO PANHANDLE NATIONAL FORESTS
1-15258
MARCH 15, 2017
SHEET NO.
JDE
JDE
RME
KFY
engineering
2501 BELT VIEW DRIVE
HELENA, MT 59601
(406)449-8627
R
PREPARED BY:
REGION ONE
PROJECT:
DESIGNED:
DRAWN:
DESIGN CHECKED:
DRAWING CHECKED:
DATE: NO. DATEBYREVISION DESCRIPTION
AutoCAD SHX Text
MATCH EXISTING
AutoCAD SHX Text
MATCH EXISTING
AutoCAD SHX Text
MATCH EXISTING
AutoCAD SHX Text
MATCH EXISTING
AutoCAD SHX Text
MATCH EXISTING
AutoCAD SHX Text
MATCH EXISTING
AutoCAD SHX Text
MATCH EXISTING ELEV. & WIDTH
AutoCAD SHX Text
HORIZONTAL SCALE: 1" = 20'
AutoCAD SHX Text
VERTICAL SCALE: 1" = 20'
| Sheets and Views |
| 1 Cover |
| 2 Typical Roadway Section & Estimated Quantities |
| 3 Road Plan & Profile |
| 4 Stream Plan & Profile |
| 5 Diversion Plan |
| 6 Culvert Details |
| 7 Erosion Control Details & Cutoff Wall Details |
| 8 Test Pit Log #1 |
| 9 Test Pit Log #2 |
| 10 Roadway Cross Sections |
| 11 Roadway Cross Sections |
File details come from the government source that posted it.