About this file

Site Visit attendance roster and Q&As

View the file

Other files for this federal contract opportunity

Other files attached to Lost Trail Pass Slope Stabilization, newest first.
File Type Posted
Amendment2.pdf PDF
1202NV19R0001.pdf PDF
1202NV19R0001.pdf PDF
presolicitation_notice.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE PAGE OF PAGES

1 3

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

1 05/31/2019

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

IDAWY Acquisition Service Center 1405 Hollipark Drive Idaho Falls, Idaho 83401

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.

Prospective Quoters

1202NV19R0001

9B. DATED (SEE ITEM 11)

05/09/2019

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(X) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN

THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.

The purpose of this amendment is to document the site visit, answer questions, and provide due date for questions.

See page 2 of this amendment for the site visit attendance roster. See page 3 for question/answers.

All other questions shall be submitted in writing to the Contracting Officer no later than June 5th, 2019 at 1p.m. MST to amelia.velasco@usda.gov . All other terms and conditions will remain the same.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

AMELIA RIOS VELASCO, Contracting Officer

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

05/31/2019 (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

mailto:amelia.velasco@usda.gov

1202NV19R0001 Lost Trail Pass Slope Stabilization Amendment 1 Salmon-Challis National Forest

1202NV19R0001 Lost Trail Pass Slope Stabilization Amendment 1 Salmon-Challis National Forest

The following question/answers asked during the conference are as follows:

Q: Can we start before August 12, 2019?

A:. For better results fall is best to start, but a work schedule shall be submitted to the COR for approval prior to work starting.

Q: What are the limitations with hydroseeding?

A: Hydroseeding should not be done in freezing temperatures or while raining. Please see specifications for what is needed for hydroseeding.

Dates for when hydroseeding can occur can be discussed.

Q: What about the seed mix?

A: The forest will be providing the seed.

Q: Where does the project area start and stop?

A:. The project will be flagged prior to work starting.

Q: What needs to be done with the rebar pin sticking out of the slope?

A: Rebar staples need to left in place and pounded back into the ground. Straight rebar pins mark the location of monitoring equipment and need to be left in place as-is.

Q: What abou the exposed netting at the bottom of the slope?

A: Contractor will need to dispose of any exposed netting that has sluffed off of the hillside and is now laying at the bottom of the slope only.

Q: Can we work at night?

A:. The contractor is required to apply for an Idaho Transportation Department (IDT) highway permit. This permit will determine if night shifts are authorized.

Q: What do we need to do after we mow, what will happened to the PH levels?

A: Existing vegetation should be mowed or cut back in order to get good placement of the topsol and erosion controll system. Cut vegetation should be left in place on the slope. The existing vegitation should not be grubbed or pulled from the slope.

Q: Is GREENAX and DELTAX ® products made in the USA?

A: It is our understanding that Geobrugg, the manufactujrere of these products, produces many of its products within the USA. Specific informaion on where products are made should be determined by Contractor through contacting the vendor.

Q: What type of anchor is needed at the top of the slope?

A:. An anchor could be placed at the top of the slope; however, that depends on the design selected by the contractor.

Q: Can we use this pull out for staging?

A: The contractor is responsible for acquiring the use of the pull out from ITD according to C.9 of the solicitationt.

Q: Where is the closest lodging, food, etc.?

A: Darby is a about 35 minutes from the site. Salmon is about an 1 ½ hour from the site.