(x)

12026119R0003 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

BOISE ID 83709-1663

1249 S VINNELL WAY STE 200

ATTN-TANYA SPANFELLNER

SW IDAHO-NEVADA ACQUISITION CENTER

03/08/20190002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

03/08/2019

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Purpose of Amendment is:

1. Refer to page 35 and the beginning of paragraph: The offeror shall submit Past

Performance Questionnaires (Attachment 5 and 6), and replace that you shall submit Past

Performance Questionnaires (Attachment 5). Replace Attachment 5 with an updated Attachment

5 Past Performance Questionnaire. You can still use the original Attachment 5 if you have already sent out your Past Performance Questionnaires.

2. Picnic tables the Attachment #1- SOW and Specs mentions on page 98 refer to 2.1 Picnic

Tables and also reference, Drawings D2 it just says Order treated lumber 2"x10" table tops, and replace with Table planks/seats to be 3"x10" Clear Redwood stained with a

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

TANYA SPANFELLNER

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 3CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

12026119R0003/0002

Semi-Transparent Oil in Oxford Brown color.

3. See attached revised Schedule of Items, the items that been updated are highlighted-No.

322100 and 033540-1

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

USDA Forest Service

SCHEDULE OF ITEMS

HILLTOP CAMPGROUND RECONSTRUCTION

3/1/2019

ITEM NUMBER DESCRIPTION

METHOD

OF MEAS UNIT QUANTITY PRICE TOTAL

010250 Construction Staking LSQ LS 1

011900 Mobilization LSQ LS 1

024102 Removal and Disposal of Existing Structures LSQ LS 1

026460 Concrete Dumpster Pad AQ EA 3

033440 Family Unit Concrete Stairs AQ EA 116 Additional line item to include the construction of the tent pad paths. Construction of tent pad paths are identical to the family unit paths.

033540-1 Tent Pad Colored Concrete Paths AQ LF 700

033540 Family Unit Colored Concrete Paths AQ LF 1130

055210 Stair and Retaining Wall Railing AQ LF 110

101110 Kiosk and Gov't provided fee tube AQ EA 1

101400-1 Signs - Regulatory & Directional (Aluminum) AQ EA 15

101400-2 Signs - Regulatory & Directional (HDO) AQ EA 5

129400-1 Family Unit - Single AQ EA 31

129400-2 Family Unit - Double AQ EA 4

129500 Host Utilities (including propane and generator hook

up) AQ EA 1

133400 Precast Concrete Utility Building AQ EA 1

133401 Restroom Vault Installation (2-Unit) - Including Sidewalk AQ EA 4

221310 Septic Holding Tank (2,000 gallon) AQ EA 1

311000 Clearing and Grubbing Vegetation DQ AC 3

312010 Select Borrow for Roads and Spurs DQ CY 1200

312100 Project Site Preparation and Grading LSQ LS 1

321200 Hot Mix Asphalt Paving for Roads and Spurs AQ TON 2400

321204 Crushed Aggregate Base - Grading D (For Under Asphalt Roads and Spurs) DQ CY 3300

321206 Slope Stabilization Rip Rap DQ CY 615

322100 Line item below has changed to just include the construction of tent pads only.

Tent Pads and Paths

AQ EA 39

322205 Barrier Rocks AQ EA 46

322625 Recycled Plastic Wheelstops 8-Foot AQ EA 41

322640 Pavement Markings (Directional Arrows, Stop Bar, Reflectorized White) LSQ LS 1

322706 Asphalt Pavement Pulverizing (Reuse as Asphalt Base) DQ CY 500

323230 Segmental Retaining Wall and Stairs AQ SF 2400

332228 Culvert - 24-inch Galv. Corrugated Metal Pipe (16 Gage, 2 2/3"x1/2" Corrugations) AQ LF 250

Total

Amendment #2-12026119R0003