C-8. Specifications Index- By Division

01 25 00 Substitution Procedures 01 33 00 Submittal Procedures 02 41 00 Demolition 07 46 01 Wood Siding 08 53 13 Vinyl Windows 09 91 13 Exterior Painting 09 93 00 Staining and Transparent Finishing

SECTION 01 25 00

SUBSTITUTION PROCEDURES

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes administrative and procedural requirements for substitutions.

1.2 ACTION SUBMITTALS

A. Substitution Requests: Submit three copies of each request for consideration. Identify product or fabrication or installation method to be replaced. Include Specification Section number and title and Drawing numbers and titles.

1. Documentation: Show compliance with requirements for substitutions and the following, as applicable:

a. Statement indicating why specified product or fabrication or installation method cannot be provided, if applicable.

b. Coordination of information, including a list of changes or revisions needed to other parts of the Work and to construction performed by Owner and separate contractors that will be necessary to accommodate proposed substitution.

c. Detailed comparison of significant qualities of proposed substitutions with those of the Work specified. Include annotated copy of applicable Specification Section. Significant qualities may include attributes, such as performance, weight, size, durability, visual effect, sustainable design characteristics, warranties, and specific features and requirements indicated. Indicate deviations, if any, from the Work specified.

d. Product Data, including drawings and descriptions of products and fabrication and installation procedures.

e. Samples, where applicable or requested.

f. Certificates and qualification data, where applicable or requested.

g. List of similar installations for completed projects, with project names and addresses as well as names and addresses of architects and owners.

h. Material test reports from a qualified testing agency, indicating and interpreting test results for compliance with requirements indicated.

i. Research reports evidencing compliance with building code in effect for Project, from ICC-ES.

j. Detailed comparison of Contractor's construction schedule using proposed substitutions with products specified for the Work, including effect on the overall Contract Time. If specified product or method of construction cannot be provided within the Contract Time, include letter from manufacturer, on manufacturer's letterhead, stating date of receipt of purchase order, lack of availability, or delays in delivery.

k. Cost information, including a proposal of change, if any, in the Contract Sum.

l. Contractor's certification that proposed substitution complies with requirements in the Contract Documents, except as indicated in substitution request, is compatible with related materials and is appropriate for applications indicated.

m. Contractor's waiver of rights to additional payment or time that may subsequently become necessary because of failure of proposed substitution to produce indicated results.

2. Owner’s Action: If necessary, Contracting Officer will request additional information or documentation for evaluation within 15 days of receipt of a request for substitution.

Contracting Officer will notify Contractor of acceptance or rejection of proposed substitution within 15 days of receipt of request, or seven days of receipt of additional information or documentation, whichever is later.

a. Forms of Acceptance: Change Order, Construction Change Directive, or Supplemental Instructions for minor changes in the Work.

b. Use product specified if Contracting Officer does not issue a decision on use of a proposed substitution within time allocated.

1.3 PROCEDURES

A. Coordination: Revise or adjust affected work as necessary to integrate work of the approved substitutions.

1.4 SUBSTITUTIONS

A. Substitutions for Cause: Submit requests for substitution immediately on discovery of need for change, but not later than 15 days prior to time required for preparation and review of related submittals.

1. Conditions: Contracting Officer will consider Contractor's request for substitution when the following conditions are satisfied. If the following conditions are not satisfied, Contracting Officer will return requests without action, except to record noncompliance with these requirements:

a. Requested substitution is consistent with the Contract Documents and will produce indicated results.

b. Substitution request is fully documented and properly submitted.

c. Requested substitution will not adversely affect Contractor's construction schedule.

d. Requested substitution has received necessary approvals of authorities having jurisdiction.

e. Requested substitution is compatible with other portions of the Work.

f. Requested substitution has been coordinated with other portions of the Work.

g. Requested substitution provides specified warranty.

h. If requested substitution involves more than one contractor, requested substitution has been coordinated with other portions of the Work, is uniform and consistent, is compatible with other products, and is acceptable to all contractors involved.

SECTION 01 33 00

SUBMITTAL PROCEDURES

PART 1 – GENERAL

1.01 DESCRIPTION

A. Reviewing, Certifying, Approving Authority: Contractor shall be responsible for reviewing and certifying that submittals are in compliance with contract requirements.

B. Scheduling: Allow review period, beginning with receipt by approving authority that includes at least 10 working days for submittals for contracting officer approval. Period of review for submittals with contracting officer approval begins when Government receives submittal from contractor. Period of review for each resubmittal is the same as for initial submittal.

C. Variations: Variations from contract requirements require Government approval pursuant to contract Clause entitled “FAR 52.236-21, Specifications and Drawings for Construction” and will be considered where advantages to government.

D. All products identified in these specifications shall require approved submittals prior to installation.

E. Finishes: See specification sections and submit for approval by COR before ordering. Submit all paint colors, cabinet/counter texture and colors, as one submittal to be coordinated for approval.

SECTION 02 41 00

DEMOLITION

PART 1 - GENERAL

1.01 DESCRIPTION

A. This section covers the furnishing of materials, labor, and equipment required to partially or entirely remove and/or demolish those items identified on in this contract and restore any disturbed areas or components impacted by demolition.

1.02 JOB CONDITIONS

A. Protection: Ensure safe passage of persons around area of demolition. Conduct operations to prevent injury to adjacent buildings, structures, and persons.

B. Egress: Maintain two paths of egress to any occupied apartment.

C. Damages: Promptly repair damages caused to adjacent structures by demolition or construction operations at no cost to the Owner.

PART 2 - PRODUCTS

Not applicable.

PART 3 - EXECUTION

3.01 DISPOSAL OF DEMOLISHED MATERIALS

A. All debris, rubbish, and other materials resulting from demolition operations and not identified as salvageable by the Owner’s Representative shall be removed and transported to a Contractor-furnished disposal site.

B. Burning of removed materials will not be permitted on site.

EXTERIOR FINISH CARPENTRY 062013 - 1

SECTION 074601- WOOD SIDING

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Exterior Trim.

2. Lumber siding.

1.2 SUBMITTALS

A. Product Data: For each type of product involving selection of colors, profiles, or textures.

B. Samples: Full-size units of each type of siding and trim indicated for each color, texture and pattern specified.

1.3 MEASUREMENT AND PAYMENT

A. There will be no separate measurement or payment for work in this section. Payment will be included at the contract unit price for items shown on the Schedule of Items.

1.4 QUALITY ASSURANCE

A. Qualifications: Engage an experienced installer who has completed siding installations similar in material, design and extent to that indicated.

B. Regulatory Requirements and Approvals:

1. International Conference of Building Officials (ICBO):

a. Report No. ICBO-ES ER1962.

C. Mock-Ups: Before installing siding, construct sample wall panels to verify selections made under sample submittals and to demonstrate aesthetic effects and qualities of materials and execution.

1.5 DELIVERY, STORAGE & HANDLING

A. Delivery: Deliver materials in manufacturer’s original, unopened, undamaged containers with identification labels intact.

B. Storage and Protection: Store materials protected from exposure to harmful environmental conditions and at temperature and humidity conditions recommended by the manufacturer.

C. Stack lumber, plywood, and other panels flat with spacers between each bundle to provide air circulation. Protect materials from weather by covering with waterproof sheeting, securely anchored. Provide for air circulation around stacks and under coverings.

EXTERIOR FINISH CARPENTRY 062013 - 2

1.6 FIELD CONDITIONS

A. Weather Limitations: Proceed with installation only when existing and forecast weather conditions permit work to be performed and at least one coat of specified finish can be applied without exposure to rain, snow, or dampness.

B. Do not install finish carpentry materials that are wet, moisture damaged, or mold damaged.

1. Indications that materials are wet or moisture damaged include, but are not limited to, discoloration, sagging, or irregular shape.

2. Indications that materials are mold damaged include, but are not limited to, fuzzy or splotchy surface contamination and discoloration.

PART 2 - PRODUCTS

2.1 MATERIALS, GENERAL

A. Lumber: DOC PS 20 and the following grading rules:

1. NeLMA: Northeastern Lumber Manufacturers' Association, "Standard Grading Rules for Northeastern Lumber."

2. NLGA: National Lumber Grades Authority, "Standard Grading Rules for Canadian Lumber."

3. RIS: Redwood Inspection Service, "Standard Specifications for Grades of California Redwood Lumber."

4. SPIB: The Southern Pine Inspection Bureau, "Standard Grading Rules for Southern Pine Lumber."

5. WCLIB: West Coast Lumber Inspection Bureau, Standard No. 17, "Grading Rules for West Coast Lumber."

6. WWPA: Western Wood Products Association, "Western Lumber Grading Rules."

B. Factory mark each piece of lumber with grade stamp of inspection agency indicating grade, species, moisture content at time of surfacing, and mill.

a. For exposed lumber, mark grade stamp on end or back of each piece.

C. Softwood Plywood: DOC PS 1.

D. Hardboard: ANSI A135.4.

2.2 LUMBER SIDING

A. Provide kiln-dried lumber siding complying with DOC PS 20 with no more than 15% moisture content.

B. Species and Grade: Coordinate with COR to match existing wood species and grade.

Yellow Cedar; NeLMA, NLGA, WCLIB, or WWPA premium grade.

2.3 MISCELLANEOUS MATERIALS

EXTERIOR FINISH CARPENTRY 062013 - 3

A. Building Paper:

1. Material: Dupont Tyvek Drain Wrap.

B. Fasteners for Exterior Finish Carpentry: Provide nails or screws, in sufficient length to penetrate not less than 1-1/2 inches (38 mm) into wood substrate.

1. For exposed wood, provide stainless steel screws.

2. For concealed wood, provide epoxy coated steel fasteners.

C. Sealants: Latex, complying with ASTM C 834 Type OP, Grade NF recommended by sealant manufacturer and manufacturer of substrates for intended application.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine substrates, with Installer present, for compliance with requirements for installation tolerances and other conditions affecting performance.

B. Examine finish carpentry materials before installation. Reject materials that are wet, moisture damaged, and mold damaged.

C. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 PREPARATION

A. Prime lumber and moldings to be painted, including both faces and edges, unless factory primed. Cut to required lengths and prime ends.

3.3 INSTALLATION, GENERAL

A. Do not use materials that are unsound, warped, improperly treated or finished, inadequately seasoned, or too small to fabricate with proper jointing arrangements.

B. Install exterior finish carpentry level, plumb, true, and aligned with adjacent materials.

Use concealed shims where necessary for alignment.

1. Scribe and cut exterior finish carpentry to fit adjoining work. Refinish and seal cuts as recommended by manufacturer.

2. Install to tolerance of 1/8 inch in 96 inches (3 mm in 2438 mm) for level and plumb.

Install adjoining exterior finish carpentry with 1/32-inch (0.8-mm) maximum offset for flush installation and 1/16-inch (1.5-mm) maximum offset for reveal installation.

3. Coordinate exterior finish carpentry with materials and systems in or adjacent to it.

Provide cutouts for mechanical and electrical items that penetrate exterior finish carpentry.

3.4 STANDING AND RUNNING TRIM INSTALLATION

EXTERIOR FINISH CARPENTRY 062013 - 4

A. Install trim with minimum number of joints practical, using full-length pieces from maximum lengths of lumber available. Do not use pieces less than 24 inches (610 mm) long except where necessary.

1. Use scarf joints for end-to-end joints.

2. Stagger end joints in adjacent and related members.

B. Fit exterior joints to exclude water. Cope at returns and miter at corners.

3.5 SIDING INSTALLATION

A. Install siding to comply with manufacturer's written instructions and warranty requirements.

B. Horizontal Lumber Siding: Apply starter strip along bottom edge of sheathing or sill.

Install first course of siding with lower edge at least 1/8 inch (3 mm) below starter strip and subsequent courses lapped 1 inch (25 mm) over course below. Nail at each stud. Do not allow nails to penetrate more than one thickness of siding.

1. Leave 1/8-inch (3-mm) gap at trim and corners unless otherwise recommended by manufacturer, and apply sealant COATING

C. Drive nails flush with siding surface, penetrating studs at least 1/2 inch (12.7 mm).

3.6 ADJUSTING

A. Replace exterior finish carpentry that is damaged or does not comply with requirements.

Exterior finish carpentry may be repaired or refinished if work complies with requirements and shows no evidence of repair or refinishing. Adjust joinery for uniform appearance.

3.7 CLEANING

A. Clean exterior finish carpentry on exposed and semi-exposed surfaces.

3.8 PROTECTION

A. Protect installed products from damage from weather and other causes during construction.

B. Remove and replace finish carpentry materials that are wet, moisture damaged, and mold damaged.

1. Indications that materials are wet or moisture damaged include, but are not limited to, discoloration, sagging, or irregular shape.

2. Indications that materials are mold damaged include, but are not limited to, fuzzy or splotchy surface contamination and discoloration.

END OF SECTION 062013

SECTION 08 53 13

VINYL WINDOWS

PART 1 – GENERAL

1.1 SUMMARY

A. Section Includes:

1. Horizontal Sliding windows

1.2 SUBMITTALS

A. Submittal Procedure; submit following items:

1. Product Data: Submit Milgard product data.

2. Shop Drawings: Include window schedule, elevations, sections, details, & multiple-window assembly details. Include head, sill & jamb conditions; operable parts & direction/handing; and special mullion reinforcement details.

3. Samples: Submit selection samples for verification, include the following:

3.1. Exterior Color: White

3.2. Glass, showing specified tint color: No tint

B. Quality Assurance/Control Submittals:

1. Qualifications: Proof of Manufacturer’s qualifications.

2. U-Factor and Structural Rating charts required for NFRC and AAMA labeling requirements.

3. Installation Instructions: AAMA 2400, (“Mounting Flange Installation”) or AAMA 2410 (“Flush Fin

Installation”).

C. Closeout Submittals: Submit following items:

1. Temporary window labels to identify windows that labels were applied to.

2. Owner’s Manual/Maintenance Instructions.

3. Special Warranties.

1.3 QUALITY ASSURANCE

A. Overall Standards: Comply with ANSI/AAMA/101/I.S.2, except where noted herein.

B. Manufacturer Qualifications:

1. Minimum 10 years experience in producing vinyl windows.

2. Member AAMA & NFRC.

C. Certifications for Insulated Glass Units:

1. Insulated glass units are certified to ASTM E2188/E2190 per the Associated Laboratories Incorporated

(ALI) guidelines.

D. AAMA: Windows shall be Gold Label certified with label attached to frame per AAMA requirements.

E. NFRC: Windows shall be NFRC certified with temporary U-factor label applied to glass and an NFRC tab added to permanent AAMA frame label.

1.4 DELIVERY, STORAGE and HANDLING

A. Comply with Manufacturer’s/Dealer’s ordering instructions and lead time requirements to avoid construction delays.

B. Delivery: Deliver materials in Manufacturer’s standard packaging for protection of product.

C. Storage & Protection: Store products away from exposure to environmental conditions that may be harmful to materials.

D. Store materials off ground in an upright position. Provide cover from weather and construction activity.

E. Follow Manufacturer’s instructions on label applied to units.

1.5 WARRANTY

A. Commercial Warranty:

1. 10 Year Warranty.

2. Guarantee windows against defects in materials and workmanship including costs for replacement parts and labor.

Part 2 - PRODUCTS

2.1 MANUFACTURER

A. Products supplied by the following manufacturer or approved equal:

Milgard Manufacturing, Inc.

1010 54th Avenue East Tacoma, WA 98424 (800)-Milgard (645-4273) milgard.com

B. Window Series: Milgard Tuscany® Series

2.2 MANUFACTURED UNITS

A. Proprietary Products: Tubular Extruded Poly Vinyl Chloride (PVC) Windows

1. Tuscany® Series Windows

2. Glazing

3. Accessories

4. Substitutions: No substitutions permitted.

2.3 MATERIALS

A. Integral color PVC compound containing impact-resistant solid plasticizer, titanium dioxide UV inhibitor, and surface and color stabilizers.

B. Weatherstripping:

1. Vinyl compression bulb seal

2.4 WINDOW TYPES

A. Horizontal Slider – 8120T Series, 1-3/8”nail fin setback, Double-vent:

1. Frame: 3-1/4” minimum depth. Multi-chambered vinyl profile.

2. Sash: 1-1/4” minimum depth. Multi-chambered vinyl profile, includes vent stops located in fixed sash.

3. Sightlines: Equal for operating and fixed sash.

4. Structural Class:

a. 71-1/2” X 59-1/2” and smaller: HS-C40.

5. Hardware:

a. SmartTouch® direct action locking mechanism.

b. Nylon rollers with stainless steel axles, extruded vinyl snap-on monorail roller track.

c. Dual pull rails.

6. Weatherstripping: Fin seal polypropylene pile.

http://www.milgard.com/

2.5 GLAZING

A. Insulated Glass Units: ASTM E 774, Class A

1. Glazing Type: Dual Glaze

a. SunCoat® Low-E/Clear

2. Overall IG Unit Thickness:

a. 7/8”

3. Gas Filled:

a. None

4. Glass Thickness:

a. Per Manufacturer’s Specifications

2.6 INSECT SCREENS: Provide tight fitting screen (with hardware) for operating windows

A. Screen Frame:

1. Rolled Formed Aluminum Frame – Standard

B. Screen Mesh:

1. PureView® High Visibility Fiberglass Mesh - Standard.

2.7 FABRICATION

A. Fabricate frames and sash with mitered and fusion welded corners and joints.

B. Trim and finish corners and welds to match adjacent surfaces.

C. Provide concealed metal reinforcements in sash frame for attachment of lock mechanism.

D. Factory interior glaze with snap-on mitered PVC glazing stops matching bevels on the sash and frame.

Insulated glass units shall be reglazable without dismantling sash framing.

2.8 FINISH

A. Frame and Sash Color:

1. Exterior: White

2. Interior: White

B. Hardware: [Painted finishes as supplied by Milgard]

1. White, matched to interior frame finish

C. Screen Frame Color:

1. Matched to exterior frame color

2.9 SOURCE QUALITY CONTROL:

A. Inspect windows in accordance with Manufacturer's Quality Control Program as required by AAMA Gold Label Certification.

PART 3- EXECUTION

3.1 EXAMINATION

A. Examine openings in which windows will be installed.

1. Verify that framing complies with AAMA 2400 (Mounting Flange Installation) & AAMA 2410 (Flush

Fin Installation).

2. Verify rough opening dimensions, levelness of sill plate, and operational clearances.

3. Verify that fasteners in framed walls are fully driven and will not interfere with window installation.

4. Examine wall flashings, vapor retarders, water and weather barriers, and other built-in components to ensure weathertight window installation.

B. Coordinate with responsible entity to correct unsatisfactory conditions.

C. Commencement of work by installer is acceptance of substrate conditions.

3.2 INSTALLATION

A. Install windows in framed walls in accordance with AAMA 2400 (“Mounting Flange Installation”) and/or AAMA 2410 (“Flush Fin Installation”).

B. Install windows level, plumb, square, true to line, without distortion, anchored securely in place to structural support, and in proper relation to wall flashing and other adjacent construction to produce weathertight construction.

C. Do not remove temporary labels.

D. Install insect screens on operable windows.

3.3 CLEANING AND FINISHING

A. Old windows become the property of the contractor and shall be removed from the site.

B. Remove temporary labels and retain for Closeout Submittals.

C. Clean soiled painted surfaces and glass using a mild detergent and warm water solution with soft, clean cloths.

END OF SECTION

Copyright 2013 AIA MasterSpec Small Project 10/13

EXTERIOR PAINTING 099113 - 1

SECTION 099113 - EXTERIOR PAINTING

PART 1 - GENERAL

1.1 SECTION REQUIREMENTS

A. Submittals:

1. Product Data: For each type of product indicated.

2. Samples for initial selection: For each type of topcoat product indicated.

B. Extra Materials: Deliver to Owner [1 gal. (3.8 L)] of each color and type of finish-coat paint used on Project, in containers, properly labeled and sealed.

PART 2 - PRODUCTS

2.1 PAINT

A. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to the following:

1. PPG Paints.

2. Rust-Oleum Corporation; a subsidiary of RPM International, Inc.

B. MPI Standards: Provide materials that comply with MPI standards indicated and listed in its "MPI Approved Products List."

1. Block Filler, Latex: MPI #4.

2. Primer, Alkali Resistant, Water Based: MPI #3.

3. Primer, Bonding, Water Based: MPI #17.

4. Primer, Bonding, Solvent Based: MPI #69.

5. Primer, Alkyd, Anticorrosive: MPI #79.

6. Primer, Galvanized, Water Based: MPI #134.

7. Primer, Quick Dry, for Aluminum: MPI #95.

8. Primer, Latex: MPI #6.

9. Primer, Alkyd: MPI #5.

10. Latex, Exterior Flat (Gloss Level 1): MPI #10.

11. Latex, Exterior Low Sheen (Gloss Level 3-4): MPI #15.

12. Latex, Exterior Semigloss (Gloss Level 5): MPI #11.

13. Latex, Exterior, Gloss (Gloss Level 6): MPI #119.

14. Light Industrial Coating, Exterior, Water Based (Gloss Level 3): MPI #161.

15. Light Industrial Coating, Exterior, Water Based, Semigloss (Gloss Level 5): MPI #163.

16. Light Industrial Coating, Exterior, Water Based, Gloss (Gloss Level 6): MPI #164.

17. Alkyd, Exterior Flat (Gloss Level 1): MPI #8.

18. Alkyd, Exterior, Semigloss (Gloss Level 5): MPI #94.

19. Alkyd, Exterior Gloss (Gloss Level 6): MPI #9.

20. Alkyd, Quick Dry, Semigloss (Gloss Level 5): MPI #81.

http://www.specagent.com/Lookup?ulid=10242 http://www.specagent.com/Lookup?uid=123456956335 http://www.specagent.com/Lookup?uid=123456970250

EXTERIOR PAINTING 099113 - 2

21. Alkyd, Quick Dry, Gloss (Gloss Level 7): MPI #96.

22. Floor Paint, Latex, Low Gloss (Maximum Gloss Level 3): MPI #60.

23. Floor Enamel, Alkyd, Gloss (Gloss Level 6): MPI #27.

C. Material Compatibility: Provide materials that are compatible with one another and with substrates.

1. For each coat in a paint system, provide products recommended in writing by manufacturers of topcoat for use in paint system and on substrate indicated.

D. Colors: As shown in schedule.

PART 3 - EXECUTION

3.1 PREPARATION

A. Comply with recommendations in MPI's "MPI Maintenance Repainting Manual" applicable to substrates indicated.

B. Remove hardware, lighting fixtures, downspouts, and similar items that are not to be painted.

Mask items that cannot be removed. Reinstall items in each area after painting is complete.

C. Clean and prepare surfaces in an area before beginning painting in that area. Schedule painting so cleaning operations will not damage newly painted surfaces.

D. Remove all rust and existing paint with wire brush/scraper/sander and/or via sandblsating to near white. May use Ospho product per manufacturer’s recommendations to aid in rust remediation.

3.2 APPLICATION

A. Comply with recommendations in MPI's "MPI Maintenance Repainting Manual" applicable to substrates indicated.

B. Paint exposed existing surfaces unless otherwise indicated.

1. Do not paint prefinished items, items with an integral finish, operating parts, and labels unless otherwise indicated.

C. Apply paints according to manufacturer's written instructions.

1. Use brushes only where the use of other applicators is not practical.

D. Apply paints to produce surface films without cloudiness, spotting, holidays, laps, brush marks, roller tracking, runs, sags, ropiness, or other surface imperfections. Cut in sharp lines and color breaks.

1. If undercoats or other conditions show through topcoat, apply additional coats until cured film has a uniform paint finish, color, and appearance.

EXTERIOR PAINTING 099113 - 3

END OF SECTION 099113

STAINING AND TRANSPARENT FINISHING 099300 - 1

SECTION 099300 - STAINING AND TRANSPARENT FINISHING

PART 1 - GENERAL

1.1 SECTION REQUIREMENTS

A. Submittals:

1. Product Data: For each type of product indicated.

2. Samples for initial selection: For each type of topcoat product indicated.

B. Extra Materials: Deliver to Owner 1 gal. (3.8 L) of each color and type of stain and transparent finish used on Project, in containers, properly labeled and sealed.

PART 2 - PRODUCTS

2.1 STAIND AND TRANSPARENT FINISHES

A. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

1. Benjamin Moore & Co.

2. Kelly-Moore Paint Company Inc.

3. PPG Paints.

4. Sherwin-Williams Company (The).

B. MPI Standards: Provide materials that comply with MPI standards indicated and listed in its "MPI Approved Products List."

1. Wood Filler Paste: MPI #91.

2. Preservative, for Exterior Wood: MPI #37.

3. Alkyd, Sanding Sealer, Clear: MPI #102.

4. Stain, Exterior, Water Based, Solid Hide: MPI #16.

5. Stain, Exterior, Solvent Based, Solid Hide: MPI #14.

6. Stain, Exterior, Solvent Based, Semitransparent: MPI #13.

C. Material Compatibility: Provide materials that are compatible with one another and with substrates.

1. For each coat in a paint system, provide products recommended in writing by manufacturers of topcoat for use in paint system and on substrate indicated.

D. Colors: As shown in schedule.

http://www.specagent.com/Lookup?ulid=11649 http://www.specagent.com/Lookup?uid=123457053963 http://www.specagent.com/Lookup?uid=123457053971 http://www.specagent.com/Lookup?uid=123457053975 http://www.specagent.com/Lookup?uid=123457053979

STAINING AND TRANSPARENT FINISHING 099300 - 2

PART 3 - EXECUTION

3.1 PREPARATION

A. Comply with recommendations in MPI's "MPI Architectural Painting Specification Manual" applicable to substrates indicated.

B. Remove hardware, lighting fixtures, and similar items that are not to be finished. Mask items that cannot be removed. Reinstall items in each area after finishing is complete.

C. Clean and prepare surfaces in an area before beginning finishing in that area. Schedule finishing so cleaning operations will not damage newly finished surfaces.

3.2 APPLICATION

A. Comply with recommendations in MPI's "MPI Architectural Painting Specification Manual" applicable to substrates indicated.

B. Finish exposed surfaces, new and existing, unless otherwise indicated.

C. Apply stains and transparent finishes according to manufacturer's written instructions.

D. Apply stains and transparent finishes to produce surface films without color irregularity, cloudiness, holidays, lap marks, brush marks, runs, ropiness, or other imperfections. Use multiple coats to produce a smooth surface film of even luster.

3.3 EXTERIOR STAIN AND CLEAR FINISH APPLICATION SCHEDULE

A. Wood, nontraffic surfaces, including wood trim, architectural woodwork, wood siding, exposed joists, and exposed beams.

1. Solid Hide, Water-Based Stain: [Two coats] OR,

2. Solid Hide, Solvent-Based Stain: [Two coats] with appropriate PPE and used in well ventilated areas.

END OF SECTION 099300

1. Exterior Trim.
2. Lumber siding.
1. International Conference of Building Officials (ICBO):
1. Indications that materials are wet or moisture damaged include, but are not limited to, discoloration, sagging, or irregular shape.
2. Indications that materials are mold damaged include, but are not limited to, fuzzy or splotchy surface contamination and discoloration.
1. NeLMA: Northeastern Lumber Manufacturers' Association, "Standard Grading Rules for Northeastern Lumber."
2. NLGA: National Lumber Grades Authority, "Standard Grading Rules for Canadian Lumber."
3. RIS: Redwood Inspection Service, "Standard Specifications for Grades of California Redwood Lumber."
4. SPIB: The Southern Pine Inspection Bureau, "Standard Grading Rules for Southern Pine Lumber."
5. WCLIB: West Coast Lumber Inspection Bureau, Standard No. 17, "Grading Rules for West Coast Lumber."
6. WWPA: Western Wood Products Association, "Western Lumber Grading Rules."
1. Material: Dupont Tyvek Drain Wrap.
1. For exposed wood, provide stainless steel screws.
2. For concealed wood, provide epoxy coated steel fasteners.
1. Scribe and cut exterior finish carpentry to fit adjoining work. Refinish and seal cuts as recommended by manufacturer.
2. Install to tolerance of 1/8 inch in 96 inches (3 mm in 2438 mm) for level and plumb. Install adjoining exterior finish carpentry with 1/32-inch (0.8-mm) maximum offset for flush installation and 1/16-inch (1.5-mm) maximum offset for reveal install...
3. Coordinate exterior finish carpentry with materials and systems in or adjacent to it. Provide cutouts for mechanical and electrical items that penetrate exterior finish carpentry.
1. Use scarf joints for end-to-end joints.
2. Stagger end joints in adjacent and related members.
1. Leave 1/8-inch (3-mm) gap at trim and corners unless otherwise recommended by manufacturer, and apply sealant COATING
1. Indications that materials are wet or moisture damaged include, but are not limited to, discoloration, sagging, or irregular shape.
2. Indications that materials are mold damaged include, but are not limited to, fuzzy or splotchy surface contamination and discoloration.
085313 tuscany_windows.pdf
1.1 SUMMARY
1.2 SUBMITTALS
1.3 QUALITY ASSURANCE
1.4 DELIVERY, STORAGE and HANDLING
1.5 WARRANTY
2
2.1 MANUFACTURER
2.2 MANUFACTURED UNITS
2.3 MATERIALS
2.4 WINDOW TYPES
2.5 GLAZING
2.6 INSECT SCREENS: Provide tight fitting screen (with hardware) for operating windows
2.7 FABRICATION
2.8 FINISH
2.9 SOURCE QUALITY CONTROL:
3
3.1 EXAMINATION
3.2 INSTALLATION
3.3 CLEANING AND FINISHING
099113 - EXTERIOR PAINTING_SP.pdf
PART 1 - GENERAL
1.1 SECTION REQUIREMENTS
A. Submittals:
1. Product Data: For each type of product indicated.
2. Samples for initial selection: For each type of topcoat product indicated.

B. Extra Materials: Deliver to Owner [1 gal. (3.8 L)] of each color and type of finish-coat paint used on Project, in containers, properly labeled and sealed.

PART 2 - PRODUCTS
2.1 PAINT
A. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to the following:
1. PPG Paints.
2. Rust-Oleum Corporation; a subsidiary of RPM International, Inc.
B. MPI Standards: Provide materials that comply with MPI standards indicated and listed in its "MPI Approved Products List."
1. Block Filler, Latex: MPI #4.
2. Primer, Alkali Resistant, Water Based: MPI #3.
3. Primer, Bonding, Water Based: MPI #17.
4. Primer, Bonding, Solvent Based: MPI #69.
5. Primer, Alkyd, Anticorrosive: MPI #79.
6. Primer, Galvanized, Water Based: MPI #134.
7. Primer, Quick Dry, for Aluminum: MPI #95.
8. Primer, Latex: MPI #6.
9. Primer, Alkyd: MPI #5.
10. Latex, Exterior Flat (Gloss Level 1): MPI #10.
11. Latex, Exterior Low Sheen (Gloss Level 3-4): MPI #15.
12. Latex, Exterior Semigloss (Gloss Level 5): MPI #11.
13. Latex, Exterior, Gloss (Gloss Level 6): MPI #119.
14. Light Industrial Coating, Exterior, Water Based (Gloss Level 3): MPI #161.
15. Light Industrial Coating, Exterior, Water Based, Semigloss (Gloss Level 5): MPI #163.
16. Light Industrial Coating, Exterior, Water Based, Gloss (Gloss Level 6): MPI #164.
17. Alkyd, Exterior Flat (Gloss Level 1): MPI #8.
18. Alkyd, Exterior, Semigloss (Gloss Level 5): MPI #94.
19. Alkyd, Exterior Gloss (Gloss Level 6): MPI #9.
20. Alkyd, Quick Dry, Semigloss (Gloss Level 5): MPI #81.
21. Alkyd, Quick Dry, Gloss (Gloss Level 7): MPI #96.
22. Floor Paint, Latex, Low Gloss (Maximum Gloss Level 3): MPI #60.
23. Floor Enamel, Alkyd, Gloss (Gloss Level 6): MPI #27.
C. Material Compatibility: Provide materials that are compatible with one another and with substrates.
1. For each coat in a paint system, provide products recommended in writing by manufacturers of topcoat for use in paint system and on substrate indicated.

D. Colors: As shown in schedule.

PART 3 - EXECUTION
3.1 PREPARATION
A. Comply with recommendations in MPI's "MPI Maintenance Repainting Manual" applicable to substrates indicated.
B. Remove hardware, lighting fixtures, downspouts, and similar items that are not to be painted. Mask items that cannot be removed. Reinstall items in each area after painting is complete.
C. Clean and prepare surfaces in an area before beginning painting in that area. Schedule painting so cleaning operations will not damage newly painted surfaces.
D. Remove all rust and existing paint with wire brush/scraper/sander and/or via sandblsating to near white. May use Ospho product per manufacturer’s recommendations to aid in rust remediation.
3.2 APPLICATION
A. Comply with recommendations in MPI's "MPI Maintenance Repainting Manual" applicable to substrates indicated.
B. Paint exposed existing surfaces unless otherwise indicated.
1. Do not paint prefinished items, items with an integral finish, operating parts, and labels unless otherwise indicated.
C. Apply paints according to manufacturer's written instructions.
1. Use brushes only where the use of other applicators is not practical.
D. Apply paints to produce surface films without cloudiness, spotting, holidays, laps, brush marks, roller tracking, runs, sags, ropiness, or other surface imperfections. Cut in sharp lines and color breaks.
1. If undercoats or other conditions show through topcoat, apply additional coats until cured film has a uniform paint finish, color, and appearance.
099300 - STAINING AND TRANSPARENT FINISHING_SP.pdf
PART 1 - GENERAL
1.1 SECTION REQUIREMENTS
A. Submittals:
1. Product Data: For each type of product indicated.
2. Samples for initial selection: For each type of topcoat product indicated.

B. Extra Materials: Deliver to Owner 1 gal. (3.8 L) of each color and type of stain and transparent finish used on Project, in containers, properly labeled and sealed.

PART 2 - PRODUCTS
2.1 STAIND AND TRANSPARENT FINISHES
A. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
1. Benjamin Moore & Co.
2. Kelly-Moore Paint Company Inc.
3. PPG Paints.
4. Sherwin-Williams Company (The).
B. MPI Standards: Provide materials that comply with MPI standards indicated and listed in its "MPI Approved Products List."
1. Wood Filler Paste: MPI #91.
2. Preservative, for Exterior Wood: MPI #37.
3. Alkyd, Sanding Sealer, Clear: MPI #102.
4. Stain, Exterior, Water Based, Solid Hide: MPI #16.
5. Stain, Exterior, Solvent Based, Solid Hide: MPI #14.
6. Stain, Exterior, Solvent Based, Semitransparent: MPI #13.
C. Material Compatibility: Provide materials that are compatible with one another and with substrates.
1. For each coat in a paint system, provide products recommended in writing by manufacturers of topcoat for use in paint system and on substrate indicated.

D. Colors: As shown in schedule.

PART 3 - EXECUTION
3.1 PREPARATION
A. Comply with recommendations in MPI's "MPI Architectural Painting Specification Manual" applicable to substrates indicated.
B. Remove hardware, lighting fixtures, and similar items that are not to be finished. Mask items that cannot be removed. Reinstall items in each area after finishing is complete.
C. Clean and prepare surfaces in an area before beginning finishing in that area. Schedule finishing so cleaning operations will not damage newly finished surfaces.
3.2 APPLICATION
A. Comply with recommendations in MPI's "MPI Architectural Painting Specification Manual" applicable to substrates indicated.
B. Finish exposed surfaces, new and existing, unless otherwise indicated.
C. Apply stains and transparent finishes according to manufacturer's written instructions.
D. Apply stains and transparent finishes to produce surface films without color irregularity, cloudiness, holidays, lap marks, brush marks, runs, ropiness, or other imperfections. Use multiple coats to produce a smooth surface film of even luster.
3.3 EXTERIOR STAIN AND CLEAR FINISH APPLICATION SCHEDULE
A. Wood, nontraffic surfaces, including wood trim, architectural woodwork, wood siding, exposed joists, and exposed beams.
1. Solid Hide, Water-Based Stain: [Two coats] OR,
2. Solid Hide, Solvent-Based Stain: [Two coats] with appropriate PPE and used in well ventilated areas.