Cordova WC_Water Line Replacement - 12010919Q0076
SCHEDULE OF SUPPLIES/SERVICES
Base Items:
Item No.
Description
Quanti ty
Unit
Unit Price
Amount
1 11900 - Mobilization/ Demobilization/ Bonding 1 LS $ $ 2 221100-A 1-1/4” HDPE Waterline Replacement 560 LF $ $ 3 221100-B 1-1/4” Curb Valve and Box Installation 3 Each $ $ 4 221100-C 1” HDPE Waterline Replacement 170 LF $ $ 5 221100-D Waterline Tie-In 1 Each $ $ 6 221103-A Main Junction Valve Cluster Replacement 1 Each $ $ 7 221103-B Reduced Pressure Principle Backflow Assembly 1 Each $ $ 8 221103-C Service Connection Assembly A 1 Each $ $ 9 221103-D Service Connection Assembly B 3 Each $ $
Total Base
Abbreviation: LF = Lineal Foot; LS = Lump Sum;
Quoter’s must submit pricing for all items.
Magnatude of construction project is between $100,000 - $250,000.
This will be a firm fixed price contract.