QASP.pdf

PDF 176 KB Posted

Attached to
Wrangell Ranger District Cabin Maintenance BPA
Solicitation number
12010919Q0046
Issued by

About this file

Quality Assurance Surveillance Plan (QASP)

View the file

Other files

File Type Posted
SF30.pdf PDF
Amendment2.pdf PDF
SF30.pdf PDF
Amendment1.docx DOCX document
SCA_Wage_Determination.pdf PDF
WRD_Cabin_Inspection_Form.pdf PDF
12010919Q0046_RFQ.pdf PDF
Cabin_Info.pdf PDF
Wage_Determination.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cabin Maintenance on the Wrangell Ranger District

QASP

Quality Assurance Surveillance Plan (QASP)

May 17, 2019

1. Purpose This Quality Assurance Surveillance Plan (QASP) is a Government developed document used to ensure that systematic quality assurance methods are used in the administration of the Performance-based Acquisition (PBA) standards included in this Performance Work Statement (PWS). The intent is to ensure that the Contractor performs in accordance with the performance standards/acceptable quality levels contained in the PWS; that the Government receives the quality of services called for in the contract; and, that the Government only pays for the acceptable level of services received.

2. Scope It is important to understand the responsibilities of the parties and distinguish between the contractor’s quality control plan and the QASP. The Contractor is responsible for managing and developing a quality control plan to meet the quality standards established in the PWS. The QASP is put in place to provide Government surveillance and oversight of the contractor’s efforts in meeting the performance standards required by the contract.

The QASP is not part of the contract nor is it intended to duplicate the Contractor’s quality control plan. The Government may provide the Contractor with an informational copy of the QASP to support the Contractor’s efforts in developing a quality control plan that will inter-relate with the QASP.

3. Government Resources The following personnel will implement all surveillance activities:

Contracting Officer. The Contracting Officer ensures performance of all necessary actions for effective contracting, ensures compliance with the terms of the contract and safeguards the interests of the Government in the contractual relationship. It is the Contracting Officer that assures the Contractor receives impartial, fair and equitable treatment under the contract. The Contracting Officer is ultimately responsible for the final determination of the adequacy of the Contractor’s performance.

Contracting Officer: Jon Gellings Telephone Number: (907) 586-7836 Email: jonathan.gellings@usda.gov

Contracting Officer’s Representative (COR). The COR is responsible for technical administration of the contract and assures proper Government surveillance of the Contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. Any changes that the Contractor deems may affect contract price, terms, or conditions shall be referred to the Contracting Officer for action.

Contracting Officer’s Representative: Dee Galla

Telephone Number: (907) 874-7551 Email: dee.galla@usda.gov

4. Methods of Quality Assurance Surveillance The surveillance methods listed below will be used in the administration of this QASP.

The specific surveillance method for each performance standard and acceptable quality level is listed in the “Monitoring Method” column of the PWS.

Government Review – Indicates that the Government will be responsible for monitoring the Contractor’s performance in meeting specific performance standards/acceptable quality levels. The Government Review may be performed by the COR, technical monitors, inspectors, and/or other Government personnel interacting with the contractor.

In the case of a written deliverable, Government Review will consist of up to 100% inspection of the specific deliverable and supporting documentation.

In the case of day-to-day support activities, Government Review will consist of periodic inspection or random monitoring.

Feedback – Feedback may be obtained either from the results of formal satisfaction surveys or from complaints received by the Government. Complaints, to be considered valid, must set forth clearly and in writing the detailed nature of the complaint, and must be signed and forwarded to the COR, who shall assess the validity of the complaint and retain it in a documentation file. The COR shall ensure the tabulated results of all satisfaction surveys, for the life of the Contract, are kept on file.

5. Documentation The results of all monitoring activity shall be documented on the Surveillance Activity Summary Form. The COR shall submit copies of the Surveillance Activity Summary Form at the conclusion of contract performance and whenever contractor performance fails to meet acceptable quality levels.

The COR will, in addition to providing documentation to the Contracting Officer, maintain a complete quality assurance file. The file will contain copies of all reports, evaluations, recommendations, surveillance checklists, and any actions related to the Government’s performance of the quality assurance surveillance function. All such records will be retained for the life of the contract and forwarded to the Contracting Officer upon completion.

6. Incentives and Disincentives On an ongoing basis and as deliverables are submitted, the COR will assess the contractor’s performance using the Performance Requirements Summary in the PWS.

The COR will alert the CO whenever a disincentive should be included in the invoice.

No incentives or disincentives are included in this BPA. For any efforts, any rework required for poor quality will not be charged to the Forest Service.

Surveillance Activity Summary Form

Perf Std#

Service Performance Standards Acceptable Quality Level

(AQL)

Monitoring Method Monitoring Performed by/ Date(s)

Compliance with Performance

Standard/AQL

Other Comments

PS-1 Project Management:

Coordination and Communication

Government stakeholders have awareness of contractor efforts through proactive coordination between Contractor and Government technical personnel.

Government requested information is provided within ten (10) business days.

Feedback from the Government personnel on contractor efforts.

PS-2 Cabin Maintenance Activities (CLIN 1)

The completed cabin maintenance activities bring the cabin into a safe, clean, and hospitable condition acceptable to subsequent renters.

All structures maintained are as clean or functional as possible without major maintenance under CLIN 2.

Feedback from cabin users on Contractor efforts.

PS-3 Cabin Maintenance Activities (CLIN 2)

Address maintenance conditions that are not defined in the routine maintenance section, if ordered under a Call.

No deviation from Government-approved work proposal and method.

Government review of completed work.

PS-4 Cabin Inspection Documentation and Contractor Paperwork

All deliverables are submitted on-time. Deliverables are thorough, legible, and conform to prescribed standards.

The completed invoices conform to the invoice requirements, and all other requests are submitted in a timely manner.

No deviation to the deliverable schedule without prior COR approval.

Drafts may include only minor typographical errors.

Government review of the Contractor written communications, deliverables, and invoices.

Contracting Officer: Jon Gellings

File details come from the government source that posted it.