SECTION B SCHEDULE OF ITEMS
PRINCE OF WALES ISLAND AOP IMPROVEMENTS 2018
Thorne Bay Ranger District, Tongass N.F. Alaska
Item 1: RD 2050300 MP 2.85
Item No.
Supplies/Services Description
Method of Measurement Qty Unit Unit Price Amount
1.1 15101 Mobilization 1 LS $________ $_________
1.2 15221 Construction Survey and Staking 1 LS $________ $_________
1.3 15713 Soil Erosion & Pollution Control 1 LS $________ $_________
1.4 20301 Removal of Existing Corrugated Steel Pipe, Method A
1 EA $________ $_________
1.5 20901 Culvert Backfill CQ 160 CY $________ $_________
1.6 25101 Placed Riprap, Class 2 CQ 32 CY $________ $_________
1.7 60201 72” Diameter Corrugated Aluminum Pipe, 0.0075” Thickness
56 LF $________ $_________
1.8 62504 Seeding, Dry Method 1 LS $________ $_________
1.9 64802 Placed Streambed Simulation Material Bed Class X, Method A
CQ 25 CY $________ $_________
1.10 64804 Placed Streambed Channel Rock for Culvert Banks, Class CR-1, Method A
CQ 35 CY $________ $_________
1.11
64806 Placed Streambed Channel Rock for Rock Weir and Rock Ribs, Class CR-1, Method A
CQ 15 CY $________ $_________
Total Price Item 1 $______________________
Item 2: RD 2050300 MP 2.97
Supplies/Services Description
Method of Measurement Qty Unit Unit Price Amount
2.1 15101 Mobilization 1 LS $________ $_________
2.2 15221 Construction Survey and Staking 1 LS $________ $_________
2.3 15713 Soil Erosion & Pollution Control 1 LS $________ $_________
2.4 20301 Removal of Existing Corrugated Steel Pipe, Method A
1 EA $________ $_________
2.5 20411 Unclassified Borrow Excavation CQ 85 CY $________ $_________
2.6 25101 Placed Riprap, Class 2 CQ 32 CY $________ $_________
2.7 60201 72” Diameter Corrugated Aluminum Pipe, 0.0075” Thickness
44 LF $________ $_________
2.8 62504 Seeding, Dry Method 1 LS $________ $_________
2.9 64802 Placed Streambed Simulation Material Bed Class Y, Method A
CQ 18 CY $________ $_________
2.10 64804 Placed Streambed Channel Rock for Culvert Banks, Class CR-1, Method A
CQ 27 CY $________ $_________
2.11 64806 Placed Streambed Channel Rock for Rock Weirs, Class CR-1, Method A
CQ 10 CY $________ $_________
Total Price Item 2 $______________________
Supplies/Services Description
Method of Measurement Qty Unit Unit Price Amount
Item 3: Option Item 1 RD 5050300 MP 2.85
3 20501 Rock Excavation CQ 10 CY $________ $_________
Total Price Option Item 1 $______________________
Item 4: Option Item 2 RD 5050300 MP 2.97
4 20501 Rock Excavation CQ 10 CY $________ $_________
Total Price Option Item 2 $______________________
TOTAL PRICE FOR ALL ITEMS $ __________________________