SECTION B SCHEDULE OF ITEMS

PRINCE OF WALES ISLAND AOP IMPROVEMENTS 2018

Thorne Bay Ranger District, Tongass N.F. Alaska

Item 1: RD 2050300 MP 2.85

Item No.

Supplies/Services Description

Method of Measurement Qty Unit Unit Price Amount

1.1 15101 Mobilization 1 LS $________ $_________

1.2 15221 Construction Survey and Staking 1 LS $________ $_________

1.3 15713 Soil Erosion & Pollution Control 1 LS $________ $_________

1.4 20301 Removal of Existing Corrugated Steel Pipe, Method A

1 EA $________ $_________

1.5 20901 Culvert Backfill CQ 160 CY $________ $_________

1.6 25101 Placed Riprap, Class 2 CQ 32 CY $________ $_________

1.7 60201 72” Diameter Corrugated Aluminum Pipe, 0.0075” Thickness

56 LF $________ $_________

1.8 62504 Seeding, Dry Method 1 LS $________ $_________

1.9 64802 Placed Streambed Simulation Material Bed Class X, Method A

CQ 25 CY $________ $_________

1.10 64804 Placed Streambed Channel Rock for Culvert Banks, Class CR-1, Method A

CQ 35 CY $________ $_________

1.11

64806 Placed Streambed Channel Rock for Rock Weir and Rock Ribs, Class CR-1, Method A

CQ 15 CY $________ $_________

Total Price Item 1 $______________________

Item 2: RD 2050300 MP 2.97

Supplies/Services Description

Method of Measurement Qty Unit Unit Price Amount

2.1 15101 Mobilization 1 LS $________ $_________

2.2 15221 Construction Survey and Staking 1 LS $________ $_________

2.3 15713 Soil Erosion & Pollution Control 1 LS $________ $_________

2.4 20301 Removal of Existing Corrugated Steel Pipe, Method A

1 EA $________ $_________

2.5 20411 Unclassified Borrow Excavation CQ 85 CY $________ $_________

2.6 25101 Placed Riprap, Class 2 CQ 32 CY $________ $_________

2.7 60201 72” Diameter Corrugated Aluminum Pipe, 0.0075” Thickness

44 LF $________ $_________

2.8 62504 Seeding, Dry Method 1 LS $________ $_________

2.9 64802 Placed Streambed Simulation Material Bed Class Y, Method A

CQ 18 CY $________ $_________

2.10 64804 Placed Streambed Channel Rock for Culvert Banks, Class CR-1, Method A

CQ 27 CY $________ $_________

2.11 64806 Placed Streambed Channel Rock for Rock Weirs, Class CR-1, Method A

CQ 10 CY $________ $_________

Total Price Item 2 $______________________

Supplies/Services Description

Method of Measurement Qty Unit Unit Price Amount

Item 3: Option Item 1 RD 5050300 MP 2.85

3 20501 Rock Excavation CQ 10 CY $________ $_________

Total Price Option Item 1 $______________________

Item 4: Option Item 2 RD 5050300 MP 2.97

4 20501 Rock Excavation CQ 10 CY $________ $_________

Total Price Option Item 2 $______________________

TOTAL PRICE FOR ALL ITEMS $ __________________________