12-QM Boiler Replacement - Drawings.pdf
PDF 15 MB Posted
- Attached to
- CSP - Boiler Replacement at Quentin Mease Health Center for Harris Health (Estimated Budget $2, 115, 812)
- Solicitation number
- 26/0021
- Issued by
- Harris County, Texas
About this file
Boiler Replacement Project at Quentin Mease Health Center
This is a comprehensive set of construction drawings and technical documentation for a boiler replacement project at the Quentin Mease Health Center, located at 3601 N MacGregor Way in Houston, Texas, prepared for Harris County Hospital District (Harris Health). The project scope involves the complete replacement of existing boilers with three new 2,000,000 BTUH condensing boilers (Models B-1, B-2, and B-3) and associated equipment including heating hot water pumps, expansion tanks, and air/dirt separators. The work is divided into four distinct phases: Phase 1 establishes temporary boiler and pump service via trailer, Phase 2 involves demolition of existing equipment, Phase 3 installs new permanent equipment, and Phase 4 removes temporary installations. The project includes substantial mechanical, electrical, and plumbing work, with drawings dated December 18, 2025 marked "Issue for Permit and Pricing." The work encompasses a 520 square foot boiler room area and requires coordination across multiple building systems while maintaining continuity of service to the occupied facility.
The project documents include detailed specifications developed by Wylie Engineering (MEP), Browne McGregor Architects (Architect), and Fractal Structural Engineering (Structural), prepared in accordance with the 2021 International Building Code and applicable Houston amendments. The estimated project budget is $2,115,812. All contractors must comply with comprehensive general notes addressing field verification, coordination requirements, demolition protocols, and warranty obligations of one full year including heating and cooling seasons. The work includes provision for Building Automation System (BAS) integration with new control panels, commissioning of mechanical systems per IECC C408.2 standards, and submittal of "as-built" drawings. Contractors must coordinate with existing building operations to minimize disruption to the occupied healthcare facility, with authorization required from building management for any service interruptions. Materials and equipment must be UL or ETL listed, new and in good condition, with factory defects subject to replacement at no additional cost to the owner.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FRACTAL STRUCTURAL ENGINEERING
9722 GASTON RD, SUITE 150
KATY, TX 77494
CONTACT:OSCAR VALDEZ
TEL:(832) 404-2280
email:OSCAR.VALDEZ@FRACTALSTRUCTURAL.COM
STRUCTURAL
WYLIE ENGINEERING
1177 WEST LOOP SOUTH, SUITE 900
HOUSTON, TX 77027
CONTACT:LINCOLN PRENDERGAST
TEL:(713) 781-2526, EXT. 143
email:LPRENDERGAST@WYLIEENG.COM
MEP
HARRIS COUNTY HOSPITAL DISTRICT
2525 HOLLY HALL ST.
HOUSTON, TX 77054-4124
CONTACT:ERIC CORBETT
TEL:(346) 426-0623
email:ERIC.CORBETT@HARRISHEALTH.ORG
BUILDING OWNER
ARCHITECT
BROWNE McGREGOR ARCHITECTS, INC.
520 POST OAK, SUITE 880
HOUSTON, TX 77027
CONTACT: CORY PORTER
TEL: (713) 850-1733
email: CPorter@BrowneMcGregor.com
AT
T S
XETE FO
S A
C O R
Y L
.PORT
E R
2428 9
R E G
IS
TE
RED ARCH
ITE
C T
REVISIONSREVISIONS
Scale
25047.00
BROWNE McGREGOR ARCHITECTS, INC.
520 POST OAK BOULEVARD SUITE 880
HOUSTON, TX 77027
713-850-1733 www.brownemcgregor.com
COPYRIGHT 2025
A0.00
COVER
H H
S Q
U E
N T
IN
M
E A
S E
H E
A L T
H C
E N
T E
R B
O
IL
E R
R E
P L A
C E
M E
N T
N
M A
C G
R E
G O
R W
A Y
H O
U S
T O
N
T X
12/18/2025
HHS QUENTIN MEASE HEALTH CENTER
BOILER REPLACEMENT
3061 N MACGREGOR WAY HOUSTON, TX 77004
12/18/2025 - ISSUE FOR PERMIT AND PRICING
No. Date Description
12/18/2025 ISSUE FOR PERMIT AND PRICING01
DRAWING INDEX
PROJECT LOCATION
VICINITY MAP
E
D
C
B
A x x.x x x.x xx
ENLARGED DETAIL REFERENCE
PROJECT PLAN NORTH ARROW
DOOR DESIGNATION
(ABOVE FINISH FLOOR)
FINISH KEY DESIGNATION
STRUCTURAL COLUMN CENTER LINES
PROPERTY LINES, BOUNDARY LINES
REFERENCE OR LEVEL LINE
COLUMN REFERENCE GRIDS
BUILDING SECTION
NOTE KEY DESIGNATIONS
PARTITION TYPE
DETAIL SECTION
MATCH LINE
BREAK LINE
ROOM/SPACE NUMBER
EXTERIOR ELEVATION
INTERIOR ELEVATION
REVISION CLOUD
REVISION TAG
KEY
XX
X
XXX
WALL SECTION
XXX
XXX
xx'-xx" xxxx
ARCHITECTURAL ABBREVIATIONS
DP. DAMPPROOFING
DET. DETAIL
DIA. DIAMETER
DIM. DIMENSION
DR. DOOR
DN. DOWN
DWG. DRAWING
D.F. DRINKING FOUNTAIN
DW. DRYWALL
D. DEPTH
EA. EACH
ELAS. ELASTIC
E.D.F. ELECTRIC DRINKING
FOUNTAIN
EL. ELEVATION
ELEV. ELEVATOR
ENCL. ENCLOSURE
EQ. EQUAL
EQUIP. EQUIPMENT
EXH. EXHAUST
EXIST. EXISTING
EXP. EXPANSION
EXP. ANCH. EXPANSION ANCHOR
EXP. BLT. EXPANSION BOLT
EXP. JT. EXPANSION JOINT
EXT. EXTERIOR
H
HDW. HARDWARE
HD. HEAD
HT. HEIGHT
H. PT. HIGH POINT
H.C. HOLLOW CORE
H.M. HOLLOW METAL
H.B. HOSE BIBB
HR. HOUR
I
IN. INCH
INCL. INCLUDE
INSUL. INSULATION
INT. INTERIOR
I.D. INSIDE DIAMETER
INTG. INTEGRAL
J
JT. JOINT
JST. JOIST
K
K. PL. KICK PLATE
KO. KNOCKOUT
KW. KILOWATT
L
LBL. LABEL
L.B. LAG BOLT
LAM. LAMINATE
LAV. LAVATORY
LT. LIGHT
LT. WT. LIGHT WEIGHT
L.W.C. LIGHT WEIGHT
CONCRETE
LMS. LIMESTONE
L.F. LINEAR FEET
LNTL. LINTEL
LG. LONG
LVR. LOUVER
L. PT. LOW POINT
L. LENGTH
N
NAT. NATURAL
NOM. NOMINAL
N.I.C. NOT IN CONTRACT
N.T.S. NOT TO SCALE
NO. NUMBER
O
O.C. ON CENTER
OPNG. OPENING
OPP. OPPOSITE
OP. HD. OPPOSITE HAND
O.D. OUTSIDE DIAMETER
OA. OVERALL
OVHD. OVERHEAD
OZ. OUNCE
OXY. OXYGEN
P
PTD. PAINTED
PR. PAIR
PT. PAINT
PNL. PANEL
P.T.D. PAPER TOWEL
DISPENSER
PART. BD. PARTICLE BOARD
PART. PARTITION
PC. PIECE
PLAS. PLASTER
PL. PLASTIC
PL. LAM. PLASTIC LAMINATE
PLT. PLATE
P.W. PLYWOOD
PNT. POINT
POL. POLISHED
PVC POLYVINYL CHLORIDE
P.C. PORTLAND CEMENT
PRCST. PRECAST
PROP. PROPERTY
P.S.I. POUND PER SQUARE
INCH
Q
QTY. QUANTITY
Q.T. QUARRY TILE
R
RAB. RABBET
RAD. RADIUS
RE: REFER, REFERENCE
REFL. REFLECTED
REINF. REINFORCE
REQ. REQUIRED
REQD. REQUIRED
R.A. RETURN AIR
REV. REVISE, REVISION
R.O.W. RIGHT OF WAY
R.D. ROOF DRAIN
RFG. ROOFING
RM. ROOM
R.O. ROUGH OPENING
RUB. RUBBER
T
TEL. TELEPHONE
TEMP. TEMPERED
T.C. TERRA COTTA
TERR. TERRAZZO
THK. THICKNESS
THD. THREAD
THRESH. THRESHOLD
T. ACC. TOILET ACCESSORY
T.P.D. TOILET PAPER
DISPENSER
T.O.C. TOP OF CURB
T.O.S. TOP OF SLAB
T.O.STL. TOP OF STEEL
T.B. TOWEL BAR
TRAV. TRAVERTINE
T.D. TREAD
TYP. TYPICAL
TLT. TOILET
U
U.C. UNDERCUT
U.L. UNDERWRITERS
LABORATORIES INC.
UR. URINAL
U.N.O. UNLESS NOTED
OTHERWISE
V
VAC. VACUUM
V.B. VAPOR BARRIER
VAR. VARIES
VERT. VERTICAL
V.W.C. VINYL WALL COVERING
V.C.T. VINYL COMPOSITION
TILE
VNR. VENEER
W
W.T.W. WALL TO WALL
W.H. WALL HUNG
W.C. WATER CLOSET
WP. WATER PROOFING
WND. WINDOW
W.W.F. WELDED WIRE FABRIC
WD. WOOD
W.P. WORK POINT
W.I. WROUGHT IRON
W/O WITHOUT
W/ WITH
W. WIDTH
Y
YD. YARD
F
FAB. FABRICATE
FAS. FASTEN
F. GL. FIBER GLASS
FIN. FINISH
F.F. FINISH FLOOR
F.E. FIRE EXTINGUISHER
F.E.C. FIRE EXTINGUISHER
CABINET
F.H.C. FIRE HOSE CABINET
F.H.R. FIRE HOSE RACK
F. PRF. FIRE PROOFING
FLG. FLASHING
F.H.S. FLAT HEAD SCREW
FLR. FLOOR
F.D. FLOOR DRAIN
FL. MTD. FLOOR MOUNTED
FT. FOOT
FDN. FOUNDATION
FUT. FUTURE
F.R.P. FIBERGLASS
REINFORCED PANEL
M
MFR. MANUFACTURER
MRB. MARBLE
MAS. MASONRY
M.O. MASONRY OPENING
MAX. MAXIMUM
MEMB. MEMBRANE
MTL. METAL
MTL. DK. METAL DECK
MTL. L. METAL LATH
M. METER
MEZZ. MEZZANINE
MM. MILLIMETER
MLWK. MILLWORK
MIN. MINIMUM
MISC. MISCELLANEOUS
MOD. MODULE
MLDG. MOULDING
MTG. MOUNTING
MULL. MULLION
S
SAF. GL. SAFETY GLASS
S.N.D. ESANITARY NAPKIN
DISPENSER
SCHED. SCHEDULE
SLNT. SEALANT
SMLS. SEAMLESS
SECT. SECTION
SEP. SEPARATE
SERV. SERVICE
S.S. SERVICE SINK
SHWR. SHOWER
SH. SHEET
SIM. SIMILAR
S.C. SOLID CORE
SPCL. SPECIAL
SPEC. SPECIFICATION
SQ. SQUARE
S. STL. STAINLESS STEEL
STD. STANDARD
STL. STEEL
S.D. STORM DRAIN
STRUC. STRUCTURAL
STRUCT. STRUCTURAL
SURF. SURFACE
SUSP. SUSPEND
SUSP. CLG. SUSPENDED CEILING
G
GAL. GALLON
GALV. GALVANIZED
GA. GAUGE
GL. GLASS
GR. GRADE
GRAN. GRANITE
GYP. BD. GYPSUM BOARD
GYP. PLAS. GYPSUM PLASTER
LB POUND
CEILING HEIGHT REFERENCE
GENERAL SYMBOL LEGEND
XXX
ENLARGED DETAIL REFERENCE
PROJECT PLAN NORTH ARROW
DOOR DESIGNATION
(ABOVE FINISH FLOOR)
FINISH KEY DESIGNATION
STRUCTURAL COLUMN CENTER LINES
PROPERTY LINES, BOUNDARY LINES
REFERENCE OR LEVEL LINE
COLUMN REFERENCE GRIDS
BUILDING SECTION
NOTE KEY DESIGNATIONS
PARTITION TYPE
DETAIL SECTION
MATCH LINE
BREAK LINE
ROOM/SPACE NUMBER
EXTERIOR ELEVATION
INTERIOR ELEVATION
REVISION CLOUD
REVISION TAG
WALL SECTION
DP. DAMPPROOFING
DET. DETAIL
DIA. DIAMETER
DIM. DIMENSION
DR. DOOR
DN. DOWN
DWG. DRAWING
D.F. DRINKING FOUNTAIN
DW. DRYWALL
D. DEPTH
EA. EACH
ELAS. ELASTIC
E.D.F. ELECTRIC DRINKING
FOUNTAIN
EL. ELEVATION
ELEV. ELEVATOR
ENCL. ENCLOSURE
EQ. EQUAL
EQUIP. EQUIPMENT
EXH. EXHAUST
EXIST. EXISTING
EXP. EXPANSION
EXP. ANCH. EXPANSION ANCHOR
EXP. BLT. EXPANSION BOLT
EXP. JT. EXPANSION JOINT
EXT. EXTERIOR
HDW. HARDWARE
HD. HEAD
HT. HEIGHT
H. PT. HIGH POINT
H.C. HOLLOW CORE
H.M. HOLLOW METAL
H.B. HOSE BIBB
HR. HOUR
IN. INCH
INCL. INCLUDE
INSUL. INSULATION
INT. INTERIOR
I.D. INSIDE DIAMETER
INTG. INTEGRAL
JT. JOINT
JST. JOIST
K. PL. KICK PLATE
KO. KNOCKOUT
KW. KILOWATT
LBL. LABEL
L.B. LAG BOLT
LAM. LAMINATE
LAV. LAVATORY
LT. LIGHT
LT. WT. LIGHT WEIGHT
L.W.C. LIGHT WEIGHT
CONCRETE
LMS. LIMESTONE
L.F. LINEAR FEET
LNTL. LINTEL
LG. LONG
LVR. LOUVER
L. PT. LOW POINT
L. LENGTH
NAT. NATURAL
NOM. NOMINAL
N.I.C. NOT IN CONTRACT
N.T.S. NOT TO SCALE
NO. NUMBER
O.C. ON CENTER
OPNG. OPENING
OPP. OPPOSITE
OP. HD. OPPOSITE HAND
O.D. OUTSIDE DIAMETER
OA. OVERALL
OVHD. OVERHEAD
OZ. OUNCE
OXY. OXYGEN
PTD. PAINTED
PR. PAIR
PT. PAINT
PNL. PANEL
P.T.D. PAPER TOWEL
DISPENSER
PART. BD. PARTICLE BOARD
PART. PARTITION
PC. PIECE
PLAS. PLASTER
PL. PLASTIC
PL. LAM. PLASTIC LAMINATE
PLT. PLATE
P.W. PLYWOOD
PNT. POINT
POL. POLISHED
PVC POLYVINYL CHLORIDE
P.C. PORTLAND CEMENT
PRCST. PRECAST
PROP. PROPERTY
P.S.I. POUND PER SQUARE
INCH
QTY. QUANTITY
Q.T. QUARRY TILE
RAB. RABBET
RAD. RADIUS
RE: REFER, REFERENCE
REFL. REFLECTED
REINF. REINFORCE
REQ. REQUIRED
REQD. REQUIRED
R.A. RETURN AIR
REV. REVISE, REVISION
R.O.W. RIGHT OF WAY
R.D. ROOF DRAIN
RFG. ROOFING
RM. ROOM
R.O. ROUGH OPENING
RUB. RUBBER
TEL. TELEPHONE
TEMP. TEMPERED
T.C. TERRA COTTA
TERR. TERRAZZO
THK. THICKNESS
THD. THREAD
THRESH. THRESHOLD
T. ACC. TOILET ACCESSORY
T.P.D. TOILET PAPER
DISPENSER
T.O.C. TOP OF CURB
T.O.S. TOP OF SLAB
T.O.STL. TOP OF STEEL
T.B. TOWEL BAR
TRAV. TRAVERTINE
T.D. TREAD
TYP. TYPICAL
TLT. TOILET
U.C. UNDERCUT
U.L. UNDERWRITERS
LABORATORIES INC.
UR. URINAL
U.N.O. UNLESS NOTED
OTHERWISE
VAC. VACUUM
V.B. VAPOR BARRIER
VAR. VARIES
VERT. VERTICAL
V.W.C. VINYL WALL COVERING
V.C.T. VINYL COMPOSITION
TILE
VNR. VENEER
W.T.W.
W.H.
W.C.
WP.
WND.
W.W.F.
WD.
W.P.
W.I.
W/O
W/
W.
YD. YARD
FAB. FABRICATE
FAS. FASTEN
F. GL. FIBER GLASS
FIN. FINISH
F.F. FINISH FLOOR
F.E. FIRE EXTINGUISHER
F.E.C. FIRE EXTINGUISHER
CABINET
F.H.C. FIRE HOSE CABINET
F.H.R. FIRE HOSE RACK
F. PRF. FIRE PROOFING
FLG. FLASHING
F.H.S. FLAT HEAD SCREW
FLR. FLOOR
F.D. FLOOR DRAIN
FL. MTD. FLOOR MOUNTED
FT. FOOT
FDN. FOUNDATION
FUT. FUTURE
F.R.P. FIBERGLASS
REINFORCED PANEL
MFR. MANUFACTURER
MRB. MARBLE
MAS. MASONRY
M.O. MASONRY OPENING
MAX. MAXIMUM
MEMB. MEMBRANE
MTL. METAL
MTL. DK. METAL DECK
MTL. L. METAL LATH
M. METER
MEZZ. MEZZANINE
MM. MILLIMETER
MLWK. MILLWORK
MIN. MINIMUM
MISC. MISCELLANEOUS
MOD. MODULE
MLDG. MOULDING
MTG. MOUNTING
MULL. MULLION
SAF. GL. SAFETY GLASS
S.N.D. ESANITARY NAPKIN
DISPENSER
SCHED. SCHEDULE
SLNT. SEALANT
SMLS. SEAMLESS
SECT. SECTION
SEP. SEPARATE
SERV. SERVICE
S.S. SERVICE SINK
SHWR. SHOWER
SH. SHEET
SIM. SIMILAR
S.C. SOLID CORE
SPCL. SPECIAL
SPEC. SPECIFICATION
SQ. SQUARE
S. STL. STAINLESS STEEL
STD. STANDARD
STL. STEEL
S.D. STORM DRAIN
STRUC. STRUCTURAL
STRUCT. STRUCTURAL
SURF. SURFACE
SUSP. SUSPEND
SUSP. CLG. SUSPENDED CEILING
GAL. GALLON
GALV. GALVANIZED
GA. GAUGE
GL. GLASS
GR. GRADE
GRAN. GRANITE
GYP. BD. GYPSUM BOARD
GYP. PLAS. GYPSUM PLASTER
LB POUND
CEILING HEIGHT REFERENCE
ENLARGED DETAIL REFERENCE
PROJECT PLAN NORTH ARROW
DOOR DESIGNATION
(ABOVE FINISH FLOOR)
FINISH KEY DESIGNATION
STRUCTURAL COLUMN CENTER LINES
PROPERTY LINES, BOUNDARY LINES
REFERENCE OR LEVEL LINE
COLUMN REFERENCE GRIDS
BUILDING SECTION
NOTE KEY DESIGNATIONS
PARTITION TYPE
DETAIL SECTION
MATCH LINE
BREAK LINE
ROOM/SPACE NUMBER
EXTERIOR ELEVATION
INTERIOR ELEVATION
REVISION CLOUD
REVISION TAG
WALL SECTION
DP. DAMPPROOFING
DET. DETAIL
DIA. DIAMETER
DIM. DIMENSION
DR. DOOR
DN. DOWN
DWG. DRAWING
D.F. DRINKING FOUNTAIN
DW. DRYWALL
D. DEPTH
EA. EACH
ELAS. ELASTIC
E.D.F. ELECTRIC DRINKING
FOUNTAIN
EL. ELEVATION
ELEV. ELEVATOR
ENCL. ENCLOSURE
EQ. EQUAL
EQUIP. EQUIPMENT
EXH. EXHAUST
EXIST. EXISTING
EXP. EXPANSION
EXP. ANCH. EXPANSION ANCHOR
EXP. BLT. EXPANSION BOLT
EXP. JT. EXPANSION JOINT
EXT. EXTERIOR
HDW. HARDWARE
HD. HEAD
HT. HEIGHT
H. PT. HIGH POINT
H.C. HOLLOW CORE
H.M. HOLLOW METAL
H.B. HOSE BIBB
HR. HOUR
IN. INCH
INCL. INCLUDE
INSUL. INSULATION
INT. INTERIOR
I.D. INSIDE DIAMETER
INTG. INTEGRAL
JT. JOINT
JST. JOIST
K. PL. KICK PLATE
KO. KNOCKOUT
KW. KILOWATT
LBL. LABEL
L.B. LAG BOLT
LAM. LAMINATE
LAV. LAVATORY
LT. LIGHT
LT. WT. LIGHT WEIGHT
L.W.C. LIGHT WEIGHT
CONCRETE
LMS. LIMESTONE
L.F. LINEAR FEET
LNTL. LINTEL
LG. LONG
LVR. LOUVER
L. PT. LOW POINT
L. LENGTH
NAT. NATURAL
NOM. NOMINAL
N.I.C. NOT IN CONTRACT
N.T.S. NOT TO SCALE
NO. NUMBER
O.C. ON CENTER
OPNG. OPENING
OPP. OPPOSITE
OP. HD. OPPOSITE HAND
O.D. OUTSIDE DIAMETER
OA. OVERALL
OVHD. OVERHEAD
OZ. OUNCE
OXY. OXYGEN
PTD. PAINTED
PR. PAIR
PT. PAINT
PNL. PANEL
P.T.D. PAPER TOWEL
DISPENSER
PART. BD. PARTICLE BOARD
PART. PARTITION
PC. PIECE
PLAS. PLASTER
PL. PLASTIC
PL. LAM. PLASTIC LAMINATE
PLT. PLATE
P.W. PLYWOOD
PNT. POINT
POL. POLISHED
PVC POLYVINYL CHLORIDE
P.C. PORTLAND CEMENT
PRCST. PRECAST
PROP. PROPERTY
P.S.I. POUND PER SQUARE
INCH
QTY. QUANTITY
Q.T. QUARRY TILE
RAB. RABBET
RAD. RADIUS
RE: REFER, REFERENCE
REFL. REFLECTED
REINF. REINFORCE
REQ. REQUIRED
REQD. REQUIRED
R.A. RETURN AIR
REV. REVISE, REVISION
R.O.W. RIGHT OF WAY
R.D. ROOF DRAIN
RFG. ROOFING
RM. ROOM
R.O. ROUGH OPENING
RUB. RUBBER
TEL. TELEPHONE
TEMP. TEMPERED
T.C. TERRA COTTA
TERR. TERRAZZO
THK. THICKNESS
THD. THREAD
THRESH. THRESHOLD
T. ACC. TOILET ACCESSORY
T.P.D. TOILET PAPER
DISPENSER
T.O.C. TOP OF CURB
T.O.S. TOP OF SLAB
T.O.STL. TOP OF STEEL
T.B. TOWEL BAR
TRAV. TRAVERTINE
T.D. TREAD
TYP. TYPICAL
TLT. TOILET
U.C. UNDERCUT
U.L. UNDERWRITERS
LABORATORIES INC.
UR. URINAL
U.N.O. UNLESS NOTED
OTHERWISE
VAC. VACUUM
V.B. VAPOR BARRIER
VAR. VARIES
VERT. VERTICAL
V.W.C. VINYL WALL COVERING
V.C.T. VINYL COMPOSITION
TILE
VNR. VENEER
W.T.W.
W.H.
W.C.
WP.
WND.
W.W.F.
WD.
W.P.
W.I.
W/O
W/
W.
YD. YARD
FAB. FABRICATE
FAS. FASTEN
F. GL. FIBER GLASS
FIN. FINISH
F.F. FINISH FLOOR
F.E. FIRE EXTINGUISHER
F.E.C. FIRE EXTINGUISHER
CABINET
F.H.C. FIRE HOSE CABINET
F.H.R. FIRE HOSE RACK
F. PRF. FIRE PROOFING
FLG. FLASHING
F.H.S. FLAT HEAD SCREW
FLR. FLOOR
F.D. FLOOR DRAIN
FL. MTD. FLOOR MOUNTED
FT. FOOT
FDN. FOUNDATION
FUT. FUTURE
F.R.P. FIBERGLASS
REINFORCED PANEL
MFR. MANUFACTURER
MRB. MARBLE
MAS. MASONRY
M.O. MASONRY OPENING
MAX. MAXIMUM
MEMB. MEMBRANE
MTL. METAL
MTL. DK. METAL DECK
MTL. L. METAL LATH
M. METER
MEZZ. MEZZANINE
MM. MILLIMETER
MLWK. MILLWORK
MIN. MINIMUM
MISC. MISCELLANEOUS
MOD. MODULE
MLDG. MOULDING
MTG. MOUNTING
MULL. MULLION
SAF. GL. SAFETY GLASS
S.N.D. ESANITARY NAPKIN
DISPENSER
SCHED. SCHEDULE
SLNT. SEALANT
SMLS. SEAMLESS
SECT. SECTION
SEP. SEPARATE
SERV. SERVICE
S.S. SERVICE SINK
SHWR. SHOWER
SH. SHEET
SIM. SIMILAR
S.C. SOLID CORE
SPCL. SPECIAL
SPEC. SPECIFICATION
SQ. SQUARE
S. STL. STAINLESS STEEL
STD. STANDARD
STL. STEEL
S.D. STORM DRAIN
STRUC. STRUCTURAL
STRUCT. STRUCTURAL
SURF. SURFACE
SUSP. SUSPEND
SUSP. CLG. SUSPENDED CEILING
GAL. GALLON
GALV. GALVANIZED
GA. GAUGE
GL. GLASS
GR. GRADE
GRAN. GRANITE
GYP. BD. GYPSUM BOARD
GYP. PLAS. GYPSUM PLASTER
LB POUND
CEILING HEIGHT REFERENCE
X'-XX"
ENLARGED DETAIL REFERENCE
PROJECT PLAN NORTH ARROW
DOOR DESIGNATION
(ABOVE FINISH FLOOR)
FINISH KEY DESIGNATION
STRUCTURAL COLUMN CENTER LINES
PROPERTY LINES, BOUNDARY LINES
REFERENCE OR LEVEL LINE
COLUMN REFERENCE GRIDS
BUILDING SECTION
ENLARGED PLAN REFERENCE
NOTE KEY DESIGNATIONS
PARTITION TYPE
DETAIL SECTION
MATCH LINE
BREAK LINE
ROOM/SPACE NUMBER
EXTERIOR ELEVATION
INTERIOR ELEVATION
REVISION CLOUD
REVISION TAG
WALL SECTION
PROJECT TRUE NORTH ARROW
DP. DAMPPROOFING
DET. DETAIL
DIA. DIAMETER
DIM. DIMENSION
DR. DOOR
DN. DOWN
DWG. DRAWING
D.F. DRINKING FOUNTAIN
DW. DRYWALL
D. DEPTH
EA. EACH
ELAS. ELASTIC
E.D.F. ELECTRIC DRINKING
FOUNTAIN
EL. ELEVATION
ELEV. ELEVATOR
ENCL. ENCLOSURE
EQ. EQUAL
EQUIP. EQUIPMENT
EXH. EXHAUST
EXIST. EXISTING
EXP. EXPANSION
EXP. ANCH. EXPANSION ANCHOR
EXP. BLT. EXPANSION BOLT
EXP. JT. EXPANSION JOINT
EXT. EXTERIOR
HDW. HARDWARE
HD. HEAD
HT. HEIGHT
H. PT. HIGH POINT
H.C. HOLLOW CORE
H.M. HOLLOW METAL
H.B. HOSE BIBB
HR. HOUR
IN. INCH
INCL. INCLUDE
INSUL. INSULATION
INT. INTERIOR
I.D. INSIDE DIAMETER
INTG. INTEGRAL
JT. JOINT
JST. JOIST
K. PL. KICK PLATE
KO. KNOCKOUT
KW. KILOWATT
LBL. LABEL
L.B. LAG BOLT
LAM. LAMINATE
LAV. LAVATORY
LT. LIGHT
LT. WT. LIGHT WEIGHT
L.W.C. LIGHT WEIGHT
CONCRETE
LMS. LIMESTONE
L.F. LINEAR FEET
LNTL. LINTEL
LG. LONG
LVR. LOUVER
L. PT. LOW POINT
L. LENGTH
NAT. NATURAL
NOM. NOMINAL
N.I.C. NOT IN CONTRACT
N.T.S. NOT TO SCALE
NO. NUMBER
O.C. ON CENTER
OPNG. OPENING
OPP. OPPOSITE
OP. HD. OPPOSITE HAND
O.D. OUTSIDE DIAMETER
OA. OVERALL
OVHD. OVERHEAD
OZ. OUNCE
OXY. OXYGEN
PTD. PAINTED
PR. PAIR
PT. PAINT
PNL. PANEL
P.T.D. PAPER TOWEL
DISPENSER
PART. BD. PARTICLE BOARD
PART. PARTITION
PC. PIECE
PLAS. PLASTER
PL. PLASTIC
PL. LAM. PLASTIC LAMINATE
PLT. PLATE
P.W. PLYWOOD
PNT. POINT
POL. POLISHED
PVC POLYVINYL CHLORIDE
P.C. PORTLAND CEMENT
PRCST. PRECAST
PROP. PROPERTY
P.S.I. POUND PER SQUARE
INCH
QTY. QUANTITY
Q.T. QUARRY TILE
RAB. RABBET
RAD. RADIUS
RE: REFER, REFERENCE
REFL. REFLECTED
REINF. REINFORCE
REQ. REQUIRED
REQD. REQUIRED
R.A. RETURN AIR
REV. REVISE, REVISION
R.O.W. RIGHT OF WAY
R.D. ROOF DRAIN
RFG. ROOFING
RM. ROOM
R.O. ROUGH OPENING
RUB. RUBBER
TEL. TELEPHONE
TEMP. TEMPERED
T.C. TERRA COTTA
TERR. TERRAZZO
THK. THICKNESS
THD. THREAD
THRESH. THRESHOLD
T. ACC. TOILET ACCESSORY
T.P.D. TOILET PAPER
DISPENSER
T.O.C. TOP OF CURB
T.O.S. TOP OF SLAB
T.O.STL. TOP OF STEEL
T.B. TOWEL BAR
TRAV. TRAVERTINE
T.D. TREAD
TYP. TYPICAL
TLT. TOILET
U.C. UNDERCUT
U.L. UNDERWRITERS
LABORATORIES INC.
UR. URINAL
U.N.O. UNLESS NOTED
OTHERWISE
VAC. VACUUM
V.B. VAPOR BARRIER
VAR. VARIES
VERT. VERTICAL
V.W.C. VINYL WALL COVERING
V.C.T. VINYL COMPOSITION
TILE
VNR. VENEER
W.T.W.
W.H.
W.C.
WP.
WND.
W.W.F.
WD.
W.P.
W.I.
W/O
W/
W.
YD. YARD
FAB. FABRICATE
FAS. FASTEN
F. GL. FIBER GLASS
FIN. FINISH
F.F. FINISH FLOOR
F.E. FIRE EXTINGUISHER
F.E.C. FIRE EXTINGUISHER
CABINET
F.H.C. FIRE HOSE CABINET
F.H.R. FIRE HOSE RACK
F. PRF. FIRE PROOFING
FLG. FLASHING
F.H.S. FLAT HEAD SCREW
FLR. FLOOR
F.D. FLOOR DRAIN
FL. MTD. FLOOR MOUNTED
FT. FOOT
FDN. FOUNDATION
FUT. FUTURE
F.R.P. FIBERGLASS
REINFORCED PANEL
MFR. MANUFACTURER
MRB. MARBLE
MAS. MASONRY
M.O. MASONRY OPENING
MAX. MAXIMUM
MEMB. MEMBRANE
MTL. METAL
MTL. DK. METAL DECK
MTL. L. METAL LATH
M. METER
MEZZ. MEZZANINE
MM. MILLIMETER
MLWK. MILLWORK
MIN. MINIMUM
MISC. MISCELLANEOUS
MOD. MODULE
MLDG. MOULDING
MTG. MOUNTING
MULL. MULLION
SAF. GL. SAFETY GLASS
S.N.D. ESANITARY NAPKIN
DISPENSER
SCHED. SCHEDULE
SLNT. SEALANT
SMLS. SEAMLESS
SECT. SECTION
SEP. SEPARATE
SERV. SERVICE
S.S. SERVICE SINK
SHWR. SHOWER
SH. SHEET
SIM. SIMILAR
S.C. SOLID CORE
SPCL. SPECIAL
SPEC. SPECIFICATION
SQ. SQUARE
S. STL. STAINLESS STEEL
STD. STANDARD
STL. STEEL
S.D. STORM DRAIN
STRUC. STRUCTURAL
STRUCT. STRUCTURAL
SURF. SURFACE
SUSP. SUSPEND
SUSP. CLG. SUSPENDED CEILING
GAL. GALLON
GALV. GALVANIZED
GA. GAUGE
GL. GLASS
GR. GRADE
GRAN. GRANITE
GYP. BD. GYPSUM BOARD
GYP. PLAS. GYPSUM PLASTER
LB POUND
CEILING HEIGHT REFERENCE
WINDOW DESIGNATION
GENERAL PROJECT NOTES
2.
4.
5.
6.
7.
10.
12.
13.
14.
15.
DO NOT SCALE OFF THE DRAWINGS. DIMENSIONS SHALL GOVERN.
PATCH AND SEAL ALL PENETRATIONS THROUGH THE FLOOR TO COMPLY WITH APPLICABLE BUILDING CODES.
RECESSED CEILING FIXTURES, APPURTENANCES, ACCESSORIES, SPRINKLER HEADS, AND OTHER SIMILIAR ITEMS SHALL BE CENTERED IN CEILING TILE OR GYP BD.. PANEL, U.N.O.
ALL FASTENINGS AND ATTACHMENTS SHALL BE FULLY CONCEALED FROM VIEW.
ALL FLOOR FINISH CHANGES TO OCCUR UNDER DOORS IN THEIR CLOSED POSITION.
'TYPICAL' MEANS THE REFERENCED DETAIL SHALL APPLY FOR ALL SIMILAR CONDITIONS U.N.O.
TWO OR MORE LIGHT SWITCHES IN THE SAME LOCATION SHALL BE GANGED TOGETHER WITH A SINGLE COVER PLATE
COMPLY WITH REQUIREMENTS OF ALL RATED ASSEMBLIES NOTED PER UL DESIGNATION AND WITH LOCAL AND STATE CODES.
FIRE PROTECTION AND FIRE ALARM SYSTEMS TO BE PERMITTED SEPARATELY BY CONTRACTOR IN ACCORDANCE WITH LOCAL AND STATE CODES.
PER IBC SECTION 107.3.4.1, DOCUMENTS FOR DEFERRED SUBMITAL ITEMS SHALL BE SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE
WHO SHALL REVIEW THEM AND FORWARD THEM TO THE BUILDING OFFICIAL WITH A NOTATION INDICATING THAT THE DEFERRED SUBMITTAL DOCUMETNS HAVE
BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL ITEMS SHALL NOT BE INSTALLED
UNTIL THE DEFERRED SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING OFFICIAL. THE FOLLOWING LIST INCLUDES DEFERRED SUBMITTAL ITEMS IN
THE SCOPE OF THIS PROJECT, WHICH SHALL BE ENGINEERED BY THE GENERAL CONTRACTOR IN ACCORDANCE WITH ALL APPLICABLE CODES AND SUBMITTED TO THE
REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE FOR REVIEW, AND SHALL BE REVIEWED FOR PERMIT AND INSPECTED DURING CONSTRUCTION BY THE
BUILDING OFFICIAL:
A. .
B. .
C. .
ALL MATERIALS USED WITHIN CONCEALED SPACES, (I.E.. CAVITIES OF WALLS, PARTITIONS, CEILINGS AND SHAFTS) SHALL QUALIFY AS NONCOMBUSTIBLE, AS DEFINED
BY THE LOCAL BUILDING CODE OR HAVE A MAXIMUM FLAME SPREAD RATING OF 25 AND A MAXIMUM SMOKE DEVELOPED RATING OF 50 WHEN TESTED AND LISTED
IN ACCORDANCE WITH ASTM E84. MATERIALS ENCASED CONCRETE OR MASONRY WITH 2" MIN. COVER OR MATERIALS LOCATED IN NONCOMBUSTIBLE ENCLOSURES
DO NOT HAVE TO COMPLY WITH THESE QUALIFICATIONS.
11. THE CONTRACTOR IS RESPONSIBLE FOR ALL MECHANICAL AND ELECTRICAL ITEMS SHOWN ON THE ARCHITECTURAL, MECHANICAL AND ELECTRICAL DRAWINGS. ALL
ITEMS INDICATED ON ANY DRAWING ARE TO BE IN GENERAL CONTRACTOR'S SCOPE OF WORK.
9. ALL WOOD USED AS BLOCKING OR BRACING SHALL BE FIRE-RETARDANT TREATED AS REQUIRED BY CODE. CONTRACTOR IS RESPONSIBLE TO PROVIDE ALL NECESSARY
BLOCKING TO ACCOMMODATE INTERIOR FINISHES AND EQUIPMENT AS DESCRIBED IN THE CONTRACT DOCUMENTS.
8. FLOOR TOLERANCE: IN LAYING OUT AND DETAILING THE WORK TO BE COMPLETED, CONSIDERATION SHALL BE GIVEN TO VARIATIONS IN THE FLOOR LEVELNESS
RESULTING FROM CONSTRUCTION QUALITY AND LIVE AND DEAD LOADS IMPOSED ON THE STRUCTURE. FIELD VERIFICATIONS SHALL BE MADE OF CONDITIONS TO
VERIFY CONSTRUCTION TOLERANCES. ALIGNMENT OF DOOR HEADS AND ALL OTHER HORIZONTAL ELEMENTS SHALL BE MAINTAINED AT A CONSTANT LEVEL AND
SHALL NOT FOLLOW VARIATIONS IN FLOOR PLANE. LEVEL FLOOR AS REQUIRED USING APPROVED LEVELING COMPOUND.
3. ALL EXPOSED GYPSUM BOARD CORNERS SHALL HAVE CONTINUOUS SCREW ATTACHED METAL CORNER BEADS FLOOR TO CEILING. ALL EXPOSED GYPSUM BOARD
EDGES SHALL HAVE METAL 'L' BEADS CONTINUOUS.
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING ALL DIMENSIONS AND CONDITIONS OF CONTRACT DOCUMENTS PRIOR TO ORDERING MATERIALS OR
PROCEEDING WITH THE WORK. THE CONTRACTOR IS TO NOTIFY THE ARCHITECT OF ALL DISCREPANCIES OR QUESTIONS AND OBTAIN REQUIRED CLARIFICATION PRIOR
TO PROCEEDING WITH THE WORK.
16.
A.B. ANCHOR BOLT
ABV. ABOVE
AC. BD. ACOUSTICAL BOARD
AC. CLG. ACOUSTICAL CEILING
AC.T. ACOUSTICAL TILE
A.D. ACCESS DOOR
ADJ. ADJUSTABLE
A.F.F. ABOVE FINISHED FLOOR
AG. AGGREGATE
AL. ALUMINUM
ALT. ALTERNATE
ANCH. ANCHOR
ANOD. ANODIZED
ARCH. ARCHITECT
ASPH. ASPHALT
ASSY. ASSEMBLY
BIT. BITUMINOUS
BK. BRICK
BLDG. BUILDING
BLK. BLOCK
BLKG. BLOCKING
B.M. BENCH MARK
BM. BEAM
BSMT. BASEMENT
BTWN. BETWEEN
B.U.R. BUILT-UP ROOFING
C.JT. CONTROL JOINT
CAB. CABINET
CEM. CEMENT
CER. CERAMIC
C.I. CAST IRON
C.I.P. CAST-IN-PLACE
C.L. CENTER LINE
CLG. CEILING
CLO. CLOSET
C.M.U. CONCRETE MASONRY UNIT
COL. COLUMN
CONC. CONCRETE
CONST. CONSTRUCTION
CONT. CONTINUOUS
CPT. CARPET
CSK. COUNTERSUNK
C.T. CERAMIC TILE
CTR. CENTER
CU. FT. CUBIC FOOT
SHEET INDEX
Sheet
Number Sheet Name
Current Revision
# Date Description
00 - COVER
A0.10 GENERAL INFORMATION
A0.40 LIFE SAFETY PLAN
A0.00 COVER
03 - ARCHITECTURE
A1.10 SITE PLAN
A2.01 DEMO PLAN & DEMO ROOF PLAN
A2.11 FLOOR PLAN & ROOF PLAN
A5.20 ROOF DETAILS
A5.21 ROOF DETAILS
07 - MECHANICAL
M0.00 MECHANICAL COVER SHEET
M1.00 MECHANICAL OVERALL PLAN
M2.01 MECHANICAL PLAN - PHASE 1 - TEMP
M2.02 MECHANICAL PLAN - PHASE 2 - DEMOLITION
M2.03 MECHANICAL PLAN - PHASE 3 - NEW
M2.04 MECHANICAL PLAN - PHASE 4 - TEMP DEMO
M3.00 MECHANICAL SCHEDULES
M4.00 MECHANICAL DETAILS
M4.01 MECHANICAL SECTIONS AND MECHANICAL DIAGRAMS
M5.00 MECHANICAL CONTROLS
M5.01 MECHANICAL CONTROLS
08 - ELECTRICAL
E0.00 ELECTRICAL COVER SHEET
E1.00 ELECTRICAL OVERALL PLAN
E2.01 ELECTRICAL PLAN - PHASE 1 - TEMP
E2.02 ELECTRICAL PLAN - PHASE 2 - DEMOLITION
E2.03 ELECTRICAL PLAN - PHASE 3 - NEW
E2.04 ELECTRICAL PLAN - PHASE 4 - DEMOLITION
E3.00 ELECTRICAL RISER DIAGRAM, SCHEDULES, AND DETAILS
09 - PLUMBING
P0.00 PLUMBING COVER SHEET
P0.02 PLUMBING OVERALL PLAN
P0.03 PLUMBING PLAN - PHASE 1 - TEMP
P0.04 PLUMBING PLAN - PHASE 2 - DEMOLITION
P0.05 PLUMBING PLAN - PHASE 3 - NEW
P0.06 PLUMBING PLAN - PHASE 4 - DEMOLITION
P1.00 PLUMBING SCHEDULES AND DETAILS
10 - TECHNOLOGY
T000 TECHNOLOGY COVER SHEET
T201 TECHNOLOGY OVERALL PLAN
T211 TECHNOLOGY ENLARGED PLAN
T400 TECHNOLOGY DETAILS
GRAND TOTAL: 37
HW
Y-
DOWNTOWN
HOUSTON
THE
WOODLANDS
HWY-59
PROJECT
LOCATION
BUILDING CONSTRUCTION ANALYSIS
ZONING
TDLR #
APPLICABLE
CODES
Building Code:
Mechanical Code:
Plumbing Code:
Electrical Code:
Energy Code:
Fire Code:
Accessibility:
CONSTRUCTION TYPE
OCCUPANCY
CLASSIFICATION
BUILDING HEIGHT LIMITATIONS
NUMBER OF STORIES ABOVE
GRADE LIMITATIONS
BUILDING AREA LIMITATIONS
SEPARATION OF
OCCUPANCIES (HRS)
ALLOWABLE:
PROVIDED:
ALLOWABLE:
PROVIDED:
ALLOWABLE:
PROVIDED:
TYPE OF WORK NEW CONSTRUCTION RENOVATION/ ALTERATION ADDITION
SPRINKLED NON-SPRINKLED
SINGLE MIXED
2021 INTERNATIONAL BUILDING CODE
2021 INTERNATIONAL FIRE CODE
2021 INTERNATIONAL PLUMBING CODE
2021 INTERNATIONAL MECHANICAL CODE
2023 NATIONAL ELECTRIC CODE
2021 INTERNATIONAL ENERGY CONSERVATION CODE
TEXAS ACCESSIBILITY STANDARDS, MARCH 15th, 2012.
TABS000000000000
B
TYPE IA
X
X
B EXISTING BUILDING
T.I. BUILD-OUT CODE ANALYSIS -
SECTION 602.2
CHAPTER 3
B EXISTING BUILDING
X
B EXISTING BUILDING
SEPARATION OF OCCUPANCIES WILL BE ADDRESS DURING
INDIVIDUAL TENANT IMPROVEMENT
520 GROSS BUILDING AREA
PROJECT SCOPE OF WORK: REPLACE THE EXISTING BOILERS WITH A NEW BOILERS AND ASSOCIATED EQUIPMENT.
AT
T S
XETE FO
S A
C O R
Y L
.PORT
E R
2428 9
R E G
IS
TE
RED ARCH
ITE
C T
REVISIONSREVISIONS
Scale
25047.00
BROWNE McGREGOR ARCHITECTS, INC.
520 POST OAK BOULEVARD SUITE 880
HOUSTON, TX 77027
713-850-1733 www.brownemcgregor.com
COPYRIGHT 2025
12" = 1'-0"
A0.10
GENERAL
INFORMATION
H H
S Q
U E
N T
IN
M
E A
S E
H E
A L T
H C
E N
T E
R B
O
IL
E R
R E
P L A
C E
M E
N T
N
M A
C G
R E
G O
R W
A Y
H O
U S
T O
N
T X
12/18/2025
TRUE
NORTH
PLAN
NORTH
2 3 4 5 6 7 8 9 10 11
C
D
E
F
G
J
L.4
M.4
O
0 1.2 2.5 3.2 3.6 4.4 4.5
L
1.1 6.2 6.3 6.7 6.8 8.9
K.8
J.8
0.1 1 2.32.2 13
N.1
M.7
3.1 3.8
K
2.82.62.10.30.2 7.4 10.7
L.3
UP
ENGINEERING
BOILER ROOM
EMERGENCY
ELEC SWITCHGEAR
CENTRAL
PLANT
MAIN ELEC
SWITCHGEAR
BIO MED
WASTE
LINEN
HOLDING
STORG
CO2
ELEC ATS
IT
MATERIALS
MNGMT STORG
GEN STN
ADMIN
OFFICE
OFFICE OFFICE
CORRIDOR
CAN
WASH
ELEC
CORR
BREAKDOWN
CORR
TROUBLESHOOTER
STORAGE
STORG STAIR D STOR
HOMELESS PROG
STORG
SHARED
OFFICE
CORR
HOUSE CALLS
STORG
CORRIDOR
CORRIDOR
STORAGE
POP HEALTH
ELEC
VESTIBULE
ELEV 03
OFFICE
ELEC
ELEV 01
ELEV 02
TEL
IT
MEN
REST
WOMEN
REST
EVS
CORRIDOR
WAITING
SECURITY
VESTIBULE
PUBLIC
ENTRANCE
WAITING
STAIR B
REFRIG
STORG
FREEZER
STORG
SERVING
AREA
DINING
AREA
DRY
STORAGE
KITCHEN
OUTDOOR
DINING
VESTIBULE BREAK RM
OFFICE
OFFICE
CORR
ST REST ST REST STORAGE
CORR CORR
ELEVATOR
LOBBY
ELIGIBILITY
CHECK-IN
HIV PROJ
ANALYST
STAIR A
ST REST
CORR
WORK AREA
REFILL/CASH
OFFICE
BREAK
DOWN
PHARMACY
ADAP
CHECK-IN
ADAP
WORK AREA
OFFICE
CHECK-IN
OFFICE
PD EDUCPD EDUC
ST RESTST REST
EVS
OFFICEDRESS DRESS
ADA
CORRIDOR
CORR
LOUNGE
CORRIDOR
ELEV 04ELEV
MACH RM
PD EDUCPD EDUCPD EDUC
ELEC
RECEIVING
STORAGE
CLN STOR
UNISEX
REST
ALCOVE
PATIENT
REST
EXAM
SOILED CORR
WATER TMT
STORAGE
ISOLATION
MED PREP
OFFICE
LAB
OFFICE
OFFICE
STAIR C
CORRIDOR
CONSULT DIET
CONSULT
DIET
CONSULT
DIET
CONSULT
CORRIDOR
CORR
CORRIDOR CORRIDOR
NURSE
STATION
NURSE
STATION
CORRIDOR
BLEACH
STATION
BLEACH
STATION
CORR
CORRIDOR
DIALYSIS
TREATMENT
DIALYSIS
TREATMENT
DIALYSIS
TREATMENT
DIALYSIS
TREATMENT
DIALYSIS
TREATMENT
DIALYSIS
TREATMENT
CORR
DIALYSIS
WAITING
DIALYSIS
TREATMENT
DIALYSIS
TREATMENT
1406 1368
1707 1006 1382
1710A
1711A
1132 1134
1714A
1711B
1712A
1101 1182
1180 1178 1184
1103 1181
13561358
13741372
13801125 1126
041600
135413601362
1314 1312
1350 1348
1316 1317
1328 1330 1334 1338
1343 1341
1320 1324
C F
B E
A D
1306A
F1
D1
B B F
B B F
B B F
B B F
B B F x x x
T-6
T-6 T-6T-6 x x
28x04 x
T-6
T-6
B B F
B B F
B B F
B B F
B B F x
BBF BBF
x
28x04
28x04
28x04
28x04
B B F
B B F
B B F
B B F
B B F
BBF BBF BBF BBF BBF
28x04
28x04
P A
T H
A
P A
T H
B
EXAMPLE
6' - 0"
520 SF
AREA
EXIT
EXIT
EXIT
SYMBOL LEGEND:
TYPICAL WALL- NEW
1 HOUR FIRE RATED WALL
2 HOUR FIRE RATED WALL
3 HOUR FIRE RATED WALL
SMOKE BARRIER WALL
ACCESSORY STOR, MECH
BUSINESS
ASSEMBLY WITHOUT FIXED SEATS:
UNCONCENTRATED (tables & chairs)
EGRESS TRAVEL PATH
BUILDING EXIT (EXIT WIDTH)
FIRE EXTINGUISHER
EXIT
FEC
TRUE
NORTH
PLAN
NORTH
EGRESS TRAVEL PATH
TRAVEL PATH TRAVEL DISTANCE
PATH A 36' - 0"
PATH B 65' - 0"
SCALE: 3/32" = 1'-0"1
LIFE SAFETY FLOOR PLAN - LEVEL 1
AT
T S
XETE FO
S A
C O R
Y L
.PORT
E R
2428 9
R E G
IS
TE
RED ARCH
ITE
C T
REVISIONSREVISIONS
Scale
25047.00
BROWNE McGREGOR ARCHITECTS, INC.
520 POST OAK BOULEVARD SUITE 880
HOUSTON, TX 77027
713-850-1733 www.brownemcgregor.com
COPYRIGHT 2025
As indicated
A0.40
LIFE SAFETY PLAN
H H
S Q
U E
N T
IN
M
E A
S E
H E
A L T
H C
E N
T E
R B
O
IL
E R
R E
P L A
C E
M E
N T
N
M A
C G
R E
G O
R W
A Y
H O
U S
T O
N
T X
12/18/2025
PROJECT AREA
KEYED NOTES
SCALE: 3/32" = 1'-0"1
SITE PLAN
BUILDING GROSS AREA
Level Area
LEVEL 1 520 SF
520 SF
TRUE
NORTH
PLAN
NORTH
FIRE HYDRANT TRAVEL PATH
TRAVEL PATH TRAVEL DISTANCE
AT
T S
XETE FO
S A
C O R
Y L
.PORT
E R
2428 9
R E G
IS
TE
RED ARCH
ITE
C T
REVISIONSREVISIONS
Scale
25047.00
BROWNE McGREGOR ARCHITECTS, INC.
520 POST OAK BOULEVARD SUITE 880
HOUSTON, TX 77027
713-850-1733 www.brownemcgregor.com
COPYRIGHT 2025
As indicated
A1.10
SITE PLAN
H H
S Q
U E
N T
IN
M
E A
S E
H E
A L T
H C
E N
T E
R B
O
IL
E R
R E
P L A
C E
M E
N T
N
M A
C G
R E
G O
R W
A Y
H O
U S
T O
N
T X
12/18/2025
ENGINEERING
BOILER ROOM
EMERGENCY
ELEC SWITCHGEAR
CENTRAL
PLANT
MAIN ELEC
SWITCHGEAR
BIO MED
WASTE
LINEN
HOLDING
STORG
CO2
ELEC ATS
TYPICAL WALL
1 HOUR FIRE RATED WALL
2 HOUR FIRE RATED WALL
SOUND WALL
EXISTING WALL
DEMO WALL
TEMPORARY WALL
EXISTING SUSP. ACOUSTICAL
TILE CEILING TO REMAIN
EXISTING SUSP. ACOUSTICAL TILE
CEILING TO BE DEMOLISHED
DOOR & FRAME TO BE REMOVED.
REUSED DOOR, FRAME & HARDWARE
IF POSSIBLE & IF IN GOOD SHAPE
1. THIS DRAWING IS INTENDED TO BE USED IN CONJUNCTION WITH ALL OTHER PROVIDED DRAWINGS AND DOCUMENTATION FOR THIS
PROJECT. IF THERE ARE ANY DISCREPANCIES, NOTIFY BROWNE McGREGOR ARCHITECTS IMMEDIATELY.
2. NOTES TO SHEET & LEGEND - NOT ALL ITEMS ARE NECESSARILY USED
3. ALL DEMOLITION WORK SHALL BE IN ACCORDANCE WITH LOCAL, COUNTY, STATE, AND FEDERAL REGULATIONS.
4. STOP WORK AND NOTIFY OWNER AND ARCHITECT IMMEDIATELY IF HAZARDOUS CONDITIONS ARE UNCOVERED DURING DEMOLITION.
5. DEMOLISHED ITEMS SHALL BE DISPOSED OF OFF SITE IN ACCORDANCE WITH ALL LOCAL, COUNTY, STATE, AND FEDERAL REGULATIONS.
6. ALL DEMOLITION SHALL BE ACCOMPLISHED IN A MANNER THAT PREVENTS DAMAGE TO ADJOINING PROPERTIES OR ADJACENT AREAS
OF THE PROPERTY NOT INDICATED TO BE DEMOLISHED.
7. THE PROJECT SHALL BE MAINTAINED FREE FROM UNSAFE OR HAZARDOUS CONDITIONS.
8. ALL CONTRACTORS SHALL COORDINATE DEMOLITION WORK WITH ALL PHASING AND ALTERNATE REQUIREMENTS OF THE CONTRACT.
THE G.C. SHALL COORDINATE ALL DEMOLITION ACTIVITIES.
9. PROVIDE DEMOLITION WORK AS REQUIRED BY THE ENTIRE SET OF CONSTRUCTION DOCUMENTS. LIMIT REMOVAL AND DEMOLITION
WORK TO THAT SPECIFICALLY CALLED FOR IN THE CONSTRUCTION DOCUMENTS OR AS REQUIRED FOR THE INSTALLATION OF NEW
WORK.
10. PROTECT ALL EXISTING ITEMS TO REMAIN FROM DAMAGE DURING THE COURSE OF THE CONTRACT. IT SHALL BE THE RESPONSIBILITY
OF THE G.C. TO DOCUMENT EXISTING DAMAGE TO ALL ITEMS TO REMAIN AT THE TIME THAT THE AREA IS HANDED OVER TO THE
CONTRACTOR. G.C. WILL BE RESPONSIBLE FOR ANY DAMAGE NOT DOCUMENTED & TURNED OVER TO THE OWNER PRIOR TO
DEMOLITION COMMENCEMENT.
11. PRIOR TO THE COMMENCEMENT OF WORK OF SUBCONTRACTORS & THROUGHOUT THE COURSE OF THE WORK, THE G.C. SHALL
INSPECT & VERIFY THE LOCATION & CONDITION OF ALL ITEMS AFFECTED BY THE WORK UNDER THIS CONTRACT & REPORT
DISCREPANCIES TO THE ARCHITECT BEFORE DOING WORK RELATED TO THAT BEING INSPECTED. THIS MAY INCLUDE, BUT NOT BE
LIMITED TO, VERIFYING DIMENSIONS.
12. BEFORE BEGINNING WORK AT THE SITE, INSPECT ALL AREAS WHERE WORK IS TO BE PERFORMED. SURVEY THE EXISTING CONDITIONS
NOTING EXISTING CASEWORK, FINISHES, EQUIPMENT, SPECIALTIES AND OTHER MISC. ITEMS NOT LISTED IN THE CONTRACT
DOCUMENTS TO BE DEMOLISHED, BUT WILL REQUIRE REMOVAL IN ORDER TO PERFORM THE WORK REQUIRED ARE TO BE
COORDINATED WITH THE OWNER & ARCHITECT.
13. THE OWNER HAS THE FIRST RIGHT OF REFUSAL ON ALL REMOVED ITEMS. OWNER WILL MEET WITH G.C. PRIOR TO COMMENCEMENT
OF WORK AND PROVIDE A WRITTEN OR VERBAL LIST OF ITEMS THEY WANT TO BE SALVAGED AND RETURNED TO THEM.
14. DO NOT DRILL OR CUT EXISTING FLOOR JOISTS, BEAMS, COLUMNS, OR OTHER STRUCTURAL MEMBERS, UNLESS SPECIFICALLY
INDICATED.
15. ITEMS SHOWN HALF-TONED (OR WITH GRAY LINES) ARE EXISTING ITEMS TO REMAIN. ITEMS SHOWN IN BLACK/RED AND DASHED ARE
EXISTING ITEMS TO BE REMOVED. SEE OTHER GENERAL NOTES, REFERENCED NOTES AND DEMOLITION PLANS TO DETERMINE WHAT IS
TO BE DONE WITH THOSE ITEMS REMOVED.
16. THE G.C. SHALL BE RESPONSIBLE FOR ANY STRUCTURAL WALL OR FLOOR PENETRATION LARGER THAN 8" BY 8". THE GENERAL
CONTRACTOR WILL COORDINATE WITH THE APPROPRIATE SUBCONTRACTOR TO SEAL THE PENETRATION AS REQUIRED BY THE
DOCUMENTS OR BUILDING CODES. CORE DRILLING OR HOLES SMALLER THAN 8" X 8" WILL BE THE RESPONSIBILITY OF THE TRADES
REQUIRING THE PENETRATIONS. THE SAME TRADES WILL BE RESPONSIBLE FOR SEALING THE PENETRATIONS OR COORDINATING THE
SEALING WITH THE GENERAL CONTRACTOR AND OTHER APPROPRIATE SUBCONTRACTORS. ALL PENETRATIONS IN STRUCTURAL WALLS
OR FLOORS SHALL BE SEALED
17. WALL PENETRATIONS SHALL BE COORDINATED BY THE GENERAL CONTRACTOR / APPROPRIATE SUBCONTRACTOR AND SHALL BE
SEALED AS REQUIRED BY THE CONTRACT DOCUMENTS OR BUILDING CODES.
18. OPENINGS CREATED IN, OR CUTTING OF, ANY EXISTING SURFACES DURING CONSTRUCTION OR DAMAGED DURING CONSTRUCTION
SHALL BE PATCHED SUCH THAT THE MATERIAL DOES NOT APPEAR TO HAVE BEEN DAMAGED, OR THE MATERIAL SHALL BE REPLACED .
19. WHERE PERMANENT REMOVAL OF EXISTING MILLWORK, CASEWORK CABINETWORK, ACCESSORIES, EQUIPMENT, OR FURNISHINGS IS
REQUIRED, AND PREVIOUSLY CONCEALED SURFACES ARE TO REMAIN EXPOSED, PATCH PREVIOUSLY CONCEALED SURFACES TO MATCH
ADJACENT EXPOSED SURFACES AND PROVIDE A SMOOTH TRANSITION BETWEEN THE EXISTING AND PATCHED AREAS.
20. WALLS WITH EXISTING FINISHES SHALL BE PREPARED TO RECEIVE NEW WALL FINISHES. THIS MAY INCLUDE, BUT NOT LIMITED TO, REMOVAL OF GROUT AND MORTAR OR ADHESIVE FOR VINYL WALLCOVERING.
21. FLOOR AREAS THAT HAVE HAD THE EXISTING FLOOR FINISH REMOVED SHALL BE PREPARED TO RECEIVE THE A NEW FLOOR FINISH.
THIS MAY INCLUDE, BUT NOT LIMITED TO, REMOVAL OF FLOOR STONING, GROUT & MORTAR, AND ADHESIVE.
22. ALL EXISTING PAPER TOWEL, SOAP, OR LOTION DISPENSERS, CLOCKS, TACKBOARDS AND OTHER WALL BRACKETS, SUPPORTS OR
ACCESSORIES REQUIRING REMOVAL TO PERFORM THE WORK ARE TO BE REMOVED BEFORE OTHER DEMOLITION WORK BEGINS.
COORDINATE WITH THE OWNER AS TO WHETHER THESE ITEMS ARE DESIGNATED AS REUSE, SALVAGE OR REINSTALLED. ALL SIMILAR
ITEMS THAT WILL REMAIN IN PLACE ARE TO BE PROTECTED THROUGHOUT CONSTRUCTION AND CLEANED OF CONSTRUCTION
MATERIAL AND DUST BEFORE SUBSTANTIAL COMPLETION.
23. REMOVE SIGNAGE FROM EXISTING WALLS THAT ARE TO BE DEMOLISHED OR REQUIRE NEW FINISHES. PATCH ANY HOLES IN WALL.
VERIFY WITH OWNER WHICH, IF ANY, SIGNAGE IS TO BE RELOCATED OR REINSTALLED.
24. MECHANICAL AND ELECTRICAL ITEMS TO BE REMOVED ARE SHOWN FOR REFERENCE ONLY. SEE MECHANICAL AND ELECTRICAL SHEETS
FOR EXTENT OF DEMOLITION WORK ASSOCIATED WITH THOSE TRADES.
25. UNLESS OTHERWISE NOTED, REMOVE ALL ELECTRICAL LUMINAIRS, EQUIPMENT, SYSTEMS, DEVICES, OUTLETS, SWITCHES, PULL BOXES, JUNCTION BOXES, ETC. AS REQUIRED TO COMPLETELY TAKE OUT ITEMS SHOWN TO BE REMOVED. DISCONNECT AND REMOVE ALL
ELECTRICAL PROVISIONS TO EQUIPMENT BEING REMOVED. REMOVE ALL WIRING, CONDUIT, RACEWAYS, OUTLET BOXES, ETC.
SUPPORTING OR SERVING THE ITEMS TO BE REMOVED. NO CONDUCTORS OR CABLES SHALL BE ABANDONED IN PLACE. REMOVE
EXISTING WIRING AND CONDUIT BACK TO SOURCE.
26. EXISTING ELECTRICAL OUTLETS AND SWITCHES SHOWN TO REMAIN SHALL BE PROVIDED WITH NEW DEVICES AND COVER PLATES.
EXISTING BACK BOXES AND CONDUIT TO REMAIN.
27. SEAL OPENINGS IN FIRE RATED PARTITIONS CAUSED BY DEMOLITION. MAINTAIN FIRE RATING OF WALL OR PARTITION.
28. SYMBOLS SHOWN ARE TYPICAL AND LOCATIONS ARE APPROXIMATE. THEY ARE NOT INTENDED TO LIMIT THE AMOUNT OF
DEMOLITION. COORDINATE WITH EXISTING CONDITIONS AND THESE NOTES, AND REMOVE ALL APPLICABLE SYSTEMS AND
COMPONENTS CONFLICTING WITH THE FINISHED DESIGN INTENT.
29. ANY DEMOLITION OCCURRING OUTSIDE OF PROJECT SCOPE SHALL BE PATCHED AND REPAIRED TO MATCH EXISTING.
SYMBOL LEGEND:
DEMOLITION GENERAL NOTES:
NOT IN SCOPE
NOTE:
CONTRACTOR TO COORDINATE WITH OWNER BEFORE DEMOLITION, TO SCHEDULE ITEMS TO BE SALVAGED
AND REUSED. ALL ITEMS SCHEDULED FOR SALVAGE OR RE-USE SHALL BE REMOVED WITH CARE, STORED AND
PROTECTED FROM DAMAGE UNTIL SALVAGED ITEMS ARE INCORPORATED IN THE NEW WORK OR DELIVERED
TO OWNER.
4 4
SLOPE
1/4" : 1'-0"
SL
O
PE
1/ 4"
1'
-0
SL
O
PE
1/ 4"
1'
-0
SLOPE
1/4" : 1'-0"
TRUE
NORTH
PLAN
NORTH
KEYED NOTES
1 SEE MEP DRAWINGS FOR MORE INFORMATION
2 REMOVE EXISTING ROOF OVERFLOW SCUPPER.
3 REMOVE EXISTING ROOF DRAIN.
4 CLEAN EXISTING RUSTING PIPINGS AND PIPE HANGERS TO RECEIVE NEW FINISH.
5 REPAIR EXISTING METAL DECKING AND PATCH PENETRATIONS WITH METAL DECKING EQUAL TO THE EXISTING
SPECIFICATION OF THE EXISTING METAL DECKING.
7 TYPICAL ROOF ASSEMBLY: SCHED. 60 MIL TPO MEMBRANE ROOFING MECH. FASTENED TO 1/2" DENSDECK OVER
RIGID INSULATION 5" MIN., R-25CI MIN. ON TH EXISTING METAL DECKING.
8 SEE MEP DRAWINGS FOR MORE INFORMATION ABOUT THE EQUIPMENT IN THIS SPACE.
10 REMOVE EXISTING BOILER ROOF TOP VERTICAL VENT AND EXISTING ACCESSORIES. SEE MECHANICAL DRAWINGS
FOR MORE INFORMATION.
11 REMOVE EXISTING LIGHTNING PROTECTION REMOVE EXISTING LIGHTING PROTECTION TO MAKE WAY FOR THE
REMOVAL OF THE EXISTING PARAPET. COORDINATE WITH OWNERS LIGHTING PROTECTION CONTRACTOR.
12 REMOVE PART OF THE EXISTING ROOF EXHAUST VENT. SEE MECHANICAL DRAWINGS FROM MORE INFORMATION
TO MAKE WAY FOR THE REMOVAL OF THE EXISTING PARAPET.
13 REMOVE EXISTING ALUMINUM PARAPET CAP FLASHING.
14 REMOVE EXISTING ROOF PENETRATION AND WEATHER-HEAD FLASHING SYSTEM AT THE EXISTING GAS PIPE.
15 REMOVE EXISTING CAPPED ROOF PENETRATION.
16 REMOVE EXISTING ROOF ACCESS STAIRS TO ALLOW THE REMOVAL FOR THE EXISTING ROOF SYSTEM AND
ASSOCIATED WORK. SALVAGE THE ROOF ACCESS STAIRS TO BE REFINISHED AND REINSTALLED
17 LOCATION WHERE THE EXISTING ALUMINUM PARAPET CAP FLASHING MET THE EXISTING PARAPET CAP FLASHING
FOR THE ADJACENT TPO ROOF SYSTEM.
18 REMOVE EXISTING ROOF CURB FLASHING AT EXPANSION JOINT BETWEEN ROOF AND EXISTING BRICK WALL.
AT
T S
XETE FO
S A
C O R
Y L
.PORT
E R
2428 9
R E G
IS
TE
RED ARCH
ITE
C T
REVISIONSREVISIONS
Scale
25047.00
BROWNE McGREGOR ARCHITECTS, INC.
520 POST OAK BOULEVARD SUITE 880
HOUSTON, TX 77027
713-850-1733 www.brownemcgregor.com
COPYRIGHT 2025
As indicated
A2.01
DEMO PLAN & DEMO
ROOF PLAN
H H
S Q
U E
N T
IN
M
E A
S E
H E
A L T
H C
E N
T E
R B
O
IL
E R
R E
P L A
C E
M E
N T
N
M A
C G
R E
G O
R W
A Y
H O
U S
T O
N
T X
12/18/2025
SCALE:
BACK REF: /
1/4" = 1'-0"2
DEMO ROOF PLAN
SCALE:
BACK REF: /
1/4" = 1'-0"
01 A3.00
DEMO FLOOR PLAN - LEVEL 1
12/18/202501
EMERGENCY
ELEC SWITCHGEAR
CENTRAL
PLANT
MAIN ELEC
SWITCHGEAR
BIO MED
WASTE
LINEN
HOLDING
STORG
CO2
ELEC ATS
TV
15"
SYMBOL LEGEND:
TYPICAL WALL- NEW
WINDOW TYPE,
RE: A9.21 & A9.22
DOOR NUMBER, RE: A9.20
X
X
X/A-TX.XX
ROOM NAME
WALL TYPE, RE: A9.00
INTERIOR ELEVATION
ROOM NAME & NUMBER
RECESSED TV RECEPTACLE W/
POWER, COAX, & DATA
1 HOUR FIRE RATED WALL
SPECIFIED EQUIPMENT ITEM.
RE: FURNITURE FLOOR PLAN
FOR EQUIP. DESCRIPTION.
2 HOUR FIRE RATED WALL
3 HOUR FIRE RATED WALL
SMOKE BARRIER WALL
SOUND WALL WALL PROTECTION, WP-1
GENERAL NOTES:
1. THIS DRAWING IS INTENDED TO BE USED IN CONJUNCTION WITH ALL OTHER PROVIDED
DRAWINGS AND DOCUMENTATION FOR THIS PROJECT. IF THERE ARE ANY DISCREPANCIES,
NOTIFY BROWNE McGREGOR ARCHITECTS IMMEDIATELY.
2. NOTES TO SHEET & LEGEND: NOT ALL ITEMS ARE NECESSARILY USED
3. ALL WALLS TO BE PARTITION TYPE G, U.N.O.
4. ALL DOORS TO BE MOUNTED WITH HINGE SIDE OF FRAME @ 4" FROM PERPENDICULAR
WALL, U.N.O.
5. CASEWORK IS BASED ON A.W.I. CUSTOM GRADE STANDARD AND FLUSH OVERLAY DESIGN.
NO PARTICLE BOARD WILL BE ACCEPTED U.N.O.
6. INTERIOR DIMENSIONS ARE FROM FACE OF FINISH MATERIAL, CENTERS OF FIXTURES AND
EQUIPMENT, FACE OF WINDOW FRAME, FACE OF EXISTING MATERIAL SURFACE, EDGE OF
SLAB, OR AS OTHERWISE NOTED.
7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING ALL DIMENSIONS AND
CONDITIONS OF PROJECT AREA PRIOR TO ORDERING MATERIALS OR PROCEEDING WITH THE
WORK. THE CONTRACTOR SHALL NOTIFY THE ARCHITECT OF ANY DISCREPANCIES OR
QUESTIONS ABOUT DESIGN INTENT AND OBTAIN DIRECTIONS FROM THE ARCHITECT PRIOR
TO PROCEEDING WITH THE WORK.
8. ALL EXPOSED GYP. BD. CORNERS SHALL HAVE CONT. SCREW ATTACHED PLASTIC CORNER
BEADS FLOOR TO CEILING. ALL EXPOSED GYP. BD. EDGES SHALL HAVE PLASTIC "L" BEADS
CONTINUOUS.
9. PATCH AND SEAL ALL PENETRATIONS THROUGH THE FLOOR TO COMPLY WITH APPLICABLE
BUILDING AND/OR FIRE CODES.
10. ALL WOOD USED AS BLOCKING OR BRACING SHALL BE FIRE RETARDANT TREATED AS
REQUIRED BY CODE. CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL NECESSARY
BLOCKING TO ACCOMMODATE INTERIOR FINISHES, CASEWORK, ACCESSORIES, EQUIPMENT,
AND OTHER WALL HUNG OR WALL SUPPORTED COMPONENTS INDICATED IN THE
DRAWINGS.
11. FIRE EXTINGUISHERS MOUNTED ON CORRIDOR WALLS NOT TO PROTRUDE MORE THAN 4"
FROM WALL.
12. ALL ANGLED WALLS SHALL BE AT 45 DEGREES U.N.O.
13. REFER TO CIVIL, STRUCTURAL, PLUMBING, MECHANICAL, ELECTRICAL, AND ANY OTHER
DRAWINGS AD SPECIFICATIONS INCLUDED IN CONTRACT DOCUMENTS FOR ADDITIONAL
INFORMATION REGARDING THE WORK OF THOSE TRADES. THE CONTRACTOR IS TO
COORDINATE WITH THE WORK OF THOSE TRADES.
14. ALL WAITING ROOMS ARE TO RECEIVE CHAIR RAILS, U.N.O.
15. G.C. TO COORDINATE WITH FINISH SCHEDULE FOR WALLS TO RECEIVE FINISHES, ALL
SURFACES ARE TO BE PREPARED FOR FINISHES AS DIRECTED BY MANUF. WRITTEN
INSTRUCTIONS.
16. ALL FLOOR FINISH CHANGES TO OCCUR UNDER DOORS IN THEIR CLOSED POSITION, U.N.O.
17. ALL CABINETS ARE TO HAVE PLAM FINISH
18. PROVIDE ALL ITEMS REQUIRED BY CODE IN HANDICAPPED TOILET ROOMS.
19. FIRE ALARM DESIGN PLANS SHALL BE SUBMITTED TO THE LOCAL AUTHORITY FOR APPROVAL
PRIOR TO INSTALLATION AND THE INSTALLATION MUST BE APPROVED BEFORE THE
CERTIFICATE OF OCCUPANCY MAY BE ISSUED.
20. DUCT DETECTORS WILL BE FURNISHED AND INSTALLED BY THE FIRE ALARM CONTRACTORS.
21. GYPSUM BOARD INSTALLED IN WET AREAS SUCH AS BREAKROOMS AND RESTROOMS SHALL
BE WATER RESISTANT (GREEN BOARD) OR AN EQUIVALENT WATERPROOF SHEATHING
MATERIAL.
22. LOCATE AND IDENTIFY ALL EXISTING UTILITIES WITHIN PROJECT BOUNDARIES PRIOR TO
EXCAVATION AND TAKE ALL NECESSARY PRECAUTIONS TO ENSURE THAT NO DAMAGE TO
UTILITES OR RESULTANT LOSS OF SERVICE IS ENCOUNTERED.
EXISTING PARTITION
ROOF PLAN GENERAL NOTES:
1. THIS DRAWING IS INTENDED TO BE USED IN CONJUNCTION WITH ALL OTHER PROVIDED
DRAWINGS AND DOCUMENTATION FOR THIS PROJECT. IF THERE ARE ANY DISCREPANCIES,
NOTIFY BROWNE McGREGOR ARCHITECTS IMMEDIATELY.
2. THESE NOTES ARE TYPICAL UNLESS INDICATED OTHERWISE
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING ALL DIMENSIONS AND
CONDITIONS OF PROJECT AREA PRIOR TO ORDERING MATERIALS OR PROCEEDING WITH THE
WORK. THE CONTRACTOR SHALL NOTIFY THE ARCHITECT OF ANY DISCREPANCIES OR
QUESTIONS ABOUT DESIGN INTENT AND OBTAIN DIRECTIONS FROM THE ARCHITECT PRIOR
TO PROCEEDING WITH THE WORK.
4. REFER TO CIVIL, STRUCTURAL, PLUMBING, MECHANICAL, ELECTRICAL, AND ANY OTHER
DRAWINGS AND SPECIFICATIONS INCLUDED IN CONTRACT DOCUMENTS FOR ADDITIONAL
INFORMATION REGARDING THE WORK OF THOSE TRADES. THE CONTRACTOR IS TO
COORDINATE WITH THE WORK OF THOSE TRADES.
5. ROOF SLOPE IS GENERALLY PROVIDED BY SLOPING STEEL EXCEPT WHERE TAPERED
INSULATION INDICATED. PROVIDE CRICKET TAPERED INSULATION AT UPHILL SIDE OF
EQUIPMENT CURBS, ROOF HATCH CURBS, ROOF DRAINS, AND ANOTHER LOCATION AS
SHOWN OR REQUIRED TO PROVIDE POSITIVE DRAINAGE TO MAINTAIN MINIMUM 1/4" SLOPE
PER FOOT.
6. INSTALL 4" WOOD CANT AT ROOF HATCHES, UNDER WALL ACCESS PANELS AT ROOF, AND
OTHER LOCATIONS AS INDICATED.
7. TPO ROOF SYSTEM 60 MIL OVER POLYISOCYNOURATE RIGID INSULATION OF MINIMUM
VALUE OF R-25ci, RE: PROJECT MANUAL.
8. SOLAR REFLECTANT = 0.80, THERMAL EMITTANCE = 0.84.
9. EXTERIOR ROOF COVERING MUST HAVE A MINIMUM SOLAR REFLECTANCE OF 0.70 WHEN
TESTED IN ACCORDANCE WITH ONE OF THE FOLLOWING METHODS; [ASTM C1549, ASTM
E903, ASTM E1175, OR ASTM E1918].
10. EXTERIOR ROOF COVERING MUST HAVE A MINIMUM THERMAL EMITTANCE 0.70 WHEN
TESTED IN ACCORDANCE WITH ONE OF THE FOLLOWING METHODS; [ASTM C835, ASTM
C1371, ASTM E408].
11. CONTRACTOR WILL ENSURE POSITIVE DRAINAGE OF THE ROOF TO DRAINS WITHOUT
PONDING.
12. LOCATE AND IDENTIFY ALL EXISTING UTILITIES WITHIN PROJECT BOUNDARIES PRIOR TO
EXCAVATION AND TAKE ALL NECESSARY PRECAUTIONS TO ENSURE THAT NO DAMAGE TO
UTILITES OR RESULTANT LOSS OF SERVICE IS ENCOUNTERED.
3' - 0" 5' - 0"
3'
0"
3'
0"
SLOPE
1/4" : 1'-0"
SL
O
PE
1/ 4"
1'
-0
SL
O
PE
1/ 4"
1'
-0
SLOPE
1/4" : 1'-0"
11 11
KEYED NOTES
1 EXISTING ROOF ACCESS STAIR.
2 REFINISH THE EXISTING ROOF ACCESS STAIR AND INSTALL ON THE ROOF AND REST ON
HEAVY-DUTY RECYCLED RUBBER BASE SUPPORTS.
3 REMOVE PART OF THE EXISTING ROOF EXHAUST VENT. SEE MECHANICAL DRAWINGS FROM
MORE INFORMATION TO MAKE WAY FOR THE REMOVAL OF THE EXISTING PARAPET.
4 PROVIDE NEW ROOF EXHAUST VENT. SEE MECHANICAL DRAWINGS FROM MORE
INFORMATION.
5 PROVIDE A NEW ROOF ASSEMBLY: SCHED. 60 MIL TPO MEMBRANE ROOFING MECH.
FASTENED TO 1/2" DENSDECK OVER RIGID INSULATION 5" MIN., R-25CI MIN. ON TH
EXISTING METAL
6 PROVIDE A NEW WALKING PAD PATH, COORDINATE AROUND MECH. EQUIP. WITH
EQUIPMENT ACCESS LOCATIONS.
7 SEE MEP DRAWINGS FOR MORE INFORMATION
8 SEE MEP DRAWINGS FOR MORE INFORMATION ABOUT THE EQUIPMENT IN THIS SPACE.
9 THE GENERAL CONTRACTOR (GC) SHALL MAKE ALL EXISTING PENETRATIONS THROUGH
THIS FIRE RATED PARTITION BE PROPERLY SEALED WITH FIRE CAULK TO MEET THE
REQUIRED 1-HOUR FIRE SEPARATION. ALSO, THE GC SHALL STENCIL IN RED THE FIRE
RATING ON BOTH SIDES OF THE EXISTING PARTITION PER THE REQUIREMENT OF 2021
INTERNATIONAL BUILDING CODE (IBC), CHAPTER 7, SECTION 703.5 MARKING AND
INDENTIFICATION.
10 REPLACE THE PART OF THE EXISTING ROOF ACCESS STAIR REMOVED TO REMOVE THE
EXISTING AND ADD THE NEW ALUMINUM PARAPET CAP FLASHING.
11 REFINISH THE EXISTING PIPES AND PIPE HANGER.
12 REINSTALL LIGHTNING PROTECTION ON THE NEW PARAPET AND NEW ROOF TOP
EQUIPMENT PER HHS STANDARDS. CONNECT TO THE BUILDING'S EXISTING LIGHTING
PROTECTION SYSTEM. COORDINATE WITH OWNERS LIGHTING PROTECTION CONTRACTOR.
13 PROVIDE A NEW ROOF DRAIN.
14 PROVIDE A NEW THROUGH WALL OVER-FLOW ROOF SCUPPER.
15 PROVIDE A NEW ROOF CURB FLASHING AT EXPANSION JOINT BETWEEN ROOF AND
EXISTING BRICK WALL.
16 PROVIDE A NEW PREFINISHED ALUMINUM PARAPET CAP FLASHING.
TRUE
NORTH
PLAN
NORTH
SCALE:
BACK REF: /
1/4" = 1'-0"
01 A3.00
FLOOR PLAN - LEVEL 1
AT
T S
XETE FO
S A
C O R
Y L
.PORT
E R
2428 9
R E G
IS
TE
RED ARCH
ITE
C T
REVISIONSREVISIONS
Scale
25047.00
BROWNE McGREGOR ARCHITECTS, INC.
520 POST OAK BOULEVARD SUITE 880
HOUSTON, TX 77027
713-850-1733 www.brownemcgregor.com
COPYRIGHT 2025
As indicated
A2.11
FLOOR PLAN & ROOF
PLAN
H H
S Q
U E
N T
IN
M
E A
S E
H E
A L T
H C
E N
T E
R B
O
IL
E R
R E
P L A
C E
M E
N T
N
M A
C G
R E
G O
R W
A Y
H O
U S
T O
N
T X
12/18/2025
2015 IECC MINIMUMS:
PER CHAPTER 3 & 4 (CE) ZONE 2A:
• ROOFS:
• INSULATION ENTIRELY ABOVE ROOF DECK
• REQUIRED = R-25ci
• PROVIDED = R-25ci
• ROOF SOLAR REFLECTANCE = 3 TR. AGED 0.55 + 3 YR. AGED THERMAL EMIT 0.75
• ROOF SOLAR REFLECTANCE INDEX = 64
SCALE:
BACK REF: /
1/4" = 1'-0"
02 A3.00
ROOF PLAN
ROOFING SYSTEM - ULTRAPLY TPO MEMBRANE (60 MIL)
SOLAR REFLECTANCE (WHITE TPO MEMBRANE) .79 (INITIAL) / .69 (3-YEARS AGED)
THERMAL EMITTANCE (WHITE TPO MEMBRANE) .85 (INITIAL) / .83 (3-YEARS AGED)
SOLAR REFLECTANCE INDEX (SRI) 98 (INITIAL) / 83 (3-YEARS AGED)
AGED SOLAR REFLECTANCE METHODS: ASTM C 1549, ASTM E 903, OR ASTM E1918 OR
CRRC-1
AGED THERMAL EMITTANCE TEST METHODS: ASTM C1371, ASTM E 408 OR CRRC-1
SOLAR REFLECTANCE INDEX (SRI) DETERMINED IN ACCORDANCE WITH ASTM E 1980
FIRE CLASSIFICATION: ROOFING ASSEMBLIES COVERED UNDER THIS REPORT HAVE BEEN
TESTED FOR FIRE CLASSIFICATION CLASS A, B OR C IN ACCORDANCE WITH UL 790 (ASTM
E108) AS REQUIRED BY SECTION 1505.1 OF THE 2015 IBC.
WIND UPLIFT (RESISTANCE): ROOFING ASSEMBLIES COVERED UNDER THIS REPORT
HAVE BEEN TESTED FOR WIND UPLIFT RESISTANCE IN ACCORDANCE WITH FM 4474 OR
UL1897. ROOFING MEMBRANES SECTION 1504.3.1
PRE-FAB MTL. CURB & INSUL.
FURN. & INSTALL. BY
MECHANICAL CONTRACTOR
CONTRACTOR
BASE FLASHING
TPO ROOF RE:
ROOF PLAN
2x TRT'D WOOD NAILER/S
BOLTED TO STRUC. W/
1/2" BOLTS @ 24" O.C.
ANGLE FRAME WELDED TO
ANGLES BETWEEN JOISTS
PROVIDE BREAKMETAL
SURROUND AT ROOF DECK
FASTENERS WITH NEOPRENE
WASHERS AT 6" O.C.
24 GA. GALV.
COUNTER FLASHING
4" FIBER CANT
PIPE/STEEL TUBE THRU ROOF
CONT. SEALANT
GALVANIZED UMBRELLA
FLASHING STRAPPED TO PIPE
GALVANIZED JACK FLASHING
SINGLE-PLY ROOFING
MEMBRANE OVER RIGID
INSULATION & METAL DECK
4" 1"
2" 4"
NOTES:
DECK CLAMP
STRAINER
CLAMPING RING
SEAL AS
REQUIRED BY
ROOF MANUF.
REFER PLANS FOR
TYPE OF ROOF
TAPER INSUL. @ 24"
DOWN TO DRAIN.
PROVIDE FLASHING INTO ROOFING MEMBRANE AS PER ROOFING MANUFACTURER'S WRITTEN
INSTRUCTIONS. G.C. TO COORDINATE ALL CONNECTIONS, AND TRADES. MEMBRANE PLIES, METAL
FLASHING AND FLASHING-IN PLIES EXTEND UNDER CLAMPING RING. STRIPPING FELTS - EXTEND 4"
AND 6" BEYOND EDGE OF FLASHING SHEET.
REFER PLANS FOR DECK & INSUL.
ROOF INSULATION INSULATION
(SEE NOTES)
1/2" (12.7mm) MIN.
SEE NOTES
METAL DECKING
1/2" (12.7mm) MIN.
SEE NOTES
OVERFLOW
ROOF DRAIN
PRIMARY
ROOF DRAIN
12" (304.8 mm)
1" MAX.
(25.4 mm)
REFER STRUCTURAL
SUMP AREA FIELD SEAM
REQUIREMENTS:
1. IF FIELD SEAM EDGE IS WITHIN 9" OF DRAIN
COMPRESSION RING, TPO TARGET PATCH REQUIRED
2. IF FIELD SEAM EDGE IS WITHIN 9" TO 18" OF DRAIN
COMPRESSION RING, HEAT WELD A LAYER OF TPO
FLASHING (UNSUPPORTED) OR MEMBRANE
CENTERED OVER SEAM EDGE. FLASHING MUST
EXTEND 3" MIN. BEYOND EDGE OF SUMP.
5'-6" MAX.
1. REFER TO ROOF MANUF. INFORMATION FOR THE MOST
CURRENT INFORMATION.
2. HOLE IN MEMBRANE SHOULD EXTEND A MINIMUM OF 1/2"
BEYOND CLAMPING RING AND SHOULD NOT BE SMALLER
THAN THE DIAMETER OF THE LADDER PIPE.
3. INSULATION ADJACENT TO DRAIN TO BE APPROPRIATE ROOFING
INSULATION WITH APPROPRIATE BONDING SURFACE
4. ROOF MANUF. WATERBLOCK MIN. OF 1/2 OF 10 OZ (295 ML) TUBE PER
4" DRAIN. USE ADDITIONAL WATERBLOCK FOR LARGER DRAINS.
NOTES:
STRAINER BASKET
WATER DAM COMPRESSION RING
CONTINUOUS BEAD OF ROOF MANUF. WATERBLOCK
(TYP., SEE NOTES)
TPO MEMBRANE
TPO BONDING ADHESIVE
STRAINER BASKET
COMPRESSION RING
PIPE AND EQUIPMENT SUPPORTS
SUPPLIED BY ROOFING MANUFACTURER
WOOD SLEEPERS.
ARE RECOMMENDED IN PLACE OF
PROVIDE 4" SECTION OF
INSULATION AT WOOD BASE
FOR LIQUID LINES
PIPES ON ROOF, TYP.
REFER TO MEP DWGS
GALVANIZED
PIPE CLAMP, TYP.
GALVANIZED
PIPE SADDLE, TYP.
ROOF MEMBRANE
PROTECTION LAYER
4"x4"x24" LONG WOLMANIZED BLOCK PROVIDE AT
6'-0" O.C. MAXIMUM AND WITHIN 1'-0" OF EACH
CHANGE OF PIPING DIRECTION
(DO NOT INSTALL WD. SLEEPER OVER BATTEN
STRIPS, FASTENER HEADS, METAL PLATES OR FIELD
SEAMS)
ROOF INSULATION AND DECK
RE: SECTIONS
GENERAL NOTE: THE WALKPADS MUST NOT BE INSTALLED OVER FIELD SEAMS AND FASTENER
ROWS AND MUST BE GAPPED FROM THESE AREAS A MINIMUM OF 6"
WALKPAD AS SPECIFIED SPACED @ 12" APART
EDGE SEALANT (IF REQUIRED)
1 1/2” MINIMUM CONTINUOUS WELD AROUND
EDGE OF WALKPAD
STL. ROOF DECKING & INSULATION
ROOFING MEMBRANE AS SPECIFIED (REFER TO
SPECS)
SIM
3' - 4"
EQ EQ
5/ A5.20
E Q
E Q
SCALE: 1 1/2" = 1'-0"1
EQUIPMENT CURB DETAIL
SCALE: 1 1/2" = 1'-0"2
PIPE THRU ROOF DETAIL
SCALE: 1/2" = 1'-0"3
ROOF DRAIN DETAIL
SCALE: 1/4" = 1'-0"5
ROOF DRAIN SECTION
SCALE: 1/4" = 1'-0"6
ROOF PIPE SUPPORT DETAIL
SCALE: 3/8" = 1'-0"4
ROOF WALKING PAD DETAIL
AT
T S
XETE FO
S A
C O R
Y L
.PORT
E R
2428 9
R E G
IS
TE
RED ARCH
ITE
C T
REVISIONSREVISIONS
Scale
25047.00
BROWNE McGREGOR ARCHITECTS, INC.
520 POST OAK BOULEVARD SUITE 880
HOUSTON, TX 77027
713-850-1733 www.brownemcgregor.com
COPYRIGHT 2025
As indicated
A5.20
ROOF DETAILS
H H
S Q
U E
N T
IN
M
E A
S E
H E
A L T
H C
E N
T E
R B
O
IL
E R
R E
P L A
C E
M E
N T
N
M A
C G
R E
G O
R W
A Y
H O
U S
T O
N
T X
12/18/2025
SCALE:
BACK REF: /
1/4" = 1'-0"7
ROOF DRAIN PLAN DETAIL
No. Date Description
12/18/2025 ISSUE FOR PERMIT AND PRICING01
TPO AT MULTI ROOF PENETRATION
TPO AT ROOF PENETRATION
TPO AT THRU WALL SCUPPER
TPO AT WALL FLASHING
TPO FLUSH FACE COPING AT PARAPET
AT
T S
XETE FO
S A
C O R
Y L
.PORT
E R
2428 9
R E G
IS
TE
RED ARCH
ITE
C T
REVISIONSREVISIONS
Scale
25047.00
BROWNE McGREGOR ARCHITECTS, INC.
520 POST OAK BOULEVARD SUITE 880
HOUSTON, TX 77027
713-850-1733 www.brownemcgregor.com
COPYRIGHT 2025
1/4" = 1'-0"
A5.21
ROOF DETAILS
H H
S Q
U E
N T
IN
M
E A
S E
H E
A L T
H C
E N
T E
R B
O
IL
E R
R E
P L A
C E
M E
N T
N
M A
C G
R E
G O
R W
A Y
H O
U S
T O
N
T X
12/18/2025
No. Date Description
TPO CONTINUOUS CLEAT COPING AT PARAPET
APPLICABLE CODES & STANDARDS
1. BUILDING CODE - 2021 IBC WITH CITY OF HOUSTON AMENDMENTS
2. FIRE CODE - 2021 IFC WITH CITY OF HOUSTON AMENDMENTS
3. ELECTRICAL CODE - 2023 NEC WITH CITY OF HOUSTON AMENDMENTS
4. MECHANICAL CODE - 2021 UMC WITH CITY OF HOUSTON AMENDMENTS
5. PLUMBING CODE - 2021 UPC WITH CITY OF HOUSTON AMENDMENTS
6. ENERGY CODE - 2021 INTERNATIONAL ENERGY CONSERVATION CODE WITH CITY OF
HOUSTON AMENDMENTS.
7. OTHER - LIFE SAFETY CODE (NFPA 101)
8. OTHER - FEDERAL DEPARTMENT OF JUSTICE AMERICANS WITH DISABILITIES ACT AND TEXAS
ACCESSIBILITY STANDARDS.
9. FIRE ALARM - 2019 NFPA 72 WITH CITY OF HOUSTON AMENDMENTS.
GENERAL NOTES
1. FURNISH AND INSTALL ALL ITEMS, INCLUDING EVERY ARTICLE, DEVICE, OR ACCESSORY REASONABLY NECESSARY TO FACILITATE EACH
SYSTEM'S FUNCTIONING AS INDICATED BY THE DESIGN AND THE EQUIPMENT SPECIFIED. ELEMENTS OF THE WORK SHALL INCLUDE, BUT ARE NOT LIMITED TO, MATERIALS, LABOR, SUPERVISION, SUPPLIES, EQUIPMENT, TRANSPORTATION,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .