12-1.7 Addendum 1.pdf

PDF 3 MB Posted

Attached to
Douglass Center Gymnasium Renovations
Solicitation number
2026-01
Issued by
Sumter County, Florida

About this file

This document is an Addendum to the Invitation to Bid (ITB) for the Douglass Center Gymnasium Renovations project, issued by the Suwannee County Board of County Commissioners located in Live Oak, Florida. The project involves comprehensive renovations of approximately 1,303 square feet of existing classroom space and associated mechanical, electrical, and infrastructure upgrades at the Douglass Gymnasium. The scope includes selective demolition of interior finishes, non-load-bearing partitions, ceilings, and mechanical equipment; architectural renovation of two classrooms with new gypsum board partitions, ceilings, flooring, doors, and painting; mechanical system upgrades including new rooftop HVAC units and ductwork; electrical work involving new lighting fixtures, power outlets, and low-voltage raceways; fire alarm and life safety system integration; and exterior mechanical yard construction with equipment pads and protective fencing.

The technical specifications document provides detailed requirements for various building systems, including concrete formwork, reinforcing, cast-in-place concrete, unit masonry, structural steel framing, rough carpentry, thermal insulation, weather barriers, sheet metal flashing, roofing, and fire protection systems. The project will utilize specific materials and installation methods to meet Florida Building Code standards, with particular attention to mechanical, electrical, and fire suppression infrastructure. While specific budget details are not explicitly stated, the comprehensive renovation suggests a substantial investment in modernizing the facility to improve functionality, safety, and accessibility for the Suwannee County community.

View the file

Other files

File Type Posted
5-1.1 Bid Summary.pdf PDF
11-0.1 Instructions.pdf PDF
1-1.3. Bid Form Ack.pdf PDF
10-0.3 Plans.pdf PDF
3-0.4. Standard Conditions Construction Contract.pdf PDF
2-1.5. Refs form.pdf PDF
8-0.0 Advertisement.jpg JPG image
9-0.2 Technical Specifications.pdf PDF
7-1.6 Time Allocation Ack.pdf PDF
6-1.4 Fillable Forms.pdf PDF
4-1.2 Bid Form - Douglass Gymnasium Renovations (BT-13AC).xlsx XLSX spreadsheet
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Phone: 386-364-3400 suwanneecountyfl.gov Fax: 386-362-1032

Board of County Commissioners 224 Pine Ave SW, 2nd Floor, Live Oak, FL 32064

Travis Land, Chairman

9 October 2025

RE: Addendum 1 to 2026-01 ITB Douglass Center Gymnasium Renovations

To whom it may concern, Please disregard the file titled “0.2 Technical Specifications” because it is the incorrect version of the file.

In the following pages, please review the correct and complete version of the Technical Specifications.

Sincerely, Holland Freeman Procurement Coordinator

SPECIFICATIONS

Douglass Gymnasium

Renovations

Live Oak, Florida

August 2025 Date Issued

Technical Specifications – Project Phase – 100% Technical Specifications

Suwannee County Board of County

Commissioners 13150 Voyles Street

Live Oak, Florida 32060

TOC - 1

TABLE OF CONTENTS

Douglass Gymnasium Renovation

Cover Page

Table of Contents

DIVISION 2 – EXISTING CONDITIONS

024119 - Selective Demolition

DIVISION 3 – CONCRETE

031000 - Concrete Formwork

032000 - Concrete Reinforcement

033000 - Cast in Place Concrete

DIVISION 4 – MASONRY

042000 - Unit Masonry

DIVISION 5 – METALS

051200 - Structural Steel Framing

DIVISION 6 – WOOD, PLASTICS AND COMPOSITES

061000 - Rough Carpentry

061053 - Miscellaneous Rough Carpentry

062013 - Exterior Finish Carpentry – As - Required

DIVISION 7 - THERMAL AND MOISTURE PROTECTION

071326 - Self Adhering Sheet Waterproofing

072100 - Thermal Insulation

072119 - Foamed in Place Insultation

072500 - Weather Barriers

072726 - Fluid Applied Membrane Air Barriers

074113 - Standing Seam Metal Roof

076200 - Sheet Metal Flashing and Trim

077100 - Roof Specialties

079200 - Joint Sealants

TOC - 2

DIVISION 9 - FINISHES

099113 - Exterior Painting

099123 - Interior Painting

DIVISION 10 - SPECIALTIES

104413 - Fire Extinguisher Cabinets

104416 - Fire Extinguishers

DIVISION 20 – MECHANICAL

200010 - Basic Mechanical Requirements

DIVISION 21 – FIRE SUPPRESSION

210523 - General-Duty Valves for Fire Protection Piping

210529 - Hangers and Supports for Fire Suppression Piping and Equipment

210553 - Identification for Fire-Suppression Piping and Equipment

211100 - Facility Fire-Suppression Water-Service Piping

211313 - Wet-Pipe Sprinkler Systems

211316 - Dry-Pipe Sprinkler Systems

DIVISION 31 - EARTHWORK

312000 - Building Earthwork

024119 - 1

SECTION 024119 - SELECTIVE DEMOLITION

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes:

1. Demolition and removal of selected portions of building or structure.

2. Demolition and removal of selected site elements.

3. Salvage of existing items to be reused or recycled.

B. Related Requirements:

1. Section 011000 "Summary" for restrictions on use of the premises, Owner-occupancy requirements, and phasing requirements.

2. Section 017300 "Execution" for cutting and patching procedures.

3. Section 311000 "Site Clearing" for site clearing and removal of above- and below-grade improvements not part of selective demolition.

1.3 DEFINITIONS

A. Remove: Detach items from existing construction and dispose of them off-site unless indicated to be salvaged or reinstalled.

B. Remove and Salvage: Detach items from existing construction, in a manner to prevent damage, and store.

C. Remove and Reinstall: Detach items from existing construction, in a manner to prevent damage, prepare for reuse, and reinstall where indicated.

D. Existing to Remain: Leave existing items that are not to be removed and that are not otherwise indicated to be salvaged or reinstalled.

E. Dismantle: To remove by disassembling or detaching an item from a surface, using gentle methods and equipment to prevent damage to the item and surfaces; disposing of items unless indicated to be salvaged or reinstalled.

1.4 MATERIALS OWNERSHIP

A. Unless otherwise indicated, demolition waste becomes property of Contractor.

024119 - 2

B. Historic items, relics, antiques, and similar objects including, but not limited to, cornerstones and their contents, commemorative plaques and tablets, and other items of interest or value to Owner that may be uncovered during demolition remain the property of Owner.

1. No historical elements have been discovered at this time. If elements are discovered, carefully salvage in a manner to prevent damage and promptly return to Owner.

1.5 PREINSTALLATION MEETINGS

A. Predemolition Conference: Conduct conference at Project site or via Video Conference.

1. Inspect and discuss condition of construction to be selectively demolished.

2. Review structural load limitations of existing structure.

3. Review and finalize selective demolition schedule and verify availability of materials, demolition personnel, equipment, and facilities needed to make progress and avoid delays.

4. Review requirements of work performed by other trades that rely on substrates exposed by selective demolition operations.

5. Review areas where existing construction is to remain and requires protection.

1.6 INFORMATIONAL SUBMITTALS

A. Proposed Protection Measures: Submit report, including Drawings as required, that indicates the measures proposed for protecting individuals and property for environmental protection, for dust control and for noise control. Indicate proposed locations and construction of barriers.

B. Schedule of Selective Demolition Activities: Indicate the following:

1. Detailed sequence of selective demolition and removal work, with starting and ending dates for each activity. Ensure Owner's on-site operations are uninterrupted.

2. Interruption of utility services. Indicate how long utility services will be interrupted.

3. Coordination for shutoff, capping, and continuation of utility services.

4. Coordination of Owner's continuing occupancy of portions of existing building and of Owner's partial occupancy of completed Work.

C. Predemolition Photographs or Video: Show existing conditions of adjoining construction, including finish surfaces, that might be misconstrued as damage caused by demolition operations.

D. Warranties: Documentation indicating that existing warranties are still in effect after completion of selective demolition.

1.7 CLOSEOUT SUBMITTALS

A. Inventory: Submit a list of items that have been removed and salvaged.

024119 - 3

1.8 FIELD CONDITIONS

A. Owner�s tenant will occupy the building immediately adjacent to selective demolition area. Conduct selective demolition so Owner's tenant operations will not be disrupted.

B. Conditions existing at time of inspection for bidding purpose will be maintained by Owner as far as practical.

1. Before selective demolition, Owner will remove the following items:

a. None at this time.

C. Notify Architect of discrepancies between existing conditions and Drawings before proceeding with selective demolition.

D. Hazardous Materials: Present in buildings and structures to be selectively demolished. A report on the presence of hazardous materials has not been issued. If the contractor becomes aware of locations where hazardous materials are present, notify the Architect of Record.

1. Do not disturb hazardous materials or items suspected of containing hazardous materials except under procedures specified elsewhere in the Contract Documents.

2. Owner will provide material safety data sheets for suspected hazardous materials that are known to be present in buildings and structures to be selectively demolished because of building operations or processes performed there.

E. Historic Areas: Demolition and hauling equipment and other materials shall be of sizes that clear surfaces within historic spaces, areas, rooms, and openings, including temporary protection, by 12 inches or more.

F. Storage or sale of removed items or materials on-site is not permitted.

G. Utility Service: Maintain existing utilities indicated to remain in service and protect them against damage during selective demolition operations.

1. Maintain fire-protection facilities in service during selective demolition operations.

1.9 WARRANTY

A. Existing Warranties: Remove, replace, patch, and repair materials and surfaces cut or damaged during selective demolition, by methods and with materials and using approved contractors so as not to void existing warranties. Notify warrantor before proceeding. Existing warranties include the following:

1. There are no existing warranties that the Architect has been made aware of.

B. Notify warrantor on completion of selective demolition, and obtain documentation verifying that existing system has been inspected and warranty remains in effect. Submit documentation at Project closeout.

024119 - 4

1.10 COORDINATION

A. Arrange selective demolition schedule so as not to interfere with Owner's operations.

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS

A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning selective demolition. Comply with hauling and disposal regulations of authorities having jurisdiction.

B. Standards: Comply with ASSE A10.6 and NFPA 241.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Verify that utilities have been disconnected and capped before starting selective demolition operations.

B. Review Project Record Documents of existing construction or other existing condition and hazardous material information provided by Owner. Owner does not guarantee that existing conditions are same as those indicated in Project Record Documents.

C. Perform an engineering survey of condition of building to determine whether removing any element might result in structural deficiency or unplanned collapse of any portion of structure or adjacent structures during selective building demolition operations.

1. Perform surveys as the Work progresses to detect hazards resulting from selective demolition activities.

D. Verify that hazardous materials have been remediated before proceeding with building demolition operations.

E. Survey of Existing Conditions: Record existing conditions by use of preconstruction photographs or video.

1. Inventory and record the condition of items to be removed and salvaged. Provide photographs or video of conditions that might be misconstrued as damage caused by salvage operations.

2. Before selective demolition or removal of existing building elements that will be reproduced or duplicated in final Work, make permanent record of measurements, materials, and construction details required to make exact reproduction.

024119 - 5

3.2 UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS

A. Existing Services/Systems to Remain: Maintain services/systems indicated to remain and protect them against damage.

B. Existing Services/Systems to Be Removed, Relocated, or Abandoned: Locate, identify, disconnect, and seal or cap off utility services and mechanical/electrical systems serving areas to be selectively demolished.

1. Arrange to shut off utilities with utility companies.

2. If services/systems are required to be removed, relocated, or abandoned, provide temporary services/systems that bypass area of selective demolition and that maintain continuity of services/systems to other parts of building.

3. Disconnect, demolish, and remove fire-suppression systems, plumbing, and HVAC systems, equipment, and components indicated on Drawings to be removed.

a. Piping to Be Removed: Remove portion of piping indicated to be removed and cap or plug remaining piping with same or compatible piping material.

b. Piping to Be Abandoned in Place: Drain piping and cap or plug piping with same or compatible piping material and leave in place.

c. Equipment to Be Removed: Disconnect and cap services and remove equipment.

d. Equipment to Be Removed and Reinstalled: Disconnect and cap services and remove, clean, and store equipment; when appropriate, reinstall, reconnect, and make equipment operational.

e. Equipment to Be Removed and Salvaged: Disconnect and cap services and remove equipment and deliver to Owner.

f. Ducts to Be Removed: Remove portion of ducts indicated to be removed and plug remaining ducts with same or compatible ductwork material.

g. Ducts to Be Abandoned in Place: Cap or plug ducts with same or compatible ductwork material and leave in place.

3.3 PROTECTION

A. Temporary Protection: Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.

1. Provide protection to ensure safe passage of people around selective demolition area and to and from occupied portions of building.

2. Provide temporary weather protection, during interval between selective demolition of existing construction on exterior surfaces and new construction, to prevent water leakage and damage to structure and interior areas.

3. Protect walls, ceilings, floors, and other existing finish work that are to remain or that are exposed during selective demolition operations.

4. Cover and protect furniture, furnishings, and equipment that have not been removed.

5. Comply with requirements for temporary enclosures, dust control, heating, and cooling specified in

Section 015000 "Temporary Facilities and Controls."

B. Temporary Shoring: Design, provide, and maintain shoring, bracing, and structural supports as required to preserve stability and prevent movement, settlement, or collapse of construction and

024119 - 6 finishes to remain, and to prevent unexpected or uncontrolled movement or collapse of construction being demolished.

1. Strengthen or add new supports when required during progress of selective demolition.

C. Remove temporary barricades and protections where hazards no longer exist.

3.4 SELECTIVE DEMOLITION, GENERAL

A. General: Demolish and remove existing construction only to the extent required by new construction and as indicated. Use methods required to complete the Work within limitations of governing regulations and as follows:

1. Proceed with selective demolition systematically, from higher to lower level. Complete selective demolition operations above each floor or tier before disturbing supporting members on the next lower level.

2. Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction to remain or adjoining construction. Use hand tools or small power tools designed for sawing or grinding, not hammering and chopping. Temporarily cover openings to remain.

3. Cut or drill from the exposed or finished side into concealed surfaces to avoid marring existing finished surfaces.

4. Do not use cutting torches until work area is cleared of flammable materials. At concealed spaces, such as duct and pipe interiors, verify condition and contents of hidden space before starting flame-cutting operations. Maintain portable fire-suppression devices during flame-cutting operations.

5. Maintain fire watch during and for at least two hours after flame-cutting operations.

6. Maintain adequate ventilation when using cutting torches.

7. Remove decayed, vermin-infested, or otherwise dangerous or unsuitable materials and promptly dispose of off-site.

8. Remove structural framing members and lower to ground by method suitable to avoid free fall and to prevent ground impact or dust generation.

9. Locate selective demolition equipment and remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing.

10. Dispose of demolished items and materials promptly.

B. Site Access and Temporary Controls: Conduct selective demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.

C. Removed and Salvaged Items:

1. Clean salvaged items.

2. Pack or crate items after cleaning. Identify contents of containers.

3. Store items in a secure area until delivery to Owner.

4. Transport items to Owner's storage area off-site.

5. Protect items from damage during transport and storage.

D. Removed and Reinstalled Items:

024119 - 7

1. Clean and repair items to functional condition adequate for intended reuse.

2. Pack or crate items after cleaning and repairing. Identify contents of containers.

3. Protect items from damage during transport and storage.

4. Reinstall items in locations indicated. Comply with installation requirements for new materials and equipment. Provide connections, supports, and miscellaneous materials necessary to make item functional for use indicated.

E. Existing Items to Remain: Protect construction indicated to remain against damage and soiling during selective demolition. When permitted by Architect, items may be removed to a suitable, protected storage location during selective demolition and cleaned and reinstalled in their original locations after selective demolition operations are complete.

3.5 SELECTIVE DEMOLITION PROCEDURES FOR SPECIFIC MATERIALS

A. Concrete: Demolish in small sections. Using power-driven saw, cut concrete to a depth of at least 3/4 inch

(19 mm) at junctures with construction to remain. Dislodge concrete from reinforcement at perimeter of areas being demolished, cut reinforcement, and then remove remainder of concrete. Neatly trim openings to dimensions indicated.

B. Concrete: Demolish in sections. Cut concrete full depth at junctures with construction to remain and at regular intervals using power-driven saw, and then remove concrete between saw cuts.

C. Masonry: Demolish in small sections. Cut masonry at junctures with construction to remain, using power-driven saw, and then remove masonry between saw cuts.

D. Concrete Slabs-on-Grade: Saw-cut perimeter of area to be demolished, and then break up and remove.

E. Resilient Floor Coverings: Remove floor coverings and adhesive according to recommendations in RFCI's

"Recommended Work Practices for the Removal of Resilient Floor Coverings.

F. Roofing: Remove no more existing roofing than what can be covered in one day by new roofing and so that building interior remains watertight and weathertight.

1. Remove existing roof membrane, flashings, copings, and roof accessories.

2. Remove existing roofing system down to substrate.

3.6 DISPOSAL OF DEMOLISHED MATERIALS

A. Remove demolition waste materials from Project site

1. Do not allow demolished materials to accumulate on-site.

2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.

3. Remove debris from elevated portions of building by chute, hoist, or other device that will convey debris to grade level in a controlled descent.

B. Burning: Do not burn demolished materials.

024119 - 8

3.7 CLEANING

A. Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began.

END OF SECTION 024119

CONCRETE FORMWORK 031000 - 1

SECTION 031000 � CONCRETE FORMWORK

PART 1 - GENERAL

1.1 DESIGN FORMWORK

A. Assume all responsibility for the design and engineering of the formwork, as well as its construction and removal.

B. Design formwork for the loads, lateral pressure, and allowable stresses outlined in Chapter 2, �Guide to Formwork for Concrete", ACI 347, latest edition.

PART 2 - PRODUCTS

2.1 MATERIALS

A. Facing Materials shall be such as to provide the specified surface finish.

B. Form Coating shall be a field applied chemical concrete release agent capable of preventing bond between poured concrete and the form and shall contain no oil, or shall be factory applied non-absorptive liner. Coat form before reinforcement is placed.

C. Form Ties shall be broken back at 1-inch from surface of concrete. Tie Cones, 1-inch diameter by 1-inch long, shall be used on all exposed concrete.

D. Pre-molded Expansion Joint material (E.J.) shall conform to ASTM D1751, "Preformed

Expansion Joint Fillers for Concrete Paving and Structural Concrete (non-extruding and resilient bituminous types)".

2.2 FABRICATION

A. Construct formwork so that concrete surfaces will conform to the tolerance limits specified in

Table 4.3.1, "Tolerances for Formed Surfaces", ACI 301, latest edition.

B. Provide positive means of adjustment (wedges or jacks) of shores and struts to compensate for anticipated deflections and settlement in the Formwork during concrete placing operations.

PART 3 - EXECUTION

3.1 ERECTION OF FORMS

A. Build forms tight to prevent loss of mortar from the concrete.

CONCRETE FORMWORK 031000 - 2

B. Provide clean-out openings at base of pier and wall forms to facilitate cleaning and observation immediately before concrete is placed.

C. Unless shown otherwise on drawings, corners of concrete members exposed to view after all other finish materials are in place shall be beveled by the use of chamfer strips (maximum ½-inch across the beveled face) placed in the forms. Submit sample for approval before proceeding.

D. Overlap and hold forms against hardened concrete of a previous placement to prevent offsets or loss of mortar at the construction joint and to maintain a true surface.

3.2 INSTALLATION OF EMBEDDED ITEMS

A. Install inserts and materials to be cast into concrete.

B. Set 1-inch deep 24-gage galvanized iron wall slots in all concrete surfaces adjacent to brick or block masonry. Slots shall be set vertical in concrete surfaces and spaced 16-inches on center horizontally. Provide masonry anchors spaced 16-inches on center vertically in each wall slot.

C. Separate parallel runs of conduit by not less than 1-inch. Do not displace reinforcing bars from positions. No conduit shall be greater than ½ slab thickness. Bury conduit in slabs.

D. Install Adjustable Wedge Inserts at 32-inches on center in concrete for shelf angles.

3.3 REMOVAL OF FORMS

A. Horizontal member forms used to support the weight of concrete of structural members shall remain in place until the concrete has gained not less than 2/3 of the specified 28-day strength, or a minimum of 7 days.

B. Vertical member forms and forms not supporting the weight of concrete shall not be removed in less than 24 hours.

END OF SECTION 031000

CONCRETE REINFORMENT 032000 - 1

SECTION 032000 � CONCRETE REINFORCMENT

PART 1 - GENERAL

1.1 SUBMITTALS

A. Submit six copies of shop drawings for the fabrication and placing of reinforcing steel for approval, after being checked and approved by the contractor and before proceeding. Any changes by contractor or Fabricator of contract document details, materials, member sizes, or reinforcement shall be "flagged" on shop drawings accompanied by a written request for authorization and reason for requested change.

B. Placing plans shall show all dimensions, details, notes, locations, sizes, lengths and each bar mark together with accessories and material belonging to the reinforcing for the concrete.

C. Schedules shall show all information and be of the same form as those on the contract drawings.

D. Concrete wall reinforcing shall be shown in elevation.

E. Detail all reinforcing steel in accordance with the �ACI Detailing Manual�, ACI Publication SP-

66 (2004), unless otherwise indicated on the drawings.

PART 2 - PRODUCTS

2.1 MATERIALS

A. Reinforcement shall be fabricated from ASTM A615 "Deformed Billet-Steel Bars for Concrete

Reinforcement", Grade 60.

B. Reinforcement to be welded shall be fabricated from ASTM A706 "Low Alloy Steel Deformed

Bars for Concrete, Grade 60.

C. Welded smooth wire fabric (WWF) shall conform to "Specifications for Welded Steel Wire

Fabric for Concrete Reinforcement", ASTM A185, and shall be fabricated from plain wire conforming to "Specifications for Cold-Drawn Steel Wire for Concrete Reinforcement", ASTM

A82.

D. Wire bar supports shall conform to the National Bureau of Standards PS7, "Wire Bar Supports for Reinforced Concrete Construction".

2.2 FABRICATION

A. All hooks shall be bent using the pin diameters and dimensions as "ACI Standard Hooks" in the

"Manual of Standard Practice for Reinforced Concrete Construction", CRSI latest edition, unless otherwise shown on the plans.

CONCRETE REINFORMENT 032000 - 2

B. Reinforcing bars shall not be bent or straightened in a manner that will injure the materials.

C. Reinforcing bars shall conform to the dimensions shown on the plans and within the fabricating tolerances as shown in the "Manual of Standard Practices for Reinforced Concrete

Construction", CRSI latest Edition.

PART 3 - EXECUTION

3.1 PLACEMENT/BAR REINFORCEMENT

A. Bar reinforcement shall be placed in specified positions in the forms and held in place, before and during the placing of concrete by means of bar supports, to carry the reinforcing bars they support within the following tolerances from the positions shown on the drawings or specified herein:

1. For clear concrete protection and for depth "d" in Flexural members, walls, and compression members where "d" is:

a. 8 inches or less � plus or minus 1/4�

b. More than 8 inches but less than 24 inches � plus or minus 1/2� , but the cover shall not be reduced by more than one-half of the specified cover.

2. For longitudinal location of bends and end of bars:

a. +2 inches except at discontinuous ends of member where tolerance shall be + 1/2 inch.

3. For spacing

a. +2 inches except that total number of bars shall not be reduced.

B. Except as shown otherwise on structural drawings, concrete cover for Reinforcing Bars shall be as follows:

1. Cast against and permanently exposed to earth � 3 inches

2. Exposed to earth or weather � 2 inches

3. Interior formed surfaces:

a. Piers and Columns � 1/2 inch

b. Beams � 1/2 inch

c. Walls � 3/4 inch

d. Slabs & Joists � 3/4 inch

CONCRETE REINFORMENT 032000 - 3

C. �Continuous� bars, unless otherwise indicated on drawings, shall be lapped 36 diameters at splices. Provide corner bars to match primary reinforcing at all corner conditions, including continuous wall footings and grade beams.

D. Splices not shown in contract documents shall be subject to approval.

E. Support all reinforcing bars.

F. Space bar supports a maximum of 4-feet on center with the first support not greater than 2-feet from the ends of the bars. Tie to prevent displacement during the concreting operations.

Provide #4 support bars at 48-inches spacing where not supported by perpendicular reinforcement.

G. Reinforcement shall not be "field" bent after being embedded in hardened concrete except where specifically shown on the drawings.

H. Set and hold all vertical dowels in footings by template.

3.2 WELDING REINFORCEMENT

A. The welding of reinforcing bars will be permitted only on approval on the shop drawings by the

Architect.

B. The welding of reinforcing bars at intersections for support purposes, in lieu of tie wire, is prohibited.

C. The welding of reinforcing bars shall be performed in accordance with "Recommended

Practices for Welding Reinforcing Steel, Metal Inserts and Connections for Reinforced

Concrete Construction�, AWS D 12.1-latest edition, as published by the American Welding

Society.

D. Welders shall be qualified by tests as prescribed in the "Standard Qualification Procedures, �

AWS B 3.0-latest edition, as published by the American Welding Society.

END OF SECTION 032000

CAST-IN-PLACE CONCRETE 033000 - 1

SECTION 033000 - CAST-IN-PLACE CONCRETE

PART 1 - GENERAL

1.1 RESPONSIBILTY AND QUALIFICATIONS

A. Assume all responsibility for the work, design and engineering of the formwork and the safe support of property adjacent to the work.

B. Work shall be done by one qualified to install the concrete work in accordance with the drawings and specifications. Minimum requirement for qualification shall be five years� experience with satisfactory completion of at least five similar projects.

1.2 SUBMITTALS

A. Submit six shop drawings for the fabrication and placing of reinforcing steel after being checked and approved by the Contractor and before proceeding. Submit no "Approved as Corrected" drawings for approval.

B. Design and submit mix design series along with test data from laboratory or field experience (6 copies) corresponding to the same mix design.

1. Concrete shall have 28 day compressive strength as indicated on the drawings.

C. Test reports shall show the requirements of ASTM specifications.

D. Shop Drawings shall be submitted in complete sets of a major area of work, with sheets consecutively numbered.

PART 2 - PRODUCTS

2.1 MATERIALS

A. Formwork: See Section 031000.

B. Reinforcement: See Section 032000.

C. Welded Fabric: See Section 032000.

D. Bar Supports: Section 032000.

E. Portland Cement: A domestic brand approved by the Architect for color and conforming to the requirements of ASTM C150, low alkali, Type I or Type III.

CAST-IN-PLACE CONCRETE 033000 - 2

F. Fine Aggregate: Conform to ASTM C33 except that the fineness modules shall not be less than 2.1 nor more than 3.1 and the gradation shall be as specified herein below:

Sieve No. 3/8 #4 #8 #16 #30 #50 #100

Total % Passing (By Weight) 100 95-100 80-100 50-85 25-60 10-30 2-10

G. Coarse Aggregate: Crushed stone or gravel and shall conform to ASTM C33. Size of coarse aggregate shall be as specified herein below:

1. Size #67: (3/4 inch to #4) � for Sections 4� thick and greater

2. Size #7: (1/2 inch to #4) � for Sections less than 4� thick

H. Water used in mixing concrete shall be clean and fit to drink.

I. Admixtures:

1. Air-entraining Admixtures: Conform to the requirements of ASTM C260 and shall contain no chloride. Air-entraining shall not be used for interior slabs receiving troweled finishes. Submit certification for approval.

2. Retarding Admixtures: Contain no chloride, shall be free of organic acids or salts of organic acids, shall be compatible with the air-entraining admixture to be used and shall conform to the requirements of ASTM C494, Type B. Submit certification for approval.

3. Water-Reducing Admixtures: Contain no chloride, shall be free of organic acids, or salts of organic acids, shall be compatible with the air-entraining admixture to be used and shall conform to the requirements of ASTM C494, Type A, water-reducing normal-setting admixture and, ASTM C494, Type D, water-reducing and retarding admixture. Submit certification for approval.

4. Water-Reducing, High Range (WRHR) Admixtures: Shall contain no chloride, shall be free of organic acids or salts of organic acids, shall be compatible with the air-entraining admixture to be used, and shall conform to the requirements of ASTM C494, Type F or G. Submit certification for approval.

5. High, early strength accelerating, water-reducing admixture: contains no chloride, shall be free of organic acids, shall be compatible with air-entraining admixtures to be used and shall conform to the requirements of ASTM C494, Type C or F. Submit certification for approval

6. Provide technical field service during initial pours at no cost to the Owner by one experienced in the adjustment of concrete mixes for the particular admixtures being used.

J. Waterproof Curing Paper: Conform to ASTM C171

K. Curing Compound: Contain no wax or varnish. Conform to ASTM C309, Type I, and Filor by West

Chemical Products, Inc., Kure-N-Seal by Sonneborn-Contech, Inc., Clear Bond by Guardian Chemical

Corp., Mr. Klear Seal by Castle Chemical Company, or Sealtight CS-309.

CAST-IN-PLACE CONCRETE 033000 - 3

L. Expansion Joint Material in the Building: Non-extruding and resilient non-bituminous type conforming to

ASTM D1752, Type II.

M. Dovetail Anchor Slots for Brick and Block Against Concrete: 1� x 1� 24 gage galvanized steel with drip type corrugated 16 gage galvanized steel anchors, Hohmann and Barnard, Inc., No. 305 with No. 303 anchor, Richmond Screw Anchor Co., Inc., No. 051F with 020 anchor, or Hackman Building Products

No. 100 with No. 108 anchors.

2.2 PROPORTIONING

A. Proportion ingredients for each class of concrete by weight when the slump is the maximum permitted to produce an average compressive strength at 28 days which exceeds the specified compressive strength in accordance with Chapter 5, Section 5.3 of the Building Code Requirements for Reinforced Concrete

(ACI-318-95).

B. Air content of freshly mixed, air-entrained concrete as determined by the method of ASTM C 173 shall be 5%. A field tolerance of 1%+ is acceptable. All exterior concrete, exposed to the weather, shall be air entrained. Interior concrete shall not be air entrained.

C. Water-reducing admixture shall be used in all concrete to reduce the total water requirement per cubic yard of concrete without loss of workability, and produce an increased strength proportional to the water/cement ratio. During ambient temperatures of 75 F or below use normal setting, water-reducing admixture meeting ASTM C484, Type A. During ambient temperatures of 75 F and above use set-retarding, water-reducing admixture meeting ASTM C494, Type B and Type D. During ambient temperatures of 60 F and below use a high, early strength accelerating water-reducing admixture meeting

ASTM C494, Type C and Type E.

D. The mixes shall be designed to secure concrete having the following consistency range in slump:

Type of Construction Slump Range (Inches)

Reinforcement Foundations 2-3

Elevated, Structural Slabs 2-4

Sidewalks, Driveways & Slabs-on-Grade 2-4

2.3 BATCHING AND MIXING

A. Measure cement by weight on a scale separate from those used for other materials. Cement may be measured in bags of standard weight of 94 pounds; however, no fraction of a bag shall be used in any batch.

B. Measure aggregates by weight. Batch weights shall be based on saturated surface dry materials corrected for the actual moisture condition of the aggregate.

CAST-IN-PLACE CONCRETE 033000 - 4

C. Measure water by volume or by weight by devices not subject to variation due to variable pressure in the water supply line. Measuring tanks shall be provided with means for checking their calibration.

D. Devices for measuring quantities of cement, aggregates, water and admixtures shall be accurate within

1% under operating condition.

E. Furnish deliver ticket for each batch of concrete before unloading at the site. Weights of fine and coarse aggregate, amount of cement, and total water as batches shall be printed on ticket by an automatic printing device or shall be recorded and initialed by an employee of the Contractor stationed at the batch plant. Delivery ticket shall, in addition, include the following:

1. Name of batch plant.

2. Serial number of ticket.

3. Date and truck number.

4. Name of contractor.

5. Job name and location.

6. Class of concrete and slump.

7. Cubic yards of concrete.

8. Time loaded.

9. Amount water added at job.

10. Initials of job superintendent.

F. Ready-mixed concrete shall be produced and delivered in accordance with the requirements of ASTM

C94.

PART 3 - EXECUTION

3.1 RESHORING

A. Concrete elements shall not be permitted to deflect load during form stripping.

B. After forms are removed, slabs, beams and girders over ten feet in span and cantilevers over four feet shall be reshored for the remainder of the 28-day period. Concrete elements shall not be permitted to deflect or accept load during reshoring operations.

C. Reshoring operations shall be performed so that existing concrete members are not subject to overloads, eccentric loading, or reverse bending.

D. Reshoring elements shall have the same capabilities as original shoring, and shall be wedged to provide solid bearing and support. Bracing shall be provided.

CAST-IN-PLACE CONCRETE 033000 - 5

3.2 PLACING CONCRETE

A. Give the Architect 48 hours advance notice before placing concrete in any portion of the structure to permit inspection of the forms and reinforcement. Embedded items of whatever nature shall be in place prior to inspection. An authorization of the Architect shall be secured before concrete is placed.

B. Remove water and debris from forms before depositing concrete.

C. Clean reinforcement and forms coated with foreign material or with concrete from previous placing operations before depositing concrete.

D. Place concrete not later than 1-1/2 hours after mixing. Mix temperature shall not exceed 90 F at time of placing.

E. Construction joints shall be keyed and bulkheaded vertically and located at the center of span.

F. Internal type mechanical vibrators and hand spading shall be used to consolidate the concrete.

G. Concrete shall not be placed within twenty-five feet of workmen placing or securing reinforcement.

H. Place no concrete when the atmospheric temperature is below 35 F. After concrete has been placed, if the temperature drops below 35 F, conform to paragraph 3.06, Curing and Protection.

3.3 FINISHING FORMED SURFACES

A. Rough form finish shall be confined to all concrete surfaces not exposed to public view. After removal of forms, tie holes and defects shall be patched. Fins exceeding 1/4" in height shall be chipped off or rubbed off. Otherwise, surfaces shall be left with the texture imported by the forms.

B. Smooth form finish shall be used for all concrete surfaces exposed to public view. Form facing material shall produce a smooth, hard, uniform texture on the concrete. Form material with raised grain, torn surfaces, worn edges, patches, or dents which will impair the textures of the concrete surface shall not be used. Tie holes and defects shall be patched. All fins shall be removed.

3.4 REPAIR OF DEFECTS

A. Inspection by the Architect shall determine whether or not work is acceptable; and, if repairable, the method of repair to be used. Defects in materials and workmanship shall be subject to the above inspection at all times during the progress of the work regardless of previous inspections.

B. Condemned work shall consist of any concrete work which cannot be repaired. Condemned work shall be removed and replaced, at the Contractor's expense, with work that will conform to the contract documents.

CAST-IN-PLACE CONCRETE 033000 - 6

C. Repair surface defects which are 1/2 inch or less in depth including tie holes by patching the same working day the forms are removed. Cut back defect at 90 degrees to the surface to sound concrete and at least 1" without feather edges. After soaking with water, pack a stiff mortar in the defect. In exposed concrete the mortar mix shall be determined by trial method using a mixture of white and grey portland cement to produce the described color. After mortar has attained its initial set, the patch shall be scraped or rubbed flush with the concrete and match the color and texture of the adjoining surface.

3.5 SLABS

A. Edge forms and intermediate screed strips shall be set to produce the designated elevations and contours of the finished surface. As a minimum, maintain the concrete thicknesses shown on the drawings.

B. Insure that termite treatment shall have been completed before installing vapor barrier. Install vapor barrier with 6" laps sealed with the manufacturer's recommended sealing compound.

C. Place and consolidate to produce a surface within tolerances. Test for grade (or level) and correct by removing excess or adding and compacting additional concrete. These operations must be performed before bleeding water has an opportunity to collect on the surface.

D. Where metal forms are used at joints, the edge of the form shall be flush with the surface of the concrete.

Where saw-cut joints are specified herein, cutting shall be started as soon as the concrete has hardened to prevent aggregates being dislodged by the saw, and shall be completed before shrinkage stresses become sufficient to produce cracking.

E. Scratched finish shall be applied to surfaces intended to receive bonded applied cementitious applications. Depress slabs as specified for applied finish. All pitches to drains shall be made in the concrete slab and not the setting bed. Level to a Class C tolerance and roughen surface with stiff brushes or rakes before final set. Before the concrete has fully hardened remove laitance and loose aggregate from the surface.

F. Troweled finish shall be applied to floors intended as walking surfaces or to receive contact floor coverings. Surface shall first be float-finished as specified above. It shall next be power troweled, and finally hand troweled. Final troweling shall be complete when a ringing sound is produced as the trowel is moved over the surface. The finished surface shall be free of trowel marks, uniform in texture and appearance, and shall be planed to a Class A tolerance, except tolerance for concrete on metal deck shall be Class B. Any defects of sufficient magnitude to show through floor covering shall be removed by grinding or patching.

G. Tolerance for finish surfaces shall be determined by a straight edge placed anywhere on the surface in any direction and shall be true planes within the following limitations:

1. Class A � 1/8 inch in 10 feet;

2. Class B � 1/4 inch in 10 feet;

3. Class C � 1/4 inch in 2 feet;

CAST-IN-PLACE CONCRETE 033000 - 7

3.6 CURING AND PROTECTION

A. Immediately after placement, concrete shall be protected from premature drying, temperatures above or below the range recommended in ACI 305R, latest edition, and 306R, latest edition, and mechanical injury.

B. Cure all surfaces for a period of 7 days and until average compressive strength has reached 70% of specified strength. Curing shall be by ponding, moist curing with sand or absorptive mats kept continuously wet, continuous application of steam (not exceeding 105 F) or mist spray, waterproof curing paper or liquid membrane forming curing compound. Selection of curing method shall be compatible with the finish to be applied to the concrete surface.

C. Use curing compound directly from the container without dilution and apply not later than one hour after final finishing in one coat at a coverage not to exceed 200 S.F. per gallon for surfaces with a "floated" or

"broom" finish, or 300 S.F. per gallon for surfaces with a "troweled" finish. Submit engineering testing laboratory certification for approval. Do not use curing compound on surfaces to receive mortar beds for tile work.

D. Cold weather protection shall be in accordance with recommended practices of ACI 306R, latest edition.

Whenever the mean daily outdoor temperature is less than 40 F, the temperature of the concrete shall be maintained between 50 F and 70 F for the curing period.

E. Hot weather protection shall be in accordance with ACI 305R, latest edition. When the anticipated ambient air temperature exceeds 80 F during placing or finishing operations, a retarding admixture shall be used in the mix to retard the setting time of the concrete.

3.7

A. Contractor shall submit to the Architect the concrete materials and the concrete mix designs proposed for use with a written request for review. Submittal shall include the results of all testing performed to qualify the materials and to establish the mix designs. Place no concrete in the work until mix design has been reviewed.

B. Contractor shall sample, mould, initially cure, and transport to the laboratory the acceptance test specimens for testing. During the first 24 hours after molding he shall provide means for maintaining the temperature immediately adjacent to the specimens within the range of 60 F to 80 F and prevent loss of moisture from the specimens. After the initial curing period the acceptance test specimens shall be transported in a damp condition to the laboratory in a manner to prevent damage to the specimens.

Include information for reporting of test data.

1. Slump and air content shall be determined at the beginning of each day�s pour and for each batch of concrete sampled for compressive strength tests. Make corrections to the mix if slump, unit weight, or air content are not within the specified tolerances. Slump and air content shall be determined by ASTM C143 and ASTM C173 respectively.

2. Make sets of four acceptance cylinders for strength testing for each 50 yards of concrete or fraction thereof for each class and strength for each day's concreting which shall be molded from concrete samples taken at random over the duration of the pour.

CAST-IN-PLACE CONCRETE 033000 - 8

3. Samples of concrete for strength testing shall be representative of the concrete in-place in the structure and shall not be taken from the first one-third of the concrete of the ready-mix truck. No water shall be added to the concrete after samples of concrete for strength testing have been secured.

4. Acceptance test cylinders shall be molded and cured in accordance with ASTM C31 from concrete samples in accordance with ASTM C172

5. Provide designated testing laboratory with all field data specified to be included on concrete test reports in paragraph 3.08.

6. Field sampling and testing shall be performed by ACI Certified Technicians.

3.8 LABORATORY DUTIES IN TESTING

A. Designated testing laboratory shall perform all operations of testing materials, concrete and verifying mix designs.

B. Concrete test reports shall include the following:

1. Class and strength concrete.

2. Slump.

3. Air content.

4. Temperature of concrete mix at time of placement.

5. Date and time of molding.

6. Date and age of test specimens.

7. Location of concrete in the structure.

8. Delivery ticket serial numbers.

C. Furnish five (5) copies of all test reports to the Architect.

D. Designated testing laboratory shall be selected by the Architect and paid by the Owner.

3.9 STRENGTH TESTING AND EVALUATION

A. For each set of acceptance test cylinders, one cylinder shall be broken at the age of 7 days for information and two cylinders shall be broken at the age of 28 days for acceptance. The remaining cylinder shall be held by the laboratory for 120 days for use as a verification cylinder if required. Test in accordance with

ASTM C39, latest edition.

B. Concrete shall be considered �Questionable Concrete� where any of the following test evaluations occur:

CAST-IN-PLACE CONCRETE 033000 - 9

1. Individual test strength is more than 500 psi below specified strength; or

2. Average of any three consecutive strength tests are less than specified strength; or

3. Individual test strength is less than specified strength and the concrete represented by the test is for concrete for a "critical" area of the structure. Critical areas of the structure are those areas which, in the opinion of the Architect, are critical to the structural stability of the structure as a whole.

3.10 QUESTIONABLE CONCRETE

A. Core tests shall be made at no cost to the government, and as directed by the Architect. If core tests fail to demonstrate the test strength required by the contract documents, or if they are impractical to obtain, and structural analysis does not confirm the safety of the structure, the Architect may, at his discretion, condemn the work or require load tests or additional construction. Should structural analysis confirm the safety of the structure, the Architect may, at his discretion, accept the questionable concrete in accordance with the Article of the General Conditions for the Acceptance of Defective Non-Conforming Work.

B. The Contractor shall pay all costs incurred in providing the additional testing or analysis to resolve the acceptability of questionable concrete.

C. The term �Building Official� in ACI Building Code 318 shall be deemed to mean, and does mean, the

Architect.

3.11 CORE TESTS

A. Three representative cores shall be taken from each member or area of concrete for each test considered

"questionable". Location of cores shall be as directed by the Architect to least impair the strength of the structure. Damaged cores shall be replaced.

B. Cores shall be obtained and tested in accordance with ASTM C42, latest edition except that if concrete in the structure will be dry under service conditions, the cores shall be air dried (temperature 60 F to 80 F, and relative humidity less than 60%) for 7 days before test and shall be tested dry. If the concrete in the structure will be more than superficially wet under service conditions, the cores shall be immersed in water for at least 48 hours and tested wet.

C. Concrete in the questionable area will be considered structurally acceptable if the average of the cores is equal to or greater than 90% of the specified strength and no single core is more than 500 psi below specified strength.

3.12 LOAD TESTS AND ADDITIONAL CONSTRUCTION

A. Load tests shall be applied and their results evaluated in accordance with Chapter 20 of ACI Building

Code 318, latest edition.

B. Work judged inadequate by results of a load test shall be reinforced with additional construction if so directed by the Architect or shall be replaced.

CAST-IN-PLACE CONCRETE 033000 - 10

C. Additional construction and replaced work shall be at the Contractor�s expense.

3.13 CONDUIT WORK

A. Electrical conduits shall be buried in concrete slabs. Low conduit shall be wired to the upper side of bottom reinforcing and top conduit shall be wired to the lower side of top steel.

B. Take care in spacing concrete around gangs or parallel conduit. Where such conduits occur, they shall be separated by at least one inch.

END OF SECTION 033000

UNIT MASONRY 042000 - 1

SECTION 042000 - UNIT MASONRY

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes:

1. Concrete masonry units.

2. Clay face brick.

3. Mortar and grout.

4. Steel reinforcing bars.

5. Masonry-joint reinforcement.

6. Ties and anchors.

7. Embedded flashing.

B. Related Requirements:

1. Section 071113 "Bituminous Dampproofing" for water dampproofing applied to unit masonry assemblies.

1.3 DEFINITIONS

A. CMU(s): Concrete masonry unit(s).

B. Reinforced Masonry: Masonry containing reinforcing steel in grouted cells.

1.4 PREINSTALLATION MEETINGS

A. Preinstallation Conference: Conduct conference at Project site.

1.5 ACTION SUBMITTALS

A. Product Data: For each type of product.

B. Samples for Initial Selection:

1. Clay face brick, in the form of straps of five or more bricks.

UNIT MASONRY 042000 - 2

1.6 INFORMATIONAL SUBMITTALS

A. Material Certificates: For each type and size of the following:

1. Masonry units.

a. For brick, include size-variation data verifying that actual range of sizes falls within specified tolerances.

b. For exposed brick, include test report for efflorescence according to ASTM C 67.

2. Cementitious materials. Include name of manufacturer, brand name, and type.

3. Mortar admixtures.