RFI CERFP Life Support (2-25-2020).pdf

PDF 1 MB Posted

Attached to
CERFP CTE ROLE PLAYER, RESET AND LIFE SUPPORT
Solicitation number
11447428
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Please wait...

If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.

You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.

For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.

Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.

Request for Information Worksheet Page of RFIW, v1.0 Requirement Information Requirement Description Solicitation Number Contracting Officer Questions and Answers Number Question Answer Increase Rows Decrease Rows

Notes General Notes and Information 2.1 817-852-3254 02 June 2015

136 MSG/MSC

Micah Kruse Contract Execution Checklist 03 June 2015 Section 5.8 and CST roles were removed from the Combo Synopsis Answer: No part of the exercise will be conducted at PANG. See Annex A as Toilets and Hand wash stations will need to be provided at PANG per Annex A specifications Answer: The Site survey is not required, the Pre-work Meeting scheduled for April 3rd 2020 is required.

Answer: 4-7 APR 20, 4 April is the 1st meeting. Training meeting attendance is not required by the IMT Personnel, but is strongly encouraged. All personnel will be at the Camp Rilea location for Training. All CERFP Personnel will arrive on the 3rd at PANG and depart to Camp Rilea from PANG and will return to PANG on the 9th.

No concrete slabs required.

Past Performance is a requirement to be reviewed by all vendors who submit quotes to determine if the vendor is responsible. There are no past performance requirements to be submitted with your quote for this requirement.

We are using FAR Part 13 for Simplified Acquisition Procedures (SAP). BVTO and LPTA full under FAR Part 15 and will not be used to evaluate your offer for this requirement.

This is a combo synopsis and not a proposal. The closing date for the solicitation can not change due to contracting officer availability for this requirement. After the closing date of the combo synopsis an award is expected shortly after the closing time to give vendors time to execute the requirement.

High fidelity adult and pediatric Mannequin will be in a Medical tents. There needs to be at a minimum 1 adult and 1 pediatric high fidelity Mannequin for simulated head and airway features, tension pneumothorax, decompression and chest tube insertion capability, simulated blood pressure and pulses, simulated cardiac related indicators, and simulated patient sounds.

Note: Will still need the high fidelity adult and pediatric Mannequin add-on modules per TASK 5.4 / Mannequin Support .

CurrentPage:
PageCount:
PRNumber: CERFP CTE
PRNumber: 11447428
PRNumber: Richard A Harvey
Cell1: 1
Cell1: Regarding Task 5.8: Provide CST Survey and Sampling Lane Support:

-There is no CLIN item for this task and support, can the government please add?

-Can the government confirm that the CST component will also beconducted on a designated site at Camp Rilea?

-CST support is not mentioned in Annex A, can the governmentconfirm that the CST sets are chemical only? Will the CST exercise be conducted each day, 4-7 April?

-And in addition to setting the CST lanes, what other supportservices or roles are required? Safetymonitors, facilitators, other SME role players?

Cell1: 2
Cell1: What part of the exercise will be conducted at Portland Air National Guard Base (PANG).
Cell1: 3
Cell1: Per Task 5.1, Program Management, can the government confirm that the contractor is required to attend a Site Survey in person at Camp Rilea within 10 days of contract award
Cell1: 4
Cell1: . Regarding Task 5.3,Incident Management Team Support:

-What specific dates will the 6-person IMT be required on site?

-Will the IMT be required to attend planning meetings and unit preparation meetings on 3 April?

-Will any of the IMT personnel be working at the Portland exercise location? Or all at Camp Rilea?

Cell1: 5
Cell1: Is there any contractor requirement to manufacture or provide reinforcedbreaching slabs?
Cell1: 6
Cell1: 6. Per FAR Part 9, 9.104-1 General standards. (c) Have a satisfactory performance record (see 9.104-3 < Caution-https://www.acquisition.gov/content/part-9-contractor-qualifications#i1116122 > (b) and subpart 42.15 < Caution-https://www.acquisition.gov/content/part-42-contract-administration-and-audit-services#i1074222 > ). A prospectivecontractor shall not be determined responsible or nonresponsible solely on thebasis of a lack of relevant performance history, except as provided in 9.104-2 < Caution-https://www.acquisition.gov/content/part-9-contractor-qualifications#i1116115 > .

-How many past performance references forNational Guard CBRN Response Enterprise (CRE) exercise support should bepresented as part of the proposal?

-How many past performance references as a PrimeContractor for CRE exercise support should be submitted?

Cell1: 7
Cell1: Would the government consider making the selection criteria on this Best Value Trade Off (BVTO) rather than LPTA? Recent DoD guidance to industry has stressed that LPTA would be limited to commodity or commodity-like purchase, vice complex service support agreements?
Cell1: 8
Cell1: Due to the fast approaching start date of this exercise, would the government consider moving up the proposal due date to early March to allow for a more proper contractor planning timeline and adequate time to coordinate with the Requiring Unit and the NGB Evaluators.
Cell1: 9
Cell1: Can you confirm how and where the special simulation manikins will be used? In the medical tent in an area protected from the elements? Or possibly in the rubble pile or Decon area exposed to the elements? -Will the partial body/torso versions of the simulation manikins be acceptable as the main function is working with the exercise injects of body functions and vitals?
: