Caulking Clarification
All windows in the old RTI project are to have the existing caulking removed around them and replaced with new. The contractor is responsible for new caulking from the edge of the windows horizontally and from top of lintel to bottom of window sill vertically. If windows are in series; the contractor is responsible for the entire series (everything under the window lintel).
The following figures are typical of the windows in the old RTI building.
NOTES:
1. These are figures are representative of the windows in the Old RTI; however are not intended to be all inclusive.
2. Factory caulking or seals located on the windows is not to be included in the contract.