Sol 1107143_Section D-Plans.pdf

PDF 2 MB Posted

Attached to
Alterations (Construction) of Existing Space for a Laboratory
Solicitation number
1107143
Issued by

About this file

Section D.2 Plans

View the file

Other files

File Type Posted
SF30 1107143.pdf PDF
Sol 1107143_Sections B and C - E.pdf PDF
Sol 1107143_Section A_SF1442.pdf PDF
Sol 1107143_Section D-Specifications.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US

DEPA

RT

M

EN

T

OF

HEALT &H

HUMAN

SERV

ICES

A

XX X

X

X

X

X X X X

X

X

X

X

X

X

X

X

X X X X X X

XX XXX

XXX XXX XXX XX

X

XX

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X

XXX

X

XXX X XX X X X X X X X X X XX XX X X XX X XX X XXX XXXX XX X XXX XXXX

X X X XXX X X

X

X

X

X

X

X

X

X

X

XX

X

X X X X XX XX X

X

X

X

X

X

X

X

X

X X

X X X X

X X

X X

X XX

X X

XX

X X

X X

X

X

XXXX

X X

X X

XXX X XX XX XXX

X

X

X

X

X

X

X

X

X

T

XXX

X

X

X

X

X

XX XXX XX X X X

X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

XX X X X

X

X

X

X

X

X

X

XX XXX

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

XXXX XXXX XX X XXX X XX XXX XX

XXXX XX XXX XXXX XXXX XXX XXX X XX

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X

X

X

X

X X

X

X

XXX XXX XXXX X X X

X

X

X

X

X

X

X

X

X

X

XX X X X X X

X

ARL

21 28

20 20

CERTIFICATION

"I HEREBY CERTIFY THAT THESE PLANS AND SPECIFICATIONS HAVE BEEN PREPARED BY ME

OR UNDER MY SUPERVISION. I FURTHER CERTIFY THAT TO THE BEST OF MY KNOWLEDGE

THESE PLANS AND SPECIFICATIONS ARE AS REQUIRED BY LAW AND IN COMPLIANCE WITH

THE ARKANSAS FIRE PREVENTION CODE FOR THE STATE OF ARKANSAS."

Signature Date

LITTLE

TO DALLAS

TEXARKANA

ROCK

PINE

BLUFF

RIVER

FORT SMITH

TO OKLAHOMA CITY

ARKANSAS

40 MEMPHIS

TO

S

T.

L

O U

IS

STATE LOCATION MAP

NCTR/JEFFERSON

EXIT

PINE

BLUFF

JEFFRSON PINE BLUFF

ARSENAL

RIVER

TO FORT SMITH

LITTLE ROCK

TO TEXARKANA

TO MEMPHIS

JEFFERSON LABORATORIES OF THE FDA

PROJECT LOCATION

AR

KAN

SAS

REDFIELD

HW

Y 365

NORTH LITTLE ROCK40

PROJECT LOCATION MAP

Sheet Index G.1

A.1

M.1 M.2 M.3 M.4

E.1

Cover Sheet

53A Smoke Lab - Room 225

Mechanical Notes and Legend Mechanical Plan Mechanical Details Mechanical Controls and Schedules

Electrical Plan

Sheet 1 of 7

Sheet 2 of 7

Sheet 3 of 7 Sheet 4 of 7 Sheet 5 of 7 Sheet 6 of 7

Sheet 7 of 7

BUILDING 53A SITE

62A

45T

Contractor's Entry/Gate

53A

5B

SITE MAP

JEFFERSON, ARKANSAS 72079

SUBMITTED:

STUCK ASSOCIATES ARCHITECTS

DRAWING NO. SHEET:

CHECKED BY:DRAWN BY:DATE:SCALE:

DESCRIPTION BY CHECK

A

B

C

D

E

F

G

H

I

J

K

1 2 3 4 5 6 7 8 9

JEFFERSON LABORATORIES OF THE FDA

Sheet of

As indicated

7/30/2012 8:21:31 AM

100% Submittal

ALH07.26.2012

Cover Sheet - Building 53A

Smoke Lab

G.53A

GRC

3778-12

JEFFERSON LABORATORIES OF THE FDA

BUILDING 53A - SMOKE LAB

G.11 7

US

DEPA

RT

M

EN

T

OF

HEALT &H

HUMAN

SERV

ICES

A

Smoke Lab 53A-225

Corridor 53A-260

Mech.

Office 53A-210

4 56

B S

St or ag e

C ha se

A-

3' - 0" 7' - 6"4' - 6" 3' - 6"

3' - 5"

Field Verify 1' - 1 1/16"

19' - 7 1/16"

Mech.

Corridor 53A-260

Office 53A-210

4' - 0"

2 Cold Room 53A-225

1 2

KEY PLAN

53ASmoke Lab 53A-225

Demolition Legend Demolition of an existing wall or partition

Demolition of an existing door and frame

Dust partition (Locate as req'd during construction as per NCTR request and design.)

Type HM-L Pair of Hollow Metal Doors

Uneven Leaf 20 Min.

7'

0"

3' - 0" 1' - 0"

Type HM-2 2" Head

Hollow Metal Frame 20 Min.

7'

0" 0'

2"

0' - 2"

4' - 0" 0' - 2"

2 x 4 recessed fixture in gypsum board ceiling, shading indicates emergency ballast

Mechanical Supply Diffuser

Mechanical Return Diffuser

Ceiling Plan Legend

Epoxy resin top

Rubber base

2'

6"

4" epoxy resin splash

4"

Metal support bracket;

provide as required to support worksurface

NOTE: Provide blocking in wall for mounting

2' - 6"

3'

0"

3' - 0"

Metal casework

Epoxy resin top and splash

0'

4"

Wiremold

1' - 6" 3' - 0"

Knee Space

Rubber base

Bio-safety cabinet;

Owner furnished, contractor installed

3' - 6"3' - 0"

Verify

4' - 6"

Wiremold

Epoxy resin top and splash

Metal casework

2'

6"

19' - 7"

4" rubber base

Epoxy resin top

4"

1/ 2"

2'

/2

Metal casework base cabinet

0' - 6" 2' - 0"

2' - 6"

W he re In di ca te d

3'

0" o r 2'

6"

Wiremold

Brace top of partition to structure above and seal

Ceiling; refer to ceiling plan Sound attenuation batts

3 5/8" metal studs @ 16" OC

5/8" type "x" gypsum board both sides Floor

Sound batt in all interior partitions

3 jamb anchors

Hollow metal frameCaulk each side

5/8" gyp. bd. on metal frame

Tape Visqueen to Floor

2 X 4 Studs on 24" O.C.

W/ 1/2" Plywood

3 1/2" Sound Batt. Insulation

Visqueen Tape at all Joints

Tape Visqueen to ceiling depending on existing conditions

Side of Demo. Work

To e xi st in g ce ilin g or

0'

0" t o ro of d ec k

Tape Visqueen to ceiling depending on existing conditions

JEFFERSON, ARKANSAS 72079

SUBMITTED:

STUCK ASSOCIATES ARCHITECTS

DRAWING NO. SHEET:

CHECKED BY:DRAWN BY:DATE:SCALE:

DESCRIPTION BY CHECK

A

B

C

D

E

F

G

H

I

J

K

1 2 3 4 5 6 7 8 9

JEFFERSON LABORATORIES OF THE FDA

Sheet of

As indicated

7/30/2012 8:20:42 AM

100% Submittal

ALH07.26.2012

53A Smoke Lab - Room 225

Smoke Lab

A.1

GRC

3778-12

1/4" = 1'-0"H7 Partial Floor Plan 53A 1/4" = 1'-0"H1 Demolition Floor Plan 53A

1/4" = 1'-0"H4 Partial Ceiling Plan 53A

Demolition General Notes A Areas to be removed are shown only as an approximation. The General Contractor is responsible for all demolition or relocation on drawings.

B The Contractor shall verify information shown as existing and report any discrepancies.

C Prior to demolition, the General Contractor will notify the Contracting Officer in sufficient time to salvage miscellaneous items before demolition work commences.

D During demoltion, if asbestos is found, notify Contracting Officer immediately & asbestos removal will be provided by Owner (or separate Contractor.)

53A Demolition Key Notes 1 Dust partition 2 Remove and dispose of pre-fabricated cold room and assorted mechanical and electrical items.

3 Disconnect conduit and breaker oxes from prefabricated cooler.

4 Dust Partition

5 NOT USED

53A Floor Plan Key Notes 1 3 5/8" metal stud with gypsum board attached to face of existing CMU partition. Partition to ceiling height.

2 30" high worksurface, open below - Refer to A7/A.1 3 4'-0" bio-safety cabinet. Owner furnished, contractor installed 4 Smoking machine (28" x 34" x 45"h) - By Owner 5 Mobile table (24" x 72") - By Owner 6 Chamber (25" x 25") - By Owner 7 36" counter with sink and base cabinet - Refer to A4/A.1 and D4/A.1 8 Rack with vacuum pump by smoke machine mfgr.

9 Compressor (38" x 15" x 25"h) Owner furnished, contractor installed.

10 Metal stud partitions; refer to C9/A.1 11 Reconnect existing conduit and breaker boxes 12 Wire mold to run entire length of wall 13 30" counter with base cabinet

Floor Plan General Notes A All construction shall be in accordance with the requirements of the applicable codes, engineering shall conform with all applicable municipal, state and federal regulations having jurisdiction including accessibility standards and requirements of "Americans with Disabilities Act."

B Each trade is advised that information pertinent to its work may occur in variuos sections of the contract documents. Refer to every sheet of drawings for notes and symbols. Notes shall be reviewed and applied to related building components regardless of their locations in the drawings and specifications.

C Unless noted otherwise, any note, detail, or feature indicated for one condition shall be applicable for all alike and similar conditions

D The contractor shall furnish and install all blocking, stiffeners, bracing, backing plated and supporting brackets required for the proper installation of all building components as recommended by the manufacturer and required by code. In walls, provide blocking attached to studs as backing supports for wall-mounted items.

E All dissimilar metals shall be effectively isolated from each other to avoid molecular breakdown.

F All exterior joints around window and door frames, between walls and founds, between walls and roof, between wall panels, at penetration of utilities through the envelope shall be sealed or weather-stripped to prevent air and moisture leakeage and infiltration.

G Finish floor elevations are to the top of concrete, unless noted otherwise.

H Interior partitions are dimensioned to face of partition, unless noted otherwise. Do not scale drawings.

Questions regarding dimensions shall be reported to the Contracting Officer.

1/4" = 1'-0"F8 53A Door Elevations 1/4" = 1'-0"F9 53A Door Frame Elevations

Ceiling Plan General Notes A This reflected ceiling plan constitutes a graphic representation of ceiling-mounted elements for the purpose of coordination. Refer to the appropriate discipline drawings and specifications for specific information regarding each of these elements.

B Light fixtures shall be located centered in the room or space, unless noted otherwise.

C When light fixtures are shown to be recessed in ceiling tiles, they shall be centered in ceiling tile, unless noted otherwise.

D All suspended acoustical ceiling grids shall be centered within room or space unless noted otherwise.

E Provide access panels in drywall ceilings at locations shown, or if not shown, as required to access all mechanical equipment in ceiling cavity requiring normal maintenance or operation, including but not limited to CAV and VAV boxes, A.W. reheat coils, valve, exhaust fans, balancing dampers, fire dampers, smoke dampers, fire/smoke dampers, clean-outs, or if not shown, as required to access all mechanical equipment and junction boxes. Submit layout of all ceiling elements, including access panels for architect to review prior to installation.

53A Ceiling Plan Key Notes 1 Suspended gypsum board hard ceiling at 8'-0" 2 Patch existing gypsum board ceiling disturbed by construction. Paint to match existing.

1 1/2" = 1'-0"A7 Typical Worksurface Section

3/8" = 1'-0"D4 Base Cabinet with Sink Elevation

12" = 1'-0"A1 53A Photos of Existing Cold Room

Finish Schedule - 53A Smoke Lab 225

Floor: Sheet vinyl, SVF #1 Base: Rubber, B #1 Walls: Gypsum board; PT #1 Ceiling: Gypsum board; PT #2

Mechanical Closet 230 NOTE: Tape and float walls. No other work required in this area.

Corridor 260 Floor: Existing Base: Patch to match existing rubber base Walls: Paint new walls to match adjacent Ceiling: Patch and paint gypsum board where disturbed by new construction to match existing

Color Schedule - 53A Sheet Vinyl Flooring:

SVF #1: Mannington, BioSpec MD, Green Tea 15334

Rubber Base:

B #1: Johnsonite, 45 Sandalwood

Epoxy Paint:

PT #1 (Walls): Sherwin Williams, SW6148 Wool Skein PT #2 (Ceilings): Sherwin Williams, SW 7007 Ceiling Bright White PT #3 (HM Doors and Frames): Sherwin Williams, SW 6081 Down Home

Epoxy Resin Countertops:

EPR #1: TBD at time of Submittals

Metal Lab Caswork:

TBD at time of Submittals

Plugmold:

TBD at time of Submittals

1 1/2" = 1'-0"A4 Typical Base Cabinet

1 1/2" = 1'-0"C9 Partition Section - 1 Hr.

A.1

1 1/2" = 1'-0"G8 HM Door Jamb Detail - 53A

2 7 3/4" = 1'-0"A3 Dust Partition

18/12

20ø

20/14ϴ

24/1218/18ϴ

18ø 24/12

* NOT ALL SYMBOLS MAY APPLY TO THIS PROJECT

LINEAR SLOT DIFFUSER

CEILING RETURN/EXHAUST GRILLE

CEILING SUPPLY DIFFUSER

SUPPLY DUCT UP

SUPPLY DUCT DOWN

(1) FIRE DAMPER

(2) SMOKE DAMPER

(3) MOTORIZED DAMPER

(4) CONTROL DAMPER

(1) BALANCING DAMPER

(2) SMOKE DETECTOR

RECTANGULAR DUCT WITH DUCT SIZE

TAG

GRILLE OR REGISTER ON BOTTOM OF

DUCTWORK

RETURN DUCT UP

RECTANGULAR/ROUND TRANSITION

RETURN DUCT DOWN

THERMOSTAT OR SENSOR

FLEXIBLE DUCT CONNECTION

SIDEWALL SUPPLY (RETURN SIMILAR)

SCHEDULED

DIFFUSER TYPE

DETAIL/SECTION NUMBER

SHEET NUMBER

DETAIL/SECTION DESIGNATION

AIRFLOW

M100

SD

(1) (3)

(2)

(2)

T S

(4)

EXHAUST DUCT UP

EXHAUST DUCT DOWN

ROUND DUCT WITH DUCT SIZE TAG

OVAL DUCT WITH DUCT SIZE TAG

HVAC LEGEND

(1)

AHU AIR HANDLING UNIT

AFF ABOVE FINISHED FLOOR

AP ACCESS PANEL

BHP BRAKE HORSEPOWER

BTUH BRITISH THERMAL UNIT PER HOUR

CFM CUBIC FEET PER MINUTE

COTG DOUBLW CLEANOUT TO GRADE

CRAC COMPUTER ROOM AIR CONDITIONING UNIT

D DRAIN

DB DRY BULB TEMPERATURE

DN DOWN

EA EXHAUST AIR

EAT ENTERING AIR TEMPERATURE OF THE COIL

ESP EXTERNAL STATIC PRESSURE

EWC ELECTRIC WATER COOLER

EWT ENTERING WATER TEMPERATURE

FCU FAN COIL UNIT

FLR FLOOR

FO FLAT OVAL

FPM FEET PER MINUTE (VELOCITY)

FPWH FREEZE PROOF WATER HYDRANT

GPM GALLONS PER MINUTE

HOA HAND OFF AUTO

HP HORSEPOWER

KW KILOWATT

LAT LEAVING AIR TEMPERATURE OF THE COIL

LAV LAVATORY

LWT LEAVING WATER TEMPERATURE

MAU MAKE-UP AIR UNIT

MAX MAXIMUM

MCA MINIMUM CIRCUIT AMPS

MOP MAXIMUM OVER CURRENT PROTECTION

MIN MINIMUM

MHP MOTOR HORSEPOWER

NTS NOT TO SCALE

OSA OUTSIDE AIR

PSI POUNDS PER SQUARE INCH

RA RETURN AIR

RH RELATIVE HUMIDITY

RPM REVOLUTION PER MINUTE

PRV PRESSURE REDUCING VALVE

PRZ REDUCED PRESSURE ZONE BACKFLOW DEVICE

RTU ROOF TOP (AIR CONDITIONING) UNIT

SA SUPPLY AIR

SP STATIC PRESSURE

TYP TYPICAL

URN URINAL

VAV VARIABLE AIR VOLUME

VFD VARIABLE FREQUENCY DRIVE

VTR VENT THROUGH ROOF

WB WET BULB TEMPERATURE

WC WATER CLOSET

WH WATER HEATER

' FEET

" INCHES

ø ROUND DUCT

ϴ OVAL DUCT

NEW EQUIPMENT

EXISTING EQUIPMENT TO REMAIN

REMOVE EXISTING DUCT

BACK TO POINT.

EXISTING EQUIPMENT TO BE REMOVED

EXISTING DUCT TO REMAIN

NEW DUCT

CONNECT TO EXISTING DUCT.

RECTANGULAR/OVAL TRANSITION

A/150

KEYED NOTE

AIR DEVICE DESIGNATION

EXISTING DUCT TO BE REMOVED

DIRECTION OF FLOW

THERMOMETER WITH GAUGE WELL

TEMPERATURE & PRESSURE PLUG

STRAINER (Y-TYPE) WITH GATE VALVE

ECCENTRIC REDUCER

PRESSURE GAUGE

CONCENTRIC REDUCER

AND HOSE CONNECTION

STEAM TRAP

AUTO AIR VENT

VALVE IN RISER

SOLENOID VALVE

RELIEF VALVE

MANUAL AIR VENT

PIPE UNION

PRESSURE REDUCING VALVE

PLUG VALVE

OR

END FLANGE

CAP

BRANCH - TOP OF PIPE

ELBOW

TEE

BRANCH - BOTTOM OF PIPE

HUMIDIFIER

TEE UP

PIPE UP

TEE DOWN

PIPE DOWN

H

3-WAY CONTROL VALVE

2-WAY CONTROL VALVE

DUCT RADIUS

ELBOW

NOTE: ALL

ELBOWS SHALL

BE 1.5 RADIUS

R = 1.5

ENGINEERS

BROWN

No.1323

NO

IT

AZ

IR

OHT

UAFOETACIFITR

E

R

A

RKANSAS

EENIGNE-

C LLC

US

DEPA

RT

M

EN

T

OF

HEALT &H

HUMAN

SERV

ICES

A

JEFFERSON, ARKANSAS 72079

SUBMITTED:

STUCK ASSOCIATES ARCHITECTS

DRAWING NO. SHEET:

CHECKED BY:DRAWN BY:DATE:SCALE:

DESCRIPTION BY CHECK

A

B

C

D

E

F

G

H

I

J

K

1 2 3 4 5 6 7 8 9

JEFFERSON LABORATORIES OF THE FDA

Sheet of

1/8" = 1'-0"

7/30/2012 10:49:40 AM

100% Submittal

MG07.26.2012

MECHANICAL NOTES AND LEGEND

Smoke Lab

M.1

MG

3778-12

3 7

1. REFER TO SPECIFICATIONS AND PROJECT MANUAL FOR ADDITIONAL INFORMATION AND REQUIREMENTS.

2. REFER TO ALL PROJECT DRAWINGS FOR DETAILS OF CONSTRUCTION AND INSTALLATION REQUIREMENTS.

3. CONTRACTOR SHALL BECOME, PRIOR TO BID, THOROUGHLY FAMILIAR WITH THE REQUIREMENTS OF THESE

NOTES AS WELL AS OTHER NOTES SHOWN ON THE CONTRACT DOCUMENTS.

4. THESE DRAWINGS REFLECT A SYSTEM DESIGNED AROUND SPECIFIC REFERENCE PRODUCTS (SEE

SCHEDULES), THE SELECTION OF WHICH HAS INFLUENCED THE DESIGNS OF OTHER TRADES (ELECTRICAL, STRUCTURAL, ETC.). IF SUBSTITUTE MANUFACTURERS, SIZES, OR MODEL NUMBERS ARE BID, OR SUBMITTED, IT IS THE RESPONSIBILITY OF THE CONTRACTOR AND ALL HIS SUBCONTRACTORS TO COORDINATE ALL DIFFERENCES PRIOR TO BID. ALL COSTS OF ALL TRADES ASSOCIATED WITH THE

SUBSTITUTION SHALL BE INCLUDED IN THE BID.

5. COORDINATION OF ALL MODIFICATIONS TO EACH DISCIPLINE WHICH RESULT FROM SUBSTITUTION OF EQUIPMENT OR MATERIALS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. SUBSTITUTIONS WHICH ARE INSTALLED AND SUBSEQUENTLY ARE PROVEN UNSATISFACTORY BY THE GOVERNMENT, WITHIN THE WARRANTY PERIOD, SHALL BE REMOVED COMPLETELY BY THE CONTRACTOR AND REPLACED WITH THE ORIGINAL DESIGN OR CORRECTED AS DIRECTED BY THE CONTRACTING OFFICER WITHOUT ADDITIONAL COST

TO THE GOVERNMENT.

6. ALL DRAWINGS ARE DIAGRAMMATIC AND INDICATE THE GENERAL ARRANGEMENTS OR GEOMETRICAL RELATIONSHIPS OF EQUIPMENT AND SERVICES. THEY ARE NOT INTENDED TO SPECIFY OR SHOW EVERY

OFFSET, SEQUENCE, DEVICE, OPTION, FITTING, OR COMPONENT.

7. CONTRACTOR SHALL NOT SCALE DRAWINGS. DRAWINGS SPECIFIC TO THIS DISCIPLINE DO NOT LIMIT THE

RESPONSIBILITY OF WORK REQUIRED BY THE CONTRACT DOCUMENTS.

8. EXACT LOCATIONS OF ALL EQUIPMENT, ROOF CURBS, DUCTS, DIFFUSERS, ETC. SHALL BE COORDINATED

WITH OTHER TRADES.

9. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING ALL WORK WITH THAT OF OTHER TRADES.

REFER TO ARCHITECTURAL, STRUCTURAL, ELECTRICAL, AND OTHER DRAWINGS FOR COMPLETE

INFORMATION PRIOR TO BID.

10. NO OTHER TRADES, I.E., ELECTRICAL, CEILING, PLUMBING, ETC., SHALL BE SUSPENDED, HUNG, OR

SUPPORTED FROM DUCTWORK OR PIPING.

11. SPECIAL CARE SHALL BE TAKEN ON THE ROOFS (NEW AND EXISTING) TO PREVENT DAMAGE. ANY DAMAGE SHALL BE PROMPTLY REPAIRED AT NO EXPENSE TO THE GOVERNMENT. CONTRACTOR SHALL COMPLY

WITH BONDING REQUIREMENTS OF EXISTING ROOF.

12. CONTRACTOR SHALL REPLACE ALL ARCHITECTURAL FEATURES REMOVED OR DAMAGED DURING THE

COURSE OF THE WORK.

GENERAL NOTES:

1. THE MECHANICAL RELATED DEMOLITION WORK INDICATED ON THE

PLANS, SPECIFICATIONS, AND NOTES IS TO BE CLOSELY

COORDINATED WITH THE GOVERNMENT'S REPRESENTATIVE. NO

DEMOLITION SHALL TAKE PLACE IN ANY AREA OR BUILDING UNTIL

THE CONTRACTOR HAS BEEN GIVEN APPROVAL TO PROCEED IN

THAT SPECIFIC LOCATION. REFER TO ARCHITECTURAL

DEMOLITION DRAWINGS FOR ADDITIONAL INFORMATION AND

DEMOLITION SCOPE OF WORK.

2. IF, DURING DEMOLITION, IT BECOMES NECESSARY TO

TEMPORARILY REMOVE ANY EQUIPMENT, PIPING, ETC. WHICH IS

NOT SPECIFICALLY NOTED TO BE REMOVED (THEREBY IMPLYING

THAT THEY ARE TO BE LEFT FOR FUTURE USE), THE

CONTRACTOR SHALL REINSTALL SAID SYSTEMS TO FULLY

OPERABLE CONDITION IN THEIR ORIGINAL LOCATIONS. AT NO

ADDITIONAL EXPENSE TO THE GOVERNMENT.

3. ALL DEMOLITION WORK SHALL BE SCHEDULED WITH THE

GOVERNMENT'S REPRESENTATIVE AT LEAST 48 HOURS PRIOR TO

THE WORK. IF OUTAGES OR SHUTDOWNS ARE REQUIRED, 7 DAYS

NOTICE SHALL BE GIVEN TO THE GOVERNMENT.

4. CONTRACTOR SHALL PATCH TO MATCH EXISTING ALL OPENINGS IN

WALLS, FLOORS, AND CEILINGS WHERE DUCT, PIPING, AND

CONTROLS HAVE BEEN REMOVED.

5. ANY DAMAGE TO THE GOVERNMENT'S PROPERTY, BUILDING, OR

EQUIPMENT RESULTING FROM THE CONTRACTOR'S OPERATIONS

SHALL BE REPAIRED OR REPLACED BY THE CONTRACTOR TO THE

SATISFACTION OF THE GOVERNMENT WITHOUT ADDITIONAL COST

TO THE GOVERNMENT.

6. CONTRACTOR SHALL MAINTAIN THE SECURITY OF THE BUILDING

AT ALL TIMES.

7. CONTRACTOR SHALL REMOVE EXISTING CONTROL SYSTEMS,

COMPLETE SERVING EXISTING HVAC EQUIPMENT BEING REMOVED.

8. CONTRACTOR SHALL REMOVE EXISTING SUPPORTS FOR

DUCTWORK AND EQUIPMENT BEING REMOVED.

DEMOLITION NOTES:

1. THE EQUIPMENT LOCATIONS SHOWN ON THE DRAWINGS ARE

APPROXIMATE. THE FINAL LOCATIONS SHALL BE

ESTABLISHED IN THE FIELD TO FIT THE AVAILABLE SPACE.

2. ANY EXISTING EQUIPMENT, DUCTS, OR PIPING FOUND TO BE

DAMAGED OR NON-OPERABLE SHALL BE BROUGHT TO THE

ATTENTION OF THE CONTRACTING OFFICER IMMEDIATELY.

CONTRACTOR SHALL INSPECT THE EXISTING SYSTEM. BRING

TO THE ATTENTION OF THE CONTRACTING OFFICER ANY

UNUSUAL, DAMAGED, OR NON-OPERATION CONDITION OF THE

EXISTING SYSTEM BEFORE PROCEEDING WITH RELATED

WORK.

3. CONTRACTOR SHALL MAINTAIN EXISTING BUILDING SYSTEMS

WITH PHASED DEMOLITION AND INSTALLATION OF NEW

WORK. PROVIDING TEMPORARY SERVICES AS REQUIRED TO

ACCOMPLISH PHASED WORK.

4. CONTRACTOR SHALL VISIT THE SITE TO ESTABLISH THE

EXISTING CONDITIONS PRIOR TO DUCT, PIPE, OR EQUIPMENT

FABRICATION. SYSTEMS SHALL BE ERECTED USING FIELD

MEASUREMENTS FOR COORDINATION WITH THE EXISTING

SYSTEMS IN THE SPACE.

5. CONTRACTOR SHALL VERIFY AT SITE ALL EXISTING SYSTEMS

AFFECTED BY THE WORK. REMOVE ALL PORTIONS OF

SYSTEMS BEING REMOVED OR DEMOLISHED. TERMINATE

EXISTING SYSTEMS IN A MANNER THAT WILL NOT CONFLICT

WITH NEW WORK. CLOSELY COORDINATE NEW WORK WITH

EXISTING SYSTEMS. PROVIDE OFFSETS AND TEMPORARY

CONNECTIONS IN EXISTING AND NEW SYSTEMS AS REQUIRED

TO AVOID CONFLICTS.

6. CONTRACTOR SHALL USE EXISTING PIPING SYSTEM VALVES

WHERE POSSIBLE TO ISOLATE SYSTEMS AND TO CAP

EXISTING PIPING. REPLACE EXISTING VALVES WHERE

NECESSARY WHEN EXISTING VALVES LEAK.

7. FIRE-PROOFING ON EXISTING STRUCTURE SHALL BE

REPLACED OR TOUCHED-UP WHERE DISTURBED.

8. REPLACE AND/OR PATCH TO MATCH EXISTING ANY EXISTING

DUCT OR PIPING INSULATION THAT IS TO REMAIN EXISTING

AND IS DAMAGED DURING CONSTRUCTION. WHEN

CONNECTING TO EXISTING PIPING STUB-OUTS, INSULATE

EXISTING STUB-OUT PIPING INCLUDING VALVE BODIES.

9. ALL NEW PIPING PENETRATIONS OF EXISTING CONCRETE

WALLS AND FLOORS SHALL BE CORE DRILLED.

10. COORDINATE AND SCHEDULE 7 DAYS IN ADVANCE ALL

CONNECTIONS TO EXISTING SYSTEMS AND SYSTEM SHUT-

DOWNS WITH GOVERNMENT'S REPRESENTATIVE.

RENOVATION NOTES:

1. PROVIDE ACCESS DOORS IN WALLS, FLOOR, AND CEILING FOR ACCESS TO ALL FIRE DAMPERS, EQUIPMENT, COILS, VALVES, AND BALANCING DAMPERS. WHERE DIRECTLY ACCESSIBLE THROUGH AIR DEVICES OR REMOVABLE CEILING GRID ACCESS DOORS ARE NOT REQUIRED. MINIMUM SIZE SHALL BE 24" X 24" UNLESS

NOTED OTHERWISE.

2. INSTALL FIRE DAMPERS IN THE RATED WALLS AND FLOORS AS INDICATED. SEAL AROUND ALL PENETRATIONS OF RATED WALLS, CHASES, CEILINGS, FLOORS, ETC. SHALL BE SEALED TO MAINTAIN THE FIRE/SMOKE RATING

OF THE ASSEMBLY.

3. MAINTAIN A MINIMUM OF 15'0" BETWEEN ALL FRESH AIR INTAKES AND PLUMBING VENTS, EXHAUST FAN

DISCHARGE, FLUES, ETC.

4. CONTRACTOR SHALL COORDINATE WITH GENERAL CONTRACTOR AND GOVERNMENT'S REPRESENTATIVE FOR SEALING OF ALL ROOF AND WALL PENETRATIONS, AS WELL AS ALL PENETRATIONS OF EXISTING PENTHOUSE FLOOR. FLASH AND COUNTERFLASH ROOF PENETRATIONS. MINIMUM HEIGHT OF FLASHING IS FOUR (4)

INCHES ABOVE ROOF. REFER TO ARCHITECTURAL FOR DETAILING.

5. ALL ELBOWS SHALL BE 1.5 RADIUS.

6. EXISTING LIGHTS , ABANDONED LIGHTS AND LIGHT PENDANTS SHALL BE RELOCATED AS REQUIRED TO

FACILITATE INSTALLATION.

7. PROVIDE FLEXIBLE CONNECTIONS AND TRANSITIONS ON DUCT INLET AND OUTLET CONNECTIONS TO ALL

MECHANICAL EQUIPMENT.

8. DUCT SIZES REPRESENT FREE AREA.

9. CONTRACTOR SHALL FIELD VERIFY ALL PIPE ROUTING AND ADJUST ELEVATIONS AS REQUIRED TO AVOID

CONFLICTS. FINAL PLACEMENT OF PIPING SHALL BE DETERMINED BY FIELD MEASUREMENT AND VERIFICATION.

ELEVATIONS ARE REFERENCED TO PIPE CENTERLINE UNLESS OTHERWISE NOTED.

10. DUCTWORK SHALL CONFORM TO THE FOLLOWING PRESSURE CLASSES: RETURN/MAKE-UP AIR/OUTSIDE

AIR/EXHAUST: 3" SP.

11. ALL SUPPLY, RETURN, RELIEF, AND OUTSIDE AIR DUCTWORK SHALL BE EXTERNALLY INSULATED.

12. INSTALL NEW FILTERS AT THE COMPLETION OF CONSTRUCTION. USE ONE SET OF FILTERS DURING

CONSTRUCTION. INSTALL FINAL SET PRIOR TO TEST AND BALANCE. DO NOT OPERATE AIR MOVING

EQUIPMENT FOR TEMPORARY HEATING, COOLING OR VENTILATION.

13. COORDINATE WORK CLOSELY WITH CONTROL REQUIREMENTS. PROVIDE ALL NECESSARY DUCT TAPS, PIPE TAPS, WELLS, AND OTHER APPURTENANCES REQUIRED BY CONTROL SYSTEM. PROVIDE SPARE PIPE WELL

ADJACENT TO EACH TEMPERATURE SENSOR IN PIPING.

14. CONTRACTOR SHALL VERIFY CLOSELY, AT SITE, TRANSPORTATION OF NEW HVAC EQUIPMENT INTO MECHANICAL ROOMS BEFORE BIDDING. PROVIDE COMPLETE DIS-ASSEMBLY AND RE-ASSEMBLY OF NEW AND

EXISTING EQUIPMENT AS REQUIRED FOR A COMPLETE INSTALLATION.

15. NOT ALL OF THE EXISTING EQUIPMENT, DUCT, AND PIPING SYSTEMS HAVE BEEN SHOWN, FOR CLARITY.

VERIFY, AT SITE, COORDINATION OF EXISTING SYSTEMS AND NEW WORK. VERIFY, AT SITE, EXISTING DUCT AND

PIPING SIZES.

16. NOT ALL REQUIRED PIPING, VALVES, OR FITTINGS ARE SHOWN ON DRAWINGS FOR CLARITY. COORDINATE PLAN DETAILS WITH SPECIFICATIONS, SCHEMATICS, FLOW DIAGRAMS, AND OTHER DETAILS TO PROVIDE ALL

PIPING SYSTEMS, COMPLETE.

17. REMOVAL OF ASBESTOS SHALL BE PROVIDED BY THE GOVERNMENT. COORDINATE WITH GOVERNMENT'S

REPRESENTATIVE AND SCHEDULE WORK ACCORDINGLY.

18. DEMOLITION AND SHUT-DOWN OF EXISTING HVAC SYSTEMS THAT WILL AFFECT PORTIONS OF THE BUILDING OUTSIDE OF PROJECT AREA SHALL BE COORDINATED WITH CONTRACTING OFFICER AND PLANNED TO LIMIT INCONVENIENCE AND DISRUPTION OF BUILDING OPERATIONS AS MUCH AS POSSIBLE. WORK SHALL BE PHASED

ACCORDINGLY.

19. CONTRACTOR SHALL PROVIDE DUCT ACCESS DOORS AT ALL FIRE AND CONTROL DAMPERS AND UPSTREAM OF

TURNING VANES.

20. CONTRACTOR SHALL REMOVE ALL SUPPORTS ASSOCIATED WITH EQUIPMENT, DUCTWORK, AND PIPING BE

REMOVED.

21. ALL DUCT AND PLENUMS INSULATED IN MECHANICAL EQUIPMENT ROOMS AND PENTHOUSE SHALL BE RIGID

BOARD TYPE AT OR BELOW 6'-0" A.F.F.

22. BEFORE FINAL ACCEPTANCE OF HYDRONIC SYSTEMS CONTRACTOR SHALL PULL AND REPLACE ALL STRAINER SCREENS. TIE THE OLD SCREENS TO THE DEVICE SERVED FOR REVIEW AND DISPOSAL BY THE GOVERNMENT.

23. ALL DUCTWORK IS REQUIRED TO BE TESTED IN ACCORDANCE WITH THE SPECIFICATIONS.

24. MECHANICAL CONTRACTOR (MC) SHALL COORDINATE AND VERIFY THE FOLLOWING WITH THE ELECTRICAL

CONTRACTOR (EC) PRIOR TO BID:

A) ALL STARTERS NOT PART OF A MOTOR CONTROL CENTER: FURNISHED BY MC, INSTALLED BY EC.

B) VARIABLE SPEED DRIVES (VSD): FURNISHED AND MOUNTED BY MC, POWER CONNECTIONS BY EC.

C) DUCT SMOKE DETECTORS: FURNISHED BY EC, INSTALLED BY MC.

D) ELECTRIC DAMPER ACTUATORS: FURNISHED BY MC, INSTALLED BY MC.

E) DISCONNECTS:

WHERE NOT FURNISHED WITH EQUIPMENT: FURNISHED BY EC, INSTALLED BY EC.

WHERE FURNISHED WITH EQUIPMENT: FURNISHED BY MC, INSTALLED BY EC.

F) FIRE ALARM SIGNAL FOR AHU SHUT DOWN:

DATA LINK FROM FIRE ALARM PANEL TO BUILDING CONTROL PANEL BY EC.

GATEWAY REQUIRED BETWEEN FIRE ALARM SIGNAL AND BUILDING CONTROL PANEL BY MC.

AHU SHUT DOWN SIGNAL FROM BUILDING CONTROL PANEL TO AHU BY MC.

HVAC NOTES:

Cold Room 53A-225

F

Corridor 53A-260

Office 53A-210

Mech.

KEY PLAN

53A

Mech.

/1

VAV-01

LS/285

F

Smoke Lab 53A-225

Office 53A-210

Corridor 53A-260 12ø

12/12 ø CR-01

/1

/1

CE/500

15 14

10ø ø

10ø

LS/285

H

H-VAV01

14/14

F

Smoke Lab 53A-225

Corridor 53A-260

Corridor 53A-220

VAV-01

CR-01

3/4"

1 1/4"

1"

11 1/2"

H H-VAV01

Mech.

F

Smoke Lab 53A-225

Corridor 53A-260

Corridor 53A-220

E

F

FUTURE AHU-53A-2

FUTURE AHU-53A-3

FUTURE AHU-53A-1A

6ø

EF-1 ON ROOF

EF-2 ON ROOF

FUTURE D

UCTWORK

FUTURE D

UCTWORK

14ø

NOTE:

1.NEITHER FAN SHALL BE

INSTALLED WITH DISCHARGE

FACING OPPOSITE FAN

2. ALL EXTERIOR DUCTWORK

SHALL BE ALUMINUM.

E

F

ENGINEERS

BROWN

No.1323

NO

IT

AZ

IR

OHT

UAFOETACIFITR

E

R

A

RKANSAS

EENIGNE-

C LLC

North US

DEPA

RT

M

EN

T

OF

HEALT &H

HUMAN

SERV

ICES

A

JEFFERSON, ARKANSAS 72079

SUBMITTED:

STUCK ASSOCIATES ARCHITECTS

DRAWING NO. SHEET:

CHECKED BY:DRAWN BY:DATE:SCALE:

DESCRIPTION BY CHECK

A

B

C

D

E

F

G

H

I

J

K

1 2 3 4 5 6 7 8 9

JEFFERSON LABORATORIES OF THE FDA

Sheet of

As indicated

7/30/2012 10:49:50 AM

100% Submittal

MG07.26.2012

MECHANICAL PLAN

Smoke Lab

M.2

MG

3778-12

4 7

1/4" = 1'-0"1 MECHANICAL DEMOLITION FLOOR PLAN 53A

KEYED NOTES:

1. CONTRACTOR SHALL DEMOLISH ALL MECHANICAL EQUIPMENT AND

PIPING ASSOCIATED WITH COLD ROOM. THIS IS INCLUSIVE OF ALL

REFRIGERANT PIPING AND ALL EQUIPMENT ON ROOF. REFER TO

PHOTO 1 FOR ILLUSTRATION OF ROOF MOUNTED EQUIPMENT.

NOT TO SCALE2 PHOTO 1

1/4" = 1'-0"3 MECHANICAL RENOVATION FLOOR PLAN 53A

1/4" = 1'-0"4 MECHANICAL HYDRONIC RENOVATION FLOOR PLAN 53A

KEYED NOTES:

1. NEW SUPPLY AIR TERMINAL VAV-01.

2. NEW RETURN AIR TERMINAL CR-01.

3. EXISTING SUPPLY AIR TERMINAL SERVING CORRIDOR.

4. NEW GENERAL ROOM EXHAUST GRILLE.

5. NEW RETURN AIR MAIN DUCTWORK.

6. NEW SUPPLY AIR DUCTWORK.

7. NEW LOW VELOCITY SUPPLY AIR DIFFUSER.

8. NEW RETURN AIR MAIN UNDER EXISTING.

9. NEW BIO-SAFETY HOOD.

10. NEW SINK. SEE VIEW 7 THIS SHEET.

11. EXISTING RETURN MAIN DUCTWORK.

12. EXISTING SUPPLY MAIN DUCTWORK.

13. 14" ROUND EXHAUST DUCTWORK TO EF-1 ON ROOF. SEE VIEW 6 THIS SHEET.

14. 6" ROUND EXHAUST DUCTWORK TO EF-2 ON ROOF. SEE VIEW 6 THIS SHEET.

15. 6" ROUND EXHAUST DUCTWORK SERVING INHALATION UNIT. EXHAUST DUCTWORK SHALL BE SPIRAL DUCTWORK. DUCTWORK SHALL

TRANSITION TO 4" DUCTWORK THROUGH 15 DEGREE TRANSITION BELOW CEILING. DUCTWORK SHALL TERMINATE 10" BELOW CEILING IN

MANUAL DAMPER.

16. NEW INHALATION UNIT.

17. NEW HUMIDIFIER H-VAV01. SEE VIEW FOUR THIS SHEET FOR DETAILING.

18. NEW MAGNEHELIC GAUGE. COORDINATE WITH OWNER'S REPRESENTATIVE FOR EXACT LOCATION. SEE ENVIRONMENTAL CONTROL DETAIL

ON DETAIL SHEET.

1/4" = 1'-0"7 PLUMBING FLOOR PLAN

KEYED NOTES:

1. EXISTING HWS/HWR LINES.

2. EXISTING SUPPLY TERMINAL.

3. EXISTING COMPRESSED AIR AND VACUUM VALVING FOR COLD ROOM SERVICE. COLD ROOM SERVICE

SHALL BE DEMOLISHED TO VALVING. NEW COMPRESSED AIR AND VACUUM SYSTEM FOR BIO-SAFETY

HOOD SHALL CONNECT TO EXISTING SYSTEM AT VALVING.

4. EXISTING COMPRESSED AIR.

5. EXISTING VACUUM LINE.

6. NEW 3/4" HWS/HWR LINE TO BE ROUTED AND INSTALLED TO SUPPORT NEW VAV-01, AS PER

MANUFACTURER'S RECOMMENDATION. NEW TAPS SHALL BE MADE OFF OF TOP OF EXISTING LINE.

7. NEW 1/2" COMPRESSED AIR LINE TO BE ROUTED AND INSTALLED TO SUPPORT NEW BIO-SAFETY

HOOD, AS PER MANUFACTURER'S RECOMMENDATION.

8. NEW 1/2" VACUUM LINE TO BE ROUTED AND INSTALLED TO SUPPORT NEW BIO-SAFETY HOOD, AS PER

MANUFACTURER'S RECOMMENDATION.

9. NEW INHALATION UNIT.

10. NEW BIO-SAFETY HOOD.

11. NEW 1/2" LPS/LPC LINES SERVING H-VAV01. NEW LINES SHALL BE CONNECTED TO EXISTING MAINS IN

MECHANICAL ROOM. NEW TAPS SHALL BE TAKEN OFF TOP OF MAINS. NEW LPC LINE SHALL BE

SLOPED DOWN FROM H-VAV01 TOWARD MAIN LINE. SEE DETAILS.

1/4" = 1'-0"6 MECHANICAL ROOF PLAN 53A

1/4" = 1'-0"5 Copy of MECHANICAL ROOF PLAN 53A

KEYED NOTES:

1. CONTRACTOR SHALL DEMOLISH ALL MECHANICAL EQUIPMENT AND

PIPING ASSOCIATED WITH COLD ROOM ON EXISTING EQUIPMENT

PLATFORM ON ROOF. EQUIPMENT IS IN THIS LOCATION ON ROOF.

CONTRACTOR SHALL SEAL, FLASH AND COUNTERFLASH ALL EXISTING

PENETRATIONS ON ROOF.

KEYED NOTES:

1. CONTRACTOR SHALL REPAIR ALL NEW ROOF PENETRATIONS MADE AS WELL AS

EXISTING ROOF PENETRATIONS FROM SYSTEMS REMOVED. CONTRACTOR SHALL

COMPLY WITH CURRENT WATER-TIGHT BONDING REQUIREMENTS FOR MODIFIED

BITUMEN ROOFING SYSTEMS.

2. EXHAUST DUCTWORK SHALL OFFSET BELOW ROOF TO AVOID FOOTPRINT OF FUTURE

DUCTWORK, AS SHOWN.

3. NEW EXHAUST FAN ON ROOF. FANS SHALL BE INSTALLED ON EXISTING EQUIPMENT

PLATFORM ON ROOF. SEE DETAIL SHEETS.

4. ADD NEW L4X4X3/8 EACH SIDE OF FANS FOR SUPPORT. COPE VERTICAL LEGS AT

EXISTING SUPPORT. WELD HORIZONTAL LEG TO EXISTING STRUCTURE WITH 1/4"

FILLETX3" WELDS EACH SIDE OF HORIZONTAL LEG.

5. EXHAUST FAN SHALL BE PROVIDED FACTORY PREWIRED DISCONNECT RATED FOR

EXTERIOR USE. EXHAUST FAN SHALL BE INSTALLED WITH FACTORY SUPPLIED

VIBRATION ISOLATION. EXHAUST FAN SHALL BE CONNECTED TO DUCTWORK WITH

FLEXIBLE CONNECTION.

KEYED NOTES:

1. EXISTING SINK IN COLD ROOM TO BE DEMOLISHED.

2. EXISTING DOMESTIC HOT, COLD SANITARY AND VENT LINES TO BE

REROUTED AND CONNECTED TO NEW SINK.

3. SINK BASIN SHALL BE PROVIDED BY COUNTER MANUFACTURER, REFER

TO ARCHITECTURAL. FAUCET SHALL BE EQUAL CHICAGO FAUCET

MODEL NUMBER 947, WITH VACUUM BREAKER. CONTRACTOR SHALL

COORDINATE FAUCET MOUNTING REQUIREMENTS WITH BASIN TO

PROVIDE A FULLY FUNCTIONING SYSTEM.

4. EXISTING FLOOR DRAIN IN COLD ROOM SHALL BE REPLACED AND

REINSTALLED IN NEW FLOOR. FLOOR DRAIN SHALL BE EQUAL TO ZURN

NO. Z-415B. PROVIDE WITH TRAP GUARD.

NOT TO SCALE8 PHOTO 2

KEYED NOTES:

1. EXISTING SINK IN COLD

ROOM TO BE DEMOLISHED.

2. EXISTING VACUUM AND

COMPRESSED AIR STATION IN

COLD ROOM TO BE

DEMOLISHED. (ONE OF TWO)

GENERAL NOTES:

1. ALL NEW TERMINAL BOXES SHALL BE PROVIDED WITH FAST ACTING ACTUATOR EQUAL TO

SIEMENS ATC (AUTOMATIC TEMPERATURE CONTROLS).

2. AIR COMPRESSOR AND VACUUM PUMP FOR INHALATION UNIT SHALL BE SUPPLIED AND INSTALLED

BY CH TECHNOLOGIES. THESE SYSTEMS SHALL BE DEDICATED FOR USE ONLY BY THE

INHALATION UNIT.

3. ALL EXISTING ACCESS PANELS AND DIFFUSERS DAMAGED OR DISPLACED BY WORK SHALL BE

REPAIRED TO GOVERNMENT'S SATISFACTION OR REPLACED AND INSTALLED IN CEILING.

NOTE:

THIS DESIGN IS STRICTLY BASED OFF OF INFORMATION

PROVIDED BY CH TECHNOLOGIES. SMOKING MACHINE

SHALL BE PROVIDED WITH 80 CFM AT NEGATIVE 2" H20.

THERE WILL BE NO FILTRATION IN INHALATION MACHINE

EXHAUST.

GENERAL NOTES:

1. REFER TO ARCHITECTURAL SHEETS FOR ROOF WEATHER PROOFING OF ROOF

PENETRATIONS FOR DUCTWORK, FAN SUPPORT AND CONDUITS. CONTRACTOR

SHALL COMPLY WITH CURRENT WATER-TIGHT BONDING REQUIREMENTS FOR

MODIFIED BITUMEN ROOFING SYSTEMS.

DUCT SUPPORT

ALL-THREAD ROD

HEAVY GAUGE SHEET METAL SADDLE

RECTANGULAR DUCT

BLANKET INSULATION

MECHANICAL FASTENERS

SUPPORTING INSULATION ON THE

UNDERSIDE OF DUCTS OVER 24"

WIDE. SEAL OVER FASTENER

PENETRATIONS WITH TAPE.

1. PROVIDE SADDLES AT DUCT SUPPORT POINTS.

2. DO NOT TAKE DUCT SUPPORTS OR STRAPS INTO THE INSULATION.

3. PROVIDE INSULATION INSERT SO THAT INSULATION DOES NOT

COMPRESS FROM WEIGHT OF DUCT.

4. PROVIDE SEMI-RIGID INSULATION ON ALL DUCTWORK IN MECHANICAL

EQUIPMENT ROOMS AND OTHER HIGH ABUSE AREAS AS SPECIFIED.

NOTES:

VAPOR BARRIER, TAPE OVER

TEARS AND PENETRATIONS OF

THE VAPOR- BARRIER JACKET

LAP VAPOR BARRIER AND SEAL

TAPE OVER JOINTS IN VAPOR

BARRIER

PROVIDE RIGID INSERT FOR SUPPORT SO

SO THAT INSULATION DOES NOT

COMPRESS AT DUCT SUPPORT

LOCATIONS.

ALL-THREAD ROD

MECHANICAL FASTENERS AS

REQUIRED TO SECURE

INSULATION - TAPE OVER

FASTENER PENETRATIONS.

RECTANGULAR DUCT

ADHESIVE SPACED AS

REQUIRED TO ASSIST

THE INSTALLATION.

VAPOR BARRIER, TAPE OVER

JOINTS, BREAKS AND

PENETRATIONS OF THE

VAPOR-BARRIER JACKET.

SEMI-RIGID BOARD INSULATION

HEAVY GAUGE SHEET

METAL SADDLE

NOTES:

1. PROVIDE SADDLES AT DUCT SUPPORT POINTS.

2. DO NOT TAKE DUCT SUPPORTS OR STRAPS INTO THE INSULATION.

3. PROVIDE DUCT SUPPORT SO THAT INSULATION DOES NOT COMPRESS

FROM WEIGHT OF DUCT.

4. SHAPE INSULATION BY REMOVING MITERED SEGMENTS TO CONFORM

TO ROUND ENDS OR FLAT OVAL DUCTWORK.

5. PROVIDE SEMI-RIGID INSULATION ON ALL DUCTWORK IN MECHANICAL

EQUIPMENT ROOMS AND OTHER HIGH ABUSE AREAS AS SPECIFIED.

1 W

45°

W

4" MIN.

1" WIDE NEOPRENE GASKET

SIDE OF MAIN DUCT

VOLUME DAMPER WITH

LOCKING QUADRANT

PROVIDE STAND- OFF

DAMPER BRACKET ON

INSULATED DUCTS

SEE PLANS FOR RUNOUT SIZES

HR

HS

HIGH PRESSURE

AIR DUCT

HIGH EFFICIENCY

DUCT TAKE OFF

WITH DAMPER (TYP.)

HOT WATER COIL

LOW PRESSURE DUCT

FLEX CONNECTION

UPSTREAM DUCT

1.5 DIA STRAIGHT

HIGH PRESSURE FLEX

NOTE:

TERMINAL BOX SHALL BE INSTALLED WITH

FULL SIZE CONDENSATE LINE.

CONTRACTOR TO VERIFY ROUTE AND

DESTINATION OF CONDENSATE LINE WITH

OWNER.

SHEET METAL 1.5 RADIUS

ELBOW ATTACHED TO

GRILLE

MAX LENGTH

OF FLEX = 4'-0"

AIR DEVICE, SUPPLY

RETURN AND EXHAUST

METAL ROUND BRANCH DUCT

LOCKABLE DAMPER,

HANDLE ACCESSIBLE THRU INSULATION

SEAL AT CONNECTION W/

NEOPRENE GASKET

RECTANGULAR DUCT

AI

RF

LO

W

NOTES:

1. TYPICAL FOR SA, RA, AND EXHAUST

SYSTEMS.

2. ATTACH FLEX TO DUCT AND DIFFUSER WITH

SHEET METAL SCREWS OR DRAW BANDS.

PROVIDE TRANSITION TO

AIR DEVICE NECK SIZE AT

NECK OF AIR DEVICE.

MANUAL BALANCING DAMPER.

1" WIDE NEOPRENE GASKET

VOLUME DAMPER

WITH LOCKING QUADRANT

PROVIDE STAND- OFF

DAMPER BRACKET ON

INSULATED DUCTS

GALVANIZED HIGH EFFICIENCY TAKEOFF W/DAMPER

AS MANUFACTURED BY SHEET METAL CONNECTORS,

INC. 1-800-328-1966 SPIN-IN FITTINGS WITH

SCOOPS ARE NOT ACCEPTABLE

SEE PLANS FOR RUNOUT SIZES

CLEVIS HANGER, SEE M606-T

PIPE

JACKETING

METAL

SHIELD/SADDLE

BOTTOM 90° OF

INSULATION

INSULATION

HIGH DENSITY

INSULATION INSERT

AT HANGER

FACTORY-APPLIED

VAPOR-BARRIER JACKET

SECURING TWO

INSULATION SECTIONS

TOGETHER

1. SEE SPECIFICATIONS FOR INSULATION, JACKET, AND HANGER REQUIREMENTS.

NOTE:

HWS HWR

MAINS

MANUAL AIR VENT

(TYP)

BALL VALVE (TYP)

CONTROL VALVE

BALL TYPE BALANCE VALVE

UNION (TYP)

T AND P PORT (TYP)

STRAINER

HOT WATER COIL

NOTE:

TAPS OFF OF MAIN SHALL BE

TAKEN OFF THE TOP OF THE

MAIN, AS SHOWN.

T AND P PLUG (TYP)

NOTE:

BOXES AT END OF RUNS

SHALL BE INSTALLED WITH

THREE WAY VALVES.

NOTE:

THREE WAY CONTROL VALVES SHALL

BE INSTALLED ON HOT WATER COILS

AT END OF RUNS. TWO WAY

CONTROL VALVES SHALL BE

INSTALLED ON ALL OTHERS.

EXISTING ROOF

SUPPORT WITH SPRING ISOLATORS

PROVIDED BY FAN MANUFACTURER.

WEATHERPROOF MOTOR COVER.

SEE SHEET M.2 FOR

STRUCTURAL DETAILING.

SEE DISCHARGE DETAIL ABOVE.

EXHAUST DUCTWORK

FLEX CONNECTION

NOTE:

FAN SHALL BE PROVIDED WITH FACTORY

PRE-WIRED AND MOUNTED DISCONNECT.

DISCHARGE DETAIL

BIRDSCREEN

FIELD FABRICATED DISCHARGE HOOD.

EXHAUST DISCHARGE

SHALL BE INSTALLED

WITH PARALLEL BLADE

DAMPER, PROVIDED BY

FAN MANUFACTURER.

HUMIDITY HIGH LIMIT OVERRIDE

ELECTRIC SIGNAL FROM

CONTROL SYSTEM

TWO-POSITION CONTROL VALVEHUMIDIFIER SEPARATOR

1" PIPE WITH TEMPERATURE WELL

FOR TEMPERATURE SWITCH.

COORDINATE WITH CONTROL

SYSTEM MANUFACTURER

F&T TRAP BY

HUMIDIFIER

MANUFACTURER

F&T TRAP BY

HUMIDIFIER

MANUFACTURER

DISPERSION TUBE

MANIFOLD IN DUCT

WITH INSULATED TUBES

T

LPS

LPC

TEMPERATURE SWITCH BY BLDG.

CONTROL SYSTEM MANUFACTURER -

STRAP ON IS NOT ACCEPTABLE

MODULATING CONTROL VALVE

NOTE:

CONTROL VALVES BY CONTROL SYSTEM MANUFACTURER.

GATE VALVE

GATE VALVE

WALL

FLOOR

NOTE:

DRILL PANEL COVERS FOR SENSOR

PROBE PENETRATIONS AS REQUIRED.

SEAL PENETRATIONS ON RECOVERY

ROOM SIDE, AIR AND WATER TIGHT.

NOTE:

DEVICES SHALL BE CAPABLE OF

WITHSTANDING DIRECT WATER SPRAY

OR BE EQUIPPED WITH PERMANENT

MOUNTED ENDCAP OR COVER TO

PROTECT INSTRUMENT DURING

WASHDOWN.

DIFFERENTIAL PRESSURE

SENSING TIP.

SPACE STATIC PRESSURE

SENSING PLATE

ROUGH-IN CONDUIT

2X4 ROUGH-IN BOX

TEMPERATURE AND

HUMIDITY TRANSMITTER

WITH WEATHERPROOF

COVER

6X6 ROUGH-IN BOX

DIFFERENTIAL PRESSURE

TRANSMITTER

CORRIDOR

MAG. GAGE

MAG. GAGE

TEMPERATURE

HUMIDITY

TEMPERATURE AND HUMIDITY

TRANSMITTER DETAIL

MAG GAGE DETAIL

NOTE:

DEVICES FINAL LOCATION SHALL BE

COORDINATED WITH ARCHITECT AND

OWNER'S REPRESENTATIVE.

ROOM

ENGINEERS

BROWN

No.1323

NO

IT

AZ

IR

OHT

UAFOETACIFITR

E

R

A

RKANSAS

EENIGNE-

C LLC

US

DEPA

RT

M

EN

T

OF

HEALT &H

HUMAN

SERV

ICES

A

JEFFERSON, ARKANSAS 72079

SUBMITTED:

STUCK ASSOCIATES ARCHITECTS

DRAWING NO. SHEET:

CHECKED BY:DRAWN BY:DATE:SCALE:

DESCRIPTION BY CHECK

A

B

C

D

E

F

G

H

I

J

K

1 2 3 4 5 6 7 8 9

JEFFERSON LABORATORIES OF THE FDA

Sheet of

As indicated

7/30/2012 10:50:08 AM

100% Submittal

MG07.26.2012

MECHANICAL DETAILS

Smoke Lab

M.3

MG

3778-12

5 7

NOT TO SCALE1 INSULATION - FLEXIBLE ROUND DUCT WRAP INDOORS LESS THAN 36 INCHES

NOT TO SCALE2 INSULATION - SEMI-RIGID BOARD DUCTS 36 INCHES AND LARGER

NOT TO SCALE3 RECTANGULAR BRANCH DUCT FITTING

NOT TO SCALE5 TERMINAL BOX

NOT TO SCALE6 BRANCH RUN-OUT CONNECTION

NOT TO SCALE7 ROUND BRANCH DUCT FITTING

NOT TO SCALE9 PIPE INSULATION AT CLEVIS HANGER

NOT TO SCALE10 WATER COIL AT TERMINAL BOXES

NOT TO SCALE11 ROOF EXHAUST FAN DETAIL

NOT TO SCALE4 HUMIDIFIER DETAILING

NOT TO SCALE8 ENVIRONMENTAL CONTROL DETAIL

SEQUENCE OF OPERATION

FOR ROOM 53A-225

TERMINAL

AIRFLOW

SENSOR

AFM

OCCUPIED MODE ONE SHALL BE DEFINED AS

WHEN BIO-SAFETY HOOD IS ACTIVE.

UNOCCUPIED MODE SHALL BE DEFINED AS

WHEN BIO-SAFETY HOOD IS INACTIVE.

ROOM 53A-225 SHALL BE NEGATIVE TO

ADJACENT HALLWAY AT ALL TIMES AND

THROUGHOUT ALL MODES.

HWS

HWR

TERMINAL CONTROLLER BY

CONTROL SYSTEM

MANUFACTURER.

EM

HOT WATER

COIL

SUPPLY

AIR

T

24 VOLT POWER BY

CONTROL SYSTEM

MANUFACTURER.

SPACE

TEMPERATURE

SENSOR

T

TWO

WAY

VALVE

NOTE:

SEE DRAWINGS AND DETAILS

FOR TERMINALS WITH 3-WAY

VALVES AT END OF LINES.

XFMR

TRANSFORMER FOR

CONTROL VOLTAGE BY

CONTROL MANUFACTURER

120 VOLT BY ELECTRICAL

SEQUENCE OF OPERATION

FOR SUPPLY TERMINAL BOXES

DURING UNOCCUPIED MODE, SPACE TEMPERATURE SENSOR SHALL MODULATE

TERMINAL HOT WATER VALVE IN SEQUENCE TO MAINTAIN SPACE TEMPERATURE

SETPOINT. TERMINAL SHALL PROVIDE CONSTANT AIRFLOW TO SATISFY TEMPERATURE

SETPOINT. CFM SETPOINT DURING UNOCCUPIED MODE SHALL BE 350 CFM.

DURING OCCUPIED MODE, SPACE TEMPERATURE SENSOR SHALL MODULATE TERMINAL

HOT WATER VALVE IN SEQUENCE TO MAINTAIN SPACE TEMPERATURE SETPOINT.

TERMINAL SHALL PROVIDE VARIABLE AIRFLOW TO SATISFY TEMPERATURE SETPOINT.

CFM MINIMUM SETPOINT DURING UNOCCUPIED MODE SHALL BE 570 CFM.

THROUGH THE ROOM TERMINAL CONTROLLER, SPACE HUMIDITY SENSOR SHALL

MODULATE THE HUMIDIFIER TUBE VALVE TO MAINTAIN THE HUMIDIFICATION SETPOINT.

HUMIDIFIER JACKETING VALVE SHALL OPEN WHEN HUMIDIFICATION IS REQUIRED AND

CLOSE WHEN HUMIDIFICATION IS NOT REQUIRED. A HIGH-LIMIT SENSOR IN THE SUPPLY

AIR WILL CLOSE VALVES IF THE HIGH HUMIDITY SETPOINT IS REACHED, WHEN THE AIR

HANDLING UNIT IS OFF ALL HUMIDIFIER VALVES SHALL BE CLOSED.

ALL CFM SETPOINTS SHALL BE ADJUSTABLE.

HUMIDIFIER

SEPARATOR

BOTH HUMIDIFIER VALVES ARE

PROVIDED WITH ELECTRIC OPERATORS

BY HUMIDIFIER MANUFACTURER.

TUBES

JACKET

H HHL

LPS

CONTROL LEGEND

DPT

H

CV

HHL

AFM

P

NC

HPA

SP

C

T

NO

FILTER MAGNEHELIC GAUGE

BY FILTER MANUFACTURER

FILTER

H

H

CURRENT SENSOR

HUMIDIFIER

HUMIDITY SENSOR

SD

DUCT SMOKE DETECTOR

(BY DIV. 16)

FAN OR PUMP

AIRFLOW

MEASURING

STATION

CONTROL DAMPER BY

CONTROL SYSTEM

MANUFACTURER,

UNLESS OTHERWISE

NOTED.

AFM

VARIABLE FREQUENCY DRIVE BY

CONTROL MANUFACTURER

TEMPERATURE SENSOR

LOW LIMIT TEMPERATURE

CONTROLLER

ELECTRIC DAMPER OPERATOR

DIFFERENTIAL PRESSURE SWITCH

VFD

T

LL

ELECTRIC TWO-WAY, MODULATING

CONTROL VALVE UNLESS NOTED AS

TWO-POSITION

ELECTRIC THREE-WAY, MODULATING

CONTROL VALVE UNLESS NOTED AS

TWO-POSITION

FAN OR PUMP STARTER W / HOA

ANALOG INPUT

DIGITAL OUTPUT

DIGITAL INPUT

ANALOG OUTPUT

DIFFERENTIAL PRESSURE TRANSMITTER

HUMIDISTAT, MOUNT ADJACENT TO

THERMOSTAT.

CONSTANT VOLUME

NORMALLY OPEN

COMMON

HUMIDITY HIGH LIMIT SENSOR

NORMALLY CLOSED

STATIC PRESSURE SENSOR

DIRTY FILTER ALARM

PRESSURE SENSOR

HIGH PRESSURE ALARM

AIR FLOW MEASUREMENT SIGNAL

THERMOSTAT, MOUNT 54" A.F.F., UNLESS

OTHERWISE NOTED.

FUME HOOD SASH POSTION SENSOR

FUME HOOD OPERATOR DISPLAY PANELODP

DI

AI

AO

AO

HSS

DFA

CS

EM

DPS

FUME HOOD OCCUPANCY SENSORHOS

HLA HIGH LEVEL ALARM

GATEWAY INTERFACEGWI

AIR DEVICE

MARK USE TYPE STYLE

AIR FLOW DATA

MAX

CFM

MAX S.P.

IN. WG

OPTIONS

DAMPER

TYPE

FINISH MATERIAL

MANUFACTURER AND

MODEL NO.

REMARKS

NOTES:

1. COORDINATE ALL FRAME TYPES WITH FINAL CEILING TYPES AND EXISTING CEILING OPENING SIZES.

2. PROVIDE TRANSITIONAL PIECES AS REQUIRED.

3. PROVIDE MANUAL BALANCING DAMPERS AT ALL BRANCH TAKE-OFFS TO AIR DEVICES. PROVIDE MANUAL BALANCING DAMPERS AT ALL BRANCH TAKE-OFFS IN ADDITION TO OPPOSED BLADE DAMPERS AT DEVICES.

FACE SIZE

IN. X IN.

NECK SIZE

IN. MAX

N.C.

RETURN /

EXHAUST EGGCRATE 24/24 2880 .10 NONE WHITE ALUMINUM22/22 30CE TITUS 50FCEILING MOUNT

LS SUPPLY LOW VELOCITY 24/48 500 .11 NONE WHITE ALUMINUM10"ø 20 TITUS TRITEC-ALCEILING MOUNT

TERMINAL AIR BOX

MARK TYPE

NOMINAL

INLET

SIZE IN.

AIRFLOW

CFM

MAX. SOUND DATA NC RATING

DISCHARGE @

1.0" SP

RADIATED @

1.0" SP

HEATING COIL DATA

CFM EAT/LAT

F

EWT/LWT

F

APD/ROWS GPM/MBH WPD FT

H20

MANUFACTURER AND

MODEL NO.

REMARKS

NOTES:

1. DAMPER ACTUATOR, THERMOSTAT, AND DDC CONTROLS BY CONTROLS CONTRACTOR.

2. PROVIDE AIRFLOW SENSOR AND DAMPER READY FOR ADDITION OF CONTROLLER BY CONTROLS CONTRACTOR.

3. PROVIDE 120 VOLT TO 24 VOLT TRANSFORMER AT EACH TERMINAL. CONTROLS CONTRACTOR TO EXTEND LOW VOLTAGE WIRING TO CONTROL POINTS.

4. REFER TO DRAWINGS FOR RIGHT AND LEFT HAND REQUIREMENTS.

5. PROVIDE ALL UNITS WITH HOSPITAL GRADE FIBER FREE INSULATION.

6. ALL NEW TERMINAL BOXES SHALL BE PROVIDED WITH FAST ACTING ACTUATOR EQUAL TO SIEMENS ATC (AUTOMATIC TEMPERATURE CONTROLS).

CR-01 10CONSTANT RETURN 450 25 25 -- -- -- -- -- -- TITUS DESV HOOD ON RATING 0 CFM - HOOD OFF RATING 450 CFM

VAV-01 10VARIABLE SUPPLY 570 25 25 570 55/101 180/130 0.43/3 1.2/30.6 0.3 TITUS DESV

(ALL NOTES ARE VALID FOR ALL TERMINALS)

FAN DATA

DRIVECFM

E.S.P.

"(WG)

SERVES TYPE

EXHAUST FAN

MARK LOCATION

REMARKSMANUFACTURER

& MODEL NO.

OR EQUAL

ELECTRICAL DATA

H.P.INLET SOUND

(DBA)RPM

PHASE

VOLTS/

EF-1 53A ROOF HOOD CENTRIFUGAL 670 1.6 BELT 2,295 73 0.5 120/1 COOK 80 CPV FAN SHALL BE PROVIDED WITH FACTORY PRE-WIRED DISCONNECT, AND FACTORY SPRING ISOLATION RAIL.

FAN SHALL OPERATE AT CONSTANT VOLUME. BALANCE TO CFM AND ESP INDICATED.

EF-2 53A ROOF SMOKE EQ CENTRIFUGAL 80 2.1 BELT 2,397 74 0.5 460/3 COOK 60 CPV FAN SHALL BE PROVIDED WITH FACTORY PRE-WIRED DISCONNECT, AND FACTORY SPRING ISOLATION RAIL.

FAN SHALL OPERATE AT CONSTANT VOLUME. BALANCE TO CFM AND ESP INDICATED.

DURING OCCUPIED MODE GENERAL ROOM RETURN TERMINAL DAMPER SHALL CLOSE.

DURING UNOCCUPIED MODE GENERAL ROOM RETURN TERMINAL SHALL ACT AS VARIABLE

AIRFLOW TERMINAL AND PROVIDE 100 CFM OFFSET FROM SUPPLY TERMINAL. NEGATIVE

PRESSURE IN ROOM SHALL BE CONSTANTLY BE MAINTAINED.

PROVIDE 120 VOLT POWER TO TERMINAL BOX.

ALL CFM SETPOINTS SHALL BE ADJUSTABLE.

SEQUENCE OF OPERATION FOR GENERAL ROOM RETURN

TERMINAL CONTROLLER BY

CONTROL SYSTEM

MANUFACTURER

GENERAL ROOM

RETURN

EMAFM

TERMINAL

AIRFLOW SENSOR

XFMR

120 VOLT BY

ELECTRICALTRANSFORMER FOR

CONTROL VOLTAGE BY

CONTROL MANUFACTURER

24 VOLT POWER BY CONTROL

SYSTEM MANUFACTURER

GENERAL ROOM

RETURN TERMINAL

WHEN FUME HOOD IS IN USE, EXHAUST FAN SHALL BE ACTIVATED.

WHEN FUME HOOD IS OFF EXHAUST FAN SHALL BE DE-ACTIVATED.

NEW FUME HOOD SWITCH SHALL SIGNAL CONTROL SYSTEM OF HOOD-ON AND HOOD-OFF CONDITIONS. WHERE A FUME HOOD IS NOT SUPPLIED WITH SWITCH FROM HOOD MANUFACTURER, PROVIDE NEW SWITCH AT HOOD ACCESSIBLE BY USER.

PROVIDE MONITOR POINT OF AIRFLOW.

SEQUENCE OF OPERATION FOR BIO-SAFETY HOOD CONTROL

EXHAUST AIR

AFM

AIRFLOW

SENSOR

BIO-SAFETY HOOD

FUME HOOD

EXHAUST FAN

DI

STATUS

GRAVITY BACKDRAFT

DAMPERS BY EXHAUST

FAN MANUFACTURER.CS

DOAO

WHEN INHALATION UNIT IS IN USE, EXHAUST FAN SHALL BE ACTIVATED.

WHEN INHALATION UNIT IS NOT IN USE EXHAUST FAN SHALL BE DE-

ACTIVATED.

NEW INHALATION UNIT SWITCH SHALL SIGNAL CONTROL SYSTEM OF UNIT-ON

AND UNIT-OFF CONDITIONS. WHERE INHALATION UNIT IS NOT SUPPLIED WITH

SWITCH FROM INHALATION MANUFACTURER, PROVIDE NEW SWITCH AT

INHALATION UNIT ACCESSIBLE BY USER.

PROVIDE MONITOR POINT OF AIRFLOW.

SEQUENCE OF OPERATION FOR SMOKE

EXHAUST FOR INHALATION UNIT

EXHAUST AIR

INHALATION UNIT

INHALATION UNIT

EXHAUST FAN

DI

STATUS

GRAVITY BACKDRAFT

DAMPERS BY EXHAUST

FAN MANUFACTURER.CS

DO

AFM

AIRFLOW

SENSOR

AO VF

D

D R

IV

E

HUMIDIFIER SCHEDULE

DESIGNATION SPACE TEMPERATURE

(DEG. F/% RH)

REMARKS:

1. CONTRACTOR SHALL INSTALL HUMIDIFIERS IN STRICT ACCORDANCE WITH MANUFACTURE'S RECOMMENDATIONS.

HUMIDIFIER TO BE INSTALLED WITH MANUFACTURER RECOMMENDED LENGTH OF STRAIGHT DUCT, BEFORE ELBOWS OR

TRANSITIONS, DOWN STREAM OF HUMIDIFIER TO ENSURE PROPER DISPERSION.

2. PROVIDE WITH STEAM CONTROL VALVES, TRAPS, AND TEMPERATURE SWITCH.

DUCT TEMP.

(DEG. F)

MANUF.MODEL

(DRI-STEAM OR EQUAL)

DUCT SIZE

(IN. X IN.)

AIR FLOW

(CFM)

SYSTEM OSA STEAM FLOW

(LBS/HR)

STEAM PRESSURE

(PSIG)

MAX ABSORPTION

DISTANCE

H-VAV01 75/50% 55.0 14/14" 570 100% 15.0 2.05-50 13

ENGINEERS

BROWN

No.1323

NO

IT

AZ

IR

OHT

UAFOETACIFITR

E

R

A

RKANSAS

EENIGNE-

C LLC

US

DEPA

RT

M

EN

T

OF

HEALT &H

HUMAN

SERV

ICES

A

JEFFERSON, ARKANSAS 72079

SUBMITTED:

STUCK ASSOCIATES ARCHITECTS

DRAWING NO. SHEET:

CHECKED BY:DRAWN BY:DATE:SCALE:

DESCRIPTION BY CHECK

A

B

C

D

E

F

G

H

I

J

K

1 2 3 4 5 6 7 8 9

JEFFERSON LABORATORIES OF THE FDA

Sheet of

As indicated

7/30/2012 10:50:18 AM

100% Submittal

MG07.26.2012

MECHANICAL CONTROLS AND

SCHEDULES

Smoke Lab

M.4

MG

3778-12

6 7

NOT TO SCALE1 SUPPLY TERMINAL CONTROL

NOT TO SCALE2 GENERAL ROOM RETURN CONTROL

NOT TO SCALE3 SEQUENCE OF OPERATION FOR BIO-SAFETY HOOD CONTROL

NOT TO SCALE4 INHALATION UNIT CONTROL

GENERAL NOTES:

1. ALL NEW CONTROL SYSTEMS SHALL MATCH EXISTING BUILDING

CONTROLS. NEW CONTROL SYSTEMS SHALL BE FULLY INTERACTIVE

WITH EXISTING BUILDING CONTROLS.

Mech.

Cold Room 53A-225

F D5 D5 D5 D5 D5

D5 D5 D5 D5 D5D5

D1D2 D3 D4 D1 D2 D3 D4

Corridor 53A-260

Office 53A-210

Corridor 53A-220

DISCONNECT

TRANSFORMER

DISCONNECT AND

240V OUTLET D6

TRANSFORMER

KEY PLAN

53A

Corridor Mech.

Office

Smoke Lab

BS 1

201918

F

R3

E1 E2

R4

R6

E3E4

R3

N-39

K-31

R5

N-23

N-25

N-27 N-29 N-35N-33

N-31 N-37

N-19

N-17

R7

R3R2R2

K-38

NEW VFD

FOR EF-2

VAV-01

PANEL K

PANEL N

CR-01

WIREMOLD

WIREMOLDWIREMOLD

PANEL LB

PROVIDE TOGGLE SWITCH AT

HOOD TO START/STOP EF-1.

PROVIDE TOGGLE SWITCH

AT SMOKE MACHINE TO

START/STOP EF-2.

N-19

N-19

N-17

N-17

Smoke Lab

F

A A AA

N-21

120V 20A TOGGLE SWITCH

WITH OCCUPANCY SENSOR

E

F

FUTURE AHU-53A-2

FUTURE AHU-53A-3

FUTURE AHU-53A-1A

EF-1 ON ROOF

EF-2 ON ROOF

FUTURE D

UCTWORK

FUTURE D

UCTWORK

LB-13,15,17 VIA VFD IN

MECHANICAL ROOM

N-41

ENGINEERS

BROWN

No.1323

NO

IT

AZ

IR

OHT

UAFOETACIFITR

E

R

A

RKANSAS

EENIGNE-

C LLC

North US

DEPA

RT

M

EN

T

OF

HEALT &H

HUMAN

SERV

ICES

A

JEFFERSON, ARKANSAS 72079

SUBMITTED:

STUCK ASSOCIATES ARCHITECTS

DRAWING NO. SHEET:

CHECKED BY:DRAWN BY:DATE:SCALE:

DESCRIPTION BY CHECK

A

B

C

D

E

F

G

H

I

J

K

1 2 3 4 5 6 7 8 9

JEFFERSON LABORATORIES OF THE FDA

Sheet of

As indicated

7/30/2012 11:55:53 AM

100% Submittal

MG07.26.2012

ELECTRICAL PLAN

Smoke Lab

E.1

MG

3778-12

7 7

1/4" = 1'-0"1 ELECTRICAL DEMOLITION FLOOR PLAN 53A

DEMOLITION GENERAL NOTES:

1. REMOVE LIGHTING FIXTURES, RECEPTACLES, OUTLETS, AND WIRING DEVICES SHOWN FOR REMOVAL. DEMOLISH CIRCUITS BACK TO THE PANEL AND REMOVE CIRCUIT BREAKER. REMOVE DEVICES IN WALLS TO BE REMOVED.

COORDINATE WITH ARCHITECTURAL DEMOLITION PLANS.

2. REMOVE ANY DEVICES NOT TO BE REUSED IN EXISTING WALLS THAT ARE TO REMAIN.

3. THE ELECTRICAL RELATED DEMOLITION WORK INDICATED ON THE PLANS, SPECIFICATIONS, AND NOTES IS TO BE CLOSELY

COORDINATED WITH THE OWNER'S REPRESENTATIVE. NO DEMOLITION SHALL TAKE PLACE IN ANY AREA OR BUILDING UNTIL THE CONTRACTOR HAS BEEN GIVEN APPROVAL TO PROCEED IN THAT SPECIFIC LOCATION. REFER TO ARCHITECTURAL DEMOLITION DRAWINGS FOR ADDITIONAL INFORMATION AND DEMOLITION SCOPE OF WORK.

4. IF, DURING DEMOLITION, IT BECOMES NECESSARY TO TEMPORARILY REMOVE ANY EQUIPMENT WHICH IS NOT SPECIFICALLY NOTED TO BE REMOVED (THEREBY IMPLYING THAT THEY ARE TO BE LEFT FOR FUTURE USE), THE CONTRACTOR SHALL REINSTALL SAID SYSTEMS TO FULLY OPERABLE CONDITION IN THEIR ORIGINAL LOCATIONS.

5. DISPOSE OF ALL REMOVED EQUIPMENT NOT INTENDED FOR REUSE AS DIRECTED BY THE OWNER. CAREFULLY REMOVE, STORE AND REUSE ITEMS INDICATED ON THE PLANS.

6. ALL DEMOLITION WORK SHALL BE SCHEDULED WITH THE OWNER AT LEAST 48 HOURS PRIOR TO THE WORK.

7. SCHEDULE UTILITY DOWN TIMES TO KEEP TO A MINIMUM AND TO NOT INTERFERE WITH THE DAILY SCHEDULE.

8. PATCH ALL OPENINGS IN WALLS, FLOORS, CEILINGS MADE FOR ACCESS TO THE EXISTING EQUIPMENT OR FOR

INSTALLATION FOR THE NEW SYSTEMS.

9. ANY DAMAGE TO THE OWNER'S PROPERTY, BUILDING OR EQUIPMENT RESULTING FROM THE CONTRACTOR'S OPERATIONS

SHALL BE REPAIRED OR REPLACED BY THE CONTRACTOR TO THE SATISFACTION OF THE OWNER WITHOUT ADDITIONAL

COST TO THE OWNER.

10. MAINTAIN THE SECURITY OF THE BUILDINGS AT ALL TIMES.

11. MAINTAIN THE FIRE AND SMOKE CONSTRUCTION INTEGRITY OF THE EXISTING BUILDING.

12. ASBESTOS MAY BE PRESENT IN THE BUILDING AND WILL BE ABATED BY OTHERS UNDER SEPARATE CONTRACT. IF, DURING

THE COURSE OF THE WORK, MATERIAL WHICH MAY CONTAIN ASBESTOS IS DISCOVERED , STOP WORK IMMEDIATELY AND COMPLY WITH EPA REGULATIONS TO PROTECT WORKS AND OCCUPANTS. NOTIFY OWNER AND ENGINEER.

13. WORK REQUIRED IN THE AREAS OUTSIDE OF THE FLOOR AREA FOR ELECTRICAL WORK SHALL BE SCHEDULED WITH THE

OWNER AT LEAST THREE DAYS IN ADVANCE.

14. PARTS OF THE EXISTING POWER AND SYSTEMS WILL REMAIN IN OPERATION DURING THE RENOVATIONS.

15. REMOVE ABANDONED ELECTRICAL SYSTEMS WHERE EVER POSSIBLE.

16. VERIFY EXISTING USAGE OF ALL SYSTEMS AND COMPONENTS SCHEDULED FOR REMOVAL. DO NOT REMOVE OR DE-

ENERGIZE SYSTEMS OR COMPONENTS THAT WILL IMPACT NORMAL OPERATION OF OTHER PARTS OF THE BUILDING.

17. CONTRACTOR SHALL VERIFY ALL CIRCUITS ARE UNUSED IN OTHER AREAS BEFORE DEMOLITION. CIRCUITS WHICH FEED

OTHER AREAS TO REMAIN SHALL BE BROUGHT TO THE ATTENTION OF THE CONTRACTING OFFICER FOR RESOLUTION.

18. MAINTAIN EXISTING SMOKE DETECTORS IN EXISTING LOCATION AND VERIFY OPERATION AFTER CONSTRUCTION IS

COMPLETE.

DEMOLITION KEYED NOTES:

1. REMOVE EXISTING LIGHT FIXTURES.

2. REMOVE EXISTING SWITCHES, CONDUIT, WIRE BOXES, AND SUPPORT.

3. BALLASTS IN FLUORESCENT FIXTURES CONTAIN PCB'S. REMOVE BALLAST AND PLACE IN GOVERNMENT

SUPPLIED CONTAINERS FOR DISPOSAL BY THE GOVERNMENT.

4. REMOVE FLUORESCENT LAMPS AND PLACE IN GOVERNMENT SUPPLIED CONTAINERS FOR DISPOSAL BY

GOVERNMENT.

5. REMOVE EXISTING ELECTRICAL ASSOCIATED WITH EQUIPMENT TO BE REMOVED.

6. REMOVE AND REINSTALL EQUIPMENT IN UTILITY CLOSET ON WESTERN WALL OF DEMOLISHED AREA IN

ORDER TO MAINTAIN OPERATION DURING AND AFTER CONSTRUCTION. SEE PHOTO.

D

FIXTURE SCHEDULE:

MANUFACTURER MODEL #

4PS24-232FFSA12125-EP-UCOLUMBIA

LAMPS

2-F32T8/TC835/ALTOA

VOLTS

EQUIPMENT LIST:

CHAMBER

DESCRIPTION LOAD (VA)

SMOKE MACHINE

VOLTAGE

120 V

120 V

COMPRESSOR

VACUUM PUMP 240 V

120 V

E1

E2

E3

E4

RENOVATION GENERAL NOTES:

1. THE EQUIPMENT LOCATIONS SHOWN ON THE DRAWINGS ARE APPROXIMATE. THE FINAL LOCATIONS SHALL BE ESTABLISHED

IN THE FIELD TO FIT THE AVAILABLE SPACE.

2. ANY EXISTING EQUIPMENT FOUND TO BE DAMAGED OR NON-OPERABLE SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER IMMEDIATELY. INSPECT THE EXISTING SYSTEM. BRING TO THE ATTENTION OF THE ENGINEER ANY UNUSUAL, DAMAGED, OR NON-OPERATION CONDITION OF THE EXISTING SYSTEM BEFORE PROCEEDING WITH RELATED WORK.

3. MAINTAIN EXISTING BUILDING SYSTEMS WITH PHASED DEMOLITION AND INSTALLATION OF NEW WORK. PROVIDE

TEMPORARY SERVICES AS REQUIRED TO ACCOMPLISH PHASED WORK.

4. VISIT THE SITE TO ESTABLISH THE EXISTING CONDITIONS PRIOR TO EQUIPMENT FABRICATION. SYSTEMS SHALL BE ERECTED USING FIELD MEASUREMENTS FOR COORDINATION WITH THE EXISTING EQUIPMENT, STRUCTURE, FIRE PROTECTION AND

MECHANICAL IN THE SPACE.

5. VERIFY AT SITE ALL EXISTING SYSTEMS AFFECTED BY THE WORK. REMOVE ALL PORTIONS OF SYSTEMS BEING REMOVED OR ABANDONED.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .