Sol 1107143_Section D-Plans.pdf
PDF 2 MB Posted
- Solicitation number
- 1107143
About this file
Section D.2 Plans
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF30 1107143.pdf | ||
| Sol 1107143_Sections B and C - E.pdf | ||
| Sol 1107143_Section A_SF1442.pdf | ||
| Sol 1107143_Section D-Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US
DEPA
RT
M
EN
T
OF
HEALT &H
HUMAN
SERV
ICES
A
XX X
X
X
X
X X X X
X
X
X
X
X
X
X
X
X X X X X X
XX XXX
XXX XXX XXX XX
X
XX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
XXX
X
XXX X XX X X X X X X X X X XX XX X X XX X XX X XXX XXXX XX X XXX XXXX
X X X XXX X X
X
X
X
X
X
X
X
X
X
XX
X
X X X X XX XX X
X
X
X
X
X
X
X
X
X X
X X X X
X X
X X
X XX
X X
XX
X X
X X
X
X
XXXX
X X
X X
XXX X XX XX XXX
X
X
X
X
X
X
X
X
X
T
XXX
X
X
X
X
X
XX XXX XX X X X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XX X X X
X
X
X
X
X
X
X
XX XXX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XXXX XXXX XX X XXX X XX XXX XX
XXXX XX XXX XXXX XXXX XXX XXX X XX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X X
X
X
XXX XXX XXXX X X X
X
X
X
X
X
X
X
X
X
X
XX X X X X X
X
ARL
21 28
20 20
CERTIFICATION
"I HEREBY CERTIFY THAT THESE PLANS AND SPECIFICATIONS HAVE BEEN PREPARED BY ME
OR UNDER MY SUPERVISION. I FURTHER CERTIFY THAT TO THE BEST OF MY KNOWLEDGE
THESE PLANS AND SPECIFICATIONS ARE AS REQUIRED BY LAW AND IN COMPLIANCE WITH
THE ARKANSAS FIRE PREVENTION CODE FOR THE STATE OF ARKANSAS."
Signature Date
LITTLE
TO DALLAS
TEXARKANA
ROCK
PINE
BLUFF
RIVER
FORT SMITH
TO OKLAHOMA CITY
ARKANSAS
40 MEMPHIS
TO
S
T.
L
O U
IS
STATE LOCATION MAP
NCTR/JEFFERSON
EXIT
PINE
BLUFF
JEFFRSON PINE BLUFF
ARSENAL
RIVER
TO FORT SMITH
LITTLE ROCK
TO TEXARKANA
TO MEMPHIS
JEFFERSON LABORATORIES OF THE FDA
PROJECT LOCATION
AR
KAN
SAS
REDFIELD
HW
Y 365
NORTH LITTLE ROCK40
PROJECT LOCATION MAP
Sheet Index G.1
A.1
M.1 M.2 M.3 M.4
E.1
Cover Sheet
53A Smoke Lab - Room 225
Mechanical Notes and Legend Mechanical Plan Mechanical Details Mechanical Controls and Schedules
Electrical Plan
Sheet 1 of 7
Sheet 2 of 7
Sheet 3 of 7 Sheet 4 of 7 Sheet 5 of 7 Sheet 6 of 7
Sheet 7 of 7
BUILDING 53A SITE
62A
45T
Contractor's Entry/Gate
53A
5B
SITE MAP
JEFFERSON, ARKANSAS 72079
SUBMITTED:
STUCK ASSOCIATES ARCHITECTS
DRAWING NO. SHEET:
CHECKED BY:DRAWN BY:DATE:SCALE:
DESCRIPTION BY CHECK
A
B
C
D
E
F
G
H
I
J
K
1 2 3 4 5 6 7 8 9
JEFFERSON LABORATORIES OF THE FDA
Sheet of
As indicated
7/30/2012 8:21:31 AM
100% Submittal
ALH07.26.2012
Cover Sheet - Building 53A
Smoke Lab
G.53A
GRC
3778-12
JEFFERSON LABORATORIES OF THE FDA
BUILDING 53A - SMOKE LAB
G.11 7
US
DEPA
RT
M
EN
T
OF
HEALT &H
HUMAN
SERV
ICES
A
Smoke Lab 53A-225
Corridor 53A-260
Mech.
Office 53A-210
4 56
B S
St or ag e
C ha se
A-
3' - 0" 7' - 6"4' - 6" 3' - 6"
3' - 5"
Field Verify 1' - 1 1/16"
19' - 7 1/16"
Mech.
Corridor 53A-260
Office 53A-210
4' - 0"
2 Cold Room 53A-225
1 2
KEY PLAN
53ASmoke Lab 53A-225
Demolition Legend Demolition of an existing wall or partition
Demolition of an existing door and frame
Dust partition (Locate as req'd during construction as per NCTR request and design.)
Type HM-L Pair of Hollow Metal Doors
Uneven Leaf 20 Min.
7'
0"
3' - 0" 1' - 0"
Type HM-2 2" Head
Hollow Metal Frame 20 Min.
7'
0" 0'
2"
0' - 2"
4' - 0" 0' - 2"
2 x 4 recessed fixture in gypsum board ceiling, shading indicates emergency ballast
Mechanical Supply Diffuser
Mechanical Return Diffuser
Ceiling Plan Legend
Epoxy resin top
Rubber base
2'
6"
4" epoxy resin splash
4"
Metal support bracket;
provide as required to support worksurface
NOTE: Provide blocking in wall for mounting
2' - 6"
3'
0"
3' - 0"
Metal casework
Epoxy resin top and splash
0'
4"
Wiremold
1' - 6" 3' - 0"
Knee Space
Rubber base
Bio-safety cabinet;
Owner furnished, contractor installed
3' - 6"3' - 0"
Verify
4' - 6"
Wiremold
Epoxy resin top and splash
Metal casework
2'
6"
19' - 7"
4" rubber base
Epoxy resin top
4"
1/ 2"
2'
/2
Metal casework base cabinet
0' - 6" 2' - 0"
2' - 6"
W he re In di ca te d
3'
0" o r 2'
6"
Wiremold
Brace top of partition to structure above and seal
Ceiling; refer to ceiling plan Sound attenuation batts
3 5/8" metal studs @ 16" OC
5/8" type "x" gypsum board both sides Floor
Sound batt in all interior partitions
3 jamb anchors
Hollow metal frameCaulk each side
5/8" gyp. bd. on metal frame
Tape Visqueen to Floor
2 X 4 Studs on 24" O.C.
W/ 1/2" Plywood
3 1/2" Sound Batt. Insulation
Visqueen Tape at all Joints
Tape Visqueen to ceiling depending on existing conditions
Side of Demo. Work
To e xi st in g ce ilin g or
0'
0" t o ro of d ec k
Tape Visqueen to ceiling depending on existing conditions
JEFFERSON, ARKANSAS 72079
SUBMITTED:
STUCK ASSOCIATES ARCHITECTS
DRAWING NO. SHEET:
CHECKED BY:DRAWN BY:DATE:SCALE:
DESCRIPTION BY CHECK
A
B
C
D
E
F
G
H
I
J
K
1 2 3 4 5 6 7 8 9
JEFFERSON LABORATORIES OF THE FDA
Sheet of
As indicated
7/30/2012 8:20:42 AM
100% Submittal
ALH07.26.2012
53A Smoke Lab - Room 225
Smoke Lab
A.1
GRC
3778-12
1/4" = 1'-0"H7 Partial Floor Plan 53A 1/4" = 1'-0"H1 Demolition Floor Plan 53A
1/4" = 1'-0"H4 Partial Ceiling Plan 53A
Demolition General Notes A Areas to be removed are shown only as an approximation. The General Contractor is responsible for all demolition or relocation on drawings.
B The Contractor shall verify information shown as existing and report any discrepancies.
C Prior to demolition, the General Contractor will notify the Contracting Officer in sufficient time to salvage miscellaneous items before demolition work commences.
D During demoltion, if asbestos is found, notify Contracting Officer immediately & asbestos removal will be provided by Owner (or separate Contractor.)
53A Demolition Key Notes 1 Dust partition 2 Remove and dispose of pre-fabricated cold room and assorted mechanical and electrical items.
3 Disconnect conduit and breaker oxes from prefabricated cooler.
4 Dust Partition
5 NOT USED
53A Floor Plan Key Notes 1 3 5/8" metal stud with gypsum board attached to face of existing CMU partition. Partition to ceiling height.
2 30" high worksurface, open below - Refer to A7/A.1 3 4'-0" bio-safety cabinet. Owner furnished, contractor installed 4 Smoking machine (28" x 34" x 45"h) - By Owner 5 Mobile table (24" x 72") - By Owner 6 Chamber (25" x 25") - By Owner 7 36" counter with sink and base cabinet - Refer to A4/A.1 and D4/A.1 8 Rack with vacuum pump by smoke machine mfgr.
9 Compressor (38" x 15" x 25"h) Owner furnished, contractor installed.
10 Metal stud partitions; refer to C9/A.1 11 Reconnect existing conduit and breaker boxes 12 Wire mold to run entire length of wall 13 30" counter with base cabinet
Floor Plan General Notes A All construction shall be in accordance with the requirements of the applicable codes, engineering shall conform with all applicable municipal, state and federal regulations having jurisdiction including accessibility standards and requirements of "Americans with Disabilities Act."
B Each trade is advised that information pertinent to its work may occur in variuos sections of the contract documents. Refer to every sheet of drawings for notes and symbols. Notes shall be reviewed and applied to related building components regardless of their locations in the drawings and specifications.
C Unless noted otherwise, any note, detail, or feature indicated for one condition shall be applicable for all alike and similar conditions
D The contractor shall furnish and install all blocking, stiffeners, bracing, backing plated and supporting brackets required for the proper installation of all building components as recommended by the manufacturer and required by code. In walls, provide blocking attached to studs as backing supports for wall-mounted items.
E All dissimilar metals shall be effectively isolated from each other to avoid molecular breakdown.
F All exterior joints around window and door frames, between walls and founds, between walls and roof, between wall panels, at penetration of utilities through the envelope shall be sealed or weather-stripped to prevent air and moisture leakeage and infiltration.
G Finish floor elevations are to the top of concrete, unless noted otherwise.
H Interior partitions are dimensioned to face of partition, unless noted otherwise. Do not scale drawings.
Questions regarding dimensions shall be reported to the Contracting Officer.
1/4" = 1'-0"F8 53A Door Elevations 1/4" = 1'-0"F9 53A Door Frame Elevations
Ceiling Plan General Notes A This reflected ceiling plan constitutes a graphic representation of ceiling-mounted elements for the purpose of coordination. Refer to the appropriate discipline drawings and specifications for specific information regarding each of these elements.
B Light fixtures shall be located centered in the room or space, unless noted otherwise.
C When light fixtures are shown to be recessed in ceiling tiles, they shall be centered in ceiling tile, unless noted otherwise.
D All suspended acoustical ceiling grids shall be centered within room or space unless noted otherwise.
E Provide access panels in drywall ceilings at locations shown, or if not shown, as required to access all mechanical equipment in ceiling cavity requiring normal maintenance or operation, including but not limited to CAV and VAV boxes, A.W. reheat coils, valve, exhaust fans, balancing dampers, fire dampers, smoke dampers, fire/smoke dampers, clean-outs, or if not shown, as required to access all mechanical equipment and junction boxes. Submit layout of all ceiling elements, including access panels for architect to review prior to installation.
53A Ceiling Plan Key Notes 1 Suspended gypsum board hard ceiling at 8'-0" 2 Patch existing gypsum board ceiling disturbed by construction. Paint to match existing.
1 1/2" = 1'-0"A7 Typical Worksurface Section
3/8" = 1'-0"D4 Base Cabinet with Sink Elevation
12" = 1'-0"A1 53A Photos of Existing Cold Room
Finish Schedule - 53A Smoke Lab 225
Floor: Sheet vinyl, SVF #1 Base: Rubber, B #1 Walls: Gypsum board; PT #1 Ceiling: Gypsum board; PT #2
Mechanical Closet 230 NOTE: Tape and float walls. No other work required in this area.
Corridor 260 Floor: Existing Base: Patch to match existing rubber base Walls: Paint new walls to match adjacent Ceiling: Patch and paint gypsum board where disturbed by new construction to match existing
Color Schedule - 53A Sheet Vinyl Flooring:
SVF #1: Mannington, BioSpec MD, Green Tea 15334
Rubber Base:
B #1: Johnsonite, 45 Sandalwood
Epoxy Paint:
PT #1 (Walls): Sherwin Williams, SW6148 Wool Skein PT #2 (Ceilings): Sherwin Williams, SW 7007 Ceiling Bright White PT #3 (HM Doors and Frames): Sherwin Williams, SW 6081 Down Home
Epoxy Resin Countertops:
EPR #1: TBD at time of Submittals
Metal Lab Caswork:
TBD at time of Submittals
Plugmold:
TBD at time of Submittals
1 1/2" = 1'-0"A4 Typical Base Cabinet
1 1/2" = 1'-0"C9 Partition Section - 1 Hr.
A.1
1 1/2" = 1'-0"G8 HM Door Jamb Detail - 53A
2 7 3/4" = 1'-0"A3 Dust Partition
18/12
20ø
20/14ϴ
24/1218/18ϴ
18ø 24/12
* NOT ALL SYMBOLS MAY APPLY TO THIS PROJECT
LINEAR SLOT DIFFUSER
CEILING RETURN/EXHAUST GRILLE
CEILING SUPPLY DIFFUSER
SUPPLY DUCT UP
SUPPLY DUCT DOWN
(1) FIRE DAMPER
(2) SMOKE DAMPER
(3) MOTORIZED DAMPER
(4) CONTROL DAMPER
(1) BALANCING DAMPER
(2) SMOKE DETECTOR
RECTANGULAR DUCT WITH DUCT SIZE
TAG
GRILLE OR REGISTER ON BOTTOM OF
DUCTWORK
RETURN DUCT UP
RECTANGULAR/ROUND TRANSITION
RETURN DUCT DOWN
THERMOSTAT OR SENSOR
FLEXIBLE DUCT CONNECTION
SIDEWALL SUPPLY (RETURN SIMILAR)
SCHEDULED
DIFFUSER TYPE
DETAIL/SECTION NUMBER
SHEET NUMBER
DETAIL/SECTION DESIGNATION
AIRFLOW
M100
SD
(1) (3)
(2)
(2)
T S
(4)
EXHAUST DUCT UP
EXHAUST DUCT DOWN
ROUND DUCT WITH DUCT SIZE TAG
OVAL DUCT WITH DUCT SIZE TAG
HVAC LEGEND
(1)
AHU AIR HANDLING UNIT
AFF ABOVE FINISHED FLOOR
AP ACCESS PANEL
BHP BRAKE HORSEPOWER
BTUH BRITISH THERMAL UNIT PER HOUR
CFM CUBIC FEET PER MINUTE
COTG DOUBLW CLEANOUT TO GRADE
CRAC COMPUTER ROOM AIR CONDITIONING UNIT
D DRAIN
DB DRY BULB TEMPERATURE
DN DOWN
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE OF THE COIL
ESP EXTERNAL STATIC PRESSURE
EWC ELECTRIC WATER COOLER
EWT ENTERING WATER TEMPERATURE
FCU FAN COIL UNIT
FLR FLOOR
FO FLAT OVAL
FPM FEET PER MINUTE (VELOCITY)
FPWH FREEZE PROOF WATER HYDRANT
GPM GALLONS PER MINUTE
HOA HAND OFF AUTO
HP HORSEPOWER
KW KILOWATT
LAT LEAVING AIR TEMPERATURE OF THE COIL
LAV LAVATORY
LWT LEAVING WATER TEMPERATURE
MAU MAKE-UP AIR UNIT
MAX MAXIMUM
MCA MINIMUM CIRCUIT AMPS
MOP MAXIMUM OVER CURRENT PROTECTION
MIN MINIMUM
MHP MOTOR HORSEPOWER
NTS NOT TO SCALE
OSA OUTSIDE AIR
PSI POUNDS PER SQUARE INCH
RA RETURN AIR
RH RELATIVE HUMIDITY
RPM REVOLUTION PER MINUTE
PRV PRESSURE REDUCING VALVE
PRZ REDUCED PRESSURE ZONE BACKFLOW DEVICE
RTU ROOF TOP (AIR CONDITIONING) UNIT
SA SUPPLY AIR
SP STATIC PRESSURE
TYP TYPICAL
URN URINAL
VAV VARIABLE AIR VOLUME
VFD VARIABLE FREQUENCY DRIVE
VTR VENT THROUGH ROOF
WB WET BULB TEMPERATURE
WC WATER CLOSET
WH WATER HEATER
' FEET
" INCHES
ø ROUND DUCT
ϴ OVAL DUCT
NEW EQUIPMENT
EXISTING EQUIPMENT TO REMAIN
REMOVE EXISTING DUCT
BACK TO POINT.
EXISTING EQUIPMENT TO BE REMOVED
EXISTING DUCT TO REMAIN
NEW DUCT
CONNECT TO EXISTING DUCT.
RECTANGULAR/OVAL TRANSITION
A/150
KEYED NOTE
AIR DEVICE DESIGNATION
EXISTING DUCT TO BE REMOVED
DIRECTION OF FLOW
THERMOMETER WITH GAUGE WELL
TEMPERATURE & PRESSURE PLUG
STRAINER (Y-TYPE) WITH GATE VALVE
ECCENTRIC REDUCER
PRESSURE GAUGE
CONCENTRIC REDUCER
AND HOSE CONNECTION
STEAM TRAP
AUTO AIR VENT
VALVE IN RISER
SOLENOID VALVE
RELIEF VALVE
MANUAL AIR VENT
PIPE UNION
PRESSURE REDUCING VALVE
PLUG VALVE
OR
END FLANGE
CAP
BRANCH - TOP OF PIPE
ELBOW
TEE
BRANCH - BOTTOM OF PIPE
HUMIDIFIER
TEE UP
PIPE UP
TEE DOWN
PIPE DOWN
H
3-WAY CONTROL VALVE
2-WAY CONTROL VALVE
DUCT RADIUS
ELBOW
NOTE: ALL
ELBOWS SHALL
BE 1.5 RADIUS
R = 1.5
ENGINEERS
BROWN
No.1323
NO
IT
AZ
IR
OHT
UAFOETACIFITR
E
R
A
RKANSAS
EENIGNE-
C LLC
US
DEPA
RT
M
EN
T
OF
HEALT &H
HUMAN
SERV
ICES
A
JEFFERSON, ARKANSAS 72079
SUBMITTED:
STUCK ASSOCIATES ARCHITECTS
DRAWING NO. SHEET:
CHECKED BY:DRAWN BY:DATE:SCALE:
DESCRIPTION BY CHECK
A
B
C
D
E
F
G
H
I
J
K
1 2 3 4 5 6 7 8 9
JEFFERSON LABORATORIES OF THE FDA
Sheet of
1/8" = 1'-0"
7/30/2012 10:49:40 AM
100% Submittal
MG07.26.2012
MECHANICAL NOTES AND LEGEND
Smoke Lab
M.1
MG
3778-12
3 7
1. REFER TO SPECIFICATIONS AND PROJECT MANUAL FOR ADDITIONAL INFORMATION AND REQUIREMENTS.
2. REFER TO ALL PROJECT DRAWINGS FOR DETAILS OF CONSTRUCTION AND INSTALLATION REQUIREMENTS.
3. CONTRACTOR SHALL BECOME, PRIOR TO BID, THOROUGHLY FAMILIAR WITH THE REQUIREMENTS OF THESE
NOTES AS WELL AS OTHER NOTES SHOWN ON THE CONTRACT DOCUMENTS.
4. THESE DRAWINGS REFLECT A SYSTEM DESIGNED AROUND SPECIFIC REFERENCE PRODUCTS (SEE
SCHEDULES), THE SELECTION OF WHICH HAS INFLUENCED THE DESIGNS OF OTHER TRADES (ELECTRICAL, STRUCTURAL, ETC.). IF SUBSTITUTE MANUFACTURERS, SIZES, OR MODEL NUMBERS ARE BID, OR SUBMITTED, IT IS THE RESPONSIBILITY OF THE CONTRACTOR AND ALL HIS SUBCONTRACTORS TO COORDINATE ALL DIFFERENCES PRIOR TO BID. ALL COSTS OF ALL TRADES ASSOCIATED WITH THE
SUBSTITUTION SHALL BE INCLUDED IN THE BID.
5. COORDINATION OF ALL MODIFICATIONS TO EACH DISCIPLINE WHICH RESULT FROM SUBSTITUTION OF EQUIPMENT OR MATERIALS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. SUBSTITUTIONS WHICH ARE INSTALLED AND SUBSEQUENTLY ARE PROVEN UNSATISFACTORY BY THE GOVERNMENT, WITHIN THE WARRANTY PERIOD, SHALL BE REMOVED COMPLETELY BY THE CONTRACTOR AND REPLACED WITH THE ORIGINAL DESIGN OR CORRECTED AS DIRECTED BY THE CONTRACTING OFFICER WITHOUT ADDITIONAL COST
TO THE GOVERNMENT.
6. ALL DRAWINGS ARE DIAGRAMMATIC AND INDICATE THE GENERAL ARRANGEMENTS OR GEOMETRICAL RELATIONSHIPS OF EQUIPMENT AND SERVICES. THEY ARE NOT INTENDED TO SPECIFY OR SHOW EVERY
OFFSET, SEQUENCE, DEVICE, OPTION, FITTING, OR COMPONENT.
7. CONTRACTOR SHALL NOT SCALE DRAWINGS. DRAWINGS SPECIFIC TO THIS DISCIPLINE DO NOT LIMIT THE
RESPONSIBILITY OF WORK REQUIRED BY THE CONTRACT DOCUMENTS.
8. EXACT LOCATIONS OF ALL EQUIPMENT, ROOF CURBS, DUCTS, DIFFUSERS, ETC. SHALL BE COORDINATED
WITH OTHER TRADES.
9. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING ALL WORK WITH THAT OF OTHER TRADES.
REFER TO ARCHITECTURAL, STRUCTURAL, ELECTRICAL, AND OTHER DRAWINGS FOR COMPLETE
INFORMATION PRIOR TO BID.
10. NO OTHER TRADES, I.E., ELECTRICAL, CEILING, PLUMBING, ETC., SHALL BE SUSPENDED, HUNG, OR
SUPPORTED FROM DUCTWORK OR PIPING.
11. SPECIAL CARE SHALL BE TAKEN ON THE ROOFS (NEW AND EXISTING) TO PREVENT DAMAGE. ANY DAMAGE SHALL BE PROMPTLY REPAIRED AT NO EXPENSE TO THE GOVERNMENT. CONTRACTOR SHALL COMPLY
WITH BONDING REQUIREMENTS OF EXISTING ROOF.
12. CONTRACTOR SHALL REPLACE ALL ARCHITECTURAL FEATURES REMOVED OR DAMAGED DURING THE
COURSE OF THE WORK.
GENERAL NOTES:
1. THE MECHANICAL RELATED DEMOLITION WORK INDICATED ON THE
PLANS, SPECIFICATIONS, AND NOTES IS TO BE CLOSELY
COORDINATED WITH THE GOVERNMENT'S REPRESENTATIVE. NO
DEMOLITION SHALL TAKE PLACE IN ANY AREA OR BUILDING UNTIL
THE CONTRACTOR HAS BEEN GIVEN APPROVAL TO PROCEED IN
THAT SPECIFIC LOCATION. REFER TO ARCHITECTURAL
DEMOLITION DRAWINGS FOR ADDITIONAL INFORMATION AND
DEMOLITION SCOPE OF WORK.
2. IF, DURING DEMOLITION, IT BECOMES NECESSARY TO
TEMPORARILY REMOVE ANY EQUIPMENT, PIPING, ETC. WHICH IS
NOT SPECIFICALLY NOTED TO BE REMOVED (THEREBY IMPLYING
THAT THEY ARE TO BE LEFT FOR FUTURE USE), THE
CONTRACTOR SHALL REINSTALL SAID SYSTEMS TO FULLY
OPERABLE CONDITION IN THEIR ORIGINAL LOCATIONS. AT NO
ADDITIONAL EXPENSE TO THE GOVERNMENT.
3. ALL DEMOLITION WORK SHALL BE SCHEDULED WITH THE
GOVERNMENT'S REPRESENTATIVE AT LEAST 48 HOURS PRIOR TO
THE WORK. IF OUTAGES OR SHUTDOWNS ARE REQUIRED, 7 DAYS
NOTICE SHALL BE GIVEN TO THE GOVERNMENT.
4. CONTRACTOR SHALL PATCH TO MATCH EXISTING ALL OPENINGS IN
WALLS, FLOORS, AND CEILINGS WHERE DUCT, PIPING, AND
CONTROLS HAVE BEEN REMOVED.
5. ANY DAMAGE TO THE GOVERNMENT'S PROPERTY, BUILDING, OR
EQUIPMENT RESULTING FROM THE CONTRACTOR'S OPERATIONS
SHALL BE REPAIRED OR REPLACED BY THE CONTRACTOR TO THE
SATISFACTION OF THE GOVERNMENT WITHOUT ADDITIONAL COST
TO THE GOVERNMENT.
6. CONTRACTOR SHALL MAINTAIN THE SECURITY OF THE BUILDING
AT ALL TIMES.
7. CONTRACTOR SHALL REMOVE EXISTING CONTROL SYSTEMS,
COMPLETE SERVING EXISTING HVAC EQUIPMENT BEING REMOVED.
8. CONTRACTOR SHALL REMOVE EXISTING SUPPORTS FOR
DUCTWORK AND EQUIPMENT BEING REMOVED.
DEMOLITION NOTES:
1. THE EQUIPMENT LOCATIONS SHOWN ON THE DRAWINGS ARE
APPROXIMATE. THE FINAL LOCATIONS SHALL BE
ESTABLISHED IN THE FIELD TO FIT THE AVAILABLE SPACE.
2. ANY EXISTING EQUIPMENT, DUCTS, OR PIPING FOUND TO BE
DAMAGED OR NON-OPERABLE SHALL BE BROUGHT TO THE
ATTENTION OF THE CONTRACTING OFFICER IMMEDIATELY.
CONTRACTOR SHALL INSPECT THE EXISTING SYSTEM. BRING
TO THE ATTENTION OF THE CONTRACTING OFFICER ANY
UNUSUAL, DAMAGED, OR NON-OPERATION CONDITION OF THE
EXISTING SYSTEM BEFORE PROCEEDING WITH RELATED
WORK.
3. CONTRACTOR SHALL MAINTAIN EXISTING BUILDING SYSTEMS
WITH PHASED DEMOLITION AND INSTALLATION OF NEW
WORK. PROVIDING TEMPORARY SERVICES AS REQUIRED TO
ACCOMPLISH PHASED WORK.
4. CONTRACTOR SHALL VISIT THE SITE TO ESTABLISH THE
EXISTING CONDITIONS PRIOR TO DUCT, PIPE, OR EQUIPMENT
FABRICATION. SYSTEMS SHALL BE ERECTED USING FIELD
MEASUREMENTS FOR COORDINATION WITH THE EXISTING
SYSTEMS IN THE SPACE.
5. CONTRACTOR SHALL VERIFY AT SITE ALL EXISTING SYSTEMS
AFFECTED BY THE WORK. REMOVE ALL PORTIONS OF
SYSTEMS BEING REMOVED OR DEMOLISHED. TERMINATE
EXISTING SYSTEMS IN A MANNER THAT WILL NOT CONFLICT
WITH NEW WORK. CLOSELY COORDINATE NEW WORK WITH
EXISTING SYSTEMS. PROVIDE OFFSETS AND TEMPORARY
CONNECTIONS IN EXISTING AND NEW SYSTEMS AS REQUIRED
TO AVOID CONFLICTS.
6. CONTRACTOR SHALL USE EXISTING PIPING SYSTEM VALVES
WHERE POSSIBLE TO ISOLATE SYSTEMS AND TO CAP
EXISTING PIPING. REPLACE EXISTING VALVES WHERE
NECESSARY WHEN EXISTING VALVES LEAK.
7. FIRE-PROOFING ON EXISTING STRUCTURE SHALL BE
REPLACED OR TOUCHED-UP WHERE DISTURBED.
8. REPLACE AND/OR PATCH TO MATCH EXISTING ANY EXISTING
DUCT OR PIPING INSULATION THAT IS TO REMAIN EXISTING
AND IS DAMAGED DURING CONSTRUCTION. WHEN
CONNECTING TO EXISTING PIPING STUB-OUTS, INSULATE
EXISTING STUB-OUT PIPING INCLUDING VALVE BODIES.
9. ALL NEW PIPING PENETRATIONS OF EXISTING CONCRETE
WALLS AND FLOORS SHALL BE CORE DRILLED.
10. COORDINATE AND SCHEDULE 7 DAYS IN ADVANCE ALL
CONNECTIONS TO EXISTING SYSTEMS AND SYSTEM SHUT-
DOWNS WITH GOVERNMENT'S REPRESENTATIVE.
RENOVATION NOTES:
1. PROVIDE ACCESS DOORS IN WALLS, FLOOR, AND CEILING FOR ACCESS TO ALL FIRE DAMPERS, EQUIPMENT, COILS, VALVES, AND BALANCING DAMPERS. WHERE DIRECTLY ACCESSIBLE THROUGH AIR DEVICES OR REMOVABLE CEILING GRID ACCESS DOORS ARE NOT REQUIRED. MINIMUM SIZE SHALL BE 24" X 24" UNLESS
NOTED OTHERWISE.
2. INSTALL FIRE DAMPERS IN THE RATED WALLS AND FLOORS AS INDICATED. SEAL AROUND ALL PENETRATIONS OF RATED WALLS, CHASES, CEILINGS, FLOORS, ETC. SHALL BE SEALED TO MAINTAIN THE FIRE/SMOKE RATING
OF THE ASSEMBLY.
3. MAINTAIN A MINIMUM OF 15'0" BETWEEN ALL FRESH AIR INTAKES AND PLUMBING VENTS, EXHAUST FAN
DISCHARGE, FLUES, ETC.
4. CONTRACTOR SHALL COORDINATE WITH GENERAL CONTRACTOR AND GOVERNMENT'S REPRESENTATIVE FOR SEALING OF ALL ROOF AND WALL PENETRATIONS, AS WELL AS ALL PENETRATIONS OF EXISTING PENTHOUSE FLOOR. FLASH AND COUNTERFLASH ROOF PENETRATIONS. MINIMUM HEIGHT OF FLASHING IS FOUR (4)
INCHES ABOVE ROOF. REFER TO ARCHITECTURAL FOR DETAILING.
5. ALL ELBOWS SHALL BE 1.5 RADIUS.
6. EXISTING LIGHTS , ABANDONED LIGHTS AND LIGHT PENDANTS SHALL BE RELOCATED AS REQUIRED TO
FACILITATE INSTALLATION.
7. PROVIDE FLEXIBLE CONNECTIONS AND TRANSITIONS ON DUCT INLET AND OUTLET CONNECTIONS TO ALL
MECHANICAL EQUIPMENT.
8. DUCT SIZES REPRESENT FREE AREA.
9. CONTRACTOR SHALL FIELD VERIFY ALL PIPE ROUTING AND ADJUST ELEVATIONS AS REQUIRED TO AVOID
CONFLICTS. FINAL PLACEMENT OF PIPING SHALL BE DETERMINED BY FIELD MEASUREMENT AND VERIFICATION.
ELEVATIONS ARE REFERENCED TO PIPE CENTERLINE UNLESS OTHERWISE NOTED.
10. DUCTWORK SHALL CONFORM TO THE FOLLOWING PRESSURE CLASSES: RETURN/MAKE-UP AIR/OUTSIDE
AIR/EXHAUST: 3" SP.
11. ALL SUPPLY, RETURN, RELIEF, AND OUTSIDE AIR DUCTWORK SHALL BE EXTERNALLY INSULATED.
12. INSTALL NEW FILTERS AT THE COMPLETION OF CONSTRUCTION. USE ONE SET OF FILTERS DURING
CONSTRUCTION. INSTALL FINAL SET PRIOR TO TEST AND BALANCE. DO NOT OPERATE AIR MOVING
EQUIPMENT FOR TEMPORARY HEATING, COOLING OR VENTILATION.
13. COORDINATE WORK CLOSELY WITH CONTROL REQUIREMENTS. PROVIDE ALL NECESSARY DUCT TAPS, PIPE TAPS, WELLS, AND OTHER APPURTENANCES REQUIRED BY CONTROL SYSTEM. PROVIDE SPARE PIPE WELL
ADJACENT TO EACH TEMPERATURE SENSOR IN PIPING.
14. CONTRACTOR SHALL VERIFY CLOSELY, AT SITE, TRANSPORTATION OF NEW HVAC EQUIPMENT INTO MECHANICAL ROOMS BEFORE BIDDING. PROVIDE COMPLETE DIS-ASSEMBLY AND RE-ASSEMBLY OF NEW AND
EXISTING EQUIPMENT AS REQUIRED FOR A COMPLETE INSTALLATION.
15. NOT ALL OF THE EXISTING EQUIPMENT, DUCT, AND PIPING SYSTEMS HAVE BEEN SHOWN, FOR CLARITY.
VERIFY, AT SITE, COORDINATION OF EXISTING SYSTEMS AND NEW WORK. VERIFY, AT SITE, EXISTING DUCT AND
PIPING SIZES.
16. NOT ALL REQUIRED PIPING, VALVES, OR FITTINGS ARE SHOWN ON DRAWINGS FOR CLARITY. COORDINATE PLAN DETAILS WITH SPECIFICATIONS, SCHEMATICS, FLOW DIAGRAMS, AND OTHER DETAILS TO PROVIDE ALL
PIPING SYSTEMS, COMPLETE.
17. REMOVAL OF ASBESTOS SHALL BE PROVIDED BY THE GOVERNMENT. COORDINATE WITH GOVERNMENT'S
REPRESENTATIVE AND SCHEDULE WORK ACCORDINGLY.
18. DEMOLITION AND SHUT-DOWN OF EXISTING HVAC SYSTEMS THAT WILL AFFECT PORTIONS OF THE BUILDING OUTSIDE OF PROJECT AREA SHALL BE COORDINATED WITH CONTRACTING OFFICER AND PLANNED TO LIMIT INCONVENIENCE AND DISRUPTION OF BUILDING OPERATIONS AS MUCH AS POSSIBLE. WORK SHALL BE PHASED
ACCORDINGLY.
19. CONTRACTOR SHALL PROVIDE DUCT ACCESS DOORS AT ALL FIRE AND CONTROL DAMPERS AND UPSTREAM OF
TURNING VANES.
20. CONTRACTOR SHALL REMOVE ALL SUPPORTS ASSOCIATED WITH EQUIPMENT, DUCTWORK, AND PIPING BE
REMOVED.
21. ALL DUCT AND PLENUMS INSULATED IN MECHANICAL EQUIPMENT ROOMS AND PENTHOUSE SHALL BE RIGID
BOARD TYPE AT OR BELOW 6'-0" A.F.F.
22. BEFORE FINAL ACCEPTANCE OF HYDRONIC SYSTEMS CONTRACTOR SHALL PULL AND REPLACE ALL STRAINER SCREENS. TIE THE OLD SCREENS TO THE DEVICE SERVED FOR REVIEW AND DISPOSAL BY THE GOVERNMENT.
23. ALL DUCTWORK IS REQUIRED TO BE TESTED IN ACCORDANCE WITH THE SPECIFICATIONS.
24. MECHANICAL CONTRACTOR (MC) SHALL COORDINATE AND VERIFY THE FOLLOWING WITH THE ELECTRICAL
CONTRACTOR (EC) PRIOR TO BID:
A) ALL STARTERS NOT PART OF A MOTOR CONTROL CENTER: FURNISHED BY MC, INSTALLED BY EC.
B) VARIABLE SPEED DRIVES (VSD): FURNISHED AND MOUNTED BY MC, POWER CONNECTIONS BY EC.
C) DUCT SMOKE DETECTORS: FURNISHED BY EC, INSTALLED BY MC.
D) ELECTRIC DAMPER ACTUATORS: FURNISHED BY MC, INSTALLED BY MC.
E) DISCONNECTS:
WHERE NOT FURNISHED WITH EQUIPMENT: FURNISHED BY EC, INSTALLED BY EC.
WHERE FURNISHED WITH EQUIPMENT: FURNISHED BY MC, INSTALLED BY EC.
F) FIRE ALARM SIGNAL FOR AHU SHUT DOWN:
DATA LINK FROM FIRE ALARM PANEL TO BUILDING CONTROL PANEL BY EC.
GATEWAY REQUIRED BETWEEN FIRE ALARM SIGNAL AND BUILDING CONTROL PANEL BY MC.
AHU SHUT DOWN SIGNAL FROM BUILDING CONTROL PANEL TO AHU BY MC.
HVAC NOTES:
Cold Room 53A-225
F
Corridor 53A-260
Office 53A-210
Mech.
KEY PLAN
53A
Mech.
/1
VAV-01
LS/285
F
Smoke Lab 53A-225
Office 53A-210
Corridor 53A-260 12ø
12/12 ø CR-01
/1
/1
CE/500
15 14
10ø ø
10ø
LS/285
H
H-VAV01
14/14
F
Smoke Lab 53A-225
Corridor 53A-260
Corridor 53A-220
VAV-01
CR-01
3/4"
1 1/4"
1"
11 1/2"
H H-VAV01
Mech.
F
Smoke Lab 53A-225
Corridor 53A-260
Corridor 53A-220
E
F
FUTURE AHU-53A-2
FUTURE AHU-53A-3
FUTURE AHU-53A-1A
6ø
EF-1 ON ROOF
EF-2 ON ROOF
FUTURE D
UCTWORK
FUTURE D
UCTWORK
14ø
NOTE:
1.NEITHER FAN SHALL BE
INSTALLED WITH DISCHARGE
FACING OPPOSITE FAN
2. ALL EXTERIOR DUCTWORK
SHALL BE ALUMINUM.
E
F
ENGINEERS
BROWN
No.1323
NO
IT
AZ
IR
OHT
UAFOETACIFITR
E
R
A
RKANSAS
EENIGNE-
C LLC
North US
DEPA
RT
M
EN
T
OF
HEALT &H
HUMAN
SERV
ICES
A
JEFFERSON, ARKANSAS 72079
SUBMITTED:
STUCK ASSOCIATES ARCHITECTS
DRAWING NO. SHEET:
CHECKED BY:DRAWN BY:DATE:SCALE:
DESCRIPTION BY CHECK
A
B
C
D
E
F
G
H
I
J
K
1 2 3 4 5 6 7 8 9
JEFFERSON LABORATORIES OF THE FDA
Sheet of
As indicated
7/30/2012 10:49:50 AM
100% Submittal
MG07.26.2012
MECHANICAL PLAN
Smoke Lab
M.2
MG
3778-12
4 7
1/4" = 1'-0"1 MECHANICAL DEMOLITION FLOOR PLAN 53A
KEYED NOTES:
1. CONTRACTOR SHALL DEMOLISH ALL MECHANICAL EQUIPMENT AND
PIPING ASSOCIATED WITH COLD ROOM. THIS IS INCLUSIVE OF ALL
REFRIGERANT PIPING AND ALL EQUIPMENT ON ROOF. REFER TO
PHOTO 1 FOR ILLUSTRATION OF ROOF MOUNTED EQUIPMENT.
NOT TO SCALE2 PHOTO 1
1/4" = 1'-0"3 MECHANICAL RENOVATION FLOOR PLAN 53A
1/4" = 1'-0"4 MECHANICAL HYDRONIC RENOVATION FLOOR PLAN 53A
KEYED NOTES:
1. NEW SUPPLY AIR TERMINAL VAV-01.
2. NEW RETURN AIR TERMINAL CR-01.
3. EXISTING SUPPLY AIR TERMINAL SERVING CORRIDOR.
4. NEW GENERAL ROOM EXHAUST GRILLE.
5. NEW RETURN AIR MAIN DUCTWORK.
6. NEW SUPPLY AIR DUCTWORK.
7. NEW LOW VELOCITY SUPPLY AIR DIFFUSER.
8. NEW RETURN AIR MAIN UNDER EXISTING.
9. NEW BIO-SAFETY HOOD.
10. NEW SINK. SEE VIEW 7 THIS SHEET.
11. EXISTING RETURN MAIN DUCTWORK.
12. EXISTING SUPPLY MAIN DUCTWORK.
13. 14" ROUND EXHAUST DUCTWORK TO EF-1 ON ROOF. SEE VIEW 6 THIS SHEET.
14. 6" ROUND EXHAUST DUCTWORK TO EF-2 ON ROOF. SEE VIEW 6 THIS SHEET.
15. 6" ROUND EXHAUST DUCTWORK SERVING INHALATION UNIT. EXHAUST DUCTWORK SHALL BE SPIRAL DUCTWORK. DUCTWORK SHALL
TRANSITION TO 4" DUCTWORK THROUGH 15 DEGREE TRANSITION BELOW CEILING. DUCTWORK SHALL TERMINATE 10" BELOW CEILING IN
MANUAL DAMPER.
16. NEW INHALATION UNIT.
17. NEW HUMIDIFIER H-VAV01. SEE VIEW FOUR THIS SHEET FOR DETAILING.
18. NEW MAGNEHELIC GAUGE. COORDINATE WITH OWNER'S REPRESENTATIVE FOR EXACT LOCATION. SEE ENVIRONMENTAL CONTROL DETAIL
ON DETAIL SHEET.
1/4" = 1'-0"7 PLUMBING FLOOR PLAN
KEYED NOTES:
1. EXISTING HWS/HWR LINES.
2. EXISTING SUPPLY TERMINAL.
3. EXISTING COMPRESSED AIR AND VACUUM VALVING FOR COLD ROOM SERVICE. COLD ROOM SERVICE
SHALL BE DEMOLISHED TO VALVING. NEW COMPRESSED AIR AND VACUUM SYSTEM FOR BIO-SAFETY
HOOD SHALL CONNECT TO EXISTING SYSTEM AT VALVING.
4. EXISTING COMPRESSED AIR.
5. EXISTING VACUUM LINE.
6. NEW 3/4" HWS/HWR LINE TO BE ROUTED AND INSTALLED TO SUPPORT NEW VAV-01, AS PER
MANUFACTURER'S RECOMMENDATION. NEW TAPS SHALL BE MADE OFF OF TOP OF EXISTING LINE.
7. NEW 1/2" COMPRESSED AIR LINE TO BE ROUTED AND INSTALLED TO SUPPORT NEW BIO-SAFETY
HOOD, AS PER MANUFACTURER'S RECOMMENDATION.
8. NEW 1/2" VACUUM LINE TO BE ROUTED AND INSTALLED TO SUPPORT NEW BIO-SAFETY HOOD, AS PER
MANUFACTURER'S RECOMMENDATION.
9. NEW INHALATION UNIT.
10. NEW BIO-SAFETY HOOD.
11. NEW 1/2" LPS/LPC LINES SERVING H-VAV01. NEW LINES SHALL BE CONNECTED TO EXISTING MAINS IN
MECHANICAL ROOM. NEW TAPS SHALL BE TAKEN OFF TOP OF MAINS. NEW LPC LINE SHALL BE
SLOPED DOWN FROM H-VAV01 TOWARD MAIN LINE. SEE DETAILS.
1/4" = 1'-0"6 MECHANICAL ROOF PLAN 53A
1/4" = 1'-0"5 Copy of MECHANICAL ROOF PLAN 53A
KEYED NOTES:
1. CONTRACTOR SHALL DEMOLISH ALL MECHANICAL EQUIPMENT AND
PIPING ASSOCIATED WITH COLD ROOM ON EXISTING EQUIPMENT
PLATFORM ON ROOF. EQUIPMENT IS IN THIS LOCATION ON ROOF.
CONTRACTOR SHALL SEAL, FLASH AND COUNTERFLASH ALL EXISTING
PENETRATIONS ON ROOF.
KEYED NOTES:
1. CONTRACTOR SHALL REPAIR ALL NEW ROOF PENETRATIONS MADE AS WELL AS
EXISTING ROOF PENETRATIONS FROM SYSTEMS REMOVED. CONTRACTOR SHALL
COMPLY WITH CURRENT WATER-TIGHT BONDING REQUIREMENTS FOR MODIFIED
BITUMEN ROOFING SYSTEMS.
2. EXHAUST DUCTWORK SHALL OFFSET BELOW ROOF TO AVOID FOOTPRINT OF FUTURE
DUCTWORK, AS SHOWN.
3. NEW EXHAUST FAN ON ROOF. FANS SHALL BE INSTALLED ON EXISTING EQUIPMENT
PLATFORM ON ROOF. SEE DETAIL SHEETS.
4. ADD NEW L4X4X3/8 EACH SIDE OF FANS FOR SUPPORT. COPE VERTICAL LEGS AT
EXISTING SUPPORT. WELD HORIZONTAL LEG TO EXISTING STRUCTURE WITH 1/4"
FILLETX3" WELDS EACH SIDE OF HORIZONTAL LEG.
5. EXHAUST FAN SHALL BE PROVIDED FACTORY PREWIRED DISCONNECT RATED FOR
EXTERIOR USE. EXHAUST FAN SHALL BE INSTALLED WITH FACTORY SUPPLIED
VIBRATION ISOLATION. EXHAUST FAN SHALL BE CONNECTED TO DUCTWORK WITH
FLEXIBLE CONNECTION.
KEYED NOTES:
1. EXISTING SINK IN COLD ROOM TO BE DEMOLISHED.
2. EXISTING DOMESTIC HOT, COLD SANITARY AND VENT LINES TO BE
REROUTED AND CONNECTED TO NEW SINK.
3. SINK BASIN SHALL BE PROVIDED BY COUNTER MANUFACTURER, REFER
TO ARCHITECTURAL. FAUCET SHALL BE EQUAL CHICAGO FAUCET
MODEL NUMBER 947, WITH VACUUM BREAKER. CONTRACTOR SHALL
COORDINATE FAUCET MOUNTING REQUIREMENTS WITH BASIN TO
PROVIDE A FULLY FUNCTIONING SYSTEM.
4. EXISTING FLOOR DRAIN IN COLD ROOM SHALL BE REPLACED AND
REINSTALLED IN NEW FLOOR. FLOOR DRAIN SHALL BE EQUAL TO ZURN
NO. Z-415B. PROVIDE WITH TRAP GUARD.
NOT TO SCALE8 PHOTO 2
KEYED NOTES:
1. EXISTING SINK IN COLD
ROOM TO BE DEMOLISHED.
2. EXISTING VACUUM AND
COMPRESSED AIR STATION IN
COLD ROOM TO BE
DEMOLISHED. (ONE OF TWO)
GENERAL NOTES:
1. ALL NEW TERMINAL BOXES SHALL BE PROVIDED WITH FAST ACTING ACTUATOR EQUAL TO
SIEMENS ATC (AUTOMATIC TEMPERATURE CONTROLS).
2. AIR COMPRESSOR AND VACUUM PUMP FOR INHALATION UNIT SHALL BE SUPPLIED AND INSTALLED
BY CH TECHNOLOGIES. THESE SYSTEMS SHALL BE DEDICATED FOR USE ONLY BY THE
INHALATION UNIT.
3. ALL EXISTING ACCESS PANELS AND DIFFUSERS DAMAGED OR DISPLACED BY WORK SHALL BE
REPAIRED TO GOVERNMENT'S SATISFACTION OR REPLACED AND INSTALLED IN CEILING.
NOTE:
THIS DESIGN IS STRICTLY BASED OFF OF INFORMATION
PROVIDED BY CH TECHNOLOGIES. SMOKING MACHINE
SHALL BE PROVIDED WITH 80 CFM AT NEGATIVE 2" H20.
THERE WILL BE NO FILTRATION IN INHALATION MACHINE
EXHAUST.
GENERAL NOTES:
1. REFER TO ARCHITECTURAL SHEETS FOR ROOF WEATHER PROOFING OF ROOF
PENETRATIONS FOR DUCTWORK, FAN SUPPORT AND CONDUITS. CONTRACTOR
SHALL COMPLY WITH CURRENT WATER-TIGHT BONDING REQUIREMENTS FOR
MODIFIED BITUMEN ROOFING SYSTEMS.
DUCT SUPPORT
ALL-THREAD ROD
HEAVY GAUGE SHEET METAL SADDLE
RECTANGULAR DUCT
BLANKET INSULATION
MECHANICAL FASTENERS
SUPPORTING INSULATION ON THE
UNDERSIDE OF DUCTS OVER 24"
WIDE. SEAL OVER FASTENER
PENETRATIONS WITH TAPE.
1. PROVIDE SADDLES AT DUCT SUPPORT POINTS.
2. DO NOT TAKE DUCT SUPPORTS OR STRAPS INTO THE INSULATION.
3. PROVIDE INSULATION INSERT SO THAT INSULATION DOES NOT
COMPRESS FROM WEIGHT OF DUCT.
4. PROVIDE SEMI-RIGID INSULATION ON ALL DUCTWORK IN MECHANICAL
EQUIPMENT ROOMS AND OTHER HIGH ABUSE AREAS AS SPECIFIED.
NOTES:
VAPOR BARRIER, TAPE OVER
TEARS AND PENETRATIONS OF
THE VAPOR- BARRIER JACKET
LAP VAPOR BARRIER AND SEAL
TAPE OVER JOINTS IN VAPOR
BARRIER
PROVIDE RIGID INSERT FOR SUPPORT SO
SO THAT INSULATION DOES NOT
COMPRESS AT DUCT SUPPORT
LOCATIONS.
ALL-THREAD ROD
MECHANICAL FASTENERS AS
REQUIRED TO SECURE
INSULATION - TAPE OVER
FASTENER PENETRATIONS.
RECTANGULAR DUCT
ADHESIVE SPACED AS
REQUIRED TO ASSIST
THE INSTALLATION.
VAPOR BARRIER, TAPE OVER
JOINTS, BREAKS AND
PENETRATIONS OF THE
VAPOR-BARRIER JACKET.
SEMI-RIGID BOARD INSULATION
HEAVY GAUGE SHEET
METAL SADDLE
NOTES:
1. PROVIDE SADDLES AT DUCT SUPPORT POINTS.
2. DO NOT TAKE DUCT SUPPORTS OR STRAPS INTO THE INSULATION.
3. PROVIDE DUCT SUPPORT SO THAT INSULATION DOES NOT COMPRESS
FROM WEIGHT OF DUCT.
4. SHAPE INSULATION BY REMOVING MITERED SEGMENTS TO CONFORM
TO ROUND ENDS OR FLAT OVAL DUCTWORK.
5. PROVIDE SEMI-RIGID INSULATION ON ALL DUCTWORK IN MECHANICAL
EQUIPMENT ROOMS AND OTHER HIGH ABUSE AREAS AS SPECIFIED.
1 W
45°
W
4" MIN.
1" WIDE NEOPRENE GASKET
SIDE OF MAIN DUCT
VOLUME DAMPER WITH
LOCKING QUADRANT
PROVIDE STAND- OFF
DAMPER BRACKET ON
INSULATED DUCTS
SEE PLANS FOR RUNOUT SIZES
HR
HS
HIGH PRESSURE
AIR DUCT
HIGH EFFICIENCY
DUCT TAKE OFF
WITH DAMPER (TYP.)
HOT WATER COIL
LOW PRESSURE DUCT
FLEX CONNECTION
UPSTREAM DUCT
1.5 DIA STRAIGHT
HIGH PRESSURE FLEX
NOTE:
TERMINAL BOX SHALL BE INSTALLED WITH
FULL SIZE CONDENSATE LINE.
CONTRACTOR TO VERIFY ROUTE AND
DESTINATION OF CONDENSATE LINE WITH
OWNER.
SHEET METAL 1.5 RADIUS
ELBOW ATTACHED TO
GRILLE
MAX LENGTH
OF FLEX = 4'-0"
AIR DEVICE, SUPPLY
RETURN AND EXHAUST
METAL ROUND BRANCH DUCT
LOCKABLE DAMPER,
HANDLE ACCESSIBLE THRU INSULATION
SEAL AT CONNECTION W/
NEOPRENE GASKET
RECTANGULAR DUCT
AI
RF
LO
W
NOTES:
1. TYPICAL FOR SA, RA, AND EXHAUST
SYSTEMS.
2. ATTACH FLEX TO DUCT AND DIFFUSER WITH
SHEET METAL SCREWS OR DRAW BANDS.
PROVIDE TRANSITION TO
AIR DEVICE NECK SIZE AT
NECK OF AIR DEVICE.
MANUAL BALANCING DAMPER.
1" WIDE NEOPRENE GASKET
VOLUME DAMPER
WITH LOCKING QUADRANT
PROVIDE STAND- OFF
DAMPER BRACKET ON
INSULATED DUCTS
GALVANIZED HIGH EFFICIENCY TAKEOFF W/DAMPER
AS MANUFACTURED BY SHEET METAL CONNECTORS,
INC. 1-800-328-1966 SPIN-IN FITTINGS WITH
SCOOPS ARE NOT ACCEPTABLE
SEE PLANS FOR RUNOUT SIZES
CLEVIS HANGER, SEE M606-T
PIPE
JACKETING
METAL
SHIELD/SADDLE
BOTTOM 90° OF
INSULATION
INSULATION
HIGH DENSITY
INSULATION INSERT
AT HANGER
FACTORY-APPLIED
VAPOR-BARRIER JACKET
SECURING TWO
INSULATION SECTIONS
TOGETHER
1. SEE SPECIFICATIONS FOR INSULATION, JACKET, AND HANGER REQUIREMENTS.
NOTE:
HWS HWR
MAINS
MANUAL AIR VENT
(TYP)
BALL VALVE (TYP)
CONTROL VALVE
BALL TYPE BALANCE VALVE
UNION (TYP)
T AND P PORT (TYP)
STRAINER
HOT WATER COIL
NOTE:
TAPS OFF OF MAIN SHALL BE
TAKEN OFF THE TOP OF THE
MAIN, AS SHOWN.
T AND P PLUG (TYP)
NOTE:
BOXES AT END OF RUNS
SHALL BE INSTALLED WITH
THREE WAY VALVES.
NOTE:
THREE WAY CONTROL VALVES SHALL
BE INSTALLED ON HOT WATER COILS
AT END OF RUNS. TWO WAY
CONTROL VALVES SHALL BE
INSTALLED ON ALL OTHERS.
EXISTING ROOF
SUPPORT WITH SPRING ISOLATORS
PROVIDED BY FAN MANUFACTURER.
WEATHERPROOF MOTOR COVER.
SEE SHEET M.2 FOR
STRUCTURAL DETAILING.
SEE DISCHARGE DETAIL ABOVE.
EXHAUST DUCTWORK
FLEX CONNECTION
NOTE:
FAN SHALL BE PROVIDED WITH FACTORY
PRE-WIRED AND MOUNTED DISCONNECT.
DISCHARGE DETAIL
BIRDSCREEN
FIELD FABRICATED DISCHARGE HOOD.
EXHAUST DISCHARGE
SHALL BE INSTALLED
WITH PARALLEL BLADE
DAMPER, PROVIDED BY
FAN MANUFACTURER.
HUMIDITY HIGH LIMIT OVERRIDE
ELECTRIC SIGNAL FROM
CONTROL SYSTEM
TWO-POSITION CONTROL VALVEHUMIDIFIER SEPARATOR
1" PIPE WITH TEMPERATURE WELL
FOR TEMPERATURE SWITCH.
COORDINATE WITH CONTROL
SYSTEM MANUFACTURER
F&T TRAP BY
HUMIDIFIER
MANUFACTURER
F&T TRAP BY
HUMIDIFIER
MANUFACTURER
DISPERSION TUBE
MANIFOLD IN DUCT
WITH INSULATED TUBES
T
LPS
LPC
TEMPERATURE SWITCH BY BLDG.
CONTROL SYSTEM MANUFACTURER -
STRAP ON IS NOT ACCEPTABLE
MODULATING CONTROL VALVE
NOTE:
CONTROL VALVES BY CONTROL SYSTEM MANUFACTURER.
GATE VALVE
GATE VALVE
WALL
FLOOR
NOTE:
DRILL PANEL COVERS FOR SENSOR
PROBE PENETRATIONS AS REQUIRED.
SEAL PENETRATIONS ON RECOVERY
ROOM SIDE, AIR AND WATER TIGHT.
NOTE:
DEVICES SHALL BE CAPABLE OF
WITHSTANDING DIRECT WATER SPRAY
OR BE EQUIPPED WITH PERMANENT
MOUNTED ENDCAP OR COVER TO
PROTECT INSTRUMENT DURING
WASHDOWN.
DIFFERENTIAL PRESSURE
SENSING TIP.
SPACE STATIC PRESSURE
SENSING PLATE
ROUGH-IN CONDUIT
2X4 ROUGH-IN BOX
TEMPERATURE AND
HUMIDITY TRANSMITTER
WITH WEATHERPROOF
COVER
6X6 ROUGH-IN BOX
DIFFERENTIAL PRESSURE
TRANSMITTER
CORRIDOR
MAG. GAGE
MAG. GAGE
TEMPERATURE
HUMIDITY
TEMPERATURE AND HUMIDITY
TRANSMITTER DETAIL
MAG GAGE DETAIL
NOTE:
DEVICES FINAL LOCATION SHALL BE
COORDINATED WITH ARCHITECT AND
OWNER'S REPRESENTATIVE.
ROOM
ENGINEERS
BROWN
No.1323
NO
IT
AZ
IR
OHT
UAFOETACIFITR
E
R
A
RKANSAS
EENIGNE-
C LLC
US
DEPA
RT
M
EN
T
OF
HEALT &H
HUMAN
SERV
ICES
A
JEFFERSON, ARKANSAS 72079
SUBMITTED:
STUCK ASSOCIATES ARCHITECTS
DRAWING NO. SHEET:
CHECKED BY:DRAWN BY:DATE:SCALE:
DESCRIPTION BY CHECK
A
B
C
D
E
F
G
H
I
J
K
1 2 3 4 5 6 7 8 9
JEFFERSON LABORATORIES OF THE FDA
Sheet of
As indicated
7/30/2012 10:50:08 AM
100% Submittal
MG07.26.2012
MECHANICAL DETAILS
Smoke Lab
M.3
MG
3778-12
5 7
NOT TO SCALE1 INSULATION - FLEXIBLE ROUND DUCT WRAP INDOORS LESS THAN 36 INCHES
NOT TO SCALE2 INSULATION - SEMI-RIGID BOARD DUCTS 36 INCHES AND LARGER
NOT TO SCALE3 RECTANGULAR BRANCH DUCT FITTING
NOT TO SCALE5 TERMINAL BOX
NOT TO SCALE6 BRANCH RUN-OUT CONNECTION
NOT TO SCALE7 ROUND BRANCH DUCT FITTING
NOT TO SCALE9 PIPE INSULATION AT CLEVIS HANGER
NOT TO SCALE10 WATER COIL AT TERMINAL BOXES
NOT TO SCALE11 ROOF EXHAUST FAN DETAIL
NOT TO SCALE4 HUMIDIFIER DETAILING
NOT TO SCALE8 ENVIRONMENTAL CONTROL DETAIL
SEQUENCE OF OPERATION
FOR ROOM 53A-225
TERMINAL
AIRFLOW
SENSOR
AFM
OCCUPIED MODE ONE SHALL BE DEFINED AS
WHEN BIO-SAFETY HOOD IS ACTIVE.
UNOCCUPIED MODE SHALL BE DEFINED AS
WHEN BIO-SAFETY HOOD IS INACTIVE.
ROOM 53A-225 SHALL BE NEGATIVE TO
ADJACENT HALLWAY AT ALL TIMES AND
THROUGHOUT ALL MODES.
HWS
HWR
TERMINAL CONTROLLER BY
CONTROL SYSTEM
MANUFACTURER.
EM
HOT WATER
COIL
SUPPLY
AIR
T
24 VOLT POWER BY
CONTROL SYSTEM
MANUFACTURER.
SPACE
TEMPERATURE
SENSOR
T
TWO
WAY
VALVE
NOTE:
SEE DRAWINGS AND DETAILS
FOR TERMINALS WITH 3-WAY
VALVES AT END OF LINES.
XFMR
TRANSFORMER FOR
CONTROL VOLTAGE BY
CONTROL MANUFACTURER
120 VOLT BY ELECTRICAL
SEQUENCE OF OPERATION
FOR SUPPLY TERMINAL BOXES
DURING UNOCCUPIED MODE, SPACE TEMPERATURE SENSOR SHALL MODULATE
TERMINAL HOT WATER VALVE IN SEQUENCE TO MAINTAIN SPACE TEMPERATURE
SETPOINT. TERMINAL SHALL PROVIDE CONSTANT AIRFLOW TO SATISFY TEMPERATURE
SETPOINT. CFM SETPOINT DURING UNOCCUPIED MODE SHALL BE 350 CFM.
DURING OCCUPIED MODE, SPACE TEMPERATURE SENSOR SHALL MODULATE TERMINAL
HOT WATER VALVE IN SEQUENCE TO MAINTAIN SPACE TEMPERATURE SETPOINT.
TERMINAL SHALL PROVIDE VARIABLE AIRFLOW TO SATISFY TEMPERATURE SETPOINT.
CFM MINIMUM SETPOINT DURING UNOCCUPIED MODE SHALL BE 570 CFM.
THROUGH THE ROOM TERMINAL CONTROLLER, SPACE HUMIDITY SENSOR SHALL
MODULATE THE HUMIDIFIER TUBE VALVE TO MAINTAIN THE HUMIDIFICATION SETPOINT.
HUMIDIFIER JACKETING VALVE SHALL OPEN WHEN HUMIDIFICATION IS REQUIRED AND
CLOSE WHEN HUMIDIFICATION IS NOT REQUIRED. A HIGH-LIMIT SENSOR IN THE SUPPLY
AIR WILL CLOSE VALVES IF THE HIGH HUMIDITY SETPOINT IS REACHED, WHEN THE AIR
HANDLING UNIT IS OFF ALL HUMIDIFIER VALVES SHALL BE CLOSED.
ALL CFM SETPOINTS SHALL BE ADJUSTABLE.
HUMIDIFIER
SEPARATOR
BOTH HUMIDIFIER VALVES ARE
PROVIDED WITH ELECTRIC OPERATORS
BY HUMIDIFIER MANUFACTURER.
TUBES
JACKET
H HHL
LPS
CONTROL LEGEND
DPT
H
CV
HHL
AFM
P
NC
HPA
SP
C
T
NO
FILTER MAGNEHELIC GAUGE
BY FILTER MANUFACTURER
FILTER
H
H
CURRENT SENSOR
HUMIDIFIER
HUMIDITY SENSOR
SD
DUCT SMOKE DETECTOR
(BY DIV. 16)
FAN OR PUMP
AIRFLOW
MEASURING
STATION
CONTROL DAMPER BY
CONTROL SYSTEM
MANUFACTURER,
UNLESS OTHERWISE
NOTED.
AFM
VARIABLE FREQUENCY DRIVE BY
CONTROL MANUFACTURER
TEMPERATURE SENSOR
LOW LIMIT TEMPERATURE
CONTROLLER
ELECTRIC DAMPER OPERATOR
DIFFERENTIAL PRESSURE SWITCH
VFD
T
LL
ELECTRIC TWO-WAY, MODULATING
CONTROL VALVE UNLESS NOTED AS
TWO-POSITION
ELECTRIC THREE-WAY, MODULATING
CONTROL VALVE UNLESS NOTED AS
TWO-POSITION
FAN OR PUMP STARTER W / HOA
ANALOG INPUT
DIGITAL OUTPUT
DIGITAL INPUT
ANALOG OUTPUT
DIFFERENTIAL PRESSURE TRANSMITTER
HUMIDISTAT, MOUNT ADJACENT TO
THERMOSTAT.
CONSTANT VOLUME
NORMALLY OPEN
COMMON
HUMIDITY HIGH LIMIT SENSOR
NORMALLY CLOSED
STATIC PRESSURE SENSOR
DIRTY FILTER ALARM
PRESSURE SENSOR
HIGH PRESSURE ALARM
AIR FLOW MEASUREMENT SIGNAL
THERMOSTAT, MOUNT 54" A.F.F., UNLESS
OTHERWISE NOTED.
FUME HOOD SASH POSTION SENSOR
FUME HOOD OPERATOR DISPLAY PANELODP
DI
AI
AO
AO
HSS
DFA
CS
EM
DPS
FUME HOOD OCCUPANCY SENSORHOS
HLA HIGH LEVEL ALARM
GATEWAY INTERFACEGWI
AIR DEVICE
MARK USE TYPE STYLE
AIR FLOW DATA
MAX
CFM
MAX S.P.
IN. WG
OPTIONS
DAMPER
TYPE
FINISH MATERIAL
MANUFACTURER AND
MODEL NO.
REMARKS
NOTES:
1. COORDINATE ALL FRAME TYPES WITH FINAL CEILING TYPES AND EXISTING CEILING OPENING SIZES.
2. PROVIDE TRANSITIONAL PIECES AS REQUIRED.
3. PROVIDE MANUAL BALANCING DAMPERS AT ALL BRANCH TAKE-OFFS TO AIR DEVICES. PROVIDE MANUAL BALANCING DAMPERS AT ALL BRANCH TAKE-OFFS IN ADDITION TO OPPOSED BLADE DAMPERS AT DEVICES.
FACE SIZE
IN. X IN.
NECK SIZE
IN. MAX
N.C.
RETURN /
EXHAUST EGGCRATE 24/24 2880 .10 NONE WHITE ALUMINUM22/22 30CE TITUS 50FCEILING MOUNT
LS SUPPLY LOW VELOCITY 24/48 500 .11 NONE WHITE ALUMINUM10"ø 20 TITUS TRITEC-ALCEILING MOUNT
TERMINAL AIR BOX
MARK TYPE
NOMINAL
INLET
SIZE IN.
AIRFLOW
CFM
MAX. SOUND DATA NC RATING
DISCHARGE @
1.0" SP
RADIATED @
1.0" SP
HEATING COIL DATA
CFM EAT/LAT
F
EWT/LWT
F
APD/ROWS GPM/MBH WPD FT
H20
MANUFACTURER AND
MODEL NO.
REMARKS
NOTES:
1. DAMPER ACTUATOR, THERMOSTAT, AND DDC CONTROLS BY CONTROLS CONTRACTOR.
2. PROVIDE AIRFLOW SENSOR AND DAMPER READY FOR ADDITION OF CONTROLLER BY CONTROLS CONTRACTOR.
3. PROVIDE 120 VOLT TO 24 VOLT TRANSFORMER AT EACH TERMINAL. CONTROLS CONTRACTOR TO EXTEND LOW VOLTAGE WIRING TO CONTROL POINTS.
4. REFER TO DRAWINGS FOR RIGHT AND LEFT HAND REQUIREMENTS.
5. PROVIDE ALL UNITS WITH HOSPITAL GRADE FIBER FREE INSULATION.
6. ALL NEW TERMINAL BOXES SHALL BE PROVIDED WITH FAST ACTING ACTUATOR EQUAL TO SIEMENS ATC (AUTOMATIC TEMPERATURE CONTROLS).
CR-01 10CONSTANT RETURN 450 25 25 -- -- -- -- -- -- TITUS DESV HOOD ON RATING 0 CFM - HOOD OFF RATING 450 CFM
VAV-01 10VARIABLE SUPPLY 570 25 25 570 55/101 180/130 0.43/3 1.2/30.6 0.3 TITUS DESV
(ALL NOTES ARE VALID FOR ALL TERMINALS)
FAN DATA
DRIVECFM
E.S.P.
"(WG)
SERVES TYPE
EXHAUST FAN
MARK LOCATION
REMARKSMANUFACTURER
& MODEL NO.
OR EQUAL
ELECTRICAL DATA
H.P.INLET SOUND
(DBA)RPM
PHASE
VOLTS/
EF-1 53A ROOF HOOD CENTRIFUGAL 670 1.6 BELT 2,295 73 0.5 120/1 COOK 80 CPV FAN SHALL BE PROVIDED WITH FACTORY PRE-WIRED DISCONNECT, AND FACTORY SPRING ISOLATION RAIL.
FAN SHALL OPERATE AT CONSTANT VOLUME. BALANCE TO CFM AND ESP INDICATED.
EF-2 53A ROOF SMOKE EQ CENTRIFUGAL 80 2.1 BELT 2,397 74 0.5 460/3 COOK 60 CPV FAN SHALL BE PROVIDED WITH FACTORY PRE-WIRED DISCONNECT, AND FACTORY SPRING ISOLATION RAIL.
FAN SHALL OPERATE AT CONSTANT VOLUME. BALANCE TO CFM AND ESP INDICATED.
DURING OCCUPIED MODE GENERAL ROOM RETURN TERMINAL DAMPER SHALL CLOSE.
DURING UNOCCUPIED MODE GENERAL ROOM RETURN TERMINAL SHALL ACT AS VARIABLE
AIRFLOW TERMINAL AND PROVIDE 100 CFM OFFSET FROM SUPPLY TERMINAL. NEGATIVE
PRESSURE IN ROOM SHALL BE CONSTANTLY BE MAINTAINED.
PROVIDE 120 VOLT POWER TO TERMINAL BOX.
ALL CFM SETPOINTS SHALL BE ADJUSTABLE.
SEQUENCE OF OPERATION FOR GENERAL ROOM RETURN
TERMINAL CONTROLLER BY
CONTROL SYSTEM
MANUFACTURER
GENERAL ROOM
RETURN
EMAFM
TERMINAL
AIRFLOW SENSOR
XFMR
120 VOLT BY
ELECTRICALTRANSFORMER FOR
CONTROL VOLTAGE BY
CONTROL MANUFACTURER
24 VOLT POWER BY CONTROL
SYSTEM MANUFACTURER
GENERAL ROOM
RETURN TERMINAL
WHEN FUME HOOD IS IN USE, EXHAUST FAN SHALL BE ACTIVATED.
WHEN FUME HOOD IS OFF EXHAUST FAN SHALL BE DE-ACTIVATED.
NEW FUME HOOD SWITCH SHALL SIGNAL CONTROL SYSTEM OF HOOD-ON AND HOOD-OFF CONDITIONS. WHERE A FUME HOOD IS NOT SUPPLIED WITH SWITCH FROM HOOD MANUFACTURER, PROVIDE NEW SWITCH AT HOOD ACCESSIBLE BY USER.
PROVIDE MONITOR POINT OF AIRFLOW.
SEQUENCE OF OPERATION FOR BIO-SAFETY HOOD CONTROL
EXHAUST AIR
AFM
AIRFLOW
SENSOR
BIO-SAFETY HOOD
FUME HOOD
EXHAUST FAN
DI
STATUS
GRAVITY BACKDRAFT
DAMPERS BY EXHAUST
FAN MANUFACTURER.CS
DOAO
WHEN INHALATION UNIT IS IN USE, EXHAUST FAN SHALL BE ACTIVATED.
WHEN INHALATION UNIT IS NOT IN USE EXHAUST FAN SHALL BE DE-
ACTIVATED.
NEW INHALATION UNIT SWITCH SHALL SIGNAL CONTROL SYSTEM OF UNIT-ON
AND UNIT-OFF CONDITIONS. WHERE INHALATION UNIT IS NOT SUPPLIED WITH
SWITCH FROM INHALATION MANUFACTURER, PROVIDE NEW SWITCH AT
INHALATION UNIT ACCESSIBLE BY USER.
PROVIDE MONITOR POINT OF AIRFLOW.
SEQUENCE OF OPERATION FOR SMOKE
EXHAUST FOR INHALATION UNIT
EXHAUST AIR
INHALATION UNIT
INHALATION UNIT
EXHAUST FAN
DI
STATUS
GRAVITY BACKDRAFT
DAMPERS BY EXHAUST
FAN MANUFACTURER.CS
DO
AFM
AIRFLOW
SENSOR
AO VF
D
D R
IV
E
HUMIDIFIER SCHEDULE
DESIGNATION SPACE TEMPERATURE
(DEG. F/% RH)
REMARKS:
1. CONTRACTOR SHALL INSTALL HUMIDIFIERS IN STRICT ACCORDANCE WITH MANUFACTURE'S RECOMMENDATIONS.
HUMIDIFIER TO BE INSTALLED WITH MANUFACTURER RECOMMENDED LENGTH OF STRAIGHT DUCT, BEFORE ELBOWS OR
TRANSITIONS, DOWN STREAM OF HUMIDIFIER TO ENSURE PROPER DISPERSION.
2. PROVIDE WITH STEAM CONTROL VALVES, TRAPS, AND TEMPERATURE SWITCH.
DUCT TEMP.
(DEG. F)
MANUF.MODEL
(DRI-STEAM OR EQUAL)
DUCT SIZE
(IN. X IN.)
AIR FLOW
(CFM)
SYSTEM OSA STEAM FLOW
(LBS/HR)
STEAM PRESSURE
(PSIG)
MAX ABSORPTION
DISTANCE
H-VAV01 75/50% 55.0 14/14" 570 100% 15.0 2.05-50 13
ENGINEERS
BROWN
No.1323
NO
IT
AZ
IR
OHT
UAFOETACIFITR
E
R
A
RKANSAS
EENIGNE-
C LLC
US
DEPA
RT
M
EN
T
OF
HEALT &H
HUMAN
SERV
ICES
A
JEFFERSON, ARKANSAS 72079
SUBMITTED:
STUCK ASSOCIATES ARCHITECTS
DRAWING NO. SHEET:
CHECKED BY:DRAWN BY:DATE:SCALE:
DESCRIPTION BY CHECK
A
B
C
D
E
F
G
H
I
J
K
1 2 3 4 5 6 7 8 9
JEFFERSON LABORATORIES OF THE FDA
Sheet of
As indicated
7/30/2012 10:50:18 AM
100% Submittal
MG07.26.2012
MECHANICAL CONTROLS AND
SCHEDULES
Smoke Lab
M.4
MG
3778-12
6 7
NOT TO SCALE1 SUPPLY TERMINAL CONTROL
NOT TO SCALE2 GENERAL ROOM RETURN CONTROL
NOT TO SCALE3 SEQUENCE OF OPERATION FOR BIO-SAFETY HOOD CONTROL
NOT TO SCALE4 INHALATION UNIT CONTROL
GENERAL NOTES:
1. ALL NEW CONTROL SYSTEMS SHALL MATCH EXISTING BUILDING
CONTROLS. NEW CONTROL SYSTEMS SHALL BE FULLY INTERACTIVE
WITH EXISTING BUILDING CONTROLS.
Mech.
Cold Room 53A-225
F D5 D5 D5 D5 D5
D5 D5 D5 D5 D5D5
D1D2 D3 D4 D1 D2 D3 D4
Corridor 53A-260
Office 53A-210
Corridor 53A-220
DISCONNECT
TRANSFORMER
DISCONNECT AND
240V OUTLET D6
TRANSFORMER
KEY PLAN
53A
Corridor Mech.
Office
Smoke Lab
BS 1
201918
F
R3
E1 E2
R4
R6
E3E4
R3
N-39
K-31
R5
N-23
N-25
N-27 N-29 N-35N-33
N-31 N-37
N-19
N-17
R7
R3R2R2
K-38
NEW VFD
FOR EF-2
VAV-01
PANEL K
PANEL N
CR-01
WIREMOLD
WIREMOLDWIREMOLD
PANEL LB
PROVIDE TOGGLE SWITCH AT
HOOD TO START/STOP EF-1.
PROVIDE TOGGLE SWITCH
AT SMOKE MACHINE TO
START/STOP EF-2.
N-19
N-19
N-17
N-17
Smoke Lab
F
A A AA
N-21
120V 20A TOGGLE SWITCH
WITH OCCUPANCY SENSOR
E
F
FUTURE AHU-53A-2
FUTURE AHU-53A-3
FUTURE AHU-53A-1A
EF-1 ON ROOF
EF-2 ON ROOF
FUTURE D
UCTWORK
FUTURE D
UCTWORK
LB-13,15,17 VIA VFD IN
MECHANICAL ROOM
N-41
ENGINEERS
BROWN
No.1323
NO
IT
AZ
IR
OHT
UAFOETACIFITR
E
R
A
RKANSAS
EENIGNE-
C LLC
North US
DEPA
RT
M
EN
T
OF
HEALT &H
HUMAN
SERV
ICES
A
JEFFERSON, ARKANSAS 72079
SUBMITTED:
STUCK ASSOCIATES ARCHITECTS
DRAWING NO. SHEET:
CHECKED BY:DRAWN BY:DATE:SCALE:
DESCRIPTION BY CHECK
A
B
C
D
E
F
G
H
I
J
K
1 2 3 4 5 6 7 8 9
JEFFERSON LABORATORIES OF THE FDA
Sheet of
As indicated
7/30/2012 11:55:53 AM
100% Submittal
MG07.26.2012
ELECTRICAL PLAN
Smoke Lab
E.1
MG
3778-12
7 7
1/4" = 1'-0"1 ELECTRICAL DEMOLITION FLOOR PLAN 53A
DEMOLITION GENERAL NOTES:
1. REMOVE LIGHTING FIXTURES, RECEPTACLES, OUTLETS, AND WIRING DEVICES SHOWN FOR REMOVAL. DEMOLISH CIRCUITS BACK TO THE PANEL AND REMOVE CIRCUIT BREAKER. REMOVE DEVICES IN WALLS TO BE REMOVED.
COORDINATE WITH ARCHITECTURAL DEMOLITION PLANS.
2. REMOVE ANY DEVICES NOT TO BE REUSED IN EXISTING WALLS THAT ARE TO REMAIN.
3. THE ELECTRICAL RELATED DEMOLITION WORK INDICATED ON THE PLANS, SPECIFICATIONS, AND NOTES IS TO BE CLOSELY
COORDINATED WITH THE OWNER'S REPRESENTATIVE. NO DEMOLITION SHALL TAKE PLACE IN ANY AREA OR BUILDING UNTIL THE CONTRACTOR HAS BEEN GIVEN APPROVAL TO PROCEED IN THAT SPECIFIC LOCATION. REFER TO ARCHITECTURAL DEMOLITION DRAWINGS FOR ADDITIONAL INFORMATION AND DEMOLITION SCOPE OF WORK.
4. IF, DURING DEMOLITION, IT BECOMES NECESSARY TO TEMPORARILY REMOVE ANY EQUIPMENT WHICH IS NOT SPECIFICALLY NOTED TO BE REMOVED (THEREBY IMPLYING THAT THEY ARE TO BE LEFT FOR FUTURE USE), THE CONTRACTOR SHALL REINSTALL SAID SYSTEMS TO FULLY OPERABLE CONDITION IN THEIR ORIGINAL LOCATIONS.
5. DISPOSE OF ALL REMOVED EQUIPMENT NOT INTENDED FOR REUSE AS DIRECTED BY THE OWNER. CAREFULLY REMOVE, STORE AND REUSE ITEMS INDICATED ON THE PLANS.
6. ALL DEMOLITION WORK SHALL BE SCHEDULED WITH THE OWNER AT LEAST 48 HOURS PRIOR TO THE WORK.
7. SCHEDULE UTILITY DOWN TIMES TO KEEP TO A MINIMUM AND TO NOT INTERFERE WITH THE DAILY SCHEDULE.
8. PATCH ALL OPENINGS IN WALLS, FLOORS, CEILINGS MADE FOR ACCESS TO THE EXISTING EQUIPMENT OR FOR
INSTALLATION FOR THE NEW SYSTEMS.
9. ANY DAMAGE TO THE OWNER'S PROPERTY, BUILDING OR EQUIPMENT RESULTING FROM THE CONTRACTOR'S OPERATIONS
SHALL BE REPAIRED OR REPLACED BY THE CONTRACTOR TO THE SATISFACTION OF THE OWNER WITHOUT ADDITIONAL
COST TO THE OWNER.
10. MAINTAIN THE SECURITY OF THE BUILDINGS AT ALL TIMES.
11. MAINTAIN THE FIRE AND SMOKE CONSTRUCTION INTEGRITY OF THE EXISTING BUILDING.
12. ASBESTOS MAY BE PRESENT IN THE BUILDING AND WILL BE ABATED BY OTHERS UNDER SEPARATE CONTRACT. IF, DURING
THE COURSE OF THE WORK, MATERIAL WHICH MAY CONTAIN ASBESTOS IS DISCOVERED , STOP WORK IMMEDIATELY AND COMPLY WITH EPA REGULATIONS TO PROTECT WORKS AND OCCUPANTS. NOTIFY OWNER AND ENGINEER.
13. WORK REQUIRED IN THE AREAS OUTSIDE OF THE FLOOR AREA FOR ELECTRICAL WORK SHALL BE SCHEDULED WITH THE
OWNER AT LEAST THREE DAYS IN ADVANCE.
14. PARTS OF THE EXISTING POWER AND SYSTEMS WILL REMAIN IN OPERATION DURING THE RENOVATIONS.
15. REMOVE ABANDONED ELECTRICAL SYSTEMS WHERE EVER POSSIBLE.
16. VERIFY EXISTING USAGE OF ALL SYSTEMS AND COMPONENTS SCHEDULED FOR REMOVAL. DO NOT REMOVE OR DE-
ENERGIZE SYSTEMS OR COMPONENTS THAT WILL IMPACT NORMAL OPERATION OF OTHER PARTS OF THE BUILDING.
17. CONTRACTOR SHALL VERIFY ALL CIRCUITS ARE UNUSED IN OTHER AREAS BEFORE DEMOLITION. CIRCUITS WHICH FEED
OTHER AREAS TO REMAIN SHALL BE BROUGHT TO THE ATTENTION OF THE CONTRACTING OFFICER FOR RESOLUTION.
18. MAINTAIN EXISTING SMOKE DETECTORS IN EXISTING LOCATION AND VERIFY OPERATION AFTER CONSTRUCTION IS
COMPLETE.
DEMOLITION KEYED NOTES:
1. REMOVE EXISTING LIGHT FIXTURES.
2. REMOVE EXISTING SWITCHES, CONDUIT, WIRE BOXES, AND SUPPORT.
3. BALLASTS IN FLUORESCENT FIXTURES CONTAIN PCB'S. REMOVE BALLAST AND PLACE IN GOVERNMENT
SUPPLIED CONTAINERS FOR DISPOSAL BY THE GOVERNMENT.
4. REMOVE FLUORESCENT LAMPS AND PLACE IN GOVERNMENT SUPPLIED CONTAINERS FOR DISPOSAL BY
GOVERNMENT.
5. REMOVE EXISTING ELECTRICAL ASSOCIATED WITH EQUIPMENT TO BE REMOVED.
6. REMOVE AND REINSTALL EQUIPMENT IN UTILITY CLOSET ON WESTERN WALL OF DEMOLISHED AREA IN
ORDER TO MAINTAIN OPERATION DURING AND AFTER CONSTRUCTION. SEE PHOTO.
D
FIXTURE SCHEDULE:
MANUFACTURER MODEL #
4PS24-232FFSA12125-EP-UCOLUMBIA
LAMPS
2-F32T8/TC835/ALTOA
VOLTS
EQUIPMENT LIST:
CHAMBER
DESCRIPTION LOAD (VA)
SMOKE MACHINE
VOLTAGE
120 V
120 V
COMPRESSOR
VACUUM PUMP 240 V
120 V
E1
E2
E3
E4
RENOVATION GENERAL NOTES:
1. THE EQUIPMENT LOCATIONS SHOWN ON THE DRAWINGS ARE APPROXIMATE. THE FINAL LOCATIONS SHALL BE ESTABLISHED
IN THE FIELD TO FIT THE AVAILABLE SPACE.
2. ANY EXISTING EQUIPMENT FOUND TO BE DAMAGED OR NON-OPERABLE SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER IMMEDIATELY. INSPECT THE EXISTING SYSTEM. BRING TO THE ATTENTION OF THE ENGINEER ANY UNUSUAL, DAMAGED, OR NON-OPERATION CONDITION OF THE EXISTING SYSTEM BEFORE PROCEEDING WITH RELATED WORK.
3. MAINTAIN EXISTING BUILDING SYSTEMS WITH PHASED DEMOLITION AND INSTALLATION OF NEW WORK. PROVIDE
TEMPORARY SERVICES AS REQUIRED TO ACCOMPLISH PHASED WORK.
4. VISIT THE SITE TO ESTABLISH THE EXISTING CONDITIONS PRIOR TO EQUIPMENT FABRICATION. SYSTEMS SHALL BE ERECTED USING FIELD MEASUREMENTS FOR COORDINATION WITH THE EXISTING EQUIPMENT, STRUCTURE, FIRE PROTECTION AND
MECHANICAL IN THE SPACE.
5. VERIFY AT SITE ALL EXISTING SYSTEMS AFFECTED BY THE WORK. REMOVE ALL PORTIONS OF SYSTEMS BEING REMOVED OR ABANDONED.