This document contains a pricing schedule for dockside repairs and maintenance to be performed on the USCGC James. The schedule lists various work items such as cleaning and inspecting fuel tanks, overhauling capstans, preserving decks, and modifying mechanical systems. Pricing is provided on a per-item basis, with many items listed as $0 price pending receipt of quotes. Additional details include labor rates by location, composite labor rates, and templates for estimating labor hours and material/subcontracting costs by trade.
The related federal contract opportunity is a solicitation issued by the Department of Homeland Security Coast Guard seeking quotations for dockside repairs to the USCGC James per the work items and pricing schedule. Solicitation number 70Z08022QPBPL16017 was issued as a Request for Quotations with responses due on an unspecified date.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AMENDMENT0003 page 2 JAMES DS FY22.pdf | ||
| AMENDENT0003 page 1 JAMES FY22 signed by KO.pdf | ||
| 11 - JAMES DS FQ4 FY22 SOSandS(Amendemnet 2).xls | XLS spreadsheet | |
| AMENDMENT0002 page 2 JAMES DS FY22.pdf | ||
| AMENDENT0002 page 1 JAMES FY22.pdf | ||
| AMENDMENT0001 page 2 JAMES DS FY22.pdf | ||
| AMENDENT0001 page 1 JAMES FY22.pdf | ||
| JAMES (WMSL 418) DS FQ4 DAD 22R1.pdf | ||
| Combined Synopsis Solicitation JAMES.pdf | ||
| 3 - JAMES (WMSL 418) DS FQ4 DAD 22R0.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: | |||||
| USCGC JAMES (WMSL-418) DOCKSIDE AVAILABILITY FQ4 FY2022 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Tanks (MP Fuel Storage and Overflow), Clean and Inspect | $0.00 | |||
| D-001A | 3-50-2-F | JOB | 1 | ||
| D-001B | 5-80-0-F | JOB | 1 | ||
| D-001C | 5-64-0-F | JOB | 1 | ||
| D-001D | 5-761-F | JOB | 1 | ||
| D-003 | Cargo Handling Elevator, Level 2 Inspect and Repair | JOB | 1 | $0.00 | |
| D-004 | Forward and Aft Capstans, Level 2 Overhaul | JOB | 1 | $0.00 | |
| D-005 | Incinerator Clean, Inspect and Test | JOB | 1 | $0.00 | |
| D-006 | Relief Valves, Inspct and Test | JOB | 1 | ||
| D-007 | Decks, Preserve (Full) | JOB | 1 | $0.00 | |
| D-008 | Potable Water System valves and piping, Renew | JOB | 1 | $0.00 | |
| D-009 | Pilot House Spotlight Fixture and Stuffing Tube, Reseal | JOB | 1 | $0.00 | |
| D-010 | Transmitting Magnetic Compass Foundation, Preserve and Reseal | JOB | 1 | $0.00 | |
| D-011 | Deck Covering (Ceramic Tile), Renew | JOB | 1 | $0.00 | |
| D-012 | Countermeasure Washdown Sprinkler Nozzle, Renew | JOB | 1 | $0.00 | |
| D-013 | AFFF Bilge Sprinkling Piping, Modify | JOB | 1 | $0.00 | |
| D-014 | Stern Door Structure, Modify | JOB | 1 | $0.00 | |
| D-015 | Stern Door Hydraulic and Control System, Modify | JOB | 1 | $0.00 | |
| D-016 | Central Storeroom Stowage, Modify | JOB | 1 | $0.00 | |
| D-017 | HVAC System (Foul Weather Locker, Central Engineering Storeroom and Small Arms Locker), Modify | JOB | 1 | $0.00 | |
| D-018 | Elex Dry Air Compressor Equipment, Install | JOB | 1 | $0.00 | |
| D-020 | Folding Boom Cranes, Bienniel Maintenance, Perform | JOB | 1 | $0.00 | |
| D-021 | Cofferdam, Install | JOB | 1 | $0.00 | |
| D-022 | Sea Water Valves, Renew | JOB | 1 | $0.00 | |
| D-023 | Air Conditioning, Repair | JOB | 1 | $0.00 | |
| D-024 | Temporary Services, Provide-Cutter | JOB | 1 | $0.00 | |
| Total Price of Definite Items | $0.00 | ||||
| O-002 | Tank (MP Fuel Overflow), Preserve (Partial) | JOB | 1 | $0.00 | |
| O-019 | Crane Barge | JOB | 1 | $0.00 | |
| Total Price of Option Items | $0.00 | ||||
| Total Price of Definite and Optional Items | $0.00 |
&C(2/2/2022) Draft-0 - Page &P of &N
CostEstimateBreakdowns
| Composite Labor Rate | 55 | |||||||||||||||||||||||
| Assumed G&A Factor | 15% | |||||||||||||||||||||||
| Assumed Profit Factor | 10% | Direct Labor | Direct Material/Subs Cost | |||||||||||||||||||||
| ITEM | DESCRIPTION | UNIT PRICE | Sub-Contracted (put a "1" in the blank) | Total Labor Hours | Total Material & Subs (cost + G&A + profit) | Eng Tech | Machinest/Pipe Fitter | Electrician | Shipfitter | Welder | Firewatch | Insulator/Lagger | Painter | Gen Labor/Helper/Rigger | Supt/QA/NDT | Mat/Sub Cost 1 | Mat/Sub Cost 2 | Mat/Sub Cost 3 | Mat/Sub Cost 4 | Lab Rate | Area | WorkItemID | WIFileID | LoadData |
| 62 | Baltimore, MD | |||||||||||||||||||||||
| 52 | Biloxi, MS | |||||||||||||||||||||||
| 56 | Boston, MA | |||||||||||||||||||||||
| 50 | Charleston, SC | |||||||||||||||||||||||
| 60 | Corpus Christi, TX | |||||||||||||||||||||||
| 51 | Hampton Roads | |||||||||||||||||||||||
| 64 | Honolulu, HI | |||||||||||||||||||||||
| 55 | Houston, TX | |||||||||||||||||||||||
| 56 | Los Angeles, CA | |||||||||||||||||||||||
| 55 | Median Rate | |||||||||||||||||||||||
| 49 | Miami | |||||||||||||||||||||||
| 50 | Narragansett Bay, RI | |||||||||||||||||||||||
| 55 | New London, CN | |||||||||||||||||||||||
| 45 | New Orleans | |||||||||||||||||||||||
| 62 | NYNY | |||||||||||||||||||||||
| 49 | Panama City, FL | |||||||||||||||||||||||
| 60 | Philadelphia, PA | |||||||||||||||||||||||
| 51 | Portland, ME | |||||||||||||||||||||||
| 57 | Portland, OR | |||||||||||||||||||||||
| 55 | San Diego, CA | |||||||||||||||||||||||
| 67 | San Francisco, CA | |||||||||||||||||||||||
| 55 | Santa Barbara, CA | |||||||||||||||||||||||
| 55 | SE North Carolina | |||||||||||||||||||||||
| 65 | Seattle, WA | |||||||||||||||||||||||
| 48 | Tampa-St. Petersburg | |||||||||||||||||||||||
| 60 | Wilmington, DE |