11.24.2020 GPPSS-Structured Cabling RFP-App B-Maire.pdf
PDF 819 KB Posted
- Attached to
- Structured Cabling
- Solicitation number
- RFP GPPS 210000000334 2
- Issued by
- Wayne County, Grand Rapids City, Michigan
About this file
This is a design development document prepared by Plante Moran for the Grosse Pointe Public School System's Maire Elementary School renovations project located in Grosse Pointe, Michigan (Project 2019-026). The document contains detailed floor plans for the first, second, and third floors of the facility, dated July 20, 2020, and depicts the planned installation of classroom technology infrastructure including interactive flat panels, wireless access points, audio/visual cabling, audio enhancement speakers, and general data systems throughout the school. The plans identify specific classroom locations and technology placement points across multiple instructional spaces, including standard classrooms, special education rooms, kindergarten classrooms, music rooms, library facilities, and administrative offices. The document indicates the structured cabling work is being pursued through an RFP (Request for Proposals) process, with the project encompassing technology upgrades across all three floors of the elementary school building.
The technical specifications outlined in the document establish requirements for infrastructure installation, including provisions for dedicated equipment racks with specific electrical receptacle configurations (one L5-30R and four 5-20R receptacles per rack at 120V), horizontal and vertical pathway conduits (four 4-inch trade-size conduits for horizontal pathways and riser systems), grounding busbars mounted at six inches above finished floor, and fire-treated plywood backboards measuring three-quarter inch thick and eight feet high. The document specifies environmental control requirements maintaining room temperatures between 64°F and 75°F with relative humidity between 37 and 55 percent non-condensing, with dedicated air conditioning units required. No pricing information, contract award dates, response deadlines, or funding sources are specified in this design development document.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Grosse Pointe Public School System Maire Elementary – Classroom Technology
Prepared by Plante Moran
Legend:
Interactive Flat Panel
General Data
Wireless AP
AV Cabling
Audio Enhancement Speakers
Teacher location T
A
D
W
SCALE: 1/8" = 1'-0"
5/8" ABUSE RESISTANT GYPSUM BOARD EACH SIDE OF 3 5/8" METAL STUD
AT 16" O.C. (WALL THICKNESS = 4 7/8" - NOMINAL 5")
EXTERIOR WALLS TO BE 4" NOMINAL BRICK ON CONCRETE BLOCK WALL
WITH 2" RIGID CAVITY INSULATION
C.M.U. PARTITION AS DIMENSIONED
FLOOR PLAN LEGEND
INDICATES BATT SOUND ATTENUATION INSULATION
FLOOR PLAN NOTES
ALL INTERIOR PARTITIONS SHOWN SHADED SHALL EXTEND UP TO UNDERSIDE OF
FLOOR/ROOF DECK.
PATCH ALL HOLES FROM REMOVED ITEMS SUCH AS, BUT NOT LIMITED TO
THERMOSTATS, NAIL HOLES, WALL MOUNTED CASEWORK, ETC.
INFILL EXISTING EXTERIOR LOUVERS OPENINGS WITH NEW BRICK TO MATCH
EXISTING. TOOTH-IN TO MATCH COURSING - TYPICAL.
COORDINATE EXACT LOCATION FOR NEW CASEWORK IN FIELD.
1.
2.
3.
4.
SHADING INDICATES PARTITIONS TO EXTEND TO UNDERSIDE OF
FLOOR/ROOF DECK UNLESS OTHERWISE INDICATED.
STUDY
ROOM
NORTH
STAIRWELL
SECURE
VESTIBULE
MAIN
OFFICE
PRINCIPAL
OFFICE
CLINIC
WORK RM
REST RM
CORRIDOR
ELEVATOR
LOBBY
ELEVATOR
ELEVATOR
MACH. RM.
STORAGE
KINDERGARTEN
CLASSROOM
KINDERGARTEN
CLASSROOM
COAT
ROOM
WORK
ROOM
COAT
ROOM
WORK
ROOM
CLASSROOM
CLASSROOM
CLASSROOM
ASD
CLASSROOM
YOUNG FIVES
CLASSROOM
STUDY
ROOM
BOY'S
RESTROOM
GIRL'S
RESTROOM
J.C.
J.C.
KILN
STORAGE
RECEIVING
ROOM
GYMNASIUM
RESTROOM
RESTROOM
STAGE
GARAGE
GYM
OFFICE
RESTROOM
RESTROOM
BOILER
ROOM
117 KITCHEN
STORAGE
KITCHEN
RESTROOM
ELEVATOR
EAST
VESTIBULE
GYM
VESTIBULE
WEST
VESTIBULE
WEST
STAIR
EAST
STAIR
CORRIDOR
STAIR
B
A
1 1 1 1
1 1
1 1
1 1
1 1
A2.01
FIRST FLOOR PLAN
CPM
CPM
PAC
KEY PLAN
07/20/2020 DESIGN DEVELOPMENT
GROSSE POINTE
PUBLIC SCHOOLS
MAIRE ES
RENOVATIONS
GROSSE POINTE
MICHIGAN
2019-026
T T
T
TT T
T
2D2D
2D2D
4D4D
4D4D
2D2D
2D2D
2D2D
2D2D
D
D
3D3D
3D3D 3 D
D
2D2D
DD
2D2D
2W2W
2W2W
2W2W
2W2W
2W2W
2W2W 2W2W
2W2W
2W2W2W2W2W2W
AA
AA AA AA
AA
3D3D
AA
3D3D
3D3D 3D3D 3D3D
4D4D
2D2D
2D2D
DD
DEMARC
(basement)
DD
Phone line from Demarc to Main Office. Coordinate location with Owner.
Prepared by Plante Moran
Legend:
Interactive Flat Panel
General Data
Wireless AP
AV Cabling
Audio Enhancement Speakers
Teacher location T
A
D
W
STUDY
ROOM
CONFERENCE
CORRIDOR
ELEVATOR
LOBBY
ELEVATOR
ELEVATOR
MACH. RM.
LRC
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
SENSORY
ROOM
BOY'S
RESTROOM
GIRL'S
RESTROOM
J.C.
J.C.
UPPER
GYMNASIUM
CLASSROOM
CLASSROOM
CLASSROOM
MUSIC
UPPER
STAGE
BALCONY
NORTH
STAIR
EAST
STAIR
WEST
STAIR
SCALE: 1/8" = 1'-0"
5/8" ABUSE RESISTANT GYPSUM BOARD EACH SIDE OF 3 5/8" METAL STUD
AT 16" O.C. (WALL THICKNESS = 4 7/8" - NOMINAL 5")
EXTERIOR WALLS TO BE 4" NOMINAL BRICK ON CONCRETE BLOCK WALL
WITH 2" RIGID CAVITY INSULATION
C.M.U. PARTITION AS DIMENSIONED
FLOOR PLAN LEGEND
INDICATES BATT SOUND ATTENUATION INSULATION
FLOOR PLAN NOTES
ALL INTERIOR PARTITIONS SHOWN SHADED SHALL EXTEND UP TO UNDERSIDE OF
FLOOR/ROOF DECK.
PATCH ALL HOLES FROM REMOVED ITEMS SUCH AS, BUT NOT LIMITED TO
THERMOSTATS, NAIL HOLES, WALL MOUNTED CASEWORK, ETC.
INFILL EXISTING EXTERIOR LOUVERS OPENINGS WITH NEW BRICK TO MATCH
EXISTING. TOOTH-IN TO MATCH COURSING - TYPICAL.
COORDINATE EXACT LOCATION FOR NEW CASEWORK IN FIELD.
1.
2.
3.
4.
SHADING INDICATES PARTITIONS TO EXTEND TO UNDERSIDE OF
FLOOR/ROOF DECK UNLESS OTHERWISE INDICATED.
D C
A2.02
SECOND FLOOR PLAN
CPM
CPM
PAC
KEY PLAN
07/20/2020 DESIGN DEVELOPMENT
GROSSE POINTE
PUBLIC SCHOOLS
MAIRE ES
RENOVATIONS
GROSSE POINTE
MICHIGAN
2019-026
T
T
T T
T T
T T T
T
2W2W
AA
3D3D
AA
2W2W
3D3D
2W2W
2W2W
2W2W2W2W2W2W
2W2W 2W2W
2W2W 2W2W
2W2W
2W2W
D
D
DD
3D3D
AA
3D3D 3D3D
3D3D
AA
AAAA
3D3D
3D3D3D3D
AA AA AA
AA
3D3D
AA
AA
2D2D
2D2D
3D3D
Prepared by Plante Moran
Legend:
Interactive Flat Panel
General Data
Wireless AP
AV Cabling
Audio Enhancement Speakers
Teacher location T
A
D
W
LIBRARY
OFFICE
STORAGE
COPY
ROOM
STUDY
ROOM
NORTH
STAIRWELL
CLASSROOM
BOY'S
RESTROOM
GIRL'S
RESTROOM
STORAGE
RESTRM.
WEST
STAIR
STORAGE
MAINT.
ELEVATOR
LOBBY
ELEVATOR
129 CORRIDOR
CORRIDOR
SCALE: 1/8" = 1'-0"
5/8" ABUSE RESISTANT GYPSUM BOARD EACH SIDE OF 3 5/8" METAL STUD
AT 16" O.C. (WALL THICKNESS = 4 7/8" - NOMINAL 5")
EXTERIOR WALLS TO BE 4" NOMINAL BRICK ON CONCRETE BLOCK WALL
WITH 2" RIGID CAVITY INSULATION
C.M.U. PARTITION AS DIMENSIONED
FLOOR PLAN LEGEND
INDICATES BATT SOUND ATTENUATION INSULATION
FLOOR PLAN NOTES
ALL INTERIOR PARTITIONS SHOWN SHADED SHALL EXTEND UP TO UNDERSIDE OF
FLOOR/ROOF DECK.
PATCH ALL HOLES FROM REMOVED ITEMS SUCH AS, BUT NOT LIMITED TO
THERMOSTATS, NAIL HOLES, WALL MOUNTED CASEWORK, ETC.
INFILL EXISTING EXTERIOR LOUVERS OPENINGS WITH NEW BRICK TO MATCH
EXISTING. TOOTH-IN TO MATCH COURSING - TYPICAL.
COORDINATE EXACT LOCATION FOR NEW CASEWORK IN FIELD.
1.
2.
3.
4.
SHADING INDICATES PARTITIONS TO EXTEND TO UNDERSIDE OF
FLOOR/ROOF DECK UNLESS OTHERWISE INDICATED.
A2.03
THIRD FLOOR PLAN
CPM
CPM
PAC
KEY PLAN
07/20/2020 DESIGN DEVELOPMENT
GROSSE POINTE
PUBLIC SCHOOLS
MAIRE ES
RENOVATIONS
GROSSE POINTE
MICHIGAN
2019-026
4" Slv
TG
B
General Notes:
1. Suspended ceilings are not required or desired.
2. The space should be environmentally controlled to maintain a room temperature range of 64F to 75F (18°C to 24°C) with a relative humidity level between 37% to 55% non-condensing.
Space should have a dedicated A/C unit.
3. Grounding busbars shall be provided and grounded to the main building ground. Mount and secure to backboard at 6" AFF.
Detailed Notes:
1. 1 x L5-30R and 4 x 5-20R per equipment rack, 120V. Receptacles should be mounted on the backboard.
2. Four 4" conduits should be provided for horizontal pathway from the hallway.
3. Four 4" trade-size conduits should be provided for a vertical riser at the floor and ceiling of the MDF providing pathways for the first and second floor. The conduits should extend a minimum of 1" AFF. Conduits on third floor should extend to above ceiling.
4. 3/4" A/C fire treated plywood backboards to be installed, 8’ high (or as high as feasible, mounted so the bottom is 6" AFF, painted with two coats of fire retardant white paint.
x
2W2W
2D2D
AA
2D2D 2D2D
4D4D
2D2D
2W2W
2W2W
2D2D 2D2D
2D2D
AA
2D 2D2D
2W2W
MDF
Alex.Dietrich Rectangle
File details come from the government source that posted it. Updated .