This is a bid form attachment for a construction services invitation to bid (ITB #PROJ-26-043) issued by Halifax Health Medical Center for the Port Orange Freestanding Emergency Department (PO FSED) Irrigation project located in Florida. The project involves furnishing and installing a complete irrigation system for approximately two acres of land adjacent to the facility. Bidders must submit a detailed project schedule and timeline demonstrating full understanding of the scope and specifications, along with a Schedule of Values broken down by division that includes any requested allowances listed separately. Additionally, contractors must provide a detailed work description with their bid submittal to evidence comprehension of the Scope of Work. The successful bidder will be required to complete the work according to an approved schedule submitted for Halifax Health Medical Center's review and acceptance.

Bidders must hold their proposals open for acceptance for 120 days from the bid due date and agree to accomplish all project work in accordance with the specifications provided in the bid solicitation documents. Contractors will be held responsible for any repairs needed to the facility resulting from damages caused by trucks operating outside designated routes. The bid form includes a line item for contractors to enter their total delivered price for the complete project scope, though specific pricing requirements, payment terms, and funding sources are not detailed in this attachment.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT G

HALIFAX HEALTH MEDICAL CENTER

BID FORM of TOTAL PROJECT COST

Invitation to Bid for Construction Services

ITB # PROJ-26-043 -PO FSED IRRIGATION

I/We propose to furnish the work described below at the following delivered price:

Contractor shall be responsible for any repair needed to the facility as a result of damages caused by trucks going outside designated routes.

As part of the project bid submittal, a detailed schedule/timeline must be included with each bid response. Sufficient detail will be included in the project schedule/timeline to demonstrate the bidder fully understands the project scope and specifications.

In addition, a Schedule of Values detailed by division must be provided with bid submittal and will include any requested allowances. Requested allowances will be listed separately.

Bidder will include with their bid submittal a detailed work description to show they fully understand the Scope of Work.

The Contractor agrees to:

A. Hold this bid open to acceptance for 120 days from the bid due date.

B. Accomplish project work in accordance with details provided in the bid solicitation.

C. Complete the work within a detailed schedule submitted to HHMC by the successful bidder for review and approval.

BID SUBMITTED BY:

COMPANY: ___________________________________________________________

File details come from the government source that posted it. Updated .