11-02 - LBB Perimeter Road Plans.pdf
PDF 14 MB Posted
- Attached to
- LPSIA Perimeter Road Rehabilitation
- Solicitation number
- ITB 26-19210-AE
- Issued by
- Henderson County, Texas
About this file
This is a bid set for the Lubbock Preston Smith International Airport (LPSIA) Perimeter Road Rehabilitation project, issued by the City of Lubbock, Texas, with bid number ITB No. 19210. The project involves a comprehensive rehabilitation of the airport's perimeter road, spanning approximately 24,000 linear feet, and includes full depth reclamation, milling, cement treatment, and new hot mix asphalt surfacing. The project is divided into three construction phases, with a total contract time of 85 calendar days, including substantial completion at 75 days and a 10-day punch list period. Key quantities include 6,124 square yards of pulverizing and treating existing asphalt and base, 1,427 tons of hot mix asphalt surface course, and various associated tasks like saw cutting, subgrade improvements, and pavement markings.
The project includes a base bid and an additive alternate (Asphalt Surface Treatment) with an estimated total project area of 1.40 acres. The bid documents specify detailed construction requirements, including strict airport safety protocols, phased construction approach, and specific technical specifications for pavement rehabilitation. Liquidated damages are set at $2,690 per calendar day for failure to meet substantial completion or punch list timelines. The project will require careful coordination with airport operations, maintenance of active airport infrastructure, and adherence to FAA guidelines for construction safety, with specific restrictions on working near runways and taxiways. Contractors will need to submit detailed safety and security plans, maintain communication with air traffic control, and ensure minimal disruption to airport operations during construction.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT NO.
CLIENT
# DATE DESCRIPTION
A:
\2
4\
0.
\0 3_
D
SG
N \0
1_ D
W G
\0
_G
EN
\G -0
-4
.D W
G , 1
0/
/2
2:
P
M , s da ne
Pe rim et er
R oa d R eh ab ili ta tio n
City of Lubbock, TX
Lubbock Preston Smith International Airport Lubbock, TX
44140.24
Parkhill.com
PRINT IN COLOR
1 10/14/2025 Bid Set
PRO
FESS I ONA L ENG I N
EERL
I C E N S E
D
STATE OF TEXAS
TESSA R. HAZLETT
105004
PA
R
K H
I L L
S
M I TH & COOPER , I NC
. F
- 5
10/14/2025
G-001 Cover Sheet
4222 85th St.
Lubbock, TX 79423 806.473.2200
City of Lubbock, Texas
Perimeter Road Rehabilitation Phase 1
October 2025 City of Lubbock ITB No.19210 http://www.parkhill.com/
# DATE DESCRIPTION
A:
\2
4\
0.
\0 3_
D
SG
N \0
1_ D
W G
\0
_G
EN
\G -0
-4
.D W
G , 1
0/
/2
2:
P
M , s da ne
Pe rim et er
R oa d R eh ab ili ta tio n
City of Lubbock, TX
Lubbock Preston Smith International Airport Lubbock, TX
44140.24
Parkhill.com
PRINT IN COLOR
1 10/14/2025 Bid Set
PRO
FESS I ONA L ENG I N
EERL
I C E N S E
D
STATE OF TEXAS
TESSA R. HAZLETT
105004
PA
R
K H
I L L
S
M I TH & COOPER , I NC
. F
- 5
10/14/2025
LUBBOCK
CHRISTI
CORPUS
AUSTIN
ANTONIO
SAN
ODESSA MIDLAND
SAN ANGELO
27783
ABILENE
28836
HOUSTON
WACO
35E
35W
DALLAS
FT
WORTH
35 75
60 27 287
82 82
PLAINVIEW
AMARILLO
GRAHAM
EL PASO
LUBBOCK
PRESTION
SMITH
INTERNATIONAL
AIRPORT
SEAGRAVES
PADUCAH
INTERNATIONAL AIRPORT
LUBBOCK PRESTON SMITH
PORTALES
CLOVIS
TULIA
MULESHOE
AMARILLO
FLOYDADA
REESE
BROWNFIELD
LEVELLAND
LITTLEFIELD
O
KL
AH
O
M A
SHAMROCK
CHILDRESS
CLARENDON
VEGA
HEREFORD
FRIONA
CANYON
PLAINVIEW
SLATON
POST
N
EW
M
EX
IC
O
LUBBOCK
N
87 84
LOCATION MAP
VICINITY MAP
Sheet List Table Sheet Number Sheet Title
General G-001 Cover Sheet G-002 Vicinity Map, Summary of Quantities & Sheet Index G-003 Project Summary Sheet G-004 Erosion Control Summary G-005 Erosion Control Site Plan G-006 Erosion Control Details G-007 Overall Safety & Phasing Plan G-008 Construction Safety & Phasing Plan Phase 1 (Sheet 1 of 2) G-009 Construction Safety & Phasing Plan Phase 1 (Sheet 2 of 2) G-110 Construction Safety & Phasing Plan Phase 2 (Sheet 1 of 2) G-111 Construction Safety & Phasing Plan Phase 2 (Sheet 2 of 2) G-112 Construction Safety & Phasing Plan Phase 3 (Sheet 1 of 2) G-113 Construction Safety & Phasing Plan Phase 3 (Sheet 2 of 2) G-501 Construction Safety Details
Civil C-101 Pavement Demolition Plan STA 0+00 to 16+00 C-102 Pavement Demolition Plan STA 16+00 to 24+00 C-103 Plan & Profile STA 0+00 to 8+00 C-104 Plan & Profile STA 8+00 to 16+00 C-105 Plan & Profile STA 16+00 to 24+00 C-106 Marking Plan STA 0+00 to 16+00 C-107 Marking Plan STA 16+00 to 24+00 C-501 Details
G-002
Vicinity Map, Summary Of Quantities & Sheet Index
Summary of Quantities Item Description Quantity Unit
Base Bid 1 C-100, Contractor Quality Control Program (CQCP) 1 LS 2 C-105, Mobilization 1 LS 3 Item P-101-5.1, Full Depth Saw Cut 126 LF 4 Item P-101-5.2, Mill Asphalt and Stockpile , 3-inch Thickness 596 CY 5 Item P-152-4.1, Subgrade Improvements in Isolated Soft Spots 307 SY 6 Item P-152-4.2, Grading in Unpaved Areas 2,487 SY 7 TxDOT Item 275-6.1, Pulverize, Treat, and Shape Existing Asphalt (1") and Base In-Place, 7.5" Thickness 6,124 SY 8 TxDOT Item 275-6.2, Cement (5%) 124 Ton 9 TxDOT Item 275-6.3, Microcracking 6,124 SY 10 TxDOT Item 310, Prime Coat (0.3 Gal/SY) 1,841 Gal 11 TxDOT Item 341, Tack Coat (0.15 Gal/SY) 921 Gal 12 TxDOT Item 341, Hot Mix Asphalt, Type C (PG 64-28), Surface Course, 4-inch Thickness 1,427 Ton 13 Item P-620-5.1, Permanent Pavement Markings with Reflective Beads, Color Varies 700 SF
Additive Alternate 1 A1-1 Item P-608-8.1, Asphalt Surface Treatment 6,124 SY
TW
Y
J
TW
Y J
TWY L
TWY D
TWY E
TWY P
TWY J
TWY K
R W
Y 8-
WEST RAMP
N YUCCA AV
N ASPEN AV
E D
U
BU
Q U
E
ST
N DAVID AV
TW
Y
J
TW
Y J
TW
Y
T
TW
Y
S
TW
Y
V
TW
Y
D
TW
Y M
TW
Y
Q
TW
Y
F
TWY M TWY M
TWY L
RWY 17R-35L RWY 17R-35L
TWY G
TWY R
TW
Y B
TWY N
R
W Y
8-
R W
Y 8-
EAST RAMP
RWY 17L-35R RWY 17L-35R
TERMINAL
APRON
TW
Y
F
INTERSTATE 27
MLK BLVD.
N CEDAR AVE
E
KE
U
KA
S T
N ZENITH AV
N WALNUT AV
E
IN
D
EP
EN
D
AN
C
E
ST
E F
O O
TH
IL
L
ST
N BEECH AV
N Cedar Ave
TW
Y
S
CARGO RAMP
TW
Y
M
RWY 17R-35L
TWY M
BL
U
EF
IE
LD
S
T
R
EG
IS
S
T.
UPS FEDEX
LUBBOCK
AERO
SILENT
WINGS
MUSEUM
ARMY
NATIONAL
GUARD
FAA
ATCT
LBB PAC
LBB C SAC
23 24
47 48
49 86
35L
17R
CONTROL POINT TABLE
POINT #
NORTHING
7307003.56
7300063.30
7297915.46
7300455.45
7304792.77
7302552.75
7302652.99
7302178.78
7307832.19
7307471.52
7308469.00
7310834.54
7311612.81
7311040.12
7310270.17
7307803.73
7299976.20
7300065.93
7302178.74
7302436.76
7302652.96
7301826.73
7302441.28
7301889.20
7299981.55
EASTING
954822.10
953930.54
955011.19
956542.89
957817.91
967041.35
959881.14
959834.46
954827.16
954815.98
954713.49
956228.25
955080.76
956765.22
955681.00
956175.22
954597.11
954330.56
959834.40
959875.29
959881.09
960373.82
960058.92
960265.75
960338.55
ELEVATION
3259.63
3234.75
3233.43
3246.33
3254.96
3240.33
3255.18
3255.94
3261.66
3260.08
3266.29
3277.68
3282.26
3280.10
3277.10
3267.69
3236.16
3235.37
3256.03
3255.79
3255.24
3253.27
3255.27
3253.80
3260.03
DESCRIPTION
IRON ROD BLUE CAP
IRON ROD BLUE CAP
IRON ROD BLUE CAP
X CUT
X CUT
IRON ROD BLUE CAP
IRON ROD BLUE CAP
IRON ROD BLUE CAP
IRON ROD BLUE CAP
IRON ROD BLUE CAP
IRON ROD BLUE CAP
IRON ROD BLUE CAP
ALUMINUM MONUMENT
IRON ROD CAPPED
IRON ROD CAPPED
IRON ROD CAPPED
IRON ROD BLUE CAP
IRON ROD BLUE CAP
IRON ROD BLUE CAP
IRON ROD BLUE CAP
IRON ROD BLUE CAP
IRON ROD BLUE CAP
IRON ROD BLUE CAP
IRON ROD BLUE CAP
IRON ROD BLUE CAP
BENCHMARK POINTS
POINT #
NORTHING
7306686.99
7311174.60
7309298.89
7307711.23
7309986.14
EASTING
954936.80
956659.00
956632.32
956615.21
955072.38
ELEVATION
3259.90
3280.44
3272.61
3265.56
3277.13
DESCRIPTION
ALUMINUM MONUMENT
ALUMINUM MONUMENT
ALUMINUM MONUMENT
ALUMINUM MONUMENT
ALUMINUM MONUMENT
PRIMARY AIRPORT CONTROL STATION
POINT NAME
LBB PAC
NORTHING
7301175.4800
EASTING
957064.6100
ELEVATION
3253.80
SECONDARY AIRPORT CONTROL STATION
POINT NAME
LBB C SAC
NORTHING
7311040.6130
EASTING
956753.5720
ELEVATION
3279.16
RUNWAY THRESHOLD INFORMATION
POINT NAME
17R
35L
NORTHING
7311061.2720
7299567.3750
EASTING
955969.2710
955671.7040
ELEVATION
3282.28
3242.62
PROJECT NO.
CLIENT
# DATE DESCRIPTION
A:
\2
4\
0.
\0 3_
D
SG
N \0
1_ D
W G
\0
_G
EN
\G -0
-4
.D W
G , 1
0/
/2
2:
P
M , s da ne
Pe rim et er
R oa d R eh ab ili ta tio n
City of Lubbock, TX
Lubbock Preston Smith International Airport Lubbock, TX
44140.24
Parkhill.com
PRINT IN COLOR
1 10/14/2025 Bid Set
PRO
FESS I ONA L ENG I N
EERL
I C E N S E
D
STATE OF TEXAS
TESSA R. HAZLETT
105004
PA
R
K H
I L L
S
M I TH & COOPER , I NC
. F
- 5
10/14/2025
GENERAL NOTES
A. SURVEY CONDUCTED BY PARKHILL, LUBBOCK, TEXAS. BEARINGS
ARE RELATIVE TO GRID NORTH, TEXAS STATE PLANE COORDINATE
SYSTEM NAD'83, BASED ON PRIMARY AND SECONDARY AIRPORT
CONTROL MONUMENTS AND NATIONAL SPATIAL REFERENCE
SYSTEM.
B. THE CONTRACTOR IS RESPONSIBLE FOR LOCATING AND
PROTECTING ALL UTILITIES AND INFRASTRUCTURE DURING
CONSTRUCTION. THE LOCATIONS OF ANY UTILITY OR FACILITY
SHOWN ON THE PLANS HAVE NOT BEEN VERIFIED BY THE OWNER
OR OWNER`S REPRESENTATIVE. THE CONTRACTOR SHALL
COORDINATE LOCATION AND VERIFICATION OF UTILITIES WITH THE
FOLLOWING:
- TEXAS 811
- DIG TESS 1-800-344-8377
- FAA (DEANNA BLAIR AT 432-599-8480)
- LUBBOCK PRESTON SMITH INTERNATIONAL AIRPORT (AIRPORT
OPERATIONS AT 806-775-2004)
THE CONTRACTOR SHALL SUBMIT TO THE ENGINEER IN WRITING
ANY PRE-EXISTING DAMAGE TO UTILITIES AND OTHER
INFRASTRUCTURE. UTILITIES OR OTHER INFRASTRUCTURE
DAMAGED DURING CONSTRUCTION WILL BE REPAIRED AT THE
CONTRACTORS EXPENSE.
C. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ANY AND ALL
PERMITS REQUIRED FOR CONSTRUCTION WHETHER ON THE LOCAL,
STATE OR FEDERAL LEVEL.
D. THE OWNER RESERVES THE RIGHT TO PERFORM OTHER WORK
ADJACENT TO OR WITHIN THE LIMITS OF THIS PROJECT. BOTH
CONTRACTORS SHALL COORDINATE AND COOPERATE WITH EACH
OTHER TO ENSURE UNINTERRUPTED PROGRESS WITH EACH
PROJECT. NO ADDITIONAL COMPENSATION WILL BE MADE FOR THE
COORDINATION.
E. THE STAGING AREA SHALL BE USED FOR EQUIPMENT STAGING,
MATERIAL STOCKPILE AND EMPLOYEE PARKING. ALL EQUIPMENT
SHALL BE PARKED IN THE STAGING AREA AT NIGHT OR OTHER
TIMES WHEN CONSTRUCTION IS NOT OCCURRING UNLESS
OTHERWISE APPROVED BY THE ENGINEER.
F. THE CONTRACTOR IS RESPONSIBLE FOR ALL SITE LAYOUT AND
CONSTRUCTION STAKING. COST IS SUBSIDIARY TO ALL OTHER BID
ITEMS.
G. ANY DEVIATION BETWEEN FIELD SURVEY AND PLAN INFORMATION
SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE
ENGINEER.
H. THE CONTRACTOR SHALL TAKE NECESSARY PRECAUTIONS TO
PROTECT ALL CONTROL MONUMENTS AND CONTROL POINTS
DURING CONSTRUCTION. ANY MONUMENTS OR POINTS DAMAGED
BY THE CONTRACTOR SHALL BE REPLACED AT THE SOLE COST OF
THE CONTRACTOR.
I. THE OWNER RESERVES THE RIGHT TO VERIFY ELEVATIONS OR
COORDINATES AT ANY TIME DURING CONSTRUCTION.
GENERAL
COORDINATES AND ELEVATIONS RELATIVE TO NATIONAL GEODETIC
SURVEY PRIMARY AIRPORT CONTROL STATION "LBB PAC"
HORIZONTAL: NAD 83 U.S. SURVEY FEET
VERTICAL NAVD 88 U.S. SURVEY FEET
STATE PLAN COORDINATES: TEXAS NORTH CENTRAL ZONE 4202
COMBINED SCALE FACTOR: 0.999772388
CONTROL CONVERGENCE -1°48'47.2"
LEGEND
CONTRACTOR STAGING AREA
PROJECT AREA
G-003
Project Summary Sheet
CONTRACTOR ACCESS ROUTE
EXISTING BENCHMARK POINT
CONTROL POINT
EXISTING CONTROL POINT
0 700' 1400'
N
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
# DATE DESCRIPTION
A:
\2
4\
0.
\0 3_
D
SG
N \0
1_ D
W G
\0
_G
EN
\G -0
-0
-4
.D W
G , 1
0/
/2
2:
P
M , s da ne
Pe rim et er
R oa d R eh ab ili ta tio n
City of Lubbock, TX
Lubbock Preston Smith International Airport Lubbock, TX
44140.24
Parkhill.com
PRINT IN COLOR
1 10/14/2025 Bid Set
PRO
FESS I ONA L ENG I N
EERL
I C E N S E
D
STATE OF TEXAS
TESSA R. HAZLETT
105004
PA
R
K H
I L L
S
M I TH & COOPER , I NC
. F
- 5
10/14/2025
G-004
Erosion Control Summary
VELOCITY CONTROL DEVICES
STONE OUTLET STRUCTURES
STORM INLET SEDIMENT TRAP
TIMBER MATTING AT CONSTRUCTION EXIT
ROCK BEDDING AT CONSTRUCTION EXIT
DIVERSION DIKE AND SWALE COMBINATIONS
DIVERSION, INTERCEPTOR, OR PERIMETER SWALES
DIVERSION, INTERCEPTOR, OR PERIMETER DIKES
PERMANENT PLANTING, SODDING, OR SEEDING
NARRATIVE - SEQUENCE OF CONSTRUCTION (STORM WATER MANAGEMENT) ACTIVITIES:
PRESERVATION OF NATURAL RESOURCES
SOIL STABILIZATION PRACTICES:
STORM WATER MANAGEMENT:
SCS CURVE NUMBER (BEFORE CONSTRUCTION):
COVER AND % OF EXISTING VEGETATIVE COVER:
EXISTING CONDITION OF SOIL & VEGETATIVE
SITE DESCRIPTION
(AFTER CONSTRUCTION):
NAME OF RECEIVING WATERS:
TOTAL AREA TO BE DISTURBED:
TOTAL PROJECT AREA:
MAJOR SOIL DISTURBING ACTIVITIES:
PROJECT DESCRIPTION:
PROJECT SITE:
OTHER:
STORM SEWERS
CURBS AND GUTTERS
SEDIMENT BASINS
SEDIMENT TRAPS
CHANNEL LINERS
STRUCTURAL PRACTICES:
ROCK BERMS
PAVED FLUMES
PIPE SLOPE DRAINS
SILT FENCES
HAY BALES
OTHER:
MULCHING
BUFFER ZONES
SOIL RETENTION BLANKET
TEMPORARY SEEDING
STABILIZED CONSTRUCTION ENTRANCE
LOADED HAUL TRUCKS TO BE COVERED WITH TARPAULIN
EXCESS DIRT ON PAVED SURFACES REMOVED DAILY
HAUL ROADS AND STAGING AREA DAMPENED FOR DUST CONTROL
OTHER:
REMARKS:
OFFSITE VEHICLE TRACKING:
OTHER EROSION AND SEDIMENT CONTROLS:
HAZARDOUS WASTE (INCLUDING SPILL REPORTING):
INSPECTION:
SANITARY WASTE:
WASTE MATERIALS:
MAINTENANCE:
CONTRACTOR:
SUBCONTRACTOR:
X X
X
X
X
X
MIGRATORY BIRD TREATY ACT:
GENERAL NOTES:
LBB Perimeter Road Rehabilitation Project, includes but is not limited to rehabilitation of the existing asphalt pavement, recycling of the existing surface and base course for use as base for new asphalt surface course. Project also involves marking the proposed perimeter road.
The perimeter of the construction site is currently vegetated with grass. The entire work area is currently paved.
Water from the site flows into area playa lakes
1. In the event that unanticipated archeological deposits are encountered during construction, work in the immediate area will cease and the owner will contact professional archeologist to initiate post-review discovery procedures under the provisions of 36 CFR 800.13.
2. In the event that unanticipated hazardous materials are encountered during construction, work in the immediate area will cease and the engineer and airport operations will be notified.
3. Stockpiles will not be placed within any water of the United States, including wetlands.
4. Inspection: This must occur either:
a. Once a month during dry season.
b. Every 14 days during wet season, and 24 hours after each 0.5 inch rain, or greater, or once a month if there is no rainfall.
c. Hazardous waste: All spills must be reported immediately to the engineer.
d. Off Site Tracking: Please check all four options.
5. Contractor to maintain all haul routes and have sufficient equipment in the form of water trucks for dust control on said haul routes.
If there is a burrowing owl on the nest, and that female does not leave the nest when approached, assume there are eggs or chicks in the hole regardless of the time of year. No work may occur within 100 feet of an active nest.
The active nest(s) must be protected by orange mesh safety fencing.
The federal migratory bird treaty act (mbta) (16 usc 703-711.), 50 cfr 10, and fish & game code 3503, 3513, and 3800, protect migratory and nongame birds, their occupied nests, and their eggs. in the event that migratory birds are encountered onsite during project construction from february 15 to october 1, the superintendent working on the project must take reasonable care to avoid impacts to protected birds, active nests, eggs and/or the young. a person that violates the mbta may be held strictly liable for actions that result in unpermitted take. when migratory bird nests are discovered which may be adversely affected by construction activity, or when a bird is found injured or killed as a result of construction activity, immediately stop work within 50 feet of the nest or bird and notify the rpr/engineer/ and owner.
Sand bags
The order of activities will be as follows:
1. Install sediment controls; silt fences (minimum) and other devices as required to meet TCEQ and EPA requirements.
2. Demolish existing and construct new improvements associated with the project
3. Where applicable, install additional erosion control devices.
4. When all construction activity is complete and the site is approved by the
Engineer, and after preconstruction and SWPPP cover conditions are re-established, remove all temporary sediment controls.
During construction, measures will be implemented by the contractor to help reduce sediment leaving the site. Measures will be selectively placed to achieve maximum containment of disturbed soil. The contractor will be allowed to adjust erosion control measures as necessary to meet full requirements of the contractor
- prepared SWPPP.
All erosion and sediment controls shall be maintained in good working order by the contractor. If a repair is necessary, it shall be done at the earliest date possible. The areas adjacent to creeks and drainage ways shall have priority followed by devices used for silt reduction in the disturbed areas.
All waste materials shall be collected and stored in a securely lidded metal dumpster.
The dumpster shall meet all state and local solid waste management regulations. All trash and construction debris from the site shall be deposited in the dumpster. The dumpster shall be emptied as necessary or as required by local regulations at an approved landfill. No construction waste material shall be buried on site.
At a minimum, any products in the following categories are considered to be hazardous: petroleum, oils, lubricants, paints, acids for cleaning masonary surfaces, cleaning solvents, asphalt products, chemical additives for soil stabilization, petroleums, oils, lubricants, and concrete curing compounds and additives. In the event of a spill, which may be hazardous, the Contractor shall contact the appropriate agency for such type spills immediately. LBB Operations (806-775-2044 or 806-775-2045) shall also be notified in the event of a spill.
All sanitary waste will be collected from the portable units by a licensed sanitary waste management contractor as necessary or as required by local regulation.Sanitary waste containers shall be secured to prevent disturbance by wind.
Staging areas, stockpiles, and haul roads shall be constructed in a manner that will minimize the amount of sediment that may enter receiving waters. Staging areas shall not be located in any wetlands, waterbody or streambeds. Construction staging areas and vehicle maintenance areas shall be constructed by the contractor in a manner to minimize the runoff of pollutants. All waterways shall be cleared as soon as practical of temporary bridges, matting, falsework, piling, debris or other obstructions placed during construction operations that are not a part of the finished work. The Contractor shall be responsible for implementing the necessary pollution protection controls necessary to meet TCEQ and EPA requirements.
Lubbock Preston Smith International Airport, City of Lubbock, Lubbock County, Texas
Staging area, and unplanned haul routes. Planned construction activities include edge grading.
1.80 +/- acres
1.40 +/- acres
EROSION AND SEDIMENT CONTROLS
Contractor to determine when it is necessary to cover haul trucks with a tarpaulin.
X
Inspection of construction sites must be conducted at least once every 14 calendar days and within 24 hours of the end of a storm event of 0.5 inches or greater, unless as otherwise provided in TPDES Construction General Permit Part III.F.7.(c).ii-v.
An inspection report shall be made per each inspection. Based on the inspection results, the controls shall be revised per the inspection report.The contractor shall anticipate coordination with and oversight by the City of Lubbock Storm Water Department.
An inspection shall be performed by the contractor daily of all sediment controls adjacent to any active airfield pavement to insure all controls are securely in place and not at risk of becoming FOD.
X
M
TW
Y
Q
TWY M
TERMINAL APRON
TS
A
TS
A
TS
A
TS
A
TSA
TSATSATSATSATSATSATSATSATSATSATSATSATSATSATSATSATSATSATSATSA
TSA TSA TSA TSA TSA
TS
A
TS
A
TS
A
TS
A
TS
A
ROFAROFAROFAROFAROFAROFAROFAROFAROFAROFAROFAROFAROFAROFAROFAROFAROFAROFAROFAROFAROFAROFAROFAROFAROFA
RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA
TO
FA
TO
FA
TO
FA
TOFA
TOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFA
TOFA TOFA TOFA TOFA TOFA
TO
FA
TO
FA
TO
FA
TO
FA
TO
FA
TS
A
TS
A
TS
A
TSA
TS
A
TS
A
TS
A
TS
A
TS
A
TS
A
TSATSATSATSATSATSATSATSATSATSATSATSATSATSATSA
TOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFA
SF
SF
SF
SF
SF
SF
SF
SF SF SF SF SF SF SF SF SF SF SF SF
SF
SF
SF
SF
SF
SF
SF
SF
SFSFSFSFSFSFSFSFSFSFSFSFSF
SF
SF
SF
SF
SF
SF
SF
SF
SF SF
PROJECT NO.
CLIENT
# DATE DESCRIPTION
A:
\2
4\
0.
\0 3_
D
SG
N \0
1_ D
W G
\0
_G
EN
\G -0
-0
-4
.D W
G , 1
0/
/2
2:
P
M , s da ne
Pe rim et er
R oa d R eh ab ili ta tio n
City of Lubbock, TX
Lubbock Preston Smith International Airport Lubbock, TX
44140.24
Parkhill.com
PRINT IN COLOR
1 10/14/2025 Bid Set
PRO
FESS I ONA L ENG I N
EERL
I C E N S E
D
STATE OF TEXAS
TESSA R. HAZLETT
105004
PA
R
K H
I L L
S
M I TH & COOPER , I NC
. F
- 5
10/14/2025
G-005
Erosion Control Site Plan
LEGEND
FULL DEPTH RECLAMATION
CONTRACTOR STAGING AREA
GENERAL NOTES
A. ALL DISTURBED AREAS SHALL BE MONITORED FOR FUGITIVE DUST,
EROSION AND SEDIMENT RUN-OFF AND SHALL BE SEEDED AS
SPECIFIED.
B. CONTRACTOR MAY OPT TO USE OTHER ACCEPTABLE BEST
MANAGEMENT PRACTICES (BMPS) IN LIEU OF BMPS SHOWN.
C. CONTRACTOR SHALL STRATEGICALLY PLACE CONSTRUCTION STONE
ENTRANCES TO CORRESPOND WITH CONTRACTORS OPERATIONS.
D. BMPS SHALL NOT BE INSTALLED INSIDE RSA, TSA, ROFA OR TOFA.
N
0 100' 200'
LIMITS OF DISTURBANCE
FLOW DIRECTION (PROPOSED)
FLOW DIRECTION (EXISTING)
CULVERT INLET SEDIMENT CONTROL
(SEE DETAIL C5/G-006)
SILT FENCE (SEE DETAIL A1/G-006)SF
AutoCAD SHX Text
10'
FLOW
C4/G-006
EXISTING CULVERT
EXTEND SEDIMENT CONTROL MEASURE
UPHILL ENOUGH TO PREVENT WATER FROM
FLOWING AROUND PROTECTION
CULVERT PROTECTION NOTES:
1. FABRIC SHALL ALLOW FOR A MIN. FLOW RATE OF 60 GPM/FT² OF FABRIC
2. ACCEPTABLE ALTERNATE PRODUCT IS TYPE 1 SEDIMENT LOG (20"
DIAMETER) BY AMERICAN EXCELSIOR OR APPROVED EQUAL. ANCHOR
LOG IN PLACE AS RECOMMENDED BY THE MANUFACTURER.
FLOW 2'
PO
ST
6"
COARSE AGGREGATE
(2"-4" DIAMETER)
FILTER FABRIC BARRIER
(SEE A2/C-104)
C5 CULVERT INLET PROTECTION
NOT TO SCALEC4
CULVERT INLET
SEDIMENT CONTROL
NOT TO SCALE
5' MAX. TO
9'
1.
5'
LIMITS OF
DISTURBANCE
LINE
D4 DIVERSION SWALE
NOT TO SCALE
PLACE SPOILS FROM
CHANNEL ON DOWN
HILL SIDE
6" T
O
AA
24" TO 30"
SECTION A-A
NO SCALE
D5 SAND/GRAVEL BAG
NOT TO SCALE
4"
FLOW
1. SET POSTS AND EXCAVATE 4" x 4" TRENCH
UPSLOPE ALONG LINE OF POSTS. 2. SECURE WIRE FENCING TO POSTS.
EXTENSION OF FILTER FABRIC INTO 4" X 4" TRENCH.
FLOW
4" 4"
4"
AS
N
EE
D
ED
4"
3. ATTACH FILTER MATERIAL TO WIRE FENCE AND
EXTEND IT INTO THE TRENCH.
4. BACKFILL AND COMPACT THE EXCAVATED SOD.
SILT FENCE NOTES:
1. WOVEN WIRE FENCE TO BE FASTENED SECURELY TO
FENCE POSTS WITH WIRE TIES OR STAPLES.
2. FILTER CLOTH TO BE FASTENED SECURELY TO WOVEN
WIRE FENCE WITH TIES SPACED EVERY 24" AT THE TOP
AND MIDSECTION.
3. FILTER FABRIC SHALL BE CUT FROM A CONTINUOUS
ROLL TO LENGTH REQUIRED MINIMIZING JOINTS WHERE
POSSIBLE.
4. WHEN TWO SECTIONS OF FILTER CLOTH ADJOIN EACH
OTHER, THEY SHALL BE OVERLAPPED 12" AT THE POSTS
AND FOLDED. SPACE POSTS AT MAX 10FT.
5. FENCE POSTS SHALL BE CAPABLE OF SUPPORTING
FENCE AND MAY BE METAL OR WOOD.
6. INSPECT AND CLEAN THE UPFLOW SIDE OF THE SILT
FENCE AS NEEDED.
7. REMOVE THE SILT FENCE AND RESTORE THE SITE ONCE
REQUIREMENTS OF SWPPP ARE MET AND PRIOR TO
FINAL PAYMENT BEING RELEASED TO CONTRACTOR.
FLOW
FLOW FLOW
FILTER FABRIC
WIRE FENCE
POST
10'MAX.
A1 SILT FENCE
NOT TO SCALE
50' MIN.
' M
IN
COARSE AGGREGATEPLAN
4' 4'
8" M
IN
6:1 MIN.
SLOPE (TYP)
APPROACH
PROFILE
DRAIN TO SEDIMENT
TRAPPING DEVICE
50' MIN.
FOUNDATION
COURSE 6" MIN. TRANSITION
APPROACH
TRANSITION
A4 STABILIZED CONSTRUCTION ENTRANCE & EXIT
NOT TO SCALE
4 FT MAX
4 FT MAX
FIBER ROLLS
IN
M
IN
IN
TYPICAL FIBER ROLL INSTALLATION ENTRENCHMENT DETAIL
M
AX
VERTICAL SPACING
MEASURED ALONG
THE FACE OF THE
SLOPE VARIES
BETWEEN 8 FT AND
20 FT
INSTALL A FIBER ROLL
NEAR SLOPE WHERE IT
TRANSITIONS INTO A
STEEPER SLOPE
NOTE: INSTALL FIBER
ROLL ALONG A LEVEL
CONTOUR.
4 FT MAX
4 FT MAX
SLOPE
VARIES
FIBER ROLL
8 IN. MIN.
1 IN. x 1 IN.
WOOD STAKES
MAX. 4 FT
SPACING
6"
B4 TYPICAL FIBER ROLL INSTALLATION AND ENTRENCHMENT DETAIL
NOT TO SCALE
STABILIZED CONSTRUCTION ENTRANCE NOTES:
1. THE LENGTH OF THE TYPE 1 CONSTRUCTION EXIT
SHALL NOT BE LESS THAN 50'.
2. THE COARSE AGGREGATE SHOULD BE OPEN
GRADED WITH A SIZE OF 4" TO 8".
3. THE APPROACH SHOULD BE NO STEEPER THAN 6:1.
4. THE CONSTRUCTION EXIT FOUNDATION COURSE
SHALL NE FLEXIBLE BASE, BITUMINOUS CONCRETE
OR PORTLAND CEMENT CONCRETE.
5. THE CONSTRUCTION EXIT SHALL BE GRADED TO
ALLOW DRAINAGE TO A SEDIMENT TRAPPING
DEVICE.
G-006
Erosion Control Details
PROJECT NO.
CLIENT
# DATE DESCRIPTION
A:
\2
4\
0.
\0 3_
D
SG
N \0
1_ D
W G
\0
_G
EN
\G -0
-0
-4
.D W
G , 1
0/
/2
2:
P
M , s da ne
Pe rim et er
R oa d R eh ab ili ta tio n
City of Lubbock, TX
Lubbock Preston Smith International Airport Lubbock, TX
44140.24
Parkhill.com
PRINT IN COLOR
1 10/14/2025 Bid Set
PRO
FESS I ONA L ENG I N
EERL
I C E N S E
D
STATE OF TEXAS
TESSA R. HAZLETT
105004
PA
R
K H
I L L
S
M I TH & COOPER , I NC
. F
- 5
10/14/2025
J
N YUCCA AV
E D
U
BU
Q U
E
ST
TW
Y
J
TW
Y
M
TW
Y
Q
TW
Y
F
RWY 17R-35L
TWY R
EAST RAMP
RWY 17L-35R RWY 17L-35R
TERMINAL APRON
TW
Y
F
MLK BLVD.
N WALNUT AV
E
TWY M
BL
U
EF
IE
LD
S
T
PROJECT NO.
CLIENT
# DATE DESCRIPTION
A:
\2
4\
0.
\0 3_
D
SG
N \0
1_ D
W G
\0
_G
EN
\G -0
-0
0X -4
.D W
G , 1
0/
/2
2:
P
M , s da ne
Pe rim et er
R oa d R eh ab ili ta tio n
City of Lubbock, TX
Lubbock Preston Smith International Airport Lubbock, TX
44140.24
Parkhill.com
PRINT IN COLOR
1 10/14/2025 Bid Set
PRO
FESS I ONA L ENG I N
EERL
I C E N S E
D
STATE OF TEXAS
TESSA R. HAZLETT
105004
PA
R
K H
I L L
S
M I TH & COOPER , I NC
. F
- 5
10/14/2025
G-007
Overall Safety & Phasing Plan
LEGEND
PHASE 1
PHASE 2
CONTRACTOR
STAGING AREA
PROPOSED HAUL
ROUTE PHASE 1
PHASING GENERAL NOTES
A. THIS PAGE IS INTENDED TO BE PRINTED IN COLOR. IF NOT, CONTACT ENGINEER
AS SOON AS POSSIBLE.
B. THIS PLAN IS INTENDED TO GIVE THE CONTRACTOR AN UNDERSTANDING OF THE
PHASING GOALS. ANY DEVIATION, HOWEVER, SHALL BE APPROVED BY AND
ENGINEER PRIOR TO THE PRECONSTRUCTION MEETING.
C. SCHEDULE IS IN CALENDAR DAYS. A CONTRACT TIME EXTENSION WILL BE
CONSIDERED FOR ANY DAYS LOST BECAUSE OF ADVERSE WEATHER. ANY
APPROVED EXTENSION OF TIME MUST BE SUPPORTED BY CONTRACTOR
DOCUMENTATION THAT CRITICAL PATH ACTIVITIES WERE IMPACTED. REQUESTS
MUST BE MADE WITHIN 7 CALENDAR DAYS OF THE DAY IN QUESTION. REQUESTS
WILL BE DISCUSSED AND APPROVED/DISAPPROVED DURING THE NEXT PROGRESS
MEETING WITH THE OWNER.
D. CONTRACTOR SHALL MEET ALL SCHEDULE AND PHASING GOALS IF AN
ALTERNATE SCHEDULE IS PROPOSED. SEE GOALS LISTED ON PHASING PLAN.
E. TOTAL CONTRACT TIME OF 85 CALENDAR DAYS IS BASED ON THE NUMBER OF
DAYS ALLOTTED TO COMPLETE PHASES 1 - 3 INCLUDING CURE TIME AND
COMPLETION OF PUNCH LIST.
F. INSTALL LOW PROFILE AVIATION BARRICADES ACROSS ALL AIRCRAFT MOVEMENT
AREAS ADJACENT TO CONSTRUCTION AREAS WITH ONE OR A COMBINATION OF
DETAIL A5/G-501 INSTALL OUTSIDE SAFETY AREA, OR ALONG EDGE OF APRON.
G. THE CONTRACTOR SHALL MAINTAIN ALL AIRSIDE PAVEMENTS FREE OF
CONSTRUCTION DEBRIS. IF EQUIPMENT IS ROUTED ACROSS PAVEMENT, SWEEP
THE PAVEMENT AS NEEDED TO ENSURE AIRCRAFT SAFETY. ENSURE HAUL
ROUTES REMAIN CLEAN AND SWEPT.
H. AIRCRAFT ALWAYS HAVE THE RIGHT-OF-WAY.
I. MARK AND LIGHT CONSTRUCTION AREAS AND VEHICLES AS REQUIRED IN LATEST
EDITION OF AC 150/5370-2.
J. WORK AREA BOUNDARY IN ALL UNPAVED AREAS SHALL BE MARKED WITH A
POSITIVE BARRIER WATER BALLASTED SYSTEM. BARRIER SYSTEM SHALL BE
SPACED AT 10FT SPACING.
K. CONTRACTOR SHALL MAINTAIN A 10FT CLEAR AREA ADJACENT TO BUILDING,
FENCE, OR AIRPORT STRUCTURE. AREA SHALL BE CLEAR OF STOCKPILES,
MATERIAL OR EQUIPMENT.
L. AT ALL TIMES THE CONTRACTOR SHALL TAKE PRECAUTIONS NECESSARY TO
PROTECT STRUCTURES AND TREES ADJACENT TO WORK AREA. ANY DAMAGE
CAUSED BY THE CONTRACTOR'S OPERATIONS SHALL BE REPAIRED TO THE
SATISFACTION OF THE ENGINEER, AT THE CONTRACTOR'S SOLE EXPENSE.
M. THE CONTRACTOR SHALL NOT BE INSIDE A RUNWAY OR TAXIWAY OBJECT FREE
AREA AT ANY TIME.
N. CONTRACTOR IS TO USE CAUTION DURING CONSTRUCTION TO PROTECT
EXISTING TAXIWAY SIGNS, LIGHTS, NAVIGATIONAL AIDS, AND OTHER AIRPORT
STRUCTURES.
O. LOCATION OF EXISTING UTILITIES ARE APPROXIMATE AND NOT FROM SURVEY.
CONTRACTOR WILL BE RESPONSIBLE FOR CONTACTING CALL TEXAS811, DIG
TESS, FAA, AND THE AIRPORT TO CONFIRM LOCATION OF ALL UTILITIES.
PRECAUTIONS SHALL BE TAKEN TO PROTECT EXISTING UTILITIES AND OTHER
INFRASTRUCTURE.
P. CONTRACTOR SHALL TAKE NECESSARY MEASURES TO PROTECT EXISTING
STRUCTURES (BUILDINGS, FENCE, UTILITIES, ETC.). ANY DAMAGE SHALL BE
REPAIRED AT THE CONTRACTOR'S SOLE EXPENSE.
Q. VERIFY LIMITS WITH ENGINEER PRIOR TO BEGINNING DEMOLITION.
R. CONTRACTOR SHALL COMPLETE ALL PUNCH LIST WORK WITHIN ALLOTTED TIME
PER PHASE.
S. CONTRACTOR SHALL TAKE PRECAUTIONS WHEN USING EXISTING ROADS AS HAUL
ROUTES. CONTRACTOR SHALL DISCUSS ALTERNATIVE HAUL ROUTES WITH
ENGINEER IF NEEDED. CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE TO
EXISTING ROADS CAUSED BY CONSTRUCTION TRAFFIC.
T. CONTRACTOR TO PROVIDE ACCESS TO ONE LANE (MINIMUM 9FT WIDE) OF THE
PERIMETER ROAD DURING DEMOLITION AND CONSTRUCTION.
U. PHASING PLAN SHALL ADHERE TO GUIDANCE WITHIN MANUAL ON UNIFORM
TRAFFIC CONTROL DEVICES (LATEST EDITION), INCLUDING BARRICADES,
SIGNAGE, ETC. REFER TO GUIDANCE ON SHEET G-501.
V. CONTRACTOR TO PROVIDE BARRICADES AND SIGNAGE WHEN PERIMETER ROAD
IS CLOSED OR REDUCED TO SINGLE LANE. REFER TO SHEET G-501 FOR
GUIDANCE.
W. CONTRACTOR TO PROVIDE KEY LOCK THAT WILL BE INTERLOCKED WITH EXISTING
AIRPORT LOCK AND CHAIN ON CONTRACTOR ACCESS GATE. CONTRACTOR WILL
BE RESPONSIBLE FOR KEY CONTROL OF THE LOCK. CONTRACTOR WILL BE
TRAINED BY AIRPORT OPERATIONS TO PERFORM VEHICLE INSPECTIONS TO BE
COMPLETED BY CONTRACTORS BADGES PERSONAL. VEHICLE INSPECTION MUST
OCCUR FOR EACH CONSTRUCTION VEHICLE ENTERING THE AOA.
X. THE CONTRACTOR MUST NOTIFY LBB AIRFIELD OPERATIONS WHEN WORK IS
COMPLETED EACH DAY SO THAT THE GATE CAN BE CHECKED PRIOR TO THE
CONTRACTOR LEAVING THE AREA.
Y. CONTRACTOR IS ALLOWED TO ONLY WORK IN ONE PHASE AT A TIME AND MUST
REACH SUBSTANTIAL COMPLETION IN A GIVEN PHASE BEFORE TRANSITIONING TO
ANOTHER PHASE OF THE PROJECT
SUMMARY OF PROJECT TIME AND LIQUIDATION DAMAGES
PHASE TIME (CALENDAR DAYS) LIQUIDATED DAMAGES
TIME WILL NOT BE
RESTRICTED FOR EACH
PHASE, BUT ONLY THE
OVERALL CONTRACT TIME
WILL BE MONITORED.
N/A
2 N/A
3* 8 HOURS N/A
SUBSTANTIAL COMPLETION 75 $2,690 / CALENDAR DAY
PUNCH LIST 10 $2,690 / CALENDAR DAY
FINAL COMPLETION 85 N/A
N 0 250' 500'
PROPOSED HAUL
ROUTE PHASE 2
LIMITS OF
CONTRACTOR ACCESS
PHASE 3 PROPOSED HAUL
ROUTE PHASE 3
STOCKPILE
LOCATION
CONSTRUCTION GATE
*NIGHT TIME WORK IS REQUIRED
AutoCAD SHX Text
M
TE
R
M
IN
AL
A
PR
O
N
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSATSATSATSA
TO
FA
TO
FA
TO
FA
TO
FA
TO
FA
TO
FA
TO
FA
TO
FA
TO
FA
TO
FA
TO
FA
TO
FA
TO
FA
TO
FA
TO
FA
TO
FA
TO
FA
TOFATOFATOFATOFA
TWY M
TSATSATSATSATSATSATSATSATSATSATSATSATSATSATSATSATSATSATSATSATSATSATSATSA
TOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFA PROJECT NO.
CLIENT
# DATE DESCRIPTION
A:
\2
4\
0.
\0 3_
D
SG
N \0
1_ D
W G
\0
_G
EN
\G -0
-0
0X -4
.D W
G , 1
0/
/2
2:
P
M , s da ne
Pe rim et er
R oa d R eh ab ili ta tio n
City of Lubbock, TX
Lubbock Preston Smith International Airport Lubbock, TX
44140.24
Parkhill.com
PRINT IN COLOR
1 10/14/2025 Bid Set
PRO
FESS I ONA L ENG I N
EERL
I C E N S E
D
STATE OF TEXAS
TESSA R. HAZLETT
105004
PA
R
K H
I L L
S
M I TH & COOPER , I NC
. F
- 5
10/14/2025
G-008
Construction Safety & Phasing Plan Phase 1 (Sheet 1 Of 2)
PHASE 1
ACTIVE RUNWAY/TAXIWAY/APRON
LOW PROFILE AVIATION BARRICADE (SEE DETAIL A5/G-501)
ORANGE "CONSTRUTION AHEAD" SIGN
(SEE DETAIL C1/G-501)
LEGEND
N
TAXIWAY R
N
0 40' 80'
N 0 40' 80'
A. MAINTAIN ACCESS TO ACTIVE TERMINAL APRON AND TAXIWAY MIKE AT
ALL TIMES DURING PHASE 1.
B. MAINTAIN ACTIVE HALF-WIDTH OF ROADWAY AT ALL TIMES.
A. CONTRACTOR SHALL COORDINATE WITH AIRPORT OPERATIONS FOR
DAILY TRAFFIC AND APPROVED WORK AREA.
B. HALF WIDTH PHASING PLAN SHALL ADHERE TO GUIDANCE WITHIN
MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (LATEST EDITION),
INCLUDING BARRICADES, SIGNAGE, ETC. REFER TO GUIDANCE ON
SHEET G-501.
C. TAXIWAY SAFETY AREA IS SET AT 85.5 FT FROM TAXIWAY CENTERLINE.
D. THE CONTRACTOR SHALL MAINTAIN ALL AIRSIDE PAVEMENTS FREE OF
CONSTRUCTION DEBRIS. IF EQUIPMENT IS ROUTED ACROSS PAVEMENT,
SWEEP THE PAVEMENT AS NEEDED TO ENSURE AIRCRAFT SAFETY.
E. AIRCRAFT ALWAYS HAVE THE RIGHT-OF-WAY.
F. APPLY P-608 ON HOT MIX SURFACE IN PHASE 3 IF ADDITIVE ALTERNATE
NO. 1 IS AWARDED.
G. MARK ALL REHABILITATED PAVEMENT IN PHASE 3.
PHASING NOTES
PHASING GOALS
AS INDICATED BY: 00
KEY NOTES
1. LOW PROFILE AVIATION BARRICADES (SPACED AT 4 FT.) AT END OF
WORK ZONE AT SAFETY AREA BOUNDARY, OR ALONG EDGE OF
APRON. BARRICADES INTENDED TO ALERT AIRCRAFT TRAFFIC OF
CONSTRUCTION ZONE AND ALSO PREVENT CONSTRUCTION
EQUIPMENT FROM ENCROACHING INTO SAFETY AREA.
2. INSTALL TEMPORARY ORANGE CONSTRUCTION SIGNS WITH
"CONSTRUCTION AHEAD" MESSAGING IN ACCORDANCE WITH
APPENDIX F, FIGURE F-1 IN AC 150/5370-2 ADDRESSING TRAFFIC IN
BOTH DIRECTIONS.
3. CONTRACTOR TO REMAIN CLEAR OF EXISTING FRENCH DRAIN.
PROTECT IN PLACE.
MATCHLINE THIS SHEET
M
AT
C H
LI
N
E
TH
IS
S
H
EE
T
M
AT
C H
LI
N
E
SE
E
SH
EE
T
G -0
AutoCAD SHX Text
TWY M
TS
A
TS
A
TS
A
TSA
TSA
TSA
TSA
TSATSATSATSA
TO
FA
TO
FA
TO
FA
TO
FA
TOFA
TOFA
TOFA
TOFA
TOFATOFATOFATOFA
PROJECT NO.
CLIENT
# DATE DESCRIPTION
A:
\2
4\
0.
\0 3_
D
SG
N \0
1_ D
W G
\0
_G
EN
\G -0
-0
0X -4
.D W
G , 1
0/
/2
2:
P
M , s da ne
Pe rim et er
R oa d R eh ab ili ta tio n
City of Lubbock, TX
Lubbock Preston Smith International Airport Lubbock, TX
44140.24
Parkhill.com
PRINT IN COLOR
1 10/14/2025 Bid Set
PRO
FESS I ONA L ENG I N
EERL
I C E N S E
D
STATE OF TEXAS
TESSA R. HAZLETT
105004
PA
R
K H
I L L
S
M I TH & COOPER , I NC
. F
- 5
10/14/2025
G-009
Construction Safety & Phasing Plan Phase 1 (Sheet 2 Of 2)
PHASE 1
ACTIVE RUNWAY/TAXIWAY/APRON
LEGEND
N
TAXIWAY R
N 0 40' 80'
LOW PROFILE AVIATION BARRICADE (SEE DETAIL A5/G-501)
ORANGE "CONSTRUTION AHEAD" SIGN
(SEE DETAIL C1/G-501)
A. MAINTAIN ACCESS TO ACTIVE TERMINAL APRON AND TAXIWAY MIKE AT
ALL TIMES DURING PHASE 1.
B. MAINTAIN ACTIVE HALF-WIDTH OF ROADWAY AT ALL TIMES.
A. CONTRACTOR SHALL COORDINATE WITH AIRPORT OPERATIONS FOR
DAILY TRAFFIC AND APPROVED WORK AREA.
B. HALF WIDTH PHASING PLAN SHALL ADHERE TO GUIDANCE WITHIN
MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (LATEST EDITION),
INCLUDING BARRICADES, SIGNAGE, ETC. REFER TO GUIDANCE ON
SHEET G-501.
C. TAXIWAY SAFETY AREA IS SET AT 85.5 FT FROM TAXIWAY CENTERLINE.
D. THE CONTRACTOR SHALL MAINTAIN ALL AIRSIDE PAVEMENTS FREE OF
CONSTRUCTION DEBRIS. IF EQUIPMENT IS ROUTED ACROSS PAVEMENT,
SWEEP THE PAVEMENT AS NEEDED TO ENSURE AIRCRAFT SAFETY.
E. AIRCRAFT ALWAYS HAVE THE RIGHT-OF-WAY.
F. APPLY P-608 ON HOT MIX SURFACE IN PHASE 3 IF ADDITIVE ALTERNATE
NO. 1 IS AWARDED.
G. MARK ALL REHABILITATED PAVEMENT IN PHASE 3.
PHASING NOTES
PHASING GOALS
AS INDICATED BY: 00
KEY NOTES
1. LOW PROFILE AVIATION BARRICADES (SPACED AT 4 FT.) AT END OF
WORK ZONE AT SAFETY AREA BOUNDARY, OR ALONG EDGE OF
APRON. BARRICADES INTENDED TO ALERT AIRCRAFT TRAFFIC OF
CONSTRUCTION ZONE AND ALSO PREVENT CONSTRUCTION
EQUIPMENT FROM ENCROACHING INTO SAFETY AREA.
2. INSTALL ONE LANE TWO-WAY CONTROL WITH YIELD SIGNS. SEE
A3/G-501.
M
AT
C H
LI
N
E
SE
E
SH
EE
T
G -0
M
TE
R
M
IN
AL
A
PR
O
N
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSATSATSATSA
TO
FA
TO
FA
TO
FA
TO
FA
TO
FA
TO
FA
TO
FA
TO
FA
TO
FA
TO
FA
TO
FA
TO
FA
TO
FA
TO
FA
TO
FA
TO
FA
TO
FA
TOFATOFATOFATOFA
TWY M
TSATSATSATSATSATSATSATSATSATSATSATSATSATSATSATSATSATSATSATSATSATSATSATSA
TOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFA PROJECT NO.
CLIENT
# DATE DESCRIPTION
A:
\2
4\
0.
\0 3_
D
SG
N \0
1_ D
W G
\0
_G
EN
\G -0
-0
0X -4
.D W
G , 1
0/
/2
2:
P
M , s da ne
Pe rim et er
R oa d R eh ab ili ta tio n
City of Lubbock, TX
Lubbock Preston Smith International Airport Lubbock, TX
44140.24
Parkhill.com
PRINT IN COLOR
1 10/14/2025 Bid Set
PRO
FESS I ONA L ENG I N
EERL
I C E N S E
D
STATE OF TEXAS
TESSA R. HAZLETT
105004
PA
R
K H
I L L
S
M I TH & COOPER , I NC
. F
- 5
10/14/2025
G-110
Construction Safety & Phasing Plan Phase 2 (Sheet 1 Of 2)
PHASE 2
ACTIVE RUNWAY/TAXIWAY/APRON
LEGEND
N
TAXIWAY R
N
0 40' 80'
N 0 40' 80'
LOW PROFILE AVIATION BARRICADE (SEE DETAIL A5/G-501)
ORANGE "CONSTRUTION AHEAD" SIGN
(SEE DETAIL C1/G-501)
A. MAINTAIN ACCESS TO ACTIVE TERMINAL APRON AND TAXIWAY MIKE AT
ALL TIMES DURING PHASE 2.
B. MAINTAIN ACTIVE HALF-WIDTH OF ROADWAY AT ALL TIMES.
A. CONTRACTOR SHALL COORDINATE WITH AIRPORT OPERATIONS FOR
DAILY TRAFFIC AND APPROVED WORK AREA.
B. HALF WIDTH PHASING PLAN SHALL ADHERE TO GUIDANCE WITHIN
MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (LATEST EDITION),
INCLUDING BARRICADES, SIGNAGE, ETC. REFER TO GUIDANCE ON
SHEET G-501.
C. TAXIWAY SAFETY AREA IS SET AT 85.5 FT FROM TAXIWAY CENTERLINE.
D. THE CONTRACTOR SHALL MAINTAIN ALL AIRSIDE PAVEMENTS FREE OF
CONSTRUCTION DEBRIS. IF EQUIPMENT IS ROUTED ACROSS PAVEMENT,
SWEEP THE PAVEMENT AS NEEDED TO ENSURE AIRCRAFT SAFETY.
E. AIRCRAFT ALWAYS HAVE THE RIGHT-OF-WAY.
F. APPLY P-608 ON HOT MIX SURFACE IN PHASE 3 IF ADDITIVE ALTERNATE
NO. 1 IS AWARDED.
G. MARK ALL REHABILITATED PAVEMENT IN PHASE 3.
PHASING NOTES
PHASING GOALS
AS INDICATED BY: 00
1. LOW PROFILE AVIATION BARRICADES (SPACED AT 4 FT.) AT END OF
WORK ZONE AT SAFETY AREA BOUNDARY, OR ALONG EDGE OF
APRON. BARRICADES INTENDED TO ALERT AIRCRAFT TRAFFIC OF
CONSTRUCTION ZONE AND ALSO PREVENT CONSTRUCTION
EQUIPMENT FROM ENCROACHING INTO SAFETY AREA.
2. INSTALL TEMPORARY ORANGE CONSTRUCTION SIGNS WITH
"CONSTRUCTION AHEAD" MESSAGING IN ACCORDANCE WITH
APPENDIX F, FIGURE F-1 IN AC 150/5370-2 ADDRESSING TRAFFIC IN
BOTH DIRECTIONS.
3. CONTRACTOR TO REMAIN CLEAR OF EXISTING FRENCH DRAIN.
PROTECT IN PLACE.
MATCHLINE THIS SHEET
M
AT
C H
LI
N
E
TH
IS
S
H
EE
T
M
AT
C H
LI
N
E
SE
E
SH
EE
T
G -1
KEY NOTES
AutoCAD SHX Text
A
TS
A
TS
A
TSA
TSA
TSA
TSA
TSATSATSATSA
TO
FA
TO
FA
TO
FA
TO
FA
TOFA
TOFA
TOFA
TOFA
TOFATOFATOFATOFA
PROJECT NO.
CLIENT
# DATE DESCRIPTION
A:
\2
4\
0.
\0 3_
D
SG
N \0
1_ D
W G
\0
_G
EN
\G -0
-0
0X -4
.D W
G , 1
0/
/2
2:
P
M , s da ne
Pe rim et er
R oa d R eh ab ili ta tio n
City of Lubbock, TX
Lubbock Preston Smith International Airport Lubbock, TX
44140.24
Parkhill.com
PRINT IN COLOR
1 10/14/2025 Bid Set
PRO
FESS I ONA L ENG I N
EERL
I C E N S E
D
STATE OF TEXAS
TESSA R. HAZLETT
105004
PA
R
K H
I L L
S
M I TH & COOPER , I NC
. F
- 5
10/14/2025
G-111
Construction Safety & Phasing Plan Phase 2 (Sheet 2 Of 2)
PHASE 2
ACTIVE RUNWAY/TAXIWAY/APRON
LEGEND
N
TAXIWAY R
N 0 40' 80'
LOW PROFILE AVIATION BARRICADE (SEE DETAIL A5/G-501)
ORANGE "CONSTRUTION AHEAD" SIGN
(SEE DETAIL C1/G-501)
A. MAINTAIN ACCESS TO ACTIVE TERMINAL APRON AND TAXIWAY MIKE AT
ALL TIMES DURING PHASE 2.
B. MAINTAIN ACTIVE HALF-WIDTH OF ROADWAY AT ALL TIMES.
A. CONTRACTOR SHALL COORDINATE WITH AIRPORT OPERATIONS FOR
DAILY TRAFFIC AND APPROVED WORK AREA.
B. HALF WIDTH PHASING PLAN SHALL ADHERE TO GUIDANCE WITHIN
MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (LATEST EDITION),
INCLUDING BARRICADES, SIGNAGE, ETC. REFER TO GUIDANCE ON
SHEET G-501.
C. TAXIWAY SAFETY AREA IS SET AT 85.5 FT FROM TAXIWAY CENTERLINE.
D. THE CONTRACTOR SHALL MAINTAIN ALL AIRSIDE PAVEMENTS FREE OF
CONSTRUCTION DEBRIS. IF EQUIPMENT IS ROUTED ACROSS PAVEMENT,
SWEEP THE PAVEMENT AS NEEDED TO ENSURE AIRCRAFT SAFETY.
E. AIRCRAFT ALWAYS HAVE THE RIGHT-OF-WAY.
F. APPLY P-608 ON HOT MIX SURFACE IN PHASE 3 IF ADDITIVE ALTERNATE
NO. 1 IS AWARDED
G. MARK ALL REHABILITATED PAVEMENT IN PHASE 3.
PHASING NOTES
PHASING GOALS
AS INDICATED BY: 00
KEY NOTES
1. LOW PROFILE AVIATION BARRICADES (SPACED AT 4 FT.) AT END OF
WORK ZONE AT SAFETY AREA BOUNDARY, OR ALONG EDGE OF
APRON. BARRICADES INTENDED TO ALERT AIRCRAFT TRAFFIC OF
CONSTRUCTION ZONE AND ALSO PREVENT CONSTRUCTION
EQUIPMENT FROM ENCROACHING INTO SAFETY AREA.
2. INSTALL ONE LANE TWO-WAY CONTROL WITH YIELD SIGNS. SEE
A3/G-501.
M
AT
C H
LI
N
E
SE
E
SH
EE
T
G -1
M
TE
R
M
IN
AL
A
PR
O
N
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSATSATSATSA
TO
FA
TO
FA
TO
FA
TO
FA
TO
FA
TO
FA
TO
FA
TO
FA
TO
FA
TO
FA
TO
FA
TO
FA
TO
FA
TO
FA
TO
FA
TO
FA
TO
FA
TOFATOFATOFATOFA
TWY M
TSATSATSATSATSATSATSATSATSATSATSATSATSATSATSATSATSATSATSATSATSATSATSATSA
TOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFA PROJECT NO.
CLIENT
# DATE DESCRIPTION
A:
\2
4\
0.
\0 3_
D
SG
N \0
1_ D
W G
\0
_G
EN
\G -0
-0
0X -4
.D W
G , 1
0/
/2
2:
P
M , s da ne
Pe rim et er
R oa d R eh ab ili ta tio n
City of Lubbock, TX
Lubbock Preston Smith International Airport Lubbock, TX
44140.24
Parkhill.com
PRINT IN COLOR
1 10/14/2025 Bid Set
PRO
FESS I ONA L ENG I N
EERL
I C E N S E
D
STATE OF TEXAS
TESSA R. HAZLETT
105004
PA
R
K H
I L L
S
M I TH & COOPER , I NC
. F
- 5
10/14/2025
G-112
Construction Safety & Phasing Plan Phase 3 (Sheet 1 Of 2)
PHASE 3 (P-608 AND PAVEMENT MARKINGS)
A. MAINTAIN ACCESS TO ACTIVE TERMINAL APRON AND TAXIWAY MIKE AT
ALL TIMES DURING PHASE 3.
B. LIMIT FULL-WIDTH CLOSURE TO 6 HOURS FOR APPLICATION AND CURE
OF P-608 IF ADDITIVE ALTERNATE NO. 1 IS AWARDED. LIMIT FULL-WIDTH
CLOSURE TO 2 HOURS FOR TEMPORARY MARKING.
C. NIGHT TIME WORK IS REQUIRED.
D. PERMANENT MARKINGS SHALL BE APPLIED AFTER A 30 DAY CURE TIME.
CONTRACT TIME WILL STOP DURING THE 30 DAY CURE PERIOD. LIMIT
FULL-WIDTH CLOSURE FOR PERMANENT MARKINGS TO 2 HOURS.
ACTIVE RUNWAY/TAXIWAY/APRON
LEGEND
N
TAXIWAY R
N
0 40' 80'
N 0 40' 80'
A. CONTRACTOR SHALL COORDINATE WITH AIRPORT OPERATIONS FOR
DAILY TRAFFIC AND APPROVED WORK AREA.
B. FULL WIDTH PHASING PLAN SHALL ADHERE TO GUIDANCE WITHIN
MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (LATEST EDITION),
INCLUDING BARRICADES, SIGNAGE, ETC. REFER TO GUIDANCE ON
SHEET G-501.
C. TAXIWAY SAFETY AREA IS SET AT 85.5 FT FROM TAXIWAY CENTERLINE.
D. THE CONTRACTOR SHALL MAINTAIN ALL AIRSIDE PAVEMENTS FREE OF
CONSTRUCTION DEBRIS. IF EQUIPMENT IS ROUTED ACROSS PAVEMENT,
SWEEP THE PAVEMENT AS NEEDED TO ENSURE AIRCRAFT SAFETY.
E. AIRCRAFT ALWAYS HAVE THE RIGHT-OF-WAY.
PHASING NOTES
PHASING GOALS
AS INDICATED BY: 00
KEY NOTES
1. LOW PROFILE AVIATION BARRICADES (SPACED AT 4 FT.) AT END OF
WORK ZONE AT SAFETY AREA BOUNDARY, OR ALONG EDGE OF
APRON. BARRICADES INTENDED TO ALERT AIRCRAFT TRAFFIC OF
CONSTRUCTION ZONE AND ALSO PREVENT CONSTRUCTION
EQUIPMENT FROM ENCROACHING INTO SAFETY AREA.
2. INSTALL TEMPORARY ORANGE CONSTRUCTION SIGNS WITH
"CONSTRUCTION AHEAD" MESSAGING IN ACCORDANCE WITH
APPENDIX F, FIGURE F-1 IN AC 150/5370-2 ADDRESSING TRAFFIC IN
BOTH DIRECTIONS.
3. CONTRACTOR TO REMAIN CLEAR OF EXISTING FRENCH DRAIN.
PROTECT IN PLACE.
LOW PROFILE AVIATION BARRICADE (SEE DETAIL A5/G-501)
ORANGE "CONSTRUTION AHEAD" SIGN
(SEE DETAIL C1/G-501)
MATCHLINE THIS SHEET
M
AT
C H
LI
N
E
TH
IS
S
H
EE
T
M
AT
C H
LI
N
E
SE
E
SH
EE
T
G -1
AutoCAD SHX Text
A
TS
A
TS
A
TSA
TSA
TSA
TSA
TSATSATSATSA
TO
FA
TO
FA
TO
FA
TO
FA
TOFA
TOFA
TOFA
TOFA
TOFATOFATOFATOFA
PROJECT NO.
CLIENT
# DATE DESCRIPTION
A:
\2
4\
0.
\0 3_
D
SG
N \0
1_ D
W G
\0
_G
EN
\G -0
-0
0X -4
.D W
G , 1
0/
/2
2:
P
M , s da ne
Pe rim et er
R oa d R eh ab ili ta tio n
City of Lubbock, TX
Lubbock Preston Smith International Airport Lubbock, TX
44140.24
Parkhill.com
PRINT IN COLOR
1 10/14/2025 Bid Set
PRO
FESS I ONA L ENG I N
EERL
I C E N S E
D
STATE OF TEXAS
TESSA R. HAZLETT
105004
PA
R
K H
I L L
S
M I TH & COOPER , I NC
. F
- 5
10/14/2025
G-113
Construction Safety & Phasing Plan Phase 3 (Sheet 2 Of 2)
PHASE 3 (P-608 AND PAVEMENT MARKINGS)
ACTIVE RUNWAY/TAXIWAY/APRON
LEGEND
N
TAXIWAY R
N 0 40' 80'
A. CONTRACTOR SHALL COORDINATE WITH AIRPORT OPERATIONS FOR
DAILY TRAFFIC AND APPROVED WORK AREA.
B. FULL WIDTH PHASING PLAN SHALL ADHERE TO GUIDANCE WITHIN
MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (LATEST EDITION),
INCLUDING BARRICADES, SIGNAGE, ETC. REFER TO GUIDANCE ON
SHEET G-501.
C. TAXIWAY SAFETY AREA IS SET AT 85.5 FT FROM TAXIWAY CENTERLINE.
D. THE CONTRACTOR SHALL MAINTAIN ALL AIRSIDE PAVEMENTS FREE OF
CONSTRUCTION DEBRIS. IF EQUIPMENT IS ROUTED ACROSS PAVEMENT,
SWEEP THE PAVEMENT AS NEEDED TO ENSURE AIRCRAFT SAFETY.
E. AIRCRAFT ALWAYS HAVE THE RIGHT-OF-WAY.
PHASING NOTES
LOW PROFILE AVIATION BARRICADE (SEE DETAIL A5/G-501)
ORANGE "CONSTRUTION AHEAD" SIGN
(SEE DETAIL C1/G-501)
M
AT
C H
LI
N
E
SE
E
SH
EE
T
G -1
A. MAINTAIN ACTIVE TERMINAL APRON AND TAXIWAY MIKE AT ALL TIMES
DURING PHASE 3.
B. LIMIT FULL-WIDTH CLOSURE TO 6 HOURS FOR APPLICATION AND CURE
OF P-608 IF ADDITIVE ALTERNATE NO. 1 IS AWARDED. LIMIT FULL-WIDTH
CLOSURE TO 2 HOURS FOR MARKING.
C. NIGHT TIME WORK IS REQUIRED.
D. PERMANENT MARKINGS SHALL BE APPLIED AFTER A 30 DAY CURE TIME.
CONTRACT TIME WILL STOP DURING THE 30 DAY CURE PERIOD. LIMIT
FULL-WIDTH CLOSURE FOR PERMANENT MARKINGS TO 2 HOURS.
PHASING GOALS
AS INDICATED BY: 00
KEY NOTES
1. LOW PROFILE AVIATION BARRICADES (SPACED AT 4 FT.) AT END OF
WORK ZONE AT SAFETY AREA BOUNDARY, OR ALONG EDGE OF
APRON. BARRICADES INTENDED TO ALERT AIRCRAFT TRAFFIC OF
CONSTRUCTION ZONE AND ALSO PREVENT CONSTRUCTION
EQUIPMENT FROM ENCROACHING INTO SAFETY AREA.
2. INSTALL ONE LANE TWO-WAY CONTROL WITH YIELD SIGNS. SEE
A3/G-501.
4" 4"
5' -0
" M
IN
45°
8-
B5 TYPE III BARRICADE
NOT TO SCALE
A5
LOW PROFILE
AVIATION BARRICADE
NOT TO SCALE
PLAN VIEW
NO SCALE
FRONT ELEVATION
NO SCALE
EACH DRUM SHALL
HAVE A MINIMUM OF 2
ORANGE AND 2 WHITE
STRIPES USING TYPE
A OR TYPE B
RETROFLECTIVE
SHEETING WITH THE
TOP STRIPE BEING
ORANGE
16" DIA. (TYP) FOR
MOUNTING SIGNS
AND WARNING
LIGHTS
TAPER TO ALLOW
FOR STACKING A
MINIMUM OF 5
DRUMS
HANDLE
TOP SHOULD NOT
ALLOW CONNECTION
OF WATER OR DEBRIS
" M
IN
" M
AX
2" MAX TYP.
4" MIN 8" MAX
4" MAX
4" MIN 8" MAX
18" min
3"-4"
4" MIN. ORANGE
4" MIN. WHITE
4" MIN. ORANGE
4" MIN. WHITE
2" MIN.
2" MIN.
2" MIN.
2"
M
IN
7' M
IN
8' M
AX
6' - 12'
FRANGIBLE
COUPLING 12"X30"X3/4"
PLYWOOD
STABILIZE WITH
SANDBAGS
2"X8" WITH 6"
WIDE ORANGE
REFLECTIVE
STRIPING ON
PAINTED WHITE
BACKGROUND
SOLAR OR BATTERY
OPERATED RED
FLASHING LIGHTS
2"X8"
SOLAR OR BATTERY
OPERATED RED
FLASHING LIGHTS
12"X30"X3/4"
PLYWOOD
WITH 2"
FRANGABLE
COUPLING AND
RISER TO 2"X8"
D
EV
IC
ES
A T
SP
AC
IN
G
(D R
U M
S;
SE
E D
ET
AI
L A1
W20-4 48" X 48"
(SEE DETAIL D1)
0'
B U
FF
ER
Z O
N E
D
EV
IC
ES
A T
' S
PA
C
IN
G
(G R
AB
BE
R C
O N
ES
; S
EE
D
ET
AI
L D
2)
' M
IN
TYPE III BARRICADE
(SEE DETAIL B5)
0'
AP
PR
O X.
D
EV
IC
ES
A T
' S
PA
C
IN
G
(G R
AB
BE
R C
O N
ES
SE
E
D
ET
AI
L
D 2)
R1-2E 48" X 48" X 48"
(SEE DETAIL D1)
R1-2AP
48" X 36"
GENERAL SAFETY/NOTES
A. INSPECT BARRICADES DAILY AND MAKE REPAIRS AND ADJUSTMENTS IN A TIMELY
MANNER. PROVIDE INSPECTION LOGS TO ENGINEER.
B. EMPLOYEE PARKING SHALL BE WITHIN THE STAGING AREA. ONLY AUTHORIZED
VEHICLES SHALL BE PERMITTED INSIDE THE AIRCRAFT OPERATION AREA (AOA)
SECURITY FENCE.
C. AN LBB SECURITY-APPROVED EMPLOYEE SHALL MAN CONSTRUCTION GATE AT ALL
TIMES. ALL NON-BADGED PERSONNEL, UNLESS A CONTRACTOR'S EMPLOYEE WHO
IS BEING PROPERLY ESCORTED, SHALL NOT BE ALLOWED TO ENTER THE AOA.
D. ALL CONTRACTOR'S VEHICLES SHALL BE CLEARLY MARKED WITH THE COMPANY'S
NAME AND FLASHING YELLOW LIGHT.
E. CONSTRUCTION EQUIPMENT SHALL HAVE AN ORANGE AND WHITE FLAG.
F. THE CONTRACTOR SHALL SUBMIT A SECURITY PLAN AT THE PRE-CONSTRUCTION
CONFERENCE OUTLINING PROCEDURES FOR MAINTAINING A SECURE AOA
INCLUDING COMMUNICATIONS WITH THE ATCT.
G. EQUIPMENT AND MATERIAL SHALL NOT PENETRATE THE THRESHOLD SITING
SURFACE OR THE PRECISION OBSTACLE CLEARANCE AREAS. MATERIAL
STOCKPILES SHALL NOT PENETRATE THE PRIMARY, APPROACH OR TRANSITIONAL
SURFACES. ALL EQUIPMENT OR OTHER OBJECTS THAT PENETRATE ANY OF THE
IMAGINARY SURFACES MUST BE COORDINATED WITH THE ENGINEER IN ADVANCE.
OBSTRUCTIONS TO THE IMAGINARY SURFACES MUST BE MARKED AND/OR LIGHTED
IN ACCORDANCE WITH FAA GUIDELINES.
H. THE CONTRACTOR SHALL PREPARE AND SUBMIT A DETAILED SAFETY PLAN AT THE
PRE-CONSTRUCTION CONFERENCE. THE PLAN SHALL DETAIL PLACEMENT OF
SAFETY DEVICES, MARKING, LIGHTING, ETC, DURING EACH PHASE OF THE
PROJECT AS REQUIRED IN LATEST EDITION OF AC150/5370-2 INCLUDED IN THE
SPECIFICATIONS.
I. THE CONTRACTOR SHALL PROVIDE A 24-HOUR POINT OF CONTACT WHO WILL BE
RESPONSIBLE FOR IMMEDIATE CORRECTION OF SAFETY CONCERNS.
J. THE CONTRACTOR IS RESPONSIBLE FOR ADHERING TO THE REQUIREMENTS OF
LATEST EDITION OF AC-150/5370-2 "OPERATIONAL SAFETY ON AIRPORTS DURING
CONSTRUCTION.
K. CONTINUALLY CLEAR TAXIWAY, APRONS, AND RUNWAYS OF FOREIGN OBJECT
DEBRIS RESULTING FROM CONSTRUCTION ACTIVITY. REMAIN OFF PAVED RUNWAY
SURFACES.
L. THE CONTRACTOR SHALL PROVIDE A SAFETY OFFICER/CONSTRUCTION INSPECTOR
FAMILIAR WITH AIRPORT SAFETY TO MONITOR CONSTRUCTION ACTIVITIES. THIS
INDIVIDUAL SHALL NOT BE THE PROJECT SUPERINTENDENT. MARK ALL CRITICAL
SURFACES BY FLAGGING OR OTHER APPROVED MEANS.
M. RESTRICT MOVEMENT OF CONSTRUCTION VEHICLES TO CONSTRUCTION AREAS BY
FLAGGING AND BARRICADING, ERECTING TEMPORARY FENCING, OR PROVIDING
ESCORTS AS APPROPRIATE.
N. NO CONSTRUCTION SHALL OCCUR WITHIN 250-FT OF RUNWAY 17R-35L
CENTERLINE, TO A DISTANCE OF 1,000 FT BEYOND THE RUNWAY THRESHOLD,
UNLESS THE RUNWAY IS CLOSED.
O. PERSONNEL, MATERIAL AND OR EQUIPMENT MUST NOT PENETRATE THE OFZ OR
INNER APPROACH OFZ AS DEFINED IN LATEST EDITION OF AC 150/5300-13.
P. CONTRACTOR SHALL REMAIN IN CONTACT WITH TOWER AT ALL TIMES.
Q. DURING NIGHT TIME WORK, CONTRACTOR SHALL ORIENT CONSTRUCTION LIGHTS
SO THEY DO NOT IMPACT APPROACHING AIRCRAFT.
R. EACH CREW WILL BE REQUIRED TO HAVE A LBB OPERATIONS-BADGED
SUPERVISOR WITH THE CREW AT ALL TIMES.
S. DO NOT STORE MATERIAL OR STAGE EQUIPMENT WITHIN 10 FT OF PERIMETER
SECURITY FENCE.
A3 ONE LANE TWO-WAY CONTROL WITH YIELD SIGNS
NOT TO SCALE
D2 GRABBER CONE DETAIL
NOT TO SCALED1 TEMPORARY SIGN INSTALLATION
NOT TO SCALE
A1 DRUM DETAIL
NOT TO SCALE
CONSTRUCTION
AHEAD
ENSURE LEGEND IS
NOT OBSTRUCTED
GRADE
C/2
C/2
C/2
C/2
C SEE NOTE 3
SEE NOTE 3
RIGID CONDUIT
DEPTH AS NECESSARY
(MINIMUM 30 INCHES)
NOTES:
1. TEMPORARY SIGNS SHALL MEET FULL
REQUIREMENTS OF AC 150/5345-44 AND
FAA ENGINEERING BRIEF (EB) NO.93.
2. OFFSET FROM CORRESPONDING TAXIWAY
PAVEMENT EDGE SHALL BE IN
ACCORDANCE WITH TABLE 1-1 FROM FAA
AC 150/5340-18. SIGN IS TO BE
CONSIDERED "SIZE 2".
3. CHARACTER HEIGHT (C) SHALL BE 6" PER
SECTION 7.1 OF EB NO.93.
4. SIGNS SHALL MEET MODE 1 CRITERIA PER
SECTION 1.2.5 AND 3.2.4.6 OF AC
150/5345-44.
5. SIGNS SHALL MEET THE REQUIREMENTS
OF SECTION 3.2.6.2 OF AC 150/5345-44.
6. SIGNS SHALL NOT HAVE AN INSTALLED
HEIGHT EXCEEDING 36".
7. SIGNS TO BE MOUNTED AS GRADE OR AS
CLOSE TO GRADE AS POSSIBLE.
CONTRACTOR WILL BE REQUIRED TO
PROVIDE FRANGIBLE SUPPORTS PER AC
150/5345-44.
C1 "CONSTRUCTION AHEAD" SIGN
NOT TO SCALE
PROJECT NO.
CLIENT
# DATE DESCRIPTION
A:
\2
4\
0.
\0 3_
D
SG
N \0
1_ D
W G
\0
_G
EN
\G -5
-4
.D W
G , 1
0/
/2
2:
P
M , s da ne
Pe rim et er
R oa d R eh ab ili ta tio n
City of Lubbock, TX
Lubbock Preston Smith International Airport Lubbock, TX
44140.24
Parkhill.com
PRINT IN COLOR
1 10/14/2025 Bid Set
PRO
FESS I ONA L ENG I N
EERL
I C E N S E
D
STATE OF TEXAS
TESSA R. HAZLETT
105004
PA
R
K H
I L L
S
M I TH & COOPER , I NC
. F
- 5
10/14/2025
G-501
Construction Safety Details
M
TE
R
M
IN
AL
A
PR
O
N
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSATSATSA
TO
FA
TO
FA
TO
FA
TO
FA
TO
FA
TO
FA
TO
FA
TO
FA
TO
FA
TO
FA
TO
FA
TO
FA
TO
FA
TO
FA
TO
FA
TOFATOFATOFATOFA
0+00
1+00
2+00 3+00 4+00
5+00
6+
7+
8+
A4 /C
-5
A4/C-501
BH8
101.01
101.02
TWY M
TSATSATSATSATSATSATSATSATSATSATSATSATSATSATSATSATSATSATSATSATSATSATSATSA
TOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFA
8+00 9+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00
A4 /C
-5 01A4
/C -5
BH7
BORE HOLE TABLE
POINT NAME
BH7
BH8
NORTHING
7300297.4343
7300889.8164
EASTING
956456.0152
956846.0396
CONTROL POINTS
POINT NAME
101.01
101.02
NORTHING
7300940.8110
7300972.4220
EASTING
957031.9260
957032.3140
PROJECT NO.
CLIENT
# DATE DESCRIPTION
A:
\2
4\
0.
\0 3_
D
SG
N \0
1_ D
W G
\0
_C
IV
IL
\C
-1
-1
-4
.D
W G
, 1 0/
/2
2:
P M
, s da ne
Pe rim et er
R oa d R eh ab ili ta tio n
City of Lubbock, TX
Lubbock Preston Smith International Airport Lubbock, TX
44140.24
Parkhill.com
PRINT IN COLOR
1 10/14/2025 Bid Set
PRO
FESS I ONA L ENG I N
EERL
I C E N S E
D
STATE OF TEXAS
TESSA R. HAZLETT
105004
PA
R
K H
I L L
S
M I TH & COOPER , I NC
. F
- 5
10/14/2025
C-101
Pavement Demolition Plan STA 0+00 To 16+00
MATCHLINE STA 8+00 SEE ON THS SHEET
M
AT
C
H
LI
N E
ST
A
8+
S
EE
O N
T H
IS
S
H
EE
T
M
AT
C H
LI
N
E
ST
A
+0
SE
E
SH
EE
T C
-1
N
0 40' 80'
N 0 40' 80'
DEMOLITION NOTES
A. ISOLATE ALL PAVEMENT TO BE REMOVED BY SAW CUTTING,
FORMING A CLEAN, STRAIGHT EDGE.
B. CONTRACTOR TO MILL THE EXISTING HMAC TO A DEPTH OF
+/- 3", OR AS NECESSARY TO LEAVE A 1" THICK HMAC MAT
IN PLACE. ASPHALT MILLINGS SHALL BE STOCKPILED ON
AIRPORT PROPERTY FOR THE OWNER AT A LOCATION
INDICATED IN THE PLANS. THE REMAINING 1" HMAC LAYER
SHALL THEN BE PULVERIZED INTO THE UNDERLYING 7.5"
AGGREGATE BASE TO YIELD A COMPOSITE 8.5" LAYER OF
RECLAIMED MATERIAL FOR CEMENT TREATMENT MEETING
THE REQUIREMENTS OF TXDOT ITEM 275. ALL OTHER
CONSTRUCTION DEBRIS AND WASTE SHALL BE LAWFULLY
DISPOSED OF OFF-SITE BY THE CONTRACTOR AT THE
CONTRACTOR'S EXPENSE.
C. UTILITIES SHOWN ARE APPROXIMATE AND ARE FOR
INFORMATIONAL PURPOSES ONLY. CONTRACTOR SHALL
VERIFY LOCATION AND DEPTH OF ALL UTILITIES BY
CONTACTING DIG TESS AND BY COORDINATING ON-SITE
WITH THE FAA AND OWNER. ANY LOCATION OF FAA CABLES
SHALL BE BY VACUUM TRUCK ONLY.
D. REFER TO SHEETS G-007 TO G-113 FOR PHASING AND
SAFETY REQUIREMENTS.
E. CONTRACTOR SHALL TAKE NECESSARY MEASURES TO
PROTECT EXISTING STRUCTURES (BUILDINGS, FENCE,
UTILITIES, ETC.). ANY DAMAGE SHALL BE REPAIRED AT THE
CONTRACTOR'S SOLE EXPENSE.
F. STOCKPILE LOCATION SHALL BE LOCATED NEAR THE
AIRFIELD MAINTENANCE BUILDING EAST OF THE TERMINAL
AS INDICATED IN SHEET G-007.
G. INTENT IS TO NOT DISTURB EXISTING SUBGRADE EXCEPT IF
SUBGRADE PUMPING IS OBSERVED. SEE DETAIL B3/C-501.
H. KEEP EQUIPMENT OFF ASPHALT PAVING TO REMAIN
WHERE POSSIBLE TO AVOID DAMAGES.
TOFA
TSA
EXISTING ASPHALT TO REMAIN
TAXIWAY OBJECT FREE AREA
TAXIWAY SAFETY AREA
SAWCUT FULL DEPTH
ASPHALT SURFACE/BASE TO RECLAIM
CONTROL POINT
LEGEND
BORE HOLE LOCATION
EXISTING CONCRETE TO REMAIN
BH1
EXISTING FENCE
101.01
EXISTING DRAINAGE STRUCTURE
EXISTING FRENCH DRAIN
EXISTING UNDERGROUND ELECTRIC
EXISTING EDGE LIGHT
EXISTING EDGE DRAIN
EXISTING SIGN
EXISTING SEWER LINE
EXISTING WATER LINE
EXISTING GAS LINE
EXISTING FIBER OPTIC LINE
TAXIWAY R
AutoCAD SHX Text D…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .