5-LPOEPriceSheet_revised_6-4-15.xlsx
XLSX spreadsheet 13 KB Posted
- Solicitation number
- 10PSPR-15-0025
About this file
REVISED LPOE LED Pricing Sheet--UPDATED
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Response_to_Contractor_Questions_2.pdf | ||
| 1-SF_30_RFQ_SOW_Extension.pdf | ||
| Response_to_Contractor_Questions.pdf | ||
| 1-SF_30_RFQ_SOW_Extension-MERGE.pdf | ||
| 1-SF_30_RFQ_SOW_Extension-MERGE.pdf | ||
| 4c-LPOE_Lighting_Price_Sheet.xlsx | XLSX spreadsheet | |
| 1-SF_30_RFQ_Schedule_Site_Visit-MERGE.pdf | ||
| LPOEPriceSheet.xlsx | XLSX spreadsheet | |
| CompleteRFQPackage.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 Land Port of Entry (LPOE) LED Lighting Project
| Existing Lamp | Existing Wattage | Quantity | 5% Overage | Price | ||
| Pacific Highway LPOE | ||||||
| Pole Lights | MH Double | 1000 | 48 | |||
| Dock and Warehouse | MH | 400 | 129 | |||
| Primary and Secondary Inspection | MH | 250 | 94 | |||
| Labor and Installation | Headings don't apply. Please include Lump Sum Price | |||||
| Travel | Headings don't apply. Please include Lump Sum Price | |||||
| Overhead and Profit | Headings don't apply. Please include Lump Sum Price |
| Lynden LPOE | ||||
| Wall Pack Lights (Primary) | MH | 400 | 12 | |
| Furnish and Insatll Wall Pack light to match existing (Primary) | MH | 400 | 1 | |
| Wall Pack Lights (Secondary) | MH | 400 | 9 | |
| Wall Pack Lights (Secondary Inspection Garage) | MH - Replace Fixtures | 175 | 8 | |
| Labor and Installation | Headings don't apply. Please include Lump Sum Price | |||
| Travel | Headings don't apply. Please include Lump Sum Price | |||
| Overhead and Profit | Headings don't apply. Please include Lump Sum Price |
| Sumas LPOE | ||||
| Pole Lights (Single) | HPS | 400 | 19 | |
| Pole Lights (Double) | HPS | 400 | 5 | |
| Pole Lights (Triple) | HPS | 400 | 1 | |
| Pole Lights (Quad) | HPS | 400 | 12 | |
| Wall Packs | MH | 175 | 15 | |
| Labor and Installation | Headings don't apply. Please include Lump Sum Price | |||
| Travel | Headings don't apply. Please include Lump Sum Price | |||
| Overhead and Profit | Headings don't apply. Please include Lump Sum Price |
| Peace Arch LPOE | ||||
| Pole Lights-Lamp Replacement Only | MH Double | 400 | 20 | |
| Pole Lights-Complete Pole Replacement | HPS | 250 | 1 | |
| Labor and Installation | Headings don't apply. Please include Lump Sum Price | |||
| Travel | Headings don't apply. Please include Lump Sum Price | |||
| Overhead and Profit | Headings don't apply. Please include Lump Sum Price |
| BPSHQ | ||||
| Pole Lights (11 each) lamp replacement only | HPS | 250 | 10 | |
| Complete Light Pole Replacement | HPS | 250 | 1 | |
| Can Lights (entry way) | Incandescent | 100 | 10 | |
| Installation of NEW dual Bulb LED Floodlight fixtures | 18 | |||
| Remove HPS Light fixture on East Side of Main Bldg | HPS | 1 | ||
| Remove HID light located on the west side of building | HID | 1 | ||
| Labor and Installation | Headings don't apply. Please include Lump Sum Price | |||
| Travel | Headings don't apply. Please include Lump Sum Price | |||
| Overhead and Profit | Headings don't apply. Please include Lump Sum Price |
Sheet2
Sheet3
File details come from the government source that posted it. Updated .