ATT 1 SOI. REV A2 06292023 (Big Tujunga Water System Repair_rev1).docx

DOCX document 19 KB Posted

Attached to
GAOA Big Tujunga Water System Repair, Angeles National Forest, California
Solicitation number
1099533
Issued by

View the file

Other files

File Type Posted
Amendment No. 2.docx DOCX document
ATT 2 RFI_BIGTUJUNGA.docx DOCX document
ATT 5 DRAWING. REV A2 06292023 (Big Tujunga Water System Repair_rev1).pdf PDF
ATT 3 SOW REV A2 06292023.docx DOCX document
ATT 4 SPECIFICATION REV A2 06292023 (Big Tujunga Water System Repair_rev1).doc DOC document
Amendment No. 1.docx DOCX document
StatementofWork.docx DOCX document
ContractSpecifications_BigTFormatted.doc DOC document
Wage Determination.pdf PDF
ANF FY23 Construction Big T_FirePlan.docx DOCX document
127EAW23Q0017.pdf PDF
GAOA Big T Water - SOI.pdf PDF
Big Tujunga Water System Repair (FINAL).pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 2

SCHEDULE OF ITEMS ANGELES NATIONAL FOREST

PROJECT TITLE: BIG TUJUNGA WATER SYSTEM REPAIR

Period of Performance (Required for Services and A&E)

Anticipated Delivery Date (Required for Supply and Construction)

SCHEDULE OF ITEMS

ITEM NUMBER

DESCRIPTION

PAY UNIT

EST QTY

UNIT PRICE

COST

0001
Exterior Tank Repairs
LS
1
0002
Interior Tank Lining
SF
1414
0003
Ladder
EA
4
0004
Water Level Indicator
EA
2
0005
Float Valve
EA
2
0006
Isolation Valve
EA
8
0007
Hatch Cover
EA
3
0008
Piping
LF
100
0009
Drain Line Trenching
LF
50
0010
Riprap
LS
1
0011
Disinfeciton of System
LS
1

Award anticipated to be a firm fixed price contract.

Subtotal: Assume 15% Mobilization Grand Total