10855-20250103102250 C&C WATER.pdf

PDF 92 KB Posted

Attached to
10855-20250103102250 C&C Water
Solicitation number
3170031458
Issued by
Tallahatchie County, Mississippi

About this file

This is an Advertisement for Bids from C&C Water Association, Inc. in Hillsboro, MS for construction of distribution improvements in Scott County. Sealed bids will be received at Heflin Engineering in Brandon, MS or electronically via www.heflinengineeringbids.com until 10:00 AM local time on February 12, 2025. Plans and specifications can be examined at Heflin Engineering's office and the bid schedule can be viewed at the Mississippi Procurement Technical Assistance Program office in Jackson and the East MS Contract Procurement Office in Meridian. Bidding documents are available through www.heflinengineeringbids.com.

The project is expected to be funded through the ARPA Rural Water Association Infrastructure Grant (RWAIG). A 5% bid security in the form of a bid bond, certified check, or cashier's check is required. Minority and women's business enterprises are encouraged to bid as prime contractors and explore subcontracting opportunities. The procurement must comply with Mississippi Code of 1972 requirements and multiple Uniform Guidance provisions including Subparts A-F and various CFR Parts. C&C Water Association reserves the right to hold bids for 60 days and award to the lowest, best-compliant bidder.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADVERTISEMENT FOR BIDS

C&C Water Association, Inc. PO BOX 52, Hillsboro, MS 39087 (Owner) (Address)

Separate Sealed Bids for the Construction of distribution improvements in Scott County will be received by C&C Water Association, Inc., herein called the “Owner” at the office of Heflin Engineering, 1700 W Government St, Building A, Suite J, Brandon, MS. 39042 or electronic bids submitted via www.heflinengineeringbids.com until 10:00 AM local time on February 12, 2025, and then at said office publicly opened and read aloud.

The PLANS, SPECIFICATIONS AND CONTRACT DOCUMENTS may be examined at the following location(s):

Heflin Engineering, 1700 W Government St, Building A, Suite J, Brandon, MS 39042, 601-824-7569 (Consulting Engineer’s Office)

The BID SCHEDULE may be examined at the following location:

Mississippi Procurement Technical Assistance Program (MPTAP) Mississippi Development Authority, Minority & Small Business Development

Woolfolk Building 501 North West Street, Suite B 01

Jackson, MS 39201 601-359-3448

East MS Contract Procurement Office

723 23rf Ave Meridian, MS 39301

601-934-5975

Copies of the Plans, Specifications, and other Bidding Documents are available for preview, download or in hard copy format from www.heflinengineeringbids.com. Documents must be obtained from the website and such costs are non-refundable. For questions related to the online bidding process, please contact Plan House Bidding Group (662-407-0193).

Bid security in the form of a Bid Bond, certified check or cashier’s check in an amount equal to five percent (5%) of the Bid shall be furnished by each Bidder as required by the Contract Documents.

Minority and women’s business enterprises are solicited to bid on this contract as prime contractors and are encouraged to make inquiries regarding potential subcontracting opportunities and equipment, material and/or supply needs.

Any contract or contracts awarded under this invitation for bids are expected to be funded in whole or in part by anticipated funds from the ARPA Rural Water Association Infrastructure Grant (RWAIG). Neither the State of Mississippi, the Local Governments and Rural Water Systems Improvements Board, nor any of their employees is or will be a party to this invitation for bids or any resulting or related contracts. This procurement will be subject to all applicable sections of the Mississippi Code of 1972, Annotated, as they apply to local governments, in accordance with RWAIG Program Regulations.

Based on the Assistance Listing: Coronavirus State and Local Fiscal Recovery Funds and Part 2 of the US Treasury State and Local Fiscal Recovery Funds Compliance and Reporting Guidance (v3.0 February 2022) (Compliance Guide), the following Uniform Guidance provisions will be required in all contracts:

• Subpart A, Acronyms and Definitions

• Subpart B, General provisions

• Subpart C, Pre-Federal Award Requirements and Contents of Federal Awards (except 2 CFR 200.204, .205, .210, and .213)

• Subpart D, Post Federal; Award Requirements (except 2 CFR 200.305(b)(8) & (9), .308, .309, and .320(c)(4))

• Subpart E, Cost Principles

• Subpart F, Audit Requirements

• 2 CFR Part 25 (Universal Identifier & System for Award Management)

• 2 CFR Part 170 (Reporting Subaward and Executive Compensation Information)

• 2 CFR Part 180 (OMB Guidelines to Agencies on Governmentwide Debarment and Suspension (Non-procurement)

• 2 CFR 200 Appendix ii http://www.heflinengineeringbids.com/ http://www.heflinengineeringbids.com/

C&C Water Association, Inc. is an Equal Opportunity Employer, and hereby notifies all bidders will be afforded the full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, religion, sex, national origin, age, disability, sexual preference, marital or veteran status, or any other legally protected status in consideration for an award.

C&C Water Association, Inc. reserves the right to reject any and all Bids and to waive any and all informalities, and reserves the right to hold all Bids for examination for a period not to exceed sixty (60) days and to award Contract to the lowest and best Bid complying with the Plans and Specifications within said time.

C&C WATER ASSOCIATION, INC.

Jessica Rasco, Board President

File details come from the government source that posted it. Updated .