REQUEST FOR INFORMATION (RFI) – No. 42426-RD
This is a Request for Information issued by Pacific Northwest National Laboratory (PNNL) for mid-energy electron beam (eBeam) systems. The RFI seeks vendor information to support a future formal solicitation for the procurement of a 2 MeV eBeam system designed to irradiate low- and medium-density products (0.08 to 0.2 g/cm³) in primary packaging for sterilization-validation activities and operational deployment in regulated environments. PNNL requests that vendors provide detailed technical information, compliance details, and preliminary system specifications rather than formal proposals at this stage.
The RFI specifies the following primary technical requirements: a 2 MeV electron beam accelerator with 2–10 kW beam power capability; a self-shielded cabinet design suitable for deployment in unrestricted areas with perimeter dose below 0.5 µSv/hour; end-of-line or offline integration as the primary configuration with optional in-line capability; a standard down-fire scanning beam with a 1-meter-wide scan horn; conveyor system capable of handling rectangular products measuring 45 cm × 45 cm × 5 cm; minimum throughput of 15 kGy dose in products at densities of 0.15 and 0.2 g/cm³; and start-up capability under multiple conditions (cold start, warm start, power interruptions, and full power loss). Vendors must also provide information on dose-control tolerance windows, system configuration options, scan horn specifications, beam uniformity, conveyor types and speeds, penetration expectations at 2 MeV, system efficiency for 0.1 g/cm³ products, self-shielding materials and thicknesses, facility requirements (electrical power, cooling, exhaust flow, floor loading), controls and data logging platforms, Factory Acceptance Test and Site Acceptance Test criteria, commissioning support, training provisions, preventive maintenance schedules, spare parts availability and pricing, field service response times, risks and constraints, and typical project timelines from contract to completion of site acceptance testing.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFI No. 10826-RD - QUESTIONS_CLARIFICATIONS_FINAL.pdf | ||
| Att. A - Brief Application Template - eBeam Irradiator Donation.docx | DOCX document | |
| RFI No. 10826-RD (E-BEAM DONATION).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Expected external dose rates at 10 cm from surfaces/slots during operation in unrestricted areas.
Explain radiation-monitoring approach, if any can be provided.
- Facility requirements: electrical power drop required (kVA), cooling capacity required (kW, flow, inlet temperatures to eBeam machine), exhaust flow required to outside (in order to maintain negative pressure in product path through process zone), ambient environment restrictions (temperature and humidity limits), options for anchoring to floor, required floor-loading capacity under shield, required clearance for largest system crate or component to be brought into installation area.
4.4 Controls, Data, and Cyber/Connectivity
- Human-machine interface / programmable logic controller (HMI/PLC) platform, alarm/interlock architecture.
- Data logging (all dose-relevant critical parameters; run-record reports available), audit trails, user-access control.
- Interfaces: Ethernet/Industrial Protocol (IP), Open Platform Communications Unified Architecture (OPC UA), Modbus, etc.
- Remote-support-connectivity solution and cybersecurity considerations.
4.5 Testing Support and Validation
- Factory Acceptance Test (FAT), being performed at Supplier facility. List typical acceptance criteria, include power-efficiency tests, as well as demonstration of variations/control/recording of all dose-relevant critical eBeam system parameters affecting sterilization.
- Site Acceptance Test (SAT), being performed at customer site. List typical acceptance criteria.
- Commissioning approach and support through Installation Qualification (IQ) and Operational Qualification (OQ).
- Dosimetry process support for measurements on eBeam system (recommended procedures, holders, beam control of critical parameters for characterizing impact on dose).
- Documentation packages typically provided to assist process validation for sterilization.
- Support for regulatory engagement through Process Qualification (PQ).
4.6 Project Execution and Schedule
- Typical lead time from contract to FAT.
- Typical time from FAT completion to SAT at customer site in USA.
- Major project phases, including required (if any) phase-gate approvals and customer responsibilities.