This is an Advertisement for Bids from Lake Orion Community Schools and Frank Rewold and Son Inc. for a 2018 Bond Program involving district-wide controls system upgrade, commissioning, testing and balancing, and other miscellaneous work. The project involves GMBae as the architect and Frank Rewold and Son Inc. (FRS) as the construction manager. Bid documents will be available starting February 11, 2020, through the FRS Portal. A non-mandatory pre-bid walk-through is scheduled for February 18, 2020, at 10:00 a.m., starting at Webber Elementary. Sealed bids are due by 2:00 p.m. EST on February 25, 2020, with a public bid opening immediately following at Frank Rewold and Son Inc.'s Rochester office.

The project requires a 5% bid security, with bid bonds preferred though certified or cashier checks are acceptable for bids under $50,000. Performance and Payment Bonds are required for any bid category exceeding $50,000 and may be requested for categories below $50,000. The project is not tax exempt for state sales tax and/or use tax. Prevailing wage rates are not required. Bidders must submit both a familial relationship disclosure statement and an Iran Economic Sanctions Compliance Certificate with their proposals. All questions must be directed to Kurt Ryder, the project estimator.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADVERTISEMENT FOR BIDS

Project: Lake Orion Community Schools

Description: 2018 Bond Program – District Wide Controls System Upgrade, Commissioning, Testing and Balancing, and Other Miscellaneous Work

Architect: GMBae

85 E. Eighth St., Suite 200, Holland, MI 49423

Construction Manager: Frank Rewold and Son Inc. (FRS) 303 E. Third St., Suite 300, Rochester, MI 48307

Estimator: Kurt Ryder

(248) 601-1226 kryder@frankrewold.com Questions addressed ONLY to Kurt Ryder

Bid Documents: Bid documents including bid forms may be obtained from FRS Portal at https://frankrewold.sharefile.com; Login: 10826LOCS@frs.com; Password: Frs10826# (case sensitive) Bid documents will be available on or after February 11, 2020

Non-Mandatory Prebid Walk-Through: 10:00 a.m., Tuesday, February 18, 2020 - Meet at Webber Elementary, 3191 Clarkston Rd., Lake Orion, MI 48362. Meet at the front entrance. Additional schools will be visited as required following initial walk-thru.

Bid Due Date: 2:00 p.m., Tuesday, February 25, 2020

Bids will only be accepted on forms provided. Proposal forms must be in a sealed envelope, mailed or delivered in person prior by 2:00 p.m. EST on the due date to:

Attn: John Fitzgerald and Wes Goodman, LOCS C/O Frank Rewold and Son Inc.

2:00 p.m. Public Bid Opening:

Tuesday, February 25, 2020

Frank Rewold and Son Inc.

4th Floor Mezzanine

Labor and Material and Performance

Bond:

In accordance with Michigan Compiled Laws Section 129.201, successful contractor(s) must obtain Performance and Payment Bonds for any Bid Category exceeding $50,000 and may be requested to obtain Performance and Payment Bonds for any Bid Category below $50,000. The Performance and Payment Bonds shall be in an amount equal to the contract amount. The Performance and Payment Bonds shall be for the protection of Lake Orion Community Schools and shall be executed by a surety company authorized to do business in the state of Michigan and be listed in Federal Register or have an AM Best Rating of B+ or better.

Prevailing Wage Rates: Not required

Bid Bond: 5% bid security required. Bid bonds are preferred, however, certified or cashier checks are acceptable for bids under $50,000.

Nonexempt: This project is not tax exempt for state sales tax and/or use tax. All materials and supplies incorporated and used in construction and becoming a permanent part of this project will not be exempt from state sales tax and/or tax

Disclosure Statements: A sworn and notarized statement disclosing any familial relationship that exists between owner or any employee of bidder and any member of board of education or superintendent of Lake Orion Community Schools must accompany each bid proposal. Each bid proposal must also include a signed Iran Economic Sanctions Compliance Certificate. The board of education will not accept a bid proposal that does not include this sworn and notarized familial disclosure statement or the Iran Economic Sanctions Compliance Certificate.