About this file
These are bid and permit drawings for a roof replacement project at Freeland High School located at 8250 Webster Rd in Freeland, Michigan. The project involves a comprehensive roof replacement with demolition of existing roofing materials across multiple roof sections, including removing EPDM, PVC, shingle, and standing seam roof systems. The project is scheduled for bidding and permitting as of 05.09.2025, with a project number of TC JOB NO. 107332. The drawings include detailed demolition plans, proposed roof replacement plans, and extensive technical roof details specifying removal and replacement methodologies, insulation requirements, drainage considerations, and penetration management.
The project specifications require a total roof system replacement with specific technical requirements, including installing new membrane roofing with tapered insulation to ensure proper drainage. The drawings indicate multiple roof cores and existing conditions, with detailed requirements for insulation (minimum R-31.28 total R-value), vapor barriers, and cover boards. The project includes replacing roof drains, managing existing mechanical equipment, and ensuring compliance with Michigan's 2021 Rehabilitation Building Code and energy efficiency standards. An alternate option (Alternate A-1) includes adding a fixed ladder with grab rails. The project documents suggest a mechanically fastened roofing system using Duro-Last roofing materials, with specific installation guidelines for various roof elements and penetrations.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
One SeaGate, Park Level 118
213 South Main Street, Suite 200 Ann Arbor, MI 48104 / 734.922.8002
Toledo, OH 43604 / 419.242.7405
800 North High Street, Third Floor Columbus, OH 43215 / 419.242.7405
AREA OF WORK
D1.00 DEMOLITION ROOF PLAN
A1.11
A1.12
PROPOSED ROOF REPLACEMENT PLAN
ROOF DETAILS
1 OVERALL ROOF PLANARCHITECTURAL
CIVIL
LIFE SAFETY & CODE INFORMATION
DEMOLITION
8250 Webster Rd Freeland, MI 48623
Freeland Schools High School Roof Replacement
BIDDING & PERMIT05.09.2025
PROJECT MAP
CAMPUS / CITY MAP
TC JOB NO. 107332
OWNER JOB NO. #Client Custom
DRAWING INDEX: (ALL DRAWINGS LISTED BELOW, EXCEPT THOSE UNDER "DEFFERRED SUBMITTALS"
ARE INCLUDED IN THIS PACKAGE, UNLESS NOTED OTHERWISE)
MICHAEL MUSE, 1301048954
EXPIRATION DATE: 05.06.20252026
05.08.2025
N
OWNER JOB NO. #Client Custom
BIDDING AND PERMIT05.09.2025
SHEET TITLE
SHEET NO.
D1.00
KEY PLAN
N.T.S.
DEMOLITION
ROOF PLAN
Freeland Schools
High School Roof Replacement
8250 Webster Rd Freeland,, MI 48623
TC JOB NO. 107332
MICHAEL MUSE, 1301048954
EXPIRATION DATE: 05.06.2025
PROJECT TITLE
1. ALL MECHANICAL EQUIPMENT TO REMAIN UNLESS
NOTED OTHERWISE
2. MAINTAIN ROOF DRAINS TO REMAIN IN FUNCTIONING
CONDITION TO ENSURE ROOF DRAINAGE AT THE END
OF EACH WORKDAY. PREVENT DEBRIS FROM ENTERING
OR BLOCKING ROOF DRAINS AND CONDUCTORS.
3. DIMENSIONS SHOWN ARE APPROXIMATE.
CONTRACTOR IS RESPONSIBLE TO CONFIRM SIZES AND
DIMENSIONS PRIOR TO ORDERING MATERIAL.
4. ALL MATERIALS NOTED TO BE REMOVED ARE TO BE
REPLACED WITH NEW MATERIALS (UNO)
5. ALL PLUMBING/MECHANICAL EQUIPMENT NOTED TO
REMAIN IS TO BE OPERATIONAL DURING THE DURATION
OF THE PROJECT (UNO). IF EQUIPMENT SHUTDOWN IS
REQUIRED FOR DEMOLITION WORK, CONTRACTOR
MUST COORDINATE AND SCHEDULE WITH OWNER/
PROJECT MANAGER.
6. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO
DISPOSE OF ALL MATERIALS SHOWN TO BE
DEMOLISHED AND NOT REINSTALLED
7. ROOF DRAINS: EXISTING ROOF DRAINS TO BE
REMOVED FOR REPLACEMENT RECONNECTION TO
EXISTING STORM LINES.
DEMOLITION LEGEND
REFER TO THE FOLLOWING TAG FOR GENERAL CEILING
AND FLOORING DEMOLITION INFORMATION FOR EACH
ROOM UNLESS OTHERWISE NOTED.
DEMOLITION GENERAL NOTES
(NOTE: NOT ALL NUMBERS ARE USED)
R: ROOF
R-0: NO ROOF DEMOLITION THIS AREA
R-1A: REMOVE EXISTING EPDM ROOF THIS AREA
R-1B: REMOVE EXISTING PVC ROOF THIS AREA
R-1C: REMOVE EXISTING SHINGLE ROOF THIS AREA
R-1D: REMOVE EXISTING STANDING SEAM ROOF THIS AREA
R-2: REMOVE EXISTING ROOF INSULATION
R-3: REMOVE EXISTING ROOF WALKWAY PADS
R-4: REMOVE EXISTING DRIP EDGE FLASHING
R-5: REMOVE EXISTING GRAVEL STOP
R-6: REMOVE EXISTING FLASHING AT PENETRATION
R-7: REMOVE EXISTING ROOF DRAIN AND REPLACE IN
SAME LOCATION
R-8: REMOVE CURB FLASHING, EXISTING EXHAUST FAN
TO REMAIN
DEMOLITION KEYNOTES
ROOF SLOPE (HIGH TO LOW)
EXISTING ROOF DRAIN (RD)
EXISTING PLUMB/MECH VENT STACK
(VTR)
EXISTING EXHAUST FAN (EF)
EXISTING DUCT SUPPORT CURB
(DSC)
EXISTING WALKWAY PAD
REMOVE EXISTING ROOFING
MATERIAL. EXISTING ROOF
INSULATION TO REMAIN
REMOVE EXISTING ROOFING
MATERIAL. REMOVE EXISTING ROOF
INSULATION
F7 D1.00
F7 D1.00
'-8
8'
-0 "5'-0"
47'-8"
'-0
255'-0"
4'
-0
27'-6"
R7
R7
R7
R7
R7 R7 R7
R7
R7
R7 R7
R7
R7
R7 R7 R7
R7
R7
R7
R7
R7
R7
R7 R7
R-8
R-8
R-8
R-8
R-8
R-8
R-8
R-8
R-8
R-8
R-8 R-8
R-8
R-8
R-8
R-8
R-8
R-8
R-8
R-8
R-8
R-8
R-8
R-8
R-8
R-8
R-8 R-8
R-8
R-8
R-8
R-8
R-8
R-8
R-8
R-8
R6
R6
R6
R6
R6
R6
R6
R6
R6 R6
R6 R6
R6
R6
R6
R6
R6
R6
R6
R6 R6
SIM.
CORE 3
CORE 4
CORE 4
CORE 6 CORE 7
CORE 8
CORE 9
CORE 10
CORE 11
CORE 12
CORE 13
CORE 16
CORE 17
R7
REMOVE EXISTING
METAL FLASHING
GRAVEL STOP AND
FLASHING
EXISTING PAINTED
METAL FLASHING TO
REMAIN
REMOVE SINGLE PLY ROOFING,
FLASHINGS, AND INSULATION
DOWN TO DECK
CONTRACTOR TO
EVALUATE BLOCKING AND
REPLACE AS NEEDED
EXISTING METAL
PANEL TO REMAIN
REMOVE SINGLE PLY ROOFING,
FLASHINGS, AND INSULATION
DOWN TO DECK
PARTIAL LIST OF EXISTING ROOF
CONDITIONS
Core # 4 - Dry Metal deck 3” ISO insulation Duro-Last roof membrane
Core # 5 - Dry Metal deck Fiberglass insulation BUR roof system - CTP Wood fiber insulation EPDM roof membrane Duro-Last roof membrane
Core # 6 - Dry Metal deck Fiberglass insulation BUR roof system - CTP Wood fiber insulation EPDM roof membrane Duro-Last roof membrane
Core # 7 - Dry Metal deck Fiberglass insulation BUR roof system - CTP Wood fiber insulation EPDM roof membrane Duro-Last roof membrane
Core # 8 - Dry Metal deck
3” ISO
Duro-Last roof membrane
Core # 9- Dry Metal deck Fiberglass insulation BUR roof system - CTP Wood fiber insulation EPDM roof membrane Duro-Last roof membrane
Core # 10 - Dry Metal deck Fiberglass insulation BUR roof system - CTP Wood fiber insulation EPDM roof membrane Duro-Last roof membrane
SCALE: 1/16" = 1'-0"
A1
ENLARGED PARTIAL ROOF DEMOLITION PLAN
SCALE: 1 1/2"= 1'-0"F7 DEMOLITION DETAIL
BIDDING AND PERMIT05.09.2025
SHEET TITLE
SHEET NO.
A1.11
KEY PLAN
N.T.S.
PROPOSED
ROOF
REPLACEMENT
PLAN
Freeland Schools
High School Roof Replacement
8250 Webster Rd Freeland,, MI 48623
TC JOB NO. 107332
MICHAEL MUSE, 1301048954
EXPIRATION DATE: 05.06.2025
PROJECT TITLE
ROOF GENERAL NOTES:
1. MAINTAIN ROOF DRAINS IN FUNCTIONING CONDITION
TO ENSURE ROOF DRAINAGE AT END OF EACH
WORKDAY.
2. PREVENT DEBRIS FROM ENTERING OR BLOCKING ROOF
DRAINS AND CONDUCTORS.
3. PATCH ROOF SYSTEM AT ALL REMOVED
PENETRATIONS, CURBS, AND EQUIPMENT. REFER TO
MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS.
4. PATCH ROOF SYSTEM AND PROVIDE FLASHING AT ALL
NEW ROOF PENETRATIONS, CURBS, AND EQUIPMENT.
REFER TO MECHANICAL, PLUMBING, AND ELECTRICAL
DRAWINGS.
5. PROVIDE CRICKETS ON HIGH SIDE OF ROOFTOP UNITS
& OTHER EQUIPMENT, TYPICAL.
6. FINAL LOCATION OF ROOFTOP EQUIPMENT TO BE
COORDINATED WITH STRUCTURAL AND MECHANICAL
WORK.
7. PAINT ALL EXPOSED ROOFTOP NATURAL GAS LINES,
REFER TO SPECIFICATIONS.
8. ALL EQUIPMENT IS TO REMAIN OPERATIONAL DURING
CONSTRUCTION. COORDINATE REMOVAL AND OR
REPLACEMENT OF EQUIPMENT WITH OWNER.
9. ROOF SLOPES INDICATED ON THE DRAWINGS ARE TO
INDICATE DESIGN INTENT ONLY. CONTRACTOR SHALL
PROVIDE SHOP DRAWINGS FOR THE COMPLETE
ROOFING SYSTEM TO ENSURE PROPER DRAINAGE,
INCLUDING TAPERED INSULATION LAYOUT, FLOW
DIRECTIONS, DRAIN LAYOUT, AND CRICKET LOCATIONS.
REFER TO SPECIFICATIONS FOR ADDITIONAL
INFORMATION.
10. PROVIDE ROOF FLASHING FOR ALL ROOF MOUNTED
EQUIPMENT AND PENETRATIONS AT ALL NEW ROOFING
LOCATIONS. REFER TO PLUMBING, MECHANICAL &
ELECTRICAL DRAWINGS.
11. REFER TO GENERAL ROOFING ASSEMBLY DETAILS AND
SPECIFICATIONS FOR R-VALUE REQUIRED OF ROOFING
INSULATION.
12. SEE ASSEMBLY DETAILS AND SPECIFICATIONS FOR
COVERBOARD AND VAPOR RETARDER/AIR BARRIER
REQUIREMENTS.
13. AT EXISTING AREAS TO RECEIVE NEW ROOFING,
REMOVE ALL EXISTING ROOF RELATED ACCESSORIES
INCLUDING, BUT NOT LIMITED TO, SNOW GUARDS,
PITCH POCKETS, PIPE PENETRATION SLEEVES,
EXPANSION JOINTS, CANTS, SADDLES, CRICKETS,
ATTIC VENTS, RIDGE VENTS, WALKWAY PADS AND
SIMILAR.
ROOF PLAN LEGEND:
MEMBRANE ROOF
SYSTEM ON
TAPERED
INSULATION
MEMBRANE ROOF
SYSTEM ON FLAT
INSULATION
KEYNOTES:
(NOTE: NOT ALL NUMBERS ARE USED)
RFG: ROOFING
RFG-01 SINGLE-PLY MEMBRANE ROOFING
RFG-02 ROOF MEMBRANE FLASHING
RFG-03 ROOFING INSULATION
RFG-04 TAPERED ROOFING INSULATION
RFG-05 ROOFING VAPOR RETARDER
RFG-06 TERMINATION BAR
RFG-07 PREFORMED PIPE BOOT
RFG-08 LAP SEALANT
RFG-09 MASONRY SPLASHBLOCK 36" MIN
SHM: SHEET METAL FABRICATIONS
SHM-01 GUTTER
SHM-02 DOWNSPOUT
SHM-03 GRAVEL STOP
SHM-04 COPING
SHM-05 SHEET METAL FLASHING
SHM-06 DRIP EDGE
SHM-07 COUNTERFLASHING
SHM-08 CONDUCTOR HEAD 12" TYPICAL
RD: ROOF DRAINAGE
RD-01 ROOF DRAIN REPLACEMENT
XX-#
A1.12
A1.12
A1.12
A1.12
A1.12
A1.12
A1.12
A1.12
A1.12
A1.12
NEW INSULATED ROOF
HATCH IN EXISTING OPENING
SIZE TO BE V.I.F.
NEW CRICKET
NEW CRICKET
EXIST. EXHAUST
FAN TYP. -
SEE DETAIL 4010 ON
SHEET A1.12
NEW CRICKET
EXIST
MECHANICAL
UNIT
EXIST
MECHANICAL
UNIT
EXIST
MECHANICAL
UNIT
EXIST
MECHANICAL
UNIT
RD-1
RD-01
RD-01
RD-01
RD-01
RD-01
RD-01
EXIST.
EXHAUST
FAN
NEW CRICKET
EXIST
MECHANICAL
UNIT
NEW INSULATED
ROOF
HATCH IN EXISTING
OPENING
SIZE TO BE V.I.F.
NEW CRICKET
NEW EXPANSION JOINT
ALTERNATE A-1 ADD FIXED
LADDER WITH GRAB RAILS
- KATTSAFE RL30 SERIES
BASIS OF DESIGN
RD-01
RD-01
RD-01 RD-01
RD-01
RD-01
RD-01
RD-01
RD-01 RD-01 RD-01
NEW
CRICKET
NEW
CRICKET
RD-01
NEW
CRICKET
NEW
CRICKET
EXIST. EXHAUST
FAN TYP. -
SEE DETAIL 4010 ON
SHEET A1.12
EXIST. EXHAUST
FAN TYP. -
SEE DETAIL 4010 ON
SHEET A1.12
EXIST. EXHAUST
FAN TYP. -
SEE DETAIL 4010 ON
SHEET A1.12
EXIST
MECHANICAL
UNIT
EXIST
MECHANICAL
UNIT
EXIST
MECHANICAL
UNIT
RD-01 RD-01
RD-01
RD-01
EXIST
MECHANICAL
UNIT
EXIST. CIRCULAR
PENETRATION TYP. -
SEE DETAILS ON
SHEET A1.12
EXIST. CIRCULAR
PENETRATION TYP. -
SEE DETAILS ON
SHEET A1.12
EXIST. CIRCULAR
PENETRATION TYP. -
SEE DETAILS ON
SHEET A1.12
EXIST. CIRCULAR
PENETRATION TYP. -
SEE DETAILS ON
SHEET A1.12
S
LO
P E
T A
P E
R E
D
IN
S
U
LA
TI
O
N T
O
R
O F
D R
A
IN
H
IG
H P
O
IN
T
EXISTING
SLOPE
EXISTING
SLOPE
EXISTING
SLOPE
EXISTING
SLOPE
EXISTING
SLOPE
E X
IS
TI
N G
S
LO
P E
E X
IS
TI
N G
S
LO
P E
E X
IS
TI
N G
S
LO
P E
E X
IS
TI
N G
S
LO
P E
H
IG
H P
O
IN
T
HIGHPOINT
HIGHPOINT
HIGHPOINT HIGHPOINT
S
LO
P
TA
E
R
U
LA
TI
TO
O O
F D
R A
IN
S
LO
E
R
U
LA
TI
O O
F D
R A
IN
S
LO
E
R
U
LA
TI
O O
F D
R A
IN
S
LO
E
R
U
LA
TI
O O
F D
R A
IN
S
LO
E
R
U
LA
TI
O O
F D
R A
IN
S
LO
E
R
U
LA
TI
O O
F D
R A
IN
S
LO
E
R
U
LA
TI
O O
F D
R A
IN
S
LO
E
R
U
LA
TI
O O
F D
R A
IN
S
LO
E
R
U
LA
TI
O O
F D
R A
IN
S
LO
E
R
U
LA
TI
O O
F D
R A
IN
S
LO
E
R
U
LA
TI
O O
F D
R A
IN
S
LO
E
R
U
LA
TI
O O
F D
R A
IN
S
LO
E
R
U
LA
TI
O O
F D
R A
IN
S
LO
E
R
U
LA
TI
O O
F D
R A
IN
SLOPE
TAPERED
INSULATION
TO ROOF
DRAIN
SLOPE
TAPERED
INSULATION
TO ROOF
DRAIN
S
LO
E
R
U
LA
TI
O O
F D
R A
IN
S
LO
E
R
U
LA
TI
O O
F D
R A
IN
S
LO
E
R
U
LA
TI
O O
F D
R A
IN
A1.12
A1.12
A1.12
A1.12
A1.12
A1.12
A1.12
A1.12
A1.12
A1.12
RD-01 RD-01
MECHANICAL AND
ELECTRICAL NOTES:
1. ROOF SUMPS:
∑ IF EXISTING - REMOVE ROOF SUMP AND PAN IN
LOCATION OF REMOVED DRAIN. EXTEND ROOF
CONDUCTOR AS REQUIRED TO MEMBRANE
ROOFING ELEVATION AND SEAL ALL
PENETRATIONS WEATHER TIGHT.
2. GAS PIPING:
∑ ISOLATE ALL GAS PIPING LOCATED ON ROOF.
DISCONNECT AS REQUIRED FOR ROOF
REPLACEMENT. AFTER ROOF REPLACEMENT,
EXTEND AND RE-CONNECT TO EXISTING NATURAL
GAS PIPING SIZES. PROVIDE ALL NECESSARY
SUPPORTS. CONTRACTOR TO VERIFY REQUIRED
PIPE SIZES PRIOR TO CONSTRUCTION. ALL GAS
PIPING TO BE PAINTED BRIGHT YELLOW.
3. ELECTRICAL:
∑ ANY EXISTING TO REMAIN CONDUIT SHALL BE
RAISED/RE-SUPPORTED ABOVE NEW ROOF
SYSTEM. PROVIDE AND INSTALL JUNCTION BOX IN
LOCATION THAT IS CODE COMPLIANT. EXTEND
CONDUIT AND WIRING AS REQUIRED. PROVIDE ALL
NECESSARY SUPPORTS.
OUTSIDE AIR FILM R-0.17
MEMBRANE ROOFING R-0.50
INSIDE AIR FILM R-0.61
METAL DECKING (EXISTING & NEW)
STAGER JOINTS
NOTE: TAPERED INSULATION
IS IN ADDITION TO THIS 5.2"
MINIMUM 2.6" POLYISO INSUL R-15
2.6" POLYISO INSUL R-15
EXTERIOR WALL & ROOF ASSEMBLIES FOR COMPLIANCE
WITH CODE MINIMUM R-VALUES
MICHIGAN 2021 REHABILITATION BUILDING CODE
LEVEL 1 ALTERATIONS
REFERENCES MICHIGAN ENERGY CODE, PART 10A
REFERENCES ASHREA 90.1-2019 CLIMATE ZONE 5, NONRESIDENTIAL
ASSEMBLY INSULATION
MAXIMUM U MIN. R-VALUE
ROOFS INSULATION ENTIRELY ABOVE DECK U-0.032 (R-31.25) R-30 c.i.
ROOFS METAL BUILDING U-0.037 (R-27) R-19 + R-11 Ls or R-25 + R-8 Ls
ROOFS ATTIC & OTHER U-0.021 R-49
WALLS MASS (CMU BACK-UP) U-0.090 (R-11.1) R-11.4 c.i.
WALLS METAL BUILDING U-0.050 (R-20) R-0 + R-19 c.i.
WALLS STEEL STUD U-0.055 (R-18.18) R-13 + R-10 c.i.
WALLS WOOD STUD U-0.051 (R-19.6) R-13 + R-7.5 c.i.
or R-19 + R-5 c.i.
WALLS BELOW GRADE R-7.5 c.i.
SLAB-ON-GRADE FLOORS (PERIMETER) R-15 for 24 in
ROOF TYPE - MEMBRANE ON METAL DECKING
TOTAL R-VALUE R-31.28
Note 1: It is recommended to stagger all joints between boards by 50% from row to row and layer to layer.
Note 2: Adjoin panel edges together. Neatly fit to the roof deck and around penetrations with no gaps greater than 1/4 inch.
Note 3: Fasten with approved plates and fasteners.
Note 4: These fastening patterns are to be used with mechanically fastened systems only.
DETAIL 1020
4 x 8 ft
Approved Insulation
4 x 4 ft
Approved Insulation
2 x 4 ft
Approved Insulation
4 x 8 ft
Approved Cover Board
NEW CONSTRUCTION OR RE-ROOF
INSULATION AND RECOVER FASTENING
GENERAL DETAIL FOR MECHANICALLY FASTENED SYSTEMS
SCALE:
PREVIOUS:
REVISED:
NONE
01/01/2009
01/30/2017
6"
6"
6"
6"
6"
12"
6"
6"
ROOF DRAIN
REVERSIBLE COLLAR
DRAIN EXTENSION RING
SUMP RECEIVER
INS-02
CLAMP RING
STRAINER
WATER CUT-OFF MASTIC
EXISTING DRAIN PIPE
EXISTING ROOF DECK
RFG-05
RFG-03
RFG-01
RFG-03
SCALE: 1/16" = 1'-0"
A2
ENLARGED PARTIAL ROOF PLAN - NEW
SCALE: 1 1/2"= 1'-0"E7 ROOF DRAIN EXTENSION DETAIL
BIDDING AND PERMIT05.09.2025
SHEET TITLE
SHEET NO.
A1.12
KEY PLAN
N.T.S.
ROOF DETAILS
Freeland Schools
High School Roof Replacement
8250 Webster Rd Freeland,, MI 48623
TC JOB NO. 107332
MICHAEL MUSE, 1301048954
EXPIRATION DATE: 05.06.2025
PROJECT TITLE
DETAIL 2021
NEW CONSTRUCTION OR RE-ROOF
ROOF DRAIN WITH DRAIN GUARD
DRAINAGE DETAIL FOR MECHANICALLY FASTENED SYSTEMS
SCALE:
PREVIOUS:
REVISED:
NONE
06/03/2020
N/A
Note 1: Membrane must be fastened around the perimeter of the drain with the same fastening pattern as the field membrane, no less than 1 fastener per drain.
Note 2: Openings in the CDRs must face in opposite directions. Sealant must be behind the membrane at the CDRs' location.
Note 3: Duro-Last Drain Guard attachment tabs are secured to the roof membrane by heat welding. Do not mechanically fasten.
Note 4: Duro-Last Drain Boots are made to fit specific drain sizes. Never install a Duro-Last Drain Boot into a drain of a different size.
Note 5: All field welds shall be a minimum of 1-1/2 inches wide.
Note 6: Refer to specifications for vapor barrier, insulation and cover board requirements.
Approved insulation (Note 6)
Deck Approved Duro-Last sealant (1/2 tube min.)
Field weld (typ., Note 5)
Approved Duro-Last plates/fasteners
Wing nut/bolt assembly (typ., 3 total)
Duro-Last® Drain Guard
Duro-Last custom-fabricated
Drain Boot
Attachment tabs with factory welds (typ., 3 total)
Approved cover board(Note 6)
Approved vapor barrier (Note 6)
One pair of composite drain rings (CDR) placed at the bottom of the Drain Boot (Note 2)
Existing drain body
Duro-Last membranes
6 inches min.
DETAIL 3110
NEW CONSTRUCTION OR RE-ROOF
UNIVERSAL 2-PIECE COMPRESSION EDGE
EDGE DETAIL FOR MECHANICALLY FASTENED SYSTEMS
SCALE:
PREVIOUS:
REVISED:
NONE
01/01/2009
08/24/2017
Note 1: This detail is limited to membrane thicknesses of 60 mils or less.
Note 2: This detail may also be used on parapet walls.
Note 3: The use of this detail is not to exceed a 2-inch per 12-inch slope.
Note 4: Allow for 1/8-inch expansion gap between 10-foot lengths of snap-on base.
Overlap snap-on covers by 2 inches between 10-foot lengths.
Note 5: When installing this detail with a 6-inch or greater vertical surface, an additional fastening row must be located approximately 1 1/8 inches from bottom of snap-on base.
Note 6: Wood nailers must withstand a minimum force of 180 pounds per lineal foot (per building code). Any pull values greater than 270 pounds will allow for a fastener spacing of 18 inches on center. Pull values less than 270 pounds will require additional fasteners. The installing contractor is responsible for meeting building codes.
Note 7: Refer to specifications for vapor barrier, insulation and cover board requirements.
Wood nailer
(Note 6)
Duro-Last membranes
Fasten 6-inches on center with 1 1/4-inch roofing nails. Increase fastener spacing to 3 inches on center at outer corners of roof (10 feet, min).
Note 5
Deck
Approved cover board (Note 7)
Contractor responsible to cover any exposed wood nailers with metal flashing or approved edge detail by a minimum of 1 inch
2-Piece Compression
Edge
3/4"
Snap-on Galvalume
Base
Approved insulation (Note 7)
Approved vapor barrier (Note 7)
Install fastening row approximately
1 3/4 inches from top of snap-on base
DETAIL 4010
NEW CONSTRUCTION OR RE-ROOF
RECTANGULAR PENETRATION
ROOF PENETRATION DETAIL FOR MECHANICALLY FASTENED SYSTEMS
SCALE:
PREVIOUS:
REVISED:
NONE
01/01/2009
02/23/2017
Note 1: Deck membrane shall be fastened around perimeter of roof penetration as per respective zone the roof access hatch is located within (field, perimeter, corner).
Note 2: Termination Bar shall have an approved Duro-Last fastener within 1 inch of each corner.
Note 3: All field welds shall be a minimum of 1-1/2 inches wide.
Note 4: Refer to specifications for vapor barrier, insulation and cover board requirements.
Deck
8 inches, min.
Approved Duro-Last caulk
Termination Bar and approved Duro-Last fasteners spaced 6 inches on center (Note 2)
Approved Duro-Last sealant
Duro-Last custom-fabricated
Curb Flashing
Approved Duro-Last plates/fasteners (Note 1)
Approved cover board (Note 4)
Approved insulation (Note 4)
Approved vapor barrier (Note 4)
Field weld
(Note 3)
Rectangular penetration
DETAIL 4070
NEW CONSTRUCTION OR RE-ROOF
ROUND PENETRATION
ROOF PENETRATION DETAIL FOR MECHANICALLY FASTENED SYSTEMS
SCALE:
PREVIOUS:
REVISED:
NONE
01/01/2009
02/02/2017
Note 1: Lead flashings must be removed prior to installing Duro-Last Stack Flashings.
Note 2: Deck membrane shall be fastened around the perimeter of the Duro-Last Stack
Flashing as per the respective zone the Duro-Last Stack Flashing is located within (field, perimeter, corner), no less than one fastener per flashing.
Note 3: All field welds shall be a minimum of 1-1/2 inches wide.
Note 4: Refer to specifications for vapor barrier, insulation and cover board requirements.
8 inches, min.
Approved cover board (Note 4)
Approved insulation (Note 4)
Field weld
(Note 3)
Approved Duro-Last plates/fasteners
(Note 2)
Approved Duro-Last sealant
Vent pipe
Approved Duro-Last caulk
Approved vapor barrier (Note 4)
Stainless steel band positioned
1/4 inch from top of stack flashing
Duro-Last custom-fabricated
Stack Flashing
DETAIL 4080
NEW CONSTRUCTION OR RE-ROOF
HEAT STACK
ROOF PENETRATION DETAIL FOR MECHANICALLY FASTENED SYSTEMS
SCALE:
PREVIOUS:
REVISED:
NONE
01/01/2009
02/02/2017
Note 1: This detail is required around heat stacks that exceed 120° F, including all insulated chimney stacks. A minimum of 1-inch air space is required between the metal collar and heat stack. The canopy must be positioned to allow adequate air flow above the termination.
Note 2: Lead flashings must be removed prior to installing Duro-Last Stack Flashings.
Note 3: Deck membrane shall be fastened around the perimeter of the Duro-Last Stack
Flashing as per the respective zone the Duro-Last Stack Flashing is located within (field, perimeter, corner), no less than one fastener per flashing.
Note 4: All field welds shall be a minimum of 1-1/2 inches wide.
Note 5: Refer to specifications for vapor barrier, insulation and cover board requirements.
8 inches, min.
Deck
Note 1
Canopy
(by others)
Metal collar
Approved vapor barrier (Note 5)
Approved cover board (Note 5)
Approved insulation (Note 5)
Field weld
(Note 4)
Approved Duro-Last plates/fasteners
(Note 3)
Approved Duro-Last sealant
Heat stack
Approved Duro-Last caulk
Stainless steel band positioned
1/4 inch from top of stack flashing
Duro-Last custom-fabricated
Stack Flashing
Heat-resistant sealant (by others)
DETAIL 5020
NEW CONSTRUCTION OR RE-ROOF
TWO-WAY AIR VENT
VENT DETAIL FOR MECHANICALLY FASTENED SYSTEMS
SCALE:
PREVIOUS:
REVISED:
NONE
02/02/2017
01/16/2019
INSTRUCTIONS
1. Install Two-Way Air Vents (vents) between fastener rows and at high points of roof area. Vents must not be installed within 7 feet of the building edge. Never install vents in low, or drainage areas.
a. A minimum of one vent must be installed for every 1,000 square feet of roof area, or portion thereof, but with a minimum of two vents per roof area.
b. Vent Placement
i. Corners - Vents must first be installed within 8 to 10 feet of the outer corners. Install vents at opposite corners whenever possible.
ii. Remaining Roof Area - Starting at 8 to 10 feet from the building edge, evenly distribute the remaining vents throughout the remaining roof area.
(Smaller roof areas may not have additional vents.)
2. Cut a 7-inch diameter hole and a 2-inch slit in deck membrane. Rotate vent to allow feet to slide underneath deck membrane at slit (see drawing above). Do not fasten vent to roof deck.
Note 1: Vents must NOT be used on refrigerated buildings, freezer buildings or adhered roofing systems.
Note 2: Vents are not required on open-air structures (e.g. carports) or roofing systems with overburden (e.g. ballast, paver, vegetation, etc.).
Note 3: All field welds shall be a minimum of 1-1/2 inches wide.
Note 4: Refer to specifications for vapor barrier, insulation and cover board requirements.
Two-Way Air Vent with factory-welded membrane skirt
Deck membrane
Factory weld
Field weld
(Note 3)
Vent foot
Approved cover board (Note 4)
Approved insulation
(Note 4)
Approved vapor barrier (Note 4)
Deck
DETAIL 1140
NEW CONSTRUCTION OR RE-ROOF
CURB-STYLE EXPANSION JOINT
GENERAL DETAIL FOR MECHANICALLY FASTENED SYSTEMS
SCALE:
PREVIOUS:
REVISED:
NONE
01/01/2009
01/31/2017
Note 1: Tabs that are parallel to the expansion joint must be mechanically fastened with the same fastening pattern used on the membrane in the field area.
Note 2: Leave the membrane covering the expansion joint loose enough to allow for movement of the building on either side of the joint.
Note 3: All field welds shall be a minimum of 1-1/2 inches wide.
Note 4: Refer to specifications for vapor barrier, insulation and cover board requirements.
Fasten one side only
Field weld between fasteners
(Note 3)
Approved Duro-Last plates/fasteners
Duro-Last custom-fabricated parapet flashing
Factory weld
Field weld
(Note 3)
Approved vapor barrier (Note 4)
Approved insulation (Note 4)
Approved cover board (Note 4)
Fiberglass insulation
DETAIL 1170
NEW CONSTRUCTION OR RE-ROOF
DECK-TO-WALL EXPANSION JOINT
GENERAL DETAIL FOR MECHANICALLY FASTENED SYSTEMS
SCALE:
PREVIOUS:
REVISED:
NONE
01/31/2017
03/03/2017
Note 1: Tabs that are parallel to the expansion joint must be mechanically fastened with the same fastening pattern used on the membrane in the field area.
Note 2: All field welds shall be a minimum of 1-1/2 inches wide.
Note 3: Refer to specifications for vapor barrier, insulation and cover board requirements.
8 inches minimum
Approved vapor barrier (Note 3)
Deck
Field weld (Note 2)
Approved insulation
(Note 3)
Approved cover board (Note 3)
Fiberglass insulation
Insulation or sponge tube
Factory weld
Approved Duro-Last plates/fasteners (typ.)
Duro-Last custom-fabricated membranes
Termination Bar and approved
Duro-Last fasteners spaced
6 inches on center
Approved Duro-Last sealant
Approved Duro-Last caulk
Drain Guard
Sealant
Sealant
File details come from the government source that posted it. Updated .