107331_Freeland High School - Roof Replacement - Bid_Permit Drawings.pdf

PDF 5 MB Posted

Attached to
Roof Replacement - Freeland High School
Solicitation number
MC05082025FCSD
Issued by
Saginaw County, Flint City, Michigan

About this file

These are bid and permit drawings for a roof replacement project at Freeland High School located at 8250 Webster Rd in Freeland, Michigan. The project involves a comprehensive roof replacement with demolition of existing roofing materials across multiple roof sections, including removing EPDM, PVC, shingle, and standing seam roof systems. The project is scheduled for bidding and permitting as of 05.09.2025, with a project number of TC JOB NO. 107332. The drawings include detailed demolition plans, proposed roof replacement plans, and extensive technical roof details specifying removal and replacement methodologies, insulation requirements, drainage considerations, and penetration management.

The project specifications require a total roof system replacement with specific technical requirements, including installing new membrane roofing with tapered insulation to ensure proper drainage. The drawings indicate multiple roof cores and existing conditions, with detailed requirements for insulation (minimum R-31.28 total R-value), vapor barriers, and cover boards. The project includes replacing roof drains, managing existing mechanical equipment, and ensuring compliance with Michigan's 2021 Rehabilitation Building Code and energy efficiency standards. An alternate option (Alternate A-1) includes adding a fixed ladder with grab rails. The project documents suggest a mechanically fastened roofing system using Duro-Last roofing materials, with specific installation guidelines for various roof elements and penetrations.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

One SeaGate, Park Level 118

213 South Main Street, Suite 200 Ann Arbor, MI 48104 / 734.922.8002

Toledo, OH 43604 / 419.242.7405

800 North High Street, Third Floor Columbus, OH 43215 / 419.242.7405

AREA OF WORK

D1.00 DEMOLITION ROOF PLAN

A1.11

A1.12

PROPOSED ROOF REPLACEMENT PLAN

ROOF DETAILS

1 OVERALL ROOF PLANARCHITECTURAL

CIVIL

LIFE SAFETY & CODE INFORMATION

DEMOLITION

8250 Webster Rd Freeland, MI 48623

Freeland Schools High School Roof Replacement

BIDDING & PERMIT05.09.2025

PROJECT MAP

CAMPUS / CITY MAP

TC JOB NO. 107332

OWNER JOB NO. #Client Custom

DRAWING INDEX: (ALL DRAWINGS LISTED BELOW, EXCEPT THOSE UNDER "DEFFERRED SUBMITTALS"

ARE INCLUDED IN THIS PACKAGE, UNLESS NOTED OTHERWISE)

MICHAEL MUSE, 1301048954

EXPIRATION DATE: 05.06.20252026

05.08.2025

N

OWNER JOB NO. #Client Custom

BIDDING AND PERMIT05.09.2025

SHEET TITLE

SHEET NO.

D1.00

KEY PLAN

N.T.S.

DEMOLITION

ROOF PLAN

Freeland Schools

High School Roof Replacement

8250 Webster Rd Freeland,, MI 48623

TC JOB NO. 107332

MICHAEL MUSE, 1301048954

EXPIRATION DATE: 05.06.2025

PROJECT TITLE

1. ALL MECHANICAL EQUIPMENT TO REMAIN UNLESS

NOTED OTHERWISE

2. MAINTAIN ROOF DRAINS TO REMAIN IN FUNCTIONING

CONDITION TO ENSURE ROOF DRAINAGE AT THE END

OF EACH WORKDAY. PREVENT DEBRIS FROM ENTERING

OR BLOCKING ROOF DRAINS AND CONDUCTORS.

3. DIMENSIONS SHOWN ARE APPROXIMATE.

CONTRACTOR IS RESPONSIBLE TO CONFIRM SIZES AND

DIMENSIONS PRIOR TO ORDERING MATERIAL.

4. ALL MATERIALS NOTED TO BE REMOVED ARE TO BE

REPLACED WITH NEW MATERIALS (UNO)

5. ALL PLUMBING/MECHANICAL EQUIPMENT NOTED TO

REMAIN IS TO BE OPERATIONAL DURING THE DURATION

OF THE PROJECT (UNO). IF EQUIPMENT SHUTDOWN IS

REQUIRED FOR DEMOLITION WORK, CONTRACTOR

MUST COORDINATE AND SCHEDULE WITH OWNER/

PROJECT MANAGER.

6. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO

DISPOSE OF ALL MATERIALS SHOWN TO BE

DEMOLISHED AND NOT REINSTALLED

7. ROOF DRAINS: EXISTING ROOF DRAINS TO BE

REMOVED FOR REPLACEMENT RECONNECTION TO

EXISTING STORM LINES.

DEMOLITION LEGEND

REFER TO THE FOLLOWING TAG FOR GENERAL CEILING

AND FLOORING DEMOLITION INFORMATION FOR EACH

ROOM UNLESS OTHERWISE NOTED.

DEMOLITION GENERAL NOTES

(NOTE: NOT ALL NUMBERS ARE USED)

R: ROOF

R-0: NO ROOF DEMOLITION THIS AREA

R-1A: REMOVE EXISTING EPDM ROOF THIS AREA

R-1B: REMOVE EXISTING PVC ROOF THIS AREA

R-1C: REMOVE EXISTING SHINGLE ROOF THIS AREA

R-1D: REMOVE EXISTING STANDING SEAM ROOF THIS AREA

R-2: REMOVE EXISTING ROOF INSULATION

R-3: REMOVE EXISTING ROOF WALKWAY PADS

R-4: REMOVE EXISTING DRIP EDGE FLASHING

R-5: REMOVE EXISTING GRAVEL STOP

R-6: REMOVE EXISTING FLASHING AT PENETRATION

R-7: REMOVE EXISTING ROOF DRAIN AND REPLACE IN

SAME LOCATION

R-8: REMOVE CURB FLASHING, EXISTING EXHAUST FAN

TO REMAIN

DEMOLITION KEYNOTES

ROOF SLOPE (HIGH TO LOW)

EXISTING ROOF DRAIN (RD)

EXISTING PLUMB/MECH VENT STACK

(VTR)

EXISTING EXHAUST FAN (EF)

EXISTING DUCT SUPPORT CURB

(DSC)

EXISTING WALKWAY PAD

REMOVE EXISTING ROOFING

MATERIAL. EXISTING ROOF

INSULATION TO REMAIN

REMOVE EXISTING ROOFING

MATERIAL. REMOVE EXISTING ROOF

INSULATION

F7 D1.00

F7 D1.00

'-8

8'

-0 "5'-0"

47'-8"

'-0

255'-0"

4'

-0

27'-6"

R7

R7

R7

R7

R7 R7 R7

R7

R7

R7 R7

R7

R7

R7 R7 R7

R7

R7

R7

R7

R7

R7

R7 R7

R-8

R-8

R-8

R-8

R-8

R-8

R-8

R-8

R-8

R-8

R-8 R-8

R-8

R-8

R-8

R-8

R-8

R-8

R-8

R-8

R-8

R-8

R-8

R-8

R-8

R-8

R-8 R-8

R-8

R-8

R-8

R-8

R-8

R-8

R-8

R-8

R6

R6

R6

R6

R6

R6

R6

R6

R6 R6

R6 R6

R6

R6

R6

R6

R6

R6

R6

R6 R6

SIM.

CORE 3

CORE 4

CORE 4

CORE 6 CORE 7

CORE 8

CORE 9

CORE 10

CORE 11

CORE 12

CORE 13

CORE 16

CORE 17

R7

REMOVE EXISTING

METAL FLASHING

GRAVEL STOP AND

FLASHING

EXISTING PAINTED

METAL FLASHING TO

REMAIN

REMOVE SINGLE PLY ROOFING,

FLASHINGS, AND INSULATION

DOWN TO DECK

CONTRACTOR TO

EVALUATE BLOCKING AND

REPLACE AS NEEDED

EXISTING METAL

PANEL TO REMAIN

REMOVE SINGLE PLY ROOFING,

FLASHINGS, AND INSULATION

DOWN TO DECK

PARTIAL LIST OF EXISTING ROOF

CONDITIONS

Core # 4 - Dry Metal deck 3” ISO insulation Duro-Last roof membrane

Core # 5 - Dry Metal deck Fiberglass insulation BUR roof system - CTP Wood fiber insulation EPDM roof membrane Duro-Last roof membrane

Core # 6 - Dry Metal deck Fiberglass insulation BUR roof system - CTP Wood fiber insulation EPDM roof membrane Duro-Last roof membrane

Core # 7 - Dry Metal deck Fiberglass insulation BUR roof system - CTP Wood fiber insulation EPDM roof membrane Duro-Last roof membrane

Core # 8 - Dry Metal deck

3” ISO

Duro-Last roof membrane

Core # 9- Dry Metal deck Fiberglass insulation BUR roof system - CTP Wood fiber insulation EPDM roof membrane Duro-Last roof membrane

Core # 10 - Dry Metal deck Fiberglass insulation BUR roof system - CTP Wood fiber insulation EPDM roof membrane Duro-Last roof membrane

SCALE: 1/16" = 1'-0"

A1

ENLARGED PARTIAL ROOF DEMOLITION PLAN

SCALE: 1 1/2"= 1'-0"F7 DEMOLITION DETAIL

BIDDING AND PERMIT05.09.2025

SHEET TITLE

SHEET NO.

A1.11

KEY PLAN

N.T.S.

PROPOSED

ROOF

REPLACEMENT

PLAN

Freeland Schools

High School Roof Replacement

8250 Webster Rd Freeland,, MI 48623

TC JOB NO. 107332

MICHAEL MUSE, 1301048954

EXPIRATION DATE: 05.06.2025

PROJECT TITLE

ROOF GENERAL NOTES:

1. MAINTAIN ROOF DRAINS IN FUNCTIONING CONDITION

TO ENSURE ROOF DRAINAGE AT END OF EACH

WORKDAY.

2. PREVENT DEBRIS FROM ENTERING OR BLOCKING ROOF

DRAINS AND CONDUCTORS.

3. PATCH ROOF SYSTEM AT ALL REMOVED

PENETRATIONS, CURBS, AND EQUIPMENT. REFER TO

MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS.

4. PATCH ROOF SYSTEM AND PROVIDE FLASHING AT ALL

NEW ROOF PENETRATIONS, CURBS, AND EQUIPMENT.

REFER TO MECHANICAL, PLUMBING, AND ELECTRICAL

DRAWINGS.

5. PROVIDE CRICKETS ON HIGH SIDE OF ROOFTOP UNITS

& OTHER EQUIPMENT, TYPICAL.

6. FINAL LOCATION OF ROOFTOP EQUIPMENT TO BE

COORDINATED WITH STRUCTURAL AND MECHANICAL

WORK.

7. PAINT ALL EXPOSED ROOFTOP NATURAL GAS LINES,

REFER TO SPECIFICATIONS.

8. ALL EQUIPMENT IS TO REMAIN OPERATIONAL DURING

CONSTRUCTION. COORDINATE REMOVAL AND OR

REPLACEMENT OF EQUIPMENT WITH OWNER.

9. ROOF SLOPES INDICATED ON THE DRAWINGS ARE TO

INDICATE DESIGN INTENT ONLY. CONTRACTOR SHALL

PROVIDE SHOP DRAWINGS FOR THE COMPLETE

ROOFING SYSTEM TO ENSURE PROPER DRAINAGE,

INCLUDING TAPERED INSULATION LAYOUT, FLOW

DIRECTIONS, DRAIN LAYOUT, AND CRICKET LOCATIONS.

REFER TO SPECIFICATIONS FOR ADDITIONAL

INFORMATION.

10. PROVIDE ROOF FLASHING FOR ALL ROOF MOUNTED

EQUIPMENT AND PENETRATIONS AT ALL NEW ROOFING

LOCATIONS. REFER TO PLUMBING, MECHANICAL &

ELECTRICAL DRAWINGS.

11. REFER TO GENERAL ROOFING ASSEMBLY DETAILS AND

SPECIFICATIONS FOR R-VALUE REQUIRED OF ROOFING

INSULATION.

12. SEE ASSEMBLY DETAILS AND SPECIFICATIONS FOR

COVERBOARD AND VAPOR RETARDER/AIR BARRIER

REQUIREMENTS.

13. AT EXISTING AREAS TO RECEIVE NEW ROOFING,

REMOVE ALL EXISTING ROOF RELATED ACCESSORIES

INCLUDING, BUT NOT LIMITED TO, SNOW GUARDS,

PITCH POCKETS, PIPE PENETRATION SLEEVES,

EXPANSION JOINTS, CANTS, SADDLES, CRICKETS,

ATTIC VENTS, RIDGE VENTS, WALKWAY PADS AND

SIMILAR.

ROOF PLAN LEGEND:

MEMBRANE ROOF

SYSTEM ON

TAPERED

INSULATION

MEMBRANE ROOF

SYSTEM ON FLAT

INSULATION

KEYNOTES:

(NOTE: NOT ALL NUMBERS ARE USED)

RFG: ROOFING

RFG-01 SINGLE-PLY MEMBRANE ROOFING

RFG-02 ROOF MEMBRANE FLASHING

RFG-03 ROOFING INSULATION

RFG-04 TAPERED ROOFING INSULATION

RFG-05 ROOFING VAPOR RETARDER

RFG-06 TERMINATION BAR

RFG-07 PREFORMED PIPE BOOT

RFG-08 LAP SEALANT

RFG-09 MASONRY SPLASHBLOCK 36" MIN

SHM: SHEET METAL FABRICATIONS

SHM-01 GUTTER

SHM-02 DOWNSPOUT

SHM-03 GRAVEL STOP

SHM-04 COPING

SHM-05 SHEET METAL FLASHING

SHM-06 DRIP EDGE

SHM-07 COUNTERFLASHING

SHM-08 CONDUCTOR HEAD 12" TYPICAL

RD: ROOF DRAINAGE

RD-01 ROOF DRAIN REPLACEMENT

XX-#

A1.12

A1.12

A1.12

A1.12

A1.12

A1.12

A1.12

A1.12

A1.12

A1.12

NEW INSULATED ROOF

HATCH IN EXISTING OPENING

SIZE TO BE V.I.F.

NEW CRICKET

NEW CRICKET

EXIST. EXHAUST

FAN TYP. -

SEE DETAIL 4010 ON

SHEET A1.12

NEW CRICKET

EXIST

MECHANICAL

UNIT

EXIST

MECHANICAL

UNIT

EXIST

MECHANICAL

UNIT

EXIST

MECHANICAL

UNIT

RD-1

RD-01

RD-01

RD-01

RD-01

RD-01

RD-01

EXIST.

EXHAUST

FAN

NEW CRICKET

EXIST

MECHANICAL

UNIT

NEW INSULATED

ROOF

HATCH IN EXISTING

OPENING

SIZE TO BE V.I.F.

NEW CRICKET

NEW EXPANSION JOINT

ALTERNATE A-1 ADD FIXED

LADDER WITH GRAB RAILS

- KATTSAFE RL30 SERIES

BASIS OF DESIGN

RD-01

RD-01

RD-01 RD-01

RD-01

RD-01

RD-01

RD-01

RD-01 RD-01 RD-01

NEW

CRICKET

NEW

CRICKET

RD-01

NEW

CRICKET

NEW

CRICKET

EXIST. EXHAUST

FAN TYP. -

SEE DETAIL 4010 ON

SHEET A1.12

EXIST. EXHAUST

FAN TYP. -

SEE DETAIL 4010 ON

SHEET A1.12

EXIST. EXHAUST

FAN TYP. -

SEE DETAIL 4010 ON

SHEET A1.12

EXIST

MECHANICAL

UNIT

EXIST

MECHANICAL

UNIT

EXIST

MECHANICAL

UNIT

RD-01 RD-01

RD-01

RD-01

EXIST

MECHANICAL

UNIT

EXIST. CIRCULAR

PENETRATION TYP. -

SEE DETAILS ON

SHEET A1.12

EXIST. CIRCULAR

PENETRATION TYP. -

SEE DETAILS ON

SHEET A1.12

EXIST. CIRCULAR

PENETRATION TYP. -

SEE DETAILS ON

SHEET A1.12

EXIST. CIRCULAR

PENETRATION TYP. -

SEE DETAILS ON

SHEET A1.12

S

LO

P E

T A

P E

R E

D

IN

S

U

LA

TI

O

N T

O

R

O F

D R

A

IN

H

IG

H P

O

IN

T

EXISTING

SLOPE

EXISTING

SLOPE

EXISTING

SLOPE

EXISTING

SLOPE

EXISTING

SLOPE

E X

IS

TI

N G

S

LO

P E

E X

IS

TI

N G

S

LO

P E

E X

IS

TI

N G

S

LO

P E

E X

IS

TI

N G

S

LO

P E

H

IG

H P

O

IN

T

HIGHPOINT

HIGHPOINT

HIGHPOINT HIGHPOINT

S

LO

P

TA

E

R

U

LA

TI

TO

O O

F D

R A

IN

S

LO

E

R

U

LA

TI

O O

F D

R A

IN

S

LO

E

R

U

LA

TI

O O

F D

R A

IN

S

LO

E

R

U

LA

TI

O O

F D

R A

IN

S

LO

E

R

U

LA

TI

O O

F D

R A

IN

S

LO

E

R

U

LA

TI

O O

F D

R A

IN

S

LO

E

R

U

LA

TI

O O

F D

R A

IN

S

LO

E

R

U

LA

TI

O O

F D

R A

IN

S

LO

E

R

U

LA

TI

O O

F D

R A

IN

S

LO

E

R

U

LA

TI

O O

F D

R A

IN

S

LO

E

R

U

LA

TI

O O

F D

R A

IN

S

LO

E

R

U

LA

TI

O O

F D

R A

IN

S

LO

E

R

U

LA

TI

O O

F D

R A

IN

S

LO

E

R

U

LA

TI

O O

F D

R A

IN

SLOPE

TAPERED

INSULATION

TO ROOF

DRAIN

SLOPE

TAPERED

INSULATION

TO ROOF

DRAIN

S

LO

E

R

U

LA

TI

O O

F D

R A

IN

S

LO

E

R

U

LA

TI

O O

F D

R A

IN

S

LO

E

R

U

LA

TI

O O

F D

R A

IN

A1.12

A1.12

A1.12

A1.12

A1.12

A1.12

A1.12

A1.12

A1.12

A1.12

RD-01 RD-01

MECHANICAL AND

ELECTRICAL NOTES:

1. ROOF SUMPS:

∑ IF EXISTING - REMOVE ROOF SUMP AND PAN IN

LOCATION OF REMOVED DRAIN. EXTEND ROOF

CONDUCTOR AS REQUIRED TO MEMBRANE

ROOFING ELEVATION AND SEAL ALL

PENETRATIONS WEATHER TIGHT.

2. GAS PIPING:

∑ ISOLATE ALL GAS PIPING LOCATED ON ROOF.

DISCONNECT AS REQUIRED FOR ROOF

REPLACEMENT. AFTER ROOF REPLACEMENT,

EXTEND AND RE-CONNECT TO EXISTING NATURAL

GAS PIPING SIZES. PROVIDE ALL NECESSARY

SUPPORTS. CONTRACTOR TO VERIFY REQUIRED

PIPE SIZES PRIOR TO CONSTRUCTION. ALL GAS

PIPING TO BE PAINTED BRIGHT YELLOW.

3. ELECTRICAL:

∑ ANY EXISTING TO REMAIN CONDUIT SHALL BE

RAISED/RE-SUPPORTED ABOVE NEW ROOF

SYSTEM. PROVIDE AND INSTALL JUNCTION BOX IN

LOCATION THAT IS CODE COMPLIANT. EXTEND

CONDUIT AND WIRING AS REQUIRED. PROVIDE ALL

NECESSARY SUPPORTS.

OUTSIDE AIR FILM R-0.17

MEMBRANE ROOFING R-0.50

INSIDE AIR FILM R-0.61

METAL DECKING (EXISTING & NEW)

STAGER JOINTS

NOTE: TAPERED INSULATION

IS IN ADDITION TO THIS 5.2"

MINIMUM 2.6" POLYISO INSUL R-15

2.6" POLYISO INSUL R-15

EXTERIOR WALL & ROOF ASSEMBLIES FOR COMPLIANCE

WITH CODE MINIMUM R-VALUES

MICHIGAN 2021 REHABILITATION BUILDING CODE

LEVEL 1 ALTERATIONS

REFERENCES MICHIGAN ENERGY CODE, PART 10A

REFERENCES ASHREA 90.1-2019 CLIMATE ZONE 5, NONRESIDENTIAL

ASSEMBLY INSULATION

MAXIMUM U MIN. R-VALUE

ROOFS INSULATION ENTIRELY ABOVE DECK U-0.032 (R-31.25) R-30 c.i.

ROOFS METAL BUILDING U-0.037 (R-27) R-19 + R-11 Ls or R-25 + R-8 Ls

ROOFS ATTIC & OTHER U-0.021 R-49

WALLS MASS (CMU BACK-UP) U-0.090 (R-11.1) R-11.4 c.i.

WALLS METAL BUILDING U-0.050 (R-20) R-0 + R-19 c.i.

WALLS STEEL STUD U-0.055 (R-18.18) R-13 + R-10 c.i.

WALLS WOOD STUD U-0.051 (R-19.6) R-13 + R-7.5 c.i.

or R-19 + R-5 c.i.

WALLS BELOW GRADE R-7.5 c.i.

SLAB-ON-GRADE FLOORS (PERIMETER) R-15 for 24 in

ROOF TYPE - MEMBRANE ON METAL DECKING

TOTAL R-VALUE R-31.28

Note 1: It is recommended to stagger all joints between boards by 50% from row to row and layer to layer.

Note 2: Adjoin panel edges together. Neatly fit to the roof deck and around penetrations with no gaps greater than 1/4 inch.

Note 3: Fasten with approved plates and fasteners.

Note 4: These fastening patterns are to be used with mechanically fastened systems only.

DETAIL 1020

4 x 8 ft

Approved Insulation

4 x 4 ft

Approved Insulation

2 x 4 ft

Approved Insulation

4 x 8 ft

Approved Cover Board

NEW CONSTRUCTION OR RE-ROOF

INSULATION AND RECOVER FASTENING

GENERAL DETAIL FOR MECHANICALLY FASTENED SYSTEMS

SCALE:

PREVIOUS:

REVISED:

NONE

01/01/2009

01/30/2017

6"

6"

6"

6"

6"

12"

6"

6"

ROOF DRAIN

REVERSIBLE COLLAR

DRAIN EXTENSION RING

SUMP RECEIVER

INS-02

CLAMP RING

STRAINER

WATER CUT-OFF MASTIC

EXISTING DRAIN PIPE

EXISTING ROOF DECK

RFG-05

RFG-03

RFG-01

RFG-03

SCALE: 1/16" = 1'-0"

A2

ENLARGED PARTIAL ROOF PLAN - NEW

SCALE: 1 1/2"= 1'-0"E7 ROOF DRAIN EXTENSION DETAIL

BIDDING AND PERMIT05.09.2025

SHEET TITLE

SHEET NO.

A1.12

KEY PLAN

N.T.S.

ROOF DETAILS

Freeland Schools

High School Roof Replacement

8250 Webster Rd Freeland,, MI 48623

TC JOB NO. 107332

MICHAEL MUSE, 1301048954

EXPIRATION DATE: 05.06.2025

PROJECT TITLE

DETAIL 2021

NEW CONSTRUCTION OR RE-ROOF

ROOF DRAIN WITH DRAIN GUARD

DRAINAGE DETAIL FOR MECHANICALLY FASTENED SYSTEMS

SCALE:

PREVIOUS:

REVISED:

NONE

06/03/2020

N/A

Note 1: Membrane must be fastened around the perimeter of the drain with the same fastening pattern as the field membrane, no less than 1 fastener per drain.

Note 2: Openings in the CDRs must face in opposite directions. Sealant must be behind the membrane at the CDRs' location.

Note 3: Duro-Last Drain Guard attachment tabs are secured to the roof membrane by heat welding. Do not mechanically fasten.

Note 4: Duro-Last Drain Boots are made to fit specific drain sizes. Never install a Duro-Last Drain Boot into a drain of a different size.

Note 5: All field welds shall be a minimum of 1-1/2 inches wide.

Note 6: Refer to specifications for vapor barrier, insulation and cover board requirements.

Approved insulation (Note 6)

Deck Approved Duro-Last sealant (1/2 tube min.)

Field weld (typ., Note 5)

Approved Duro-Last plates/fasteners

Wing nut/bolt assembly (typ., 3 total)

Duro-Last® Drain Guard

Duro-Last custom-fabricated

Drain Boot

Attachment tabs with factory welds (typ., 3 total)

Approved cover board(Note 6)

Approved vapor barrier (Note 6)

One pair of composite drain rings (CDR) placed at the bottom of the Drain Boot (Note 2)

Existing drain body

Duro-Last membranes

6 inches min.

DETAIL 3110

NEW CONSTRUCTION OR RE-ROOF

UNIVERSAL 2-PIECE COMPRESSION EDGE

EDGE DETAIL FOR MECHANICALLY FASTENED SYSTEMS

SCALE:

PREVIOUS:

REVISED:

NONE

01/01/2009

08/24/2017

Note 1: This detail is limited to membrane thicknesses of 60 mils or less.

Note 2: This detail may also be used on parapet walls.

Note 3: The use of this detail is not to exceed a 2-inch per 12-inch slope.

Note 4: Allow for 1/8-inch expansion gap between 10-foot lengths of snap-on base.

Overlap snap-on covers by 2 inches between 10-foot lengths.

Note 5: When installing this detail with a 6-inch or greater vertical surface, an additional fastening row must be located approximately 1 1/8 inches from bottom of snap-on base.

Note 6: Wood nailers must withstand a minimum force of 180 pounds per lineal foot (per building code). Any pull values greater than 270 pounds will allow for a fastener spacing of 18 inches on center. Pull values less than 270 pounds will require additional fasteners. The installing contractor is responsible for meeting building codes.

Note 7: Refer to specifications for vapor barrier, insulation and cover board requirements.

Wood nailer

(Note 6)

Duro-Last membranes

Fasten 6-inches on center with 1 1/4-inch roofing nails. Increase fastener spacing to 3 inches on center at outer corners of roof (10 feet, min).

Note 5

Deck

Approved cover board (Note 7)

Contractor responsible to cover any exposed wood nailers with metal flashing or approved edge detail by a minimum of 1 inch

2-Piece Compression

Edge

3/4"

Snap-on Galvalume

Base

Approved insulation (Note 7)

Approved vapor barrier (Note 7)

Install fastening row approximately

1 3/4 inches from top of snap-on base

DETAIL 4010

NEW CONSTRUCTION OR RE-ROOF

RECTANGULAR PENETRATION

ROOF PENETRATION DETAIL FOR MECHANICALLY FASTENED SYSTEMS

SCALE:

PREVIOUS:

REVISED:

NONE

01/01/2009

02/23/2017

Note 1: Deck membrane shall be fastened around perimeter of roof penetration as per respective zone the roof access hatch is located within (field, perimeter, corner).

Note 2: Termination Bar shall have an approved Duro-Last fastener within 1 inch of each corner.

Note 3: All field welds shall be a minimum of 1-1/2 inches wide.

Note 4: Refer to specifications for vapor barrier, insulation and cover board requirements.

Deck

8 inches, min.

Approved Duro-Last caulk

Termination Bar and approved Duro-Last fasteners spaced 6 inches on center (Note 2)

Approved Duro-Last sealant

Duro-Last custom-fabricated

Curb Flashing

Approved Duro-Last plates/fasteners (Note 1)

Approved cover board (Note 4)

Approved insulation (Note 4)

Approved vapor barrier (Note 4)

Field weld

(Note 3)

Rectangular penetration

DETAIL 4070

NEW CONSTRUCTION OR RE-ROOF

ROUND PENETRATION

ROOF PENETRATION DETAIL FOR MECHANICALLY FASTENED SYSTEMS

SCALE:

PREVIOUS:

REVISED:

NONE

01/01/2009

02/02/2017

Note 1: Lead flashings must be removed prior to installing Duro-Last Stack Flashings.

Note 2: Deck membrane shall be fastened around the perimeter of the Duro-Last Stack

Flashing as per the respective zone the Duro-Last Stack Flashing is located within (field, perimeter, corner), no less than one fastener per flashing.

Note 3: All field welds shall be a minimum of 1-1/2 inches wide.

Note 4: Refer to specifications for vapor barrier, insulation and cover board requirements.

8 inches, min.

Approved cover board (Note 4)

Approved insulation (Note 4)

Field weld

(Note 3)

Approved Duro-Last plates/fasteners

(Note 2)

Approved Duro-Last sealant

Vent pipe

Approved Duro-Last caulk

Approved vapor barrier (Note 4)

Stainless steel band positioned

1/4 inch from top of stack flashing

Duro-Last custom-fabricated

Stack Flashing

DETAIL 4080

NEW CONSTRUCTION OR RE-ROOF

HEAT STACK

ROOF PENETRATION DETAIL FOR MECHANICALLY FASTENED SYSTEMS

SCALE:

PREVIOUS:

REVISED:

NONE

01/01/2009

02/02/2017

Note 1: This detail is required around heat stacks that exceed 120° F, including all insulated chimney stacks. A minimum of 1-inch air space is required between the metal collar and heat stack. The canopy must be positioned to allow adequate air flow above the termination.

Note 2: Lead flashings must be removed prior to installing Duro-Last Stack Flashings.

Note 3: Deck membrane shall be fastened around the perimeter of the Duro-Last Stack

Flashing as per the respective zone the Duro-Last Stack Flashing is located within (field, perimeter, corner), no less than one fastener per flashing.

Note 4: All field welds shall be a minimum of 1-1/2 inches wide.

Note 5: Refer to specifications for vapor barrier, insulation and cover board requirements.

8 inches, min.

Deck

Note 1

Canopy

(by others)

Metal collar

Approved vapor barrier (Note 5)

Approved cover board (Note 5)

Approved insulation (Note 5)

Field weld

(Note 4)

Approved Duro-Last plates/fasteners

(Note 3)

Approved Duro-Last sealant

Heat stack

Approved Duro-Last caulk

Stainless steel band positioned

1/4 inch from top of stack flashing

Duro-Last custom-fabricated

Stack Flashing

Heat-resistant sealant (by others)

DETAIL 5020

NEW CONSTRUCTION OR RE-ROOF

TWO-WAY AIR VENT

VENT DETAIL FOR MECHANICALLY FASTENED SYSTEMS

SCALE:

PREVIOUS:

REVISED:

NONE

02/02/2017

01/16/2019

INSTRUCTIONS

1. Install Two-Way Air Vents (vents) between fastener rows and at high points of roof area. Vents must not be installed within 7 feet of the building edge. Never install vents in low, or drainage areas.

a. A minimum of one vent must be installed for every 1,000 square feet of roof area, or portion thereof, but with a minimum of two vents per roof area.

b. Vent Placement

i. Corners - Vents must first be installed within 8 to 10 feet of the outer corners. Install vents at opposite corners whenever possible.

ii. Remaining Roof Area - Starting at 8 to 10 feet from the building edge, evenly distribute the remaining vents throughout the remaining roof area.

(Smaller roof areas may not have additional vents.)

2. Cut a 7-inch diameter hole and a 2-inch slit in deck membrane. Rotate vent to allow feet to slide underneath deck membrane at slit (see drawing above). Do not fasten vent to roof deck.

Note 1: Vents must NOT be used on refrigerated buildings, freezer buildings or adhered roofing systems.

Note 2: Vents are not required on open-air structures (e.g. carports) or roofing systems with overburden (e.g. ballast, paver, vegetation, etc.).

Note 3: All field welds shall be a minimum of 1-1/2 inches wide.

Note 4: Refer to specifications for vapor barrier, insulation and cover board requirements.

Two-Way Air Vent with factory-welded membrane skirt

Deck membrane

Factory weld

Field weld

(Note 3)

Vent foot

Approved cover board (Note 4)

Approved insulation

(Note 4)

Approved vapor barrier (Note 4)

Deck

DETAIL 1140

NEW CONSTRUCTION OR RE-ROOF

CURB-STYLE EXPANSION JOINT

GENERAL DETAIL FOR MECHANICALLY FASTENED SYSTEMS

SCALE:

PREVIOUS:

REVISED:

NONE

01/01/2009

01/31/2017

Note 1: Tabs that are parallel to the expansion joint must be mechanically fastened with the same fastening pattern used on the membrane in the field area.

Note 2: Leave the membrane covering the expansion joint loose enough to allow for movement of the building on either side of the joint.

Note 3: All field welds shall be a minimum of 1-1/2 inches wide.

Note 4: Refer to specifications for vapor barrier, insulation and cover board requirements.

Fasten one side only

Field weld between fasteners

(Note 3)

Approved Duro-Last plates/fasteners

Duro-Last custom-fabricated parapet flashing

Factory weld

Field weld

(Note 3)

Approved vapor barrier (Note 4)

Approved insulation (Note 4)

Approved cover board (Note 4)

Fiberglass insulation

DETAIL 1170

NEW CONSTRUCTION OR RE-ROOF

DECK-TO-WALL EXPANSION JOINT

GENERAL DETAIL FOR MECHANICALLY FASTENED SYSTEMS

SCALE:

PREVIOUS:

REVISED:

NONE

01/31/2017

03/03/2017

Note 1: Tabs that are parallel to the expansion joint must be mechanically fastened with the same fastening pattern used on the membrane in the field area.

Note 2: All field welds shall be a minimum of 1-1/2 inches wide.

Note 3: Refer to specifications for vapor barrier, insulation and cover board requirements.

8 inches minimum

Approved vapor barrier (Note 3)

Deck

Field weld (Note 2)

Approved insulation

(Note 3)

Approved cover board (Note 3)

Fiberglass insulation

Insulation or sponge tube

Factory weld

Approved Duro-Last plates/fasteners (typ.)

Duro-Last custom-fabricated membranes

Termination Bar and approved

Duro-Last fasteners spaced

6 inches on center

Approved Duro-Last sealant

Approved Duro-Last caulk

Drain Guard

Sealant

Sealant

File details come from the government source that posted it. Updated .