SF 30 Amendment 1.pdf

PDF 1 MB Posted

Attached to
Septic tank Drain Field Systems in Northern California
Solicitation number
10-235-SOL-0003
Issued by

About this file

SF 30 Amendment 1

View the file

Other files

File Type Posted
2510 Revised.pdf PDF
Contract Submittals Document.pdf PDF
CA4 Del Norte Humbolt.pdf PDF
10-235-SOL-0003.pdf PDF
SF 25A.pdf PDF
CA9 trinity Siskiyou.pdf PDF
SF 1442.pdf PDF
Drawings.pdf PDF
SF 24.pdf PDF
SF 25.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OMS No. 0990-0115

11. CONTRACT 10 CODE IPAGE OF PAGES

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1 I 18

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE

000001 03/19/2010

6. ISSUED BY CODE 123

California Office of the Director John E Moss Federal Bldg 650 Capitol Mall, Suite 7-100 Sacramento CA 95814

4. REQUISITION/PURCHASE REQ. NO. \5. PROJECT NO. (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE l123

California Office of the Director John E Moss Federal Bldg 650 Capitol Mall, Suite 7-100 Sacramento CA 95814

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, state and ZIP Code) N.

9A. AMENDMENT OF SOLICITATION NO.

10-235-S0L-00003

X

9B. DATED (SEE ITEM 11)

03/19/2010

10A MODIFICATION OF CONTRACT/ORDER NO.

CODE FACILITY CODE

108. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

IXJ The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers jXjis extended. 0 is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing

Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening ~our and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required) .

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modificatlon and authOrity)

E. IMPORTANT: Contractor U is not. l-:l is required to sIgn this document and return ________ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including soliCitation/contract subject matter where feasible.)

This Amendment changes the bid due date. The bid due date noted in paraq:t'_?I::J:h. .lJa of Standard form 1442 is changed to read 1400 (hour) local time on -APRIL 28, 2010

Please choose one of the three methods in the instructions provided in paragrapg 11 on this form and acknowledge receipt of this amendment.

Thi s Amendment changes:

1. Delete item 107a and 207a for 2-inch Flush Hydrant Assembly. Item 107b and 207b for the 4-inch is still a valid requirement.

Continued ...

Except as provided herein, a/l terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or pn'nt) 16A NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature ofpe/'SOn authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature orContraeting Officer)

16C. DATE SIGNED

NSN 7540-01-152-8070 STANDARD FORM 30 (REV. 10-83)

Previous edition unusable Prescribe<1 by GSA

FAR (48 CFR) 53.243

REFERENCE NO. OF DOCUMENT BEING CONTINUED

CONTINUATION SHEET 10-235-S0L-00003/000001

NAME OF OFFEROR OR CONTRACTOR

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(e)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

2. Attached revised specification Section 02510 Water Distribution. Items 107b and 207b refer to this section. All references to Fire Hydrant are deleted, making it clear that the government's requirement is for a Flush hydran~ It also clarifies that the make and model number provided in paragraph 2.06 is a suggested part number and EQUAL is acceptable.

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFRI 53.110

File details come from the government source that posted it. Updated .