Contract Submittals Document.pdf
PDF 39 KB Posted
- Solicitation number
- 10-235-SOL-0003
About this file
Contract Submittal requirements and Form
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF 30 Amendment 1.pdf | ||
| 2510 Revised.pdf | ||
| CA4 Del Norte Humbolt.pdf | ||
| 10-235-SOL-0003.pdf | ||
| SF 25A.pdf | ||
| CA9 trinity Siskiyou.pdf | ||
| SF 1442.pdf | ||
| Drawings.pdf | ||
| SF 24.pdf | ||
| SF 25.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT SUBMITTAL REQUIREMENTS
SR-01 Submittals for Information
The Contractor will be responsible for obtaining the encroachment permits, application for electrical service, etc. as specified in the pre-construction submittals listed on the “Submittal Review Form”. The Project Engineer shall receive 3 copies of all approved permits and application fees for verification purposes prior to the start of any construction. The Government has provided the Contractor with the necessary information as it is related to the project on the permit applications as identified in the Exhibits section of the contract documents in order to expedite the application process.
The contractor is responsible for contacting the local utility authority to complete the application and pay the required application fees.
The Contractor within five days after the work commences shall furnish 3 copies of a work schedule, for approval, as required by contract clause. The schedule shall be in the form of a progress chart indicating the starting and completion dates of the salient features of the work, including acquiring materials and equipment. The schedule shall indicate the work by percentage for any given date.
During the course of construction, the Contractor will responsible for maintaining the integrity of all permanent survey monuments (brass cap, iron pin, hub, etc.) established by the Government through avoidance. The contractor will be responsible for making the determination as to whether or not avoidance is possible when the circumstance arises. If the Contractor deems that it is necessary to destroy the integrity of the monument, then the Contractor will be held accountable for re-establishing the survey monument’s permanency by having a legal land survey conducted by a registered land surveyor. The contractor will provide the Government 3 copies of supporting documentation with the surveyor’s certification that the monuments have been re-established.
SR-02 Material Submittals
The Contractor shall furnish to the Project Engineer 3 copies of all material submittals listed on the "Submittal Review Form". All material submittals or resubmittals shall be accompanied by and furnished in accordance with this "Submittal Review Form". The location of the specification for each of these items in the Technical Provisions is indicated on this form. If the item description for the material submittal is not the exact brand or model specified by the Government, then 3 copies of the manufacturer's descriptive literature, catalog cut-sheets, etc., must also be included with the submittal. In all cases, the Contractor shall enter the exact brand and model on the "Submittal Review Form" for that particular item. All material submittals are required within 14 days after receipt of Notice to Award. The Contractor should allow 7 days from receipt by Project Engineer for review and approval or rejection by the Government. For each material resubmittal required, the Contractor should allow an additional 7 days from date of receipt by the Project Engineer for review and approval or rejection by the Government.
SR-03 Design Submittals
For the following referenced items, 3 copies of all design submittals and related shop drawings are required. Each design submittal or re-submittal and related shop drawing shall be listed on the " Submittal Review Form" with an appropriate reference to the attached submitted. All design submittals are required within 14 days after receipt of Notice to Award. The Contractor should allow 10 days from receipt by Project Engineer for review and approval or rejection by the Government. For each design re-submittal required, the Contractor should allow an additional 10 days from date receipt by the Project Engineer for review and approval or rejection by the Government.
SR-04 Operation and Maintenance Manuals
The contractor shall prepare three (3) Operation and Maintenance (O&M) Manuals for equipment furnished and incorporated in the work. The manuals shall be prepared in durable 3-ring binders, approximately 8.5 x 11 inches in size, and with at least the following:
1. Identification on the front cover stating the general nature of manual.
2. Typed index and index tabs identifying each section.
3. Complete instructions regarding operation, maintenance, and troubleshooting of all equipment. Material list of components with manufacturers' bulletins and list of replacement parts, part numbers, and name and address of nearest vendor of the parts and equipment.
4. Physical wiring diagram of all control system devices, accessory equipment, and the physical location of each wire between connection terminals on these devices.
5. Electrical schematic (ladder) diagram of the control system showing all circuits and control components in symbolic form using standard symbols. The diagram shall include a legend that explains all symbols.
6. Outline dimension and general physical arrangement drawings of each enclosure and panel board.
7. Copy of all guarantees and warranties issued.
SR-05 As-Built Drawings
The as-built drawing shall be a record of the construction as installed and completed by the Contractor. They shall include all the information shown on the contract set of drawings and a record of all deviations, modifications or changes from those drawings which were incorporated in the work; all additional work not appearing on the contract drawings; and all changes which are made after final inspection of the contract work.
The Contractor shall mark up a set of plans to show the as-built conditions. These as-built marked prints shall be kept current and available on the job site at all times. The changes from the contract plans that are made in the work or additional information that might be uncovered in the course of construction shall be accurately and neatly recorded as they occur by means of details and notes. No construction work shall be concealed until it has been inspected, approved, and recorded. The drawings shall show at least the following:
a) The project number, contract number, community name, and other relevant general information.
b) The location and description of any utilities or other installations known to exist within the construction area.
c) The location and description of all facilities installed by the Contractor. The location of facilities shall include accurate dimensions and at least 2 ties to permanent features for all major components.
A set of as-built marked prints shall be delivered to the Project Engineer before performance period completion date. As-built drawings must be approved before final payment will be made.
SUBMITTAL REVIEW FORM
Received by Proj. Eng. Submittal No.
Date Initial Contract Name
Contract No.
Return to Contractor Contractor Date Initial Project No.
ITEM DESCRIPTION* ACTION BY
NO. (Indicate Type, Model No., Manufacturer, etc.) GOVERNMENT
MATERIAL SUBMITTALS REQUIRED
1. Compaction Test Lab Results
TP 02315
2. Compaction Test Field Results
TP 02315
3. Excavation Plan
TP 02315
4. Imported Pipe Bedding
TP 02315
5. Imported Structural Fill ______________________________
TP 02315
6. Blasting Plan
TP 02316
7. Blaster In Charge
TP 02316
8. Flowable Fill: Design Mix
TP 02322
9. Silt Fence Material ______________________________
TP 02370
10. Storm Water Pollution ______________________________
Protection Plan TP 02370
11. PVC Water Main and Fittings, TP 02510
12. Flush Hydrant Assembly ______________________________
TP 02510
13. Gate Valve and Box ______________________________
TP 02510
14. Pressure Reducing Valve ______________________________
TP 02510
15. Air Release Combination ______________________________
Valve, TP 02510
16. Special Anchoring Retainer ______________________________
Glands, TP 02510
17. Tracing Wire, Box, Splice ______________________________
Materials, TP 02510
18. Pressure Testing ______________________________
TP 02510
19. Water Service Line ______________________________
TP 02518
20. Saddles ______________________________
TP 02518
21. Corp Stop _____________________________
TP 02518
22. Curb Stop with Box ______________________________
TP 02518
23. Individual PRV ______________________________
TP 02518
24. Water Meter and Box ______________________________
TP 02518
25. Marker Post ______________________________
TP 02518
26. Meter Electronic Reading ______________________________
Transmitter, TP 02518
27. Coarse Gravel ______________________________
TP 02525
28. Spring Development Box ______________________________
TP 02525
29. Water Collection Screen ______________________________
TP 02526
30. Well Screen ______________________________
TP 02526
31. Sewer Service Line ______________________________
TP 02532
32. Sewer Wyes and Saddles ______________________________
33. Service Line Cleanout ______________________________
34. Septic Tank ______________________________
TP 02540
35. Septic Tank Riser ______________________________
TP 02540
36. Distribution Box ______________________________
TP 02540
37. Synthetic Fabric ______________________________
TP 02540
38. Inspection Port ______________________________
TP 02540
39. Flow Divider ______________________________
TP 02540
40. Diversion Valve ______________________________
TP 02540
41. Screened Baffle ______________________________
TP 02540
42. Lift Station ______________________________
TP 02541
43. Pressure Drainfield ______________________________
TP 02540
44. Chamber Drainfield ______________________________
TP 02540 & 02541
45. Piping ______________________________
TP 02540, 02541 & 02545
46. Sewage Pump ______________________________
TP 02545
47. Pump Chamber ______________________________
TP 02541 & 02545
48. Septic Tank Lift Station ______________________________
TP 02545
49. Hydro-seed ______________________________
TP 02545
50. Curtain Drain (see 02620 ______________________________
For Detail) TP 02620
51. Asphalt Concrete Paving ______________________________
TP 02740
52. Topsoil ______________________________
TP02920
53. Seed Mixture, Application ______________________________ Rate/Times, TP 02920
54. Mulching Material ______________________________
TP 02920
55. Concrete Materials ______________________________
TP 03300
56. Metal Reinforcements ______________________________
TP 03300
57. Grout Mixes ______________________________
TP 04070
58. Hypochlorinator ______________________________
TP 11240
59. Chemical Injector Assembly ______________________________
TP 11240
60. Individual Chlorinator ____________________________
System, TP 11240
61. Media Analysis ____________________________
TP 13220
62. Slow Sand Filter ______________________________
63. Roughing Filter ______________________________
64. Water Pressure Tank ______________________________
TP 15450
65. Water Storage Tank ______________________________
TP 15450
66. Pump Control Box ______________________________
TP 16100
67. Pump Protection ______________________________
TP 16100
68. Float Switch ______________________________
TP 16100
69. Float Valve ______________________________
TP 15451
70. Sample Spigot ______________________________
TP 15451
DESIGN SUBMITTALS REQUIRED
71. Blasting Log ______
TP 02316
72. Lift Station Control Panel ______________________________
TP 02545
POST CONSTRUCTION SUBMITTALS
73. Flowable Fill: Manufacturer’s
Certificate, TP 02322
74. Flowable Fill: Delivery Tickets, TP 02322
75. Pressure Test Certificate ______________________________
TP 02510
76. Disinfection Report ______________________________
TP 02156
77. Bacteriological Report ______________________________
TP 02516
78. As-Built Records ______________________________
See All TP’s
79. Warranty Information- ______________________________
Individual Sewage Lift Station
TP 02540 – TP 02545
* If the item description for a material submittal is not the exact brand or model specified by the Government, then 3 copies of the manufacturer's descriptive literature, catalog cut-sheets, etc. must be included with the submittal. For design submittals requiring design calculations, shop drawings, wiring and control diagrams, etc., 3 copies of each must also be included with this submittal. If item is exact brand or model, list brand, model and "as specified".
Submitted by:
Contractor’s Signature Date
IHS Concurrence:
District Engineer’s Signature Date
File details come from the government source that posted it. Updated .