Rough Order of Magnitude (ROM) estimate for study in Statement of Work (SOW)
As part of their market research, the FAA is requesting a Rough Order of Magnitude (ROM) estimate for completion of the simulation platform in the enclosed SOW.
I. Scope of Work
The delivery vehicle is expected to be a high fidelity Flight Schedule Monitor (FSM)/Traffic Situation Display (TSD) cloud-based interactive simulation platform that allows for scenario development. The SVRWX trainee will use simulated TSD weather and the Traffic Flow Management Convective Forecast TCF to determine the most efficient use of airspace then build/send playbook and ad-hoc reroutes. The simulation platform must allow the Air Traffic Control System Command Center (ATCSCC) to create training scenarios that can be fully manipulated by the instructors and trainees.
Please consider the following requirements when building your ROM response (From section 1.3 of the SOW):
a. To effectively create and execute the scenarios, the ATCSCC needs the ability to model and send a GDP/GS including the ability to manually build FSM data to meet the training needs.
b. Modeling, sending, and modifying TSD reroutes is a critical job task for the SVRWX specialist. To effectively create and execute the scenarios, the ATCSCC needs the ability to manipulate TSD weather, TCF, demand, and playbook routes. Being able to model, send data, and make revisions creates a realistic simulated training environment.
c. The Terminal trainee will have the ability to model and send GDPs/GSs using manually constructed airport demand via simulation equipment. Each platform will be capable of holding at least 50 scenarios each. Scenarios and simulation fidelity must closely replicate the display and functionality of the TSD and FSM. Scenarios will be scripted.
d. The simulation equipment may include a Graphical User Interface (GUI) that displays textual injects that simulate input from the airlines and FAA facilities. Automated evaluation of skill performance (demonstration) should be considered. Incorrect selections may receive context appropriate feedback messages, to include graphically illustrated demonstrations of correct control activities. Seat hours for each scenario is not expected to exceed 1 hour.
e. The vendor will incorporate the existing ATCSCC scripted scenarios into the simulation platforms. In addition, the vendor will assist the ATCSCC in developing a bank of Terminal/SVRWX scenarios.
f. Scenario Storage – Vendor must incorporate the ability to store scenarios and student scenario run-throughs.
g. Simulation options – The vendor must consider options for either interfacing with the real FSM/TSD or creating a representation of the real world FSM and TSD. The vendor must take into consideration the fact that the FSM and TSD reside in the Traffic Flow Management Workstation (TFMS) when considering simulation options.
h. Schedule - Contractor input will be taken into consideration when determining a reasonable schedule for completion of the work outlined in this SOW. A detailed task schedule will be provided in the final version of the SOW to be posted at the time the contract is officially listed.
II. Flight Schedule Monitor (FSM)
The FSM displays a current picture of the air traffic demand using real-time data from Collaborative Decision Making (CDM) participant data aggregated by the TFM Processing Center (TPC). The FSM interactive cloud-based simulation platform must be as close as possible to the real world FSM. There may be some functionalities within the FSM simulation platform that are not necessary for training purposes. These functionalities should remain on the display image even if they are not operational. (See section 3 of the SOW.)
Please provide ROM Estimates for the following options that may be considered to complete the tasks specified in the SOW. Each estimate should be reported as a single number based on what the option describes. The FAA will consider the best option based off of the ROM estimates, the timeline, and the ability for the contractor to meet the requirements of the SOW using that particular option.
*If it becomes obvious that including all aspects of the functions list, regardless of priority, does not increase the overall total of the estimate drastically, vendors may provide estimates for only Options 1 and 3.
1) Option 1: Interfacing with the current FSM using the existing Graphic User Interface (GUI) and existing software. Refer to Appendix A: FSM Functions List, column F (Priority). This column indicates the priority level for each requirement of the FSM. The Option 1 ROM estimate should include ALL requirements regardless of priority level indicated on the Functions list.
Include an estimate for the length of time it may take to complete the work in the SOW utilizing option 1 including a brief description of your proposed timeline.
2) Option 2: Interfacing with the current FSM using the existing Graphic User Interface (GUI) and existing software. Refer to Appendix A: FSM Functions List, column F (Priority). This column indicates the priority level for each requirement of the FSM. The Option 2 ROM estimate should include only those requirements listed as CRITICAL in the priority section of the functions list.
Include an estimate for the length of time it may take to complete the work in the SOW utilizing option 2 including a brief description of your proposed timeline.
*Please note, it is important to keep the appearance of FSM as close to the real thing as possible. Some of the functionalities may not be required, but the display or image should be the same just without being operational.
3) Option 3: Create a representation of the real world FSM without use of the existing GUI and software. Refer to Appendix A: FSM Functions List, column F (Priority). This column indicates the priority level for each requirement of the FSM. The Option 3 ROM estimate should include ALL requirements regardless of priority level indicated on the Functions list.
Include an estimate for the length of time it may take to complete the work in the SOW utilizing option 3 including a brief description of your proposed timeline.
4) Option 4. Create a representation of the real world FSM without use of the existing GUI and software. Refer to Appendix A: FSM Functions List, column F (Priority). This column indicates the priority level for each requirement of the FSM. The Option 4 ROM estimate should include only those requirements listed as CRITICAL in the priority section of the functions list.
Include an estimate for the length of time it may take to complete the work in the SOW utilizing option 4 including a brief description of your proposed timeline.
*Please note, it is important to keep the appearance of FSM as close to the real thing as possible. Some of the functionalities may not be required, but the display or image should be the same just without being operational.
III. Traffic Situation Display (TSD)
The Traffic Situation Display (TSD) allows the traffic manager to graphically display the current position of all instrument flight rule (IFR) flights that are in the air. The TSD also displays the current status of alerts and weather, as well as map overlays such as sectors, fixes, NAVAIDs, and airports. The display allows traffic managers to make real time traffic management decisions. It is integrated within the Traffic Flow Management System (TFMS).
The TSD automatically refreshes the display with the most up to date flight positions and replays traffic situation data with alert and weather data. There are four ways to request data and control the way the data is displayed within the TSD: menus, dialog boxes, keyboard commands, and semicolon commands. (See section 4 Of the SOW.)
Please provide ROM Estimates for the following options that may be considered to complete the tasks specified in the SOW. Each estimate should be reported as a single number based on what the option describes. The FAA will consider the best option based off of the ROM estimates, the timeline, and the ability for the contractor to meet the requirements of the SOW using that particular option.
*If it becomes obvious that including all aspects of the functions list, regardless of priority, does not increase the overall total of the estimate drastically, vendors may provide estimates for only Options 1 and 3.
1) Option 1: Interfacing with the current TSD using the existing Graphic User Interface (GUI) and existing software. Refer to Appendix B: TSD Functions List, column F (Priority). This column indicates the priority level for each requirement of the TSD. The Option 1 ROM estimate should include ALL requirements regardless of priority level indicated on the Functions list.
Include an estimate for the length of time it may take to complete the work in the SOW utilizing option 1 including a brief description of your proposed timeline.
2) Option 2: Interfacing with the current TSD using the existing Graphic User Interface (GUI) and existing software. Refer to Appendix B: TSD Functions List, column F (Priority). This column indicates the priority level for each requirement of the TSD. The Option 2 ROM estimate should include only those requirements listed as CRITICAL in the priority section of the functions list.
Include an estimate for the length of time it may take to complete the work in the SOW utilizing option 2 including a brief description of your proposed timeline.
3) Option 3: Create a representation of the real world TSD without use of the existing GUI and software. Refer to Appendix B: TSD Functions List, column F (Priority). This column indicates the priority level for each requirement of the TSD. The Option 3 ROM estimate should include ALL requirements regardless of priority level indicated on the Functions list.
Include an estimate for the length of time it may take to complete the work in the SOW utilizing option 3 including a brief description of your proposed timeline.
4) Option 4. Create a representation of the real world TSD without use of the existing GUI and software. Refer to Appendix B: TSD Functions List, column F (Priority). This column indicates the priority level for each requirement of the FSM. The Option 4 ROM estimate should include only those requirements listed as CRITICAL in the priority section of the functions list.
Include an estimate for the length of time it may take to complete the work in the SOW utilizing option 4 including a brief description of your proposed timeline.
IV. Scenario Development
Please provide a ROM estimate for Terminal/SVRWX scenario development. Scenarios will be used for the FSM and TSD simulation platform. Please provide a rate for how much you estimate the cost of building a scenario. The FAA will determine how many scenarios are required and necessary based on the given rate estimates for development. See Appendix B: Terminal Scripted Simulation Example and Appendix D: Instructor Severe Weather Training Simulation DFW Weather Scenario in the SOW for a detailed description of scenarios.
*Seat hours for each scenario are not expected to exceed 1 hour. The intent is that each scenario should be able to be completed within an hour in class.
If a scenario covers a simulated time period longer than an hour, parts of it will be sped up. Trainees will be using the FSM and TSD long enough for live updates to occur. Simulation system updates should occur at the same time intervals as the live system. However, during running the scenario in the labs the time period that would normally occur in between implementing initiatives and thus between updates can be skipped/fast forwarded through. For example: updates occur, student reviews information, implements initiative, fast forwards to next update, reviews information, modifies or implements initiative, or simply decides to keep monitoring until next update, etc.
V. Additional Information
Refer to the SOW for details of the technical requirements when developing your ROM cost estimates.
The Contractor(s) should assume all items associated with completing the simulation platform as described in the SOW are their responsibility, and the ROM should reflect this.
Please be advised that the requestors are not warranted contracting officers and do not have the authority to obligate the government or government funds in any way; this request is for information-gathering purposes only to ensure that the government objectives for the SOW are met.
Appendix A
FSM Functions List
| Task |
| Subtask |
| Model Requirements |
| Page |
| Priority |
| Open FSM Dataset from Control Panel |
| Select Monitored Live, All Live, Historical, or Active Historical mode |
| Provide ability to select Data mode, a Data set, and select the display |
components from the Open With section to view the information.
| 4-2 |
| (*critical) nice to have |
| Open FSM Dataset in GDT Mode |
| Select Live or Historical mode |
| Open by default: GDT Setup, GDT Map, and GDT Bar Graph. Open optionally: Flight List, Data Table, Demand by Center, and Time Line. |
| 4-3 to 4-12 |
| Critical |
Create, rename, and save a custom data set grouping in FSM (User Defined Groups - UDGs)
| create UDGs from the Open Data Set component |
| For UDGs, all FSM functionality is determined by the active window regardless of whether the component is assigned to a UDG or not. Control Panel menu options are enabled or disabled based on the active component. |
| 4-3 to 4-12 |
| nice to have |
| View Demand Bar Graphs |
| View predicted Demand Bar Graphs. In GDT Mode: display solid and modeled data. |
| Viewed in GDT Mode. |
critical
| View Demand Bar Graphs |
| Show Cancelled Flights |
| Cancelled flights not displayed by default. |
critical
| Adjust Demand Bar Graphs |
| Adjust Time Increment & other display options |
| Toggle buttons are at top of window. |
| 5-6 to 5-8 |
| critical |
| Adjust Demand Bar Graphs |
| View Time Increment, Unassigned Slots, Legend, GDP/AFP/GS Hours, Arrival/Departure Flow Rate, more/less hours, AAR/ADR |
| Select from View menu. |
| 5-7 |
| critical |
| Adjust Demand Bar Graphs |
| View Model Program Rate |
| Select from View menu. |
| 5-7 |
| critical |
| Adjust Demand Bar Graphs |
| Program, Pop-Up, Reserve Rate changes |
| Change from View menu. |
| 5-8 |
| critical |
| View Demand Count Report |
| Report by Demand, Center, Aircraft Categ., Aircraft Class, Arrival Fix, Departure Fix, User, Unassigned Slot |
| Select from Utilities menu. |
| 5-9 |
| nice to have |
View Historical Pop-up Demand
| Select from Utilities menu. |
| 5-10 |
| critical |
| View Flight Information |
| Rollover Events |
| Monitored Live mode timeline and bar graph; GDT mode Data Graph. Rolling mouse over features gives popup information. |
| 6-1 |
| critical |
| View Flight Information |
| Right-Click Menus/Dialogs |
| Right-click is active in Time Line, Map, Flight List, GDT Data Graph, and GDT Setup. |
| 6-2 to 6-5 |
| critical |
| View Flight Information |
| Flight Colors |
| 16 different color options are displayed as tabs on the Time Line and Bar Graph. |
| 6-7 |
| critical |
| View Flight Information |
| Flight Lists |
| Automatically generated or for select specific groups. Access via Flight List Menu, modify by filters. |
| 6-22 to 6-39 |
| critical |
| View Flight Information |
| View Single Flight |
| Search by callsign, view by flight info window, view flight detail window. |
| 6-39 to 6-47 |
| critical |
| View Flight Information |
| View Problem Flights, Surface Delay, Priority Flight, Slot Hold, Sub Opportunities Reports |
| Reports menu of the Control Panel |
| 6-47 |
| nice to have |
| Evaluate Demand vs Capacity |
| View Bar Graph |
| Evaluate Demand vs Capacity |
| View Time Line |
| TMI Evaluation |
| Generate Carrier Statistics Report |
| Select: Reports > Carrier Statistics or from View > Carrier Statistics on any TMI Coversheet. |
| 7-2 |
| nice to have |
| Evaluate Demand vs Capacity |
| Modify program rate displayed in bar graph |
| Select: Bar Graph > Model Program Rate (see submenu) |
| 7-3 to 7-5 |
| critical |
| Evaluate Demand vs Capacity |
| Modify data time (historical mode) |
| Select: Bar Graph > Set Time |
| 7-5 |
| critical (within bounds of simulation) |
| Evaluate Demand vs Capacity |
| Modify Data Time (GDT Mode) |
| Select the Data Time from the Parameters tab on the GDT Setup component. |
| 7-5 |
| critical |
| Model Ground Delay Program |
| Enter Parameters |
| Open Data Set window populated with airport list; GDT Mode in main Control Panel. Window opens to Parameters tab. |
| 8-1 to 8-2 |
| critical |
| Model Ground Delay Program |
| Enter Reserve Rate |
| Historical Pop-Ups window |
| 8-2 to 8-4 |
| critical |
| Model Ground Delay Program |
| Enter Scope |
| Main Control Panel, Scope tab. Button to select by: Distance |
| 8-5 |
| critical |
| Model Ground Delay Program |
| Impact Model |
| select parameters from Modeling Options tab in GDT Setup; displayed in bar chart |
| 8-7 |
| nice to have |
| Model Ground Delay Program |
| Data Graph: Power Run option |
| Use mouse to drag or click the black vertical line to the desired Power Run option |
| 8-12 |
| critical |
| Model Ground Delay Program |
| GDP Map |
| Clicking an Airport or Center will change the scope of the GDP and be reflected in the GDT Setup |
| 8-13 |
| critical |
| Model Ground Delay Program |
| Display Components, analysis report and enacting model |
| Data Graph, GDT Map, GDT Flight List, Demand by Center, Analysis Report (Clicking an Airport or Center will change the scope of the |
GDP and be reflected in the GDT Setup)
| Model Airspace Flow Program |
| Enter parameters in the GDT Setup Panel |
component to model, issue, and send AFPs
| System displays GDT Setup Panel, GDT Data Graph, GDT Bar Graph, and GDT Map; all elements interactive with each other |
| 9-1 |
| critical |
| Model Airspace Flow Program |
| Impact Modeling in GDT mode |
| For example, if you model a AFP for FCAMSP, you can model the impact of the AFP on JFK and LGA. Six default tabs available for airport data sets and five default tabs available for airspace data sets |
| 9-7 |
| nice to have |
| Model Airspace Flow Program |
| Generate a Model Analysis Report |
| FSM generates an analysis report after user clicks "Run Proposed or Run Actual" from GDT Setup window. Evaluate the effects of any delay operation by selecting View > Analysis from the Coversheet; FSM report generated in Excel format. |
| 9-12 |
| nice to have |
| Integrated Program Modeling (compare multiple TMIs) |
| [current limitations] |
| • You cannot send programs (proposed or actual). |
• You cannot alter Data Time.
• You cannot include multiple instances of an element in a scenario.
• You cannot run Blanket or Compression TMIs.
• You cannot model AFPs before airports TMIs.
• AFP exemptions within a GDP are limited to existing AFPs.
• You cannot model re-controls in a purge.
• There is no support for Historical IPM mode.
| Integrated Program Modeling (compare multiple TMIs) |
| Build Scenario in IPM Mode |
| Add Models and Impacts in the IPM Scenario Manager window; modify parameters (right-clicking elements in Scenarios box). |
| 10-3 |
| nice to have |
| Integrated Program Modeling (compare multiple TMIs) |
| Use Modeled Data in a Program |
| Integrated Program Modeling (compare multiple TMIs) |
| Analyze Model (view results) |
| Views include: IPM Multi-Graph, Metrics tab, Time Line, Bar Graph, Data Graph (with Power Run option), Map, Flight List, Demand by Center. |
| 10-7 to 10-15 |
| nice to have |
| Issue a Program (post-modeling) |
| Generate GDP/AFP Coversheet and send |
| Review, set parameters; complete the Advisory/Causal Factors section of coversheet; Auto Send message. |
| 11-1 to 11-3 |
| critical |
| Issue a Program (post-modeling) |
| Resend |
| Resend existing cover sheet after revisions. |
| 11-5 |
| critical |
| Issue a Program (post-modeling) |
| Purge (cancel) |
| Purge function available from GDT Setup window. |
| 11-7 to 11-9 |
| critical |
| Monitoring a Program |
| Generate Reports |
| View Timeline, Bar Graph, Flight List |
critical
| Monitoring a Program |
| Monitoring Program Parameters |
| Menu items highlighted in red when there is an update. |
| 12-11 to 12-15 |
| nice to have |
| Monitoring EDCT Compliance |
| Default report |
| CTD Compliance List defaults to flights outside +-5 minutes of their EDCT; display shows ACID, ORIG, DEST, ETD, ETA, ARTD, ARTA, CTD, CTA, ARTD-CTD. |
| 13-1 |
| critical |
| Monitoring EDCT Compliance |
| View Single Flight |
| Right-click for details. |
| 13-3 |
| critical |
| Monitoring EDCT Compliance |
| Adjust View |
| Add fields, change column size, sort; Compliance List menu. |
| 13-4 to 13-5 |
| nice to have |
| Monitoring EDCT Compliance |
| Export report to Excel |
| Monitoring EDCT Compliance |
| Confirm EDCT |
| Checks a flight's EDCT; returns current EDCT. |
| 13-6 |
| nice to have |
| Monitoring EDCT Compliance |
| Edit EDCT |
| EDCT Change Request (ECR) |
| Change EDCT |
| ECR component allows you to search for a flight, view current flight information, model suggested update times for flights, and display options for updating control times. The ECR title bar displays the data set, date, ADL time, and monitor mode. |
| 14-1 |
| critical |
| EDCT Change Request (ECR) |
| Open ECR |
| 5 ways to open an ECR are provided. |
| 14-4 to 14-5 |
| critical |
| EDCT Change Request (ECR) |
| Locate Flight |
| Locate and view flight. |
| 14-5 |
| critical |
| EDCT Change Request (ECR) |
| Update EDCT for a flight |
| Send Request. |
| 14-8 to 14-9 |
| critical |
| EDCT Change Request (ECR) |
| Adjust CTA Range |
| Manually adjust the CTA range for SCS and Limited Update Options. |
| 14-10 |
| critical |
| EDCT Change Request (ECR) |
| Set ERTA |
| EDCT Change Request (ECR) |
| Update Options |
| Four options for updating an EDCT using ECR: SCS, Unlimited, Limited, and Manual. |
| 14-14 |
| critical |
| EDCT Change Request (ECR) |
| Submit and receive SCS response |
| If the SCS request is successful, the response is a slot list of the flights affected including new control times and control types. |
| 14-14 |
| critical |
| Revise/Extend GDP or AFP |
| View current demand, weather |
| From the FSM Control Panel, select TFMS Tools > ADL Request; select TFMS Tools > Weather Request |
| 15-1 |
| critical |
| Revise/Extend GDP or AFP |
| Revise GDP; revise AFP |
| Open dataset in GDT mode, load current parameters in GDT setup. |
| 15-2 |
| critical |
| Revise/Extend GDP or AFP |
| Extend GDP, extend AFP |
| Modify Program Rate, scope; purging flights outside of parameters. |
| 15-2 to 15-5 |
| critical |
| Revise/Extend GDP or AFP |
| Revise GAAP |
| Revise/Extend GDP or AFP |
| Send Proposed Program and Advisory |
| Revise/Extend GDP or AFP |
| Issue Revision |
| Suspend Airline Substitutions and Slot Credit Substitutions before issuing revision. |
| 15-6 to 15-8 |
| critical |
| Revise/Extend GDP or AFP |
| Issue Revision |
| Exempt AFP flights from GDP. |
| 15-9 |
| critical |
| Issue Compress Flight Program |
| Adaptive Compression |
| Check if Adaptive Compression in FSM is on or off. |
| 16-1 |
| critical |
| Issue Compress Flight Program |
| Suspend Airline Substitutions and Slot Credit Substitutions |
| Temporarily suspend SCS before issuing a Compression. |
| 16-3 |
| critical |
| Issue Compress Flight Program |
| Compress Flights dialong (GDT Mode) |
| Enter Parameters and Run to Generate the Compression Coversheet. |
| 16-4 |
| critical |
| Issue Compress Flight Program |
| Preview and Issue Advisory |
| Issue Compress Flight Program |
| Issue Compress Flight Program |
| Select "Send Actual Compression" or "Send Proposed Compression". |
| 16-4 |
| critical |
| GAAP GDP - Compress Slots Program Type (Adjust Unassigned Slots in GAAP) |
| Compress Unassigned Slots |
| Ground Stops |
| Create Model |
| Set parameters in GDT Mode; set Scope in the Tier Panel. |
| 19-1 to 19-3 |
| critical |
| Ground Stops |
| Review Model |
| Use the Power Run function to determine if changes needed. |
| 19-3 |
| critical |
| Ground Stops |
| Run Proposed or Run |
Actual
| Generates coversheet and 3 reports: FADT, Analysis, and Carrier Statistics. |
| 19-4 to 19-6 |
| critical |
| Ground Stops |
| Create Advisory |
| Ground Stops |
| Send Advisory |
| Opens the Program Manager dialog (with progress bar); resend as needed. |
| 19-9 |
| critical |
| Ground Stops |
| Viewing GS Controlled Flights |
| Bar Graph and Time Line in Monitor Live mode; Query Manager Flight List (Ground_Stopped filter). |
| 19-11 |
| critical |
| Ground Stops |
| Purge a GS |
| Generate GS CNX coversheet and send. |
| 20-1 to 20-3 |
| critical |
| Ground Stops |
| Reduce GS Scope |
| Ground Stops |
| Move from GS to GDP |
| Suspend Airline Substitutions and Slot Credit Substitutions, issue GDP. |
| 20-7 to 20-9 |
| critical |
*Page refers to the page number in the Flight Schedule Monitor Users Guide.
Appendix B
TSD Functions List
| Task |
| Subtask |
| Model Requirements |
| Page |
Display Geographical Data
| Draw map overlay: NAVAIDS, fixes, airports, sector boundaries, ARTCC boundaries, SUA boundaries. |
| 6-104 |
| Critical |
Display Geographical Data
| Present dialog box for display options (icon colors, font, text size). |
| 6-104 |
| Critical |
Display Flight Data
| Draw flights with appropriate icon and data block. |
| 6-104 |
| Critical |
| Display Flight Data |
| Flag flights with missing position updates |
| Display Alerts |
| Manager turns on or off - manually or with timer function |
| Draw geographical, weather, reroute, FEA/FCA, and traffic situation alert icons with updates every minute until manager turns off. |
| 6-105 |
| Critical |
| Display Weather Data |
| Manager operates weather display |
| The manager can use a dialog box, keyboard commands, or semicolon commands to control which types of weather data are shown. |
| 6-107 |
| Nice to have |
| Display Weather Data |
| Select weather product |
| Display CIWS or Legacy weather. |
| 6-107 |
| Nice to have (Legacy) |
| Display Weather Data |
| Display other overlays |
| Overlay Jet Stream, Radar Tops, Lightning strikes, and CCFP on display using defined icons, line styles. |
| 6-107 |
| Critical |
| Display Weather Data |
| Generate RVR reports |
| Display Weather Data |
| METAR and TAF reports |
| Display in separate window on top of TSD display. |
| 6-107 |
| Not required (Like to have) |
| Reroute |
| Public, Local, Private Reroute |
| Define and display reroutes for avoiding severe weather conditions. |
| 6-108 |
| Critical |
| Reroute |
| Query Playbook Database |
| Reroute |
| Query Coded Departure Routes (CDR) database |
Reroute
More to follow
| Define/Display low Evaluation Areas/Flow Constrained Areas (FEAs/FCAs) |
| defined volume of airspace along with an associated flight filter |
| TSD displays a time line for the FEA/FCA that shows the peak 1-minute occupancy count or the total occupancy count (15min interval) from the FEA/FCA start to end time. Display bar chart hows the breakdown of these counts between active and proposed flights (15-min interval). Display FEA/FCA reports of flights predicted to intersect the FEA/FCA (15-mine interval) & display current flight positions for those flights. |
| 6-109 |
| Critical |
| Manage Collaborative Trajectory Options Program (CTOP) |
| Provide Trajectory Option Set (TOS): Enable/disable automatic revision for a CTOP, specify threshold values for time bins of each FEA/FCA, set time interval for checking threshold values against demand, set smoothing factor for automatic revision, set fixed/rolling time periods for automatic revision, specify time bins used by automatic revision, specify/remove trajectory assignment override, create/model/propose/revise/activate/view/cancel/delete CTOP TMI, enter details for constructing CTOP advisory, update EDTC for a flight |
| CTOP menu and the Create CTOP menu command is grayed-out and unavailable if the site is not a configured CTOP authorized site. GUI includes: CTOP Program level parameter data; FxA capacity, demand and parameter level data; FxA Bar Graphs display; Flight List display. |
| 6-110 |
| Nice to have |
| Show RAPT: graphical representation of each departure route in a metroplex, along with a way to coordinate departure times with the weather as it moves |
| Show RAPT route display |
| Interactive display: hovering mouse over route changes line color/width, displays route name. Display Timeline as 5min sequence of colored blocks indicating status of departures for the route. |
Nice to have
| Generate Text report |
| Get flight data for a specified airport, fix, sector, FEA/FCA, or ARTCC |
| Reports include Sector Counts (AREA), Arrival delay prediction (ARRD), Flight counts (COUNT) , FCA (FCATA), Fix loading (FIXL), List flight plan (LIFP), Flight list (LIST), Flight list original (LISTO), Verify time (VT) . |
Critical
Display flight departures by departure airport or departure fix
| start Departure Viewer from TSD Menu "Flights" tab |
| top portion of the display contains formatting and filtering controls. Below that are departure flight counts summarized by time and by either departure fix or airport. The lower section contains the flight lists that provide the detail for individual flights. Display updates once a minute; up to 4 Departure Viewers per TSD; up to 25 fixes may be selected for display per Departure Viewer. |
Nice to have
*Page refers to the page number in the TFMS Functional Description Guide.
References
Federal Aviation Administration. (2016). Traffic Management Applications. Flight Schedule Monitor User’s Guide. CSC Government Solutions LLC. A CSRA Company.