10-Project Manual Aldine Roof and Skylight Replacement.pdf
PDF 3 MB Posted
- Solicitation number
- 25/0343
- Issued by
- Harris County, Texas
About this file
The document is a comprehensive project manual for the Aldine Health Center Roof and Skylight Replacement project issued by Harris Health System in Houston, Texas. The project involves replacing the existing roof and skylights at the Aldine Health Center, with work to be performed according to detailed specifications outlined in multiple sections covering demolition, roofing, sheet metal, roof specialties, and related construction activities. The project manual provides extensive technical guidelines for contractors, including specific requirements for materials, installation methods, warranties, and quality control standards.
The estimated project budget is $1,697,021, with the work to be competitively solicited through a Construction Services Procurement (CSP) process. The project manual includes detailed technical specifications for thermoplastic membrane roofing, sheet metal flashing, roof accessories, and skylights, with specific requirements for materials like white TPO fleece-backed membrane, insulation, and metal edging. The roof replacement includes provisions for a 20-year total system warranty covering both labor and materials, with specific performance requirements such as wind speed coverage up to 120 mph, 3-inch hail resistance, and 32 man-hours per year of accidental puncture resistance. The project emphasizes quality control, with requirements for manufacturer-trained applicators, detailed testing procedures, and strict adherence to manufacturer specifications.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Harris Health System
Issue for Construction
Project Manual for
Aldine Health Center Roof and Skylight
Houston, TX
Huitt-Zollars Project No. R315308.03
September 15, 2025
HHS – Aldine Health Center Roof & Skylight SECTION 00 01 10, Page 1
Houston,TX TABLE OF CONTENTS
Huitt Zollars Project No. R315308.03
Huitt-Zollars 00 01 10 - 1 Issue for Construction
TABLE OF CONTENTS
DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTSS
COVER
00 01 10 TABLE OF CONTENTS
00 31 00 AVAILABLE PROJECT INFORMATION
HARRIS HEALTH SYSTEM DESIGN GUIDELINES
DIVISION 01 - GENERAL REQUIREMENTS
01 10 00 SUMMARY
01 20 00 PRICE AND PAYMENT PROCEDURES
01 25 00 SUBSTITUTION PROCEDURES
01 26 00 CONTRACT MODIFICATION PROCEDURES
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 35 16 ALTERATION PROJECT PROCEDURES
01 40 00 QUALITY REQUIREMENTS
01 42 16 DEFINITIONS
01 50 00 TEMPORARY FACILITIES AND CONTROLS
01 60 00 PRODUCT REQUIREMENTS
01 70 00 EXECUTION AND CLOSEOUT REQUIREMENTS
01 73 29 CUTTING AND PATCHING
01 78 00 CLOSEOUT SUBMITTALS
01 79 00 DEMONSTRATION AND TRAINING
DIVISION 02 - EXISTING CONDITIONS
02 41 19 SELECTIVE DEMOLITION
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 01 50.19 PREPARATION FOR RE-ROOFING
07 54 00 THERMOPLASTIC MEMBRANE ROOFING
07 62 00 SHEET METAL FLASHING AND TRIM
07 71 00 ROOF SPECIALTIES
07 72 00 ROOF ACCESSORIES
DIVISION 08 – OPENINGS
08 63 00 METAL FRAMED SKYLIGHTS
HHS – Aldine Health Center Roof & Skylight SECTION 00 01 10, Page 1
Houston,TX TABLE OF CONTENTS
Huitt Zollars Project No. R315308.03
Huitt-Zollars 00 01 10 - 1 Issue for Construction
08 80 00 GLAZING
DIVISION 09 – FINISHES
09 91 13 EXTERIOR PAINTING
END TABLE OF CONTENTS
HHS – Aldine Health Center Roof & Skylight SECTION 00 31 00, Page 1 Houston,TX AVAILABLE PROJECT INFORMATION Huitt Zollars Project No. R315308.03
Huitt Zollars 00 31 00 - 1 Issue for Construction
SECTION 00 31 00
AVAILABLE PROJECT INFORMATION
PART 1 GENERAL
1.01 OWNER PREPARED DOCUMENTS
A. CONTRACTOR REQUIREMENTS
1. The Owner prepared documents listed below are hereby made a part of the Contract
Documents.
a. Title: Harris Health System Design Guideline
b. Dated: February 11, 2022
c. Number of Pages: 209
2. Where these guidelines conflict with other Specification requirements, the more stringent requirement shall govern.
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION (NOT USED)
DISCLAIMER
4.01 BY EXECUTING THE AGREEMENT, THE CONTRACTOR ACCEPTS RESPONSIBILITY FOR
SUBSEQUENT ACTION TAKEN BASED UPON HIS CONCLUSIONS DRAWN FROM
INFORMATION LISTED ABOVE. NEITHER OWNER NOR ARCHITECT ASSUMES ANY
RESPONSIBILITY FOR CONCLUSIONS CONTRACTOR MAY DRAW THEREFROM.
END OF SECTION
DESIGN GUIDELINES
Facilities Project Management Office (PMO)
Date: February 11, 2022
February 11, 2022 harrishealth.org
CONTENTS
CONTENTS
0.0 DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS
INTRODUCTION TO DESIGN GUIDELINES
0.1.1 HARRIS HEALTH SYSTEM – FACILITIES PLANNING DESIGN GUIDELINES
BID FORMS
GENERAL CONDITIONS
PRECONSTRUCTION AND RISK ASSESSMENT
CODES AND STANDARDS
0.5.1 RADIATION SHIELDING STANDARDS
0.5.2 CODE AND GUIDELINES
1.0 DIVISION 01 GENERAL REQUIREMENTS
OVERVIEW
1.1.1 SPECIAL CONTRACT DOCUMENT REQUIREMENTS
PROGRAMMING
SCHEMATIC DESIGN
DESIGN DEVELOPMENT
CONSTRUCTION DOCUMENTS
STRUCTURAL AND TESTING CRITERIA
1.6.1 BUILDING SHELL
1.6.2 LOADING AND DETECTION STANDARDS
1.6.3 WIND LOADS
1.6.4 SEISMIC AND GEOLOGIC FACTORS
1.6.5 CONTROL OF DEFLECTION ‐ STEEL
1.6.6 CONTROL OF DEFLECTION ‐ CONCRETE
1.6.7 ENGINEERING TESTING
1.6.8 GEOTECHNICAL AND CONSTRUCTION MATERIAL TESTING AND INSPECTION
1.6.9 OTHER BUILDING MATERIALS
EQUIPMENT AND FURNITURE COORDINATION
1.7.1 RESPONSIBILITIES OF THE DESIGN PROFESSIONAL TEAM
1.7.2 FIXED OR BUILT‐IN FURNISHINGS AND ACCESSORIES THAT ARE THE RESPONSIBILITY OF
THE DESIGN PROFESSIONAL
FINISHES COORDINATION
1.8.1 SUBMITTALS
RESERVED FOR FUTURE EXPANSION
COMMISSIONING AGENT RESPONSIBILITIES
1.10.1 COMMISSIONING AGENT’S RESPONSIBILITIES
1.10.2 DESIGN PHASE
1.10.3 CONSTRUCTION PHASE
ARCHITECT/ENGINEER’S COMMISSIONING RESPONSIBILITIES
1.11.1 DESIGN PHASE
1.11.2 CONSTRUCTION PHASE
2.0 DIVISION 02 EXISTING CONDITIONS
SITE PREPARATION
SITE IMPROVEMENTS
2.2.1 PAVEMENT
2.2.2 SANITARY SEWER
2.2.3 STORM SEWER
2.2.4 CITY WATER METER
SITE DEVELOPMENT
LANDSCAPING/PLANTS
EXTERIOR FURNISHINGS
SELECTIVE DEMOLITION
3.0 DIVISION 03 CONCRETE
CAST IN PLACE CONCRETE
3.1.1 MATERIALS
3.1.2 LABORATORY TEST REPORTS AND MIX DESIGNS
3.1.3 MATERIAL AND MILL CERTIFICATES
3.1.4 STANDING WATER AND EQUIPMENT
4.0 DIVISION 04 MASONRY
BRICK
4.1.1 BRICK VENEER CONSTRUCTION
STONE
CAST STONE
CONCRETE MASONRY UNITS (CMU)
5.0 DIVISION 05 METALS
STRUCTURAL STEEL
STEEL JOISTS
STEEL DECK
METAL FABRICATIONS
5.4.1 STAIR CONSTRUCTION
5.4.2 STAIR CONTRACT DOCUMENT REQUIREMENTS
5.4.3 STAIR FINISHES
6.0 DIVISION 06 WOOD, PLASTICS, AND COMPOSITES
ROUGH CARPENTRY
ARCHITECTURAL WOODWORK
6.2.1 CABINET HARDWARE
7.0 DIVISION 07 THERMAL AND MOISTURE PROTECTION
BITUMINOUS DAMPPROOFING
WATERPROOFING
BUILDING INSULATION
METAL ROOF PANELS
MEMBRANE ROOFING
7.5.1 DESCRIPTION
7.5.2 RE‐ROOFING
7.5.3 NEW CONSTRUCTION
7.5.4 EXTENT OF WORK
7.5.5 SUBMITTALS
7.5.6 PRODUCT DELIVERY, STORAGE AND HANDLING
7.5.7 WORK SEQUENCE
7.5.8 USE OF THE PREMISES
7.5.9 EXISTING CONDITIONS
7.5.10 PREBID MEETING
7.5.11 PRECONSTRUCTION CONFERENCE
7.5.12 TEMPORARY FACILITIES AND CONTROLS
7.5.13 JOB SITE PROTECTION
7.5.14 SAFETY
7.5.15 WORKMANSHIP
7.5.16 QUALITY ASSURANCE
7.5.17 JOB CONDITIONS, CAUTIONS AND WARNINGS
7.5.18 WARRANTY
7.5.19 GENERAL
7.5.20 MEMBRANE
7.5.21 INSULATION/UNDERLAYMENT
7.5.22 ADHESIVES, CLEANERS AND SEALANTS
7.5.23 FASTENERS AND PLATE (FOR NAILABLE DECKS)
7.5.24 METAL EDGING AND MEMBRANE TERMINATIONS
7.5.25 WALKWAYS
7.5.26 EXECUTION
7.5.27 INSULATION PLACEMENT
7.5.28 MEMBRANE PLACEMENT AND BONDING
7.5.29 MEMBRANE SPLICING – HOT AIR WELDING
7.5.30 FLASHING
7.5.31 WALKWAYS
7.5.32 DAILY SEAL
7.5.33 CLEAN UP
FLASHING AND SHEET METAL
RESERVED FOR FUTURE EXPANSION
ROOF SPECIALTIES AND ACCESSORIES
FIRESTOPPING
JOINT SEALANTS
EXPANSION JOINT COVERS
WATER REPELLENT COATING AND ANTI‐GRAFFITI COATING
8.0 DIVISION 08 OPENINGS
DOORS AND FRAMES
8.1.1 EXTERIOR DOORS
8.1.2 INTERIOR DOORS
ACCESS DOORS
AUTOMATIC ENTRANCE DOORS
WINDOWS AND STOREFRONTS
8.4.1 EXTERIOR WINDOWS
8.4.2 INTERIOR WINDOWS
PASS‐THROUGH WINDOWS
FINISH HARDWARE
GLASS AND GLAZING
9.0 DIVISION 09 FINISHES
GENERAL LOCATIONS
9.1.1 WALL FINISHES
9.1.2 FLOOR FINISHES
9.1.3 BASE FINISHES
9.1.4 CEILING FINISHES
LATH AND PLASTER
GYPSUM BOARD AND ASSEMBLIES
9.3.1 WALL HEIGHT
9.3.2 APPLICATIONS
FLOOR TILE
ACOUSTICAL CEILING SYSTEMS
RESILIENT FLOORING
TERRAZZO FLOORING
CARPETING
9.8.1 SPECIAL WARRANTY FOR CARPET TILES
INTERIOR STONE FACING
PAINTS AND COATING
10.0 DIVISION 10 SPECIALTIES
TOILET PARTITIONS
TOILET ACCESSORIES
BULLETIN AND OTHER DISPLAY BOARDS
IMPACT RESISTANT WALL AND DOOR PROTECTION
FIRE PROTECTION
MAIL BOXES
FLAG POLES
SIGNAGE
SHELVING
10.9.1 SHOP DRAWINGS AND SUBMITTALS
10.9.2 INSTALLATION
10.9.3 WARRANTY
LOCKERS
11.0 DIVISION 11 EQUIPMENT
MEDICAL EQUIPMENT
11.1.1 TEMPLATES FOR CLINICAL SPACES
11.1.2 MEDICAL EQUIPMENT
PHARMACY EQUIPMENT
11.2.1 PASS‐THROUGH
11.2.2 EMPOROS (CASHIERING SYSTEM) CONTACT
11.2.3 CASH DRAWERS – IT
11.2.4 NARCOTIC SAFE
11.2.5 MONEY SAFE
11.2.6 PHARMACY PYXIS CONTACTS
11.2.7 Q‐MATIC (PATIENT VIDEO AND AUDIO PAGING SYSTEM) CONTACT
SUPPLY CHAIN EQUIPMENT
EVS (ENVIRONMENTAL SERVICES) EQUIPMENT (OFCI)
MISCELLANEOUS EQUIPMENT
11.5.1 PATIENT CARE BOARD
11.5.2 INSTITUTIONAL EQUIPMENT
11.5.3 BIOLOGICAL SAFETY CABINETS
11.5.4 LOADING DOCK EQUIPMENT
11.5.5 FOOD SERVICE EQUIPMENT
11.5.6 FITNESS CENTER EQUIPMENT
11.5.7 REFRIGERATORS
11.5.8 FOOD REFRIGERATOR
11.5.9 ICE MAKER
11.5.10 WALL CLOCKS
IT (INFORMATION TECHNOLOGY) EQUIPMENT
LOGISTICS EQUIPMENT
11.7.1 EXTERIOR SOLID WASTE CONTAINERS AND/OR COMPACTORS
AUDIO/VISUAL EQUIPMENT
11.8.1 ROLL‐UP PROJECTION SCREEN
11.8.2 INSTALLATION
11.8.3 DEFECTS
11.8.4 PROJECTOR
11.8.5 INSTALLATION
11.8.6 TELEVISIONS
11.8.7 INSTALLATION
MODULAR MEDICAL FURNITURE SYSTEM
11.9.1 MANUFACTURER AND PRODUCT
11.9.2 SPECIAL GUARANTEE
11.9.3 DEFECTS
11.9.4 SPECIFICATIONS INTENT
11.9.5 INSTALLER
11.9.6 STANDARDS
11.9.7 CODES
11.9.8 SUBMITTALS
11.9.9 COORDINATION
11.9.10 PROTECTION OF INSTALLATION
11.9.11 CAPACITY OF SYSTEM
11.9.12 SYSTEM DESIGN REQUIREMENTS
11.9.13 INSTALLATION AND CLEANING
PARKING EQUIPMENT
12.0 DIVISION 12 FURNISHINGS
LOBBY SEATING / TABLES
OFFICE / STAFF FURNITURE
12.2.1 ROOM TYPES
12.2.2 OFFICE FURNITURE DESK STANDARD DIRECTOR AND BELOW
12.2.3 OFFICE FURNITURE DESK STANDARD ADMINISTRATORS, VP, AND ABOVE
PATIENT HOSPITAL BED ROOM FURNITURE
12.3.1 ALL PATIENT HOSPITAL BED ROOM FURNITURE TYPICAL TO INCLUDE
12.3.2 OPTIONAL GUEST OR PATIENT CHAIR PATIENT HOSPITAL BED ROOM FURNITURE
PATIENT TREATMENT ROOM FURNITURE
MODULAR FURNITURE
12.5.1 PLASTIC LAMINATE CASEWORK
WINDOW TREATMENT (FILM, VERTICALS)
12.6.1 WINDOW TREATMENT
MISCELLANEOUS FURNITURE (TRASHCANS)
12.7.1 HEAVY DUTY EQUIPMENT RACKS
12.7.2 MISCELLANEOUS TRASHCANS
ART
CURTAINS
13.0 DIVISION 13 SPECIAL CONSTRUCTION
MODULAR BUILDINGS
CANOPIES
RADIATION SHIELDING
13.3.1 SHIELDING AND VIBRATION PROTECTION
14.0 DIVISION 14 CONVEYING EQUIPMENT
ELEVATORS/LIFTS
LIFTS AND DUMBWAITERS
21.0 DIVISION 21 FIRE SUPPRESSION
FIRE PROTECTION
21.1.1 GENERAL
21.1.2 DESIGN REQUIREMENTS
FIRE SUPPRESSION SPRINKLER SYSTEM
FIRE PUMPS
21.3.1 JOCKEY PUMPS
21.3.2 SPECIAL SYSTEMS
INSTALLATION REQUIREMENTS
21.4.1 GENERAL
21.4.2 PRESSURE TESTING
22.0 DIVISION 22 PLUMBING
PLUMBING DESIGN DOCUMENTATION
22.1.1 SCHEMATIC DESIGN
22.1.2 DESIGN DEVELOPMENT
22.1.3 CONSTRUCTION DOCUMENTS
PLUMBING FIXTURES
22.2.1 GENERAL
22.2.2 CONTRACT DOCUMENT REQUIREMENTS
22.2.3 PRODUCT REQUIREMENTS
PLUMBING SPECIALITES
22.3.1 GENERAL
22.3.2 WATER HAMMER ARRESTORS
22.3.3 BACKFLOW PREVENTORS
22.3.4 PRESSURE REDUCING VALVE (PRV) STATIONS
22.3.5 EMERGENCY EYEWASHES AND SHOWERS
DOMESTIC WATER SYSTEMS
STORM DRAINAGE, SANITARY WASTE AND VENT SYSTEMS
LABORATORY WASTE AND VENT SYSTEMS
HIGH PURITY WATER SYSTEMS
NATURAL GAS SYSTEMS
MEDICAL VACUUM AND GAS SYSTEMS
LABORATORY WASTE AND VENT SYSTEMS
PLUMBING PIPING IDENTIFICATION
23.0 DIVISION 23 HEATING, VENTILATING AND AIR‐CONDITIONING
23.1.1 HVAC GENERAL
23.1.2 COMMON WORK RESULTS FOR HVAC
23.1.3 DESIGN REQUIREMENTS – CODES AND STANDARDS
23.1.4 DESIGN REQUIREMENTS – FUTURE GROWTH, SPARE CAPACITY, EXISTING CONDITIONS
23.1.5 DESIGN REQUIREMENTS – MAINTENANCE ACCESSIBILITY
23.1.6 PREFERRED MANUFACTURERS
23.1.7 DEMOLITION REQUIREMENTS
23.1.8 OPERATING AND MAINTENANCE INSTRUCTION MANUALS
23.1.9 MECHANICAL SYSTEM DESIGN CRITERIA
23.1.10 DRAWING REQUIREMENTS
23.1.11 SHOP DRAWINGS AND AIR/WATER TEST AND BALANCE REPORTS
23.1.12 ACCESS FOR MAINTENANCE OPERATIONS
23.1.13 STRUCTURAL SUPPORTS
23.1.14 DUST PROTECTION
23.1.15 MECHANICAL IDENTIFICATION AND PAINTING
23.1.16 PIPING AND DUCTWORK IDENTIFICATION
23.1.17 EQUIPMENT IDENTIFICATION
23.1.18 VALVE IDENTIFICATION
23.1.19 HVAC PAINTING
23.1.20 AIR HANDLING UNITS
23.1.21 MECHANICAL INSULATION
23.1.22 PIPING INSULATION MATERIALS REQUIREMENTS
23.1.23 DUCTWORK INSULATION MATERIAL REQUIREMENTS
23.1.24 EQUIPMENT INSULATION
23.1.25 MECHANICAL SOUND AND VIBRATION CONTROL
23.1.26 VIBRATION DESIGN REQUIREMENTS
23.1.27 GRILLES, REGISTERS, DIFFUSERS AND AIR BALANCING ACCESSORIES
23.1.28 COOLING TOWERS
23.1.29 PACKAGED ROOF TOP AIR CONDITIONING UNITS
23.1.30 AIR FILTERS
23.1.31 FAN COIL UNITS AND BLOWER COIL UNITS
23.1.32 AIR TERMINAL UNITS
23.1.33 COMPUTER ROOM UNITS
23.1.34 DUCT SYSTEM DESIGN
23.1.35 FANS
23.1.36 REFRIGERANT MONITORING SYSTEM
23.1.37 AIR AND WATER BALANCE
23.1.38 STEAM SPECIALTIES
23.1.39 HYDRONIC SYSTEMS AND SPECIALTIES
23.1.40 CHILLED WATER SYSTEMS
23.1.41 DIRECT EXPANSION (DX) COOLING COILS AND CONDENSING UNITS
23.1.42 SPECIAL PURPOSE ROOMS
25.0 DIVISION 25 INTEGRATED AUTOMATION
25.1.1 BUILDING AUTOMATION SYSTEM
26.0 DIVISION 26 ELECTRICAL
ELECTRICAL DESIGN REQUIREMENTS
AGE AND PHYSICAL CONDITION
26.2.1 PARTS AVAILABILITY
26.2.2 CONDUIT AND JUNCTION BOXES (BOXES)
26.2.3 CONDUCTORS
26.2.4 WIRING DEVICES
26.2.5 LIGHTING FIXTURES
26.2.6 PANELBOARDS
26.2.7 OWNER RETAINED/ REMOVED EQUIPMENT
26.2.8 CONCEALED OR EXPOSED
26.2.9 CONTINUITY OF SERVICE
26.2.10 MOUNTING HEIGHTS
26.2.11 IDENTIFICATION
NEW CONDUITS AND RACEWAYS METHODS
BASIC ELECTRICAL REQUIREMENTS
26.4.1 SCOPE
26.4.2 DESIGN SCOPE OF WORK
26.4.3 DESIGN DRAWINGS
26.4.4 SPECIFICATIONS
26.4.5 SHOP DRAWINGS
26.4.6 COORDINATION OF POWER SYSTEM PROTECTION
26.4.7 RECORD DRAWINGS
26.4.8 OPERATION AND MAINTENANCE MANUALS
26.4.9 TRAINING
26.4.10 PRODUCTS
26.4.11 EXECUTION
FIRE ALARM AND SMOKE DETECTION SYSTEM
GROUNDING
26.6.1 GENERAL
26.6.2 MATERIAL REQUIREMENTS
LIGHTING GENERAL DESIGN
26.7.1 INTERIOR LIGHTING
26.7.2 EXTERIOR LIGHTING
LIGHT FIXTURES
26.8.1 EXTERIOR FIXTURES
26.8.2 GRID LAY‐IN FLUORESCENT FIXTURES
26.8.3 SURFACE AND SUSPENDED FIXTURES
26.8.4 UNDER CABINET LIGHTING
26.8.5 EXIT LIGHT FIXTURES
LIGHTING CONTROL SYSTEMS
26.9.1 GENERAL
26.9.2 DIMMER AND OTHER LIGHT CONTROL SYSTEMS
LIGHTING SYSTEMS
26.10.1 DEFINITIONS
26.10.2 LIGHTING LEVELS
DESIGN CRITERIA FOR NORMAL LIGHTING
26.11.1 LAMP AND BALLAST RECYCLING
26.11.2 LAMP REQUIREMENTS
26.11.3 REPLACEMENT BALLAST REQUIREMENTS
26.11.4 LIGHTING FIXTURE REQUIREMENTS
26.11.5 LIGHTING CONTROL REQUIREMENTS
26.11.6 AMBIENT LIGHTING CONTROLS
26.11.7 DIMMING REQUIREMENTS
EMERGENCY AND NIGHT LIGHTING
26.12.1 EXIT SIGN REQUIREMENTS
26.12.2 INSTALLATION REQUIREMENTS
LIGHTNING PROTECTION SYSTEM
26.13.1 GENERAL
26.13.2 REFERENCES
26.13.3 LIGHTNING PROTECTION SYSTEM REQUIREMENTS
26.13.4 ELECTRICAL LOAD CALCULATIONS
26.13.5 OTHER CONSIDERATIONS
MOTOR CONTROLS
26.14.1 GENERAL
26.14.2 MOTOR CONTROLLERS
26.14.3 VARIABLE FREQUENCY DRIVES, AND REDUCED VOLTAGE STARTERS
26.14.4 DISCONNECTING MEANS NEEDED IN LINE OF SIGHT OF MOTOR
26.14.5 CONTROL CIRCUIT REQUIREMENTS
26.14.6 DETECTORS
ELECTRIC POWER DESIGN
26.15.1 EQUIPMENT REQUIREMENTS
26.15.2 DESIGN REQUIREMENTS EMERGENCY POWER DISTRIBUTION
26.15.3 ESSENTIAL ELECTRICAL SYSTEMS
26.15.4 OTHER CONSIDERATIONS
SERVICE AND DISTRIBUTION
26.16.1 GENERAL
26.16.2 SWITCHBOARD AND PANELBOARD REQUIREMENTS
26.16.3 PANELBOARDS
26.16.4 SWITCHBOARDS
26.16.5 SAFETY SWITCHES
26.16.6 DISTRIBUTION TRANSFORMERS
26.16.7 DISTRIBUTION SYSTEM REQUIREMENTS
26.16.8 INSTALLATION REQUIREMENTS
VARIABLE SPEED DRIVES
26.17.1 GENERAL
26.17.2 HARMONIC DISTORTION CONSIDERATIONS
26.17.3 MAINTENANCE BYPASSES
WIRES AND CABLES
26.18.1 MEDIUM VOLTAGE PRIMARY CABLES
26.18.2 EXECUTION
COLOR CODING
DIVISION 27 COMMUNICATIONS
26.20.1 INFORMATION TECHNOLOGY DEPARTMENT VOICE & DATA TELECOMMUNICATIONS
27.0 DIVISION 27 COMMUNICATIONS
28.0 DIVISION 28 ELECTRONIC SAFETY AND SECURITY
0.0 DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS
INTRODUCTION TO DESIGN GUIDELINES
0.1.1 HARRIS HEALTH SYSTEM – FACILITIES PLANNING DESIGN GUIDELINES
This document defines Design Guidelines for design and construction of renovation and new construction projects for Harris Health System facilities. The Design Guidelines that are in effect at the time that Schematic Design begins for a given project shall be used by all Design Professionals (architects, engineers, interior designers, graphic designers, equipment planners, and other consultants) in the preparation of construction documents for a project.
The purpose of the Design Guidelines is to ensure maximum quality and value in construction projects for all Harris Health System facilities, through uniformity, system or component quality, compatibility, functionality, and ease of maintenance. These Design Guidelines are intended to provide general direction to Design Professionals as a general rule for most circumstances.
With the wide variety of facilities, varying life expectancies and program requirements, the Design Professional must specifically and correctly apply these Design Guidelines to each project. These Design Guidelines do not replace professional design analyses. Harris Health System expects the Design Professional to conduct independent evaluations for each project. Applications of proven technologies and systems to provide cost effective alternate design concepts are encouraged. Harris Health System recognizes that there will be times when deviations from these Design Guidelines may be appropriate on some projects, and in those instances, the Design Professional is expected to proactively and in writing, approach the appropriate Harris Health System Project Manager for written approval to deviate from the Design Guidelines.
References in Appendix documents may refer to HCHD or Harris County Hospital District. In 2012, the Harris County Hospital District changed its name to Harris Health System as a DBA. Future references to the Harris Health System name shall include its full name, no abbreviations. The term Owner is used throughout and the Harris Health System Project Manager, Facilities Planning Director, and the Facilities Management Vice President shall represent as the Owner. The User or End User is the client department on the project that may include a nurse manager, department head or director, the division vice president, and the facility administrator.
BID FORMS
Projects that are bid will have bid instructions and bid form documents furnished and written by the Harris County Purchasing Department. For questions, please visit their website ‐ http://www.co.harris.tx.us/purchasing.
Follow all instructions in the Bid Form. For example, the instructions may include the following: Submit your bid documents in a manila folder with the name of your company, address, name of project and the Purchasing Department’s project number and return the bid forms to the Purchasing Department, Harris County Administration Building, 1001 Preston, Room 670, Houston, Texas 77002. The Design Professional shall provide and coordinate the project description, availability of Drawings and project manual (includes the specifications and common Harris Health System requirements), with the Harris Health System Project Manager and the assigned Purchasing Agent with the Harris County Purchasing Department. The Purchasing department will schedule the pre‐bid meeting date, location, and bid due dates. Refer to Appendix_0.4_Bid form for sample instructions to Purchasing to Bid with project‐specific information to change as noted in red.
The Harris Health System Project Manager will submit this request to bid with the project specific information highlighted and modified for project‐specific requirements to the Purchasing Agent assigned to the project on the Thursday a week before the first advertisement date. The Purchasing Agent will communicate with the Harris Health System Project Manager to modify the bid forms and will issue the actual bid form. This bid form will be accessed through the Purchasing website. Purchasing will control the bid process, setup the pre‐bid meeting, will communicate with the Harris Health System Project Manager, will be the official contact with vendors and contractors, and will conduct any qualification interviews and bid opening. Some procurement processes are confidential and therefore important to follow all Purchasing requirements for communication and document control.
GENERAL CONDITIONS
Refer to the following Harris Health System’s General Conditions referred to as the Conditions and Covenants for Building Construction and Related Work. (Refer to Appendix 0.5 Conditions and Covenants for Building Construction and Related Work)
PRECONSTRUCTION AND RISK ASSESSMENT
Prior to start of construction or a new construction phase a preconstruction and risk assessment meeting will be scheduled. Meeting 1 will include the Design Consultant, Contractor and Project Manager(s). Meeting 2 will include previous meeting attendees including User Group and Support Departments such as Engineering, Safety, Infection Prevention, security (DPS – Department of Public Safety), User Groups such as Nursing, work‐affected departments, and the facility administrator’s representative. The Project Manager will provide all required risk assessment forms and coordinate any indoor quality reports. Prior to start of construction building permits, Contractor Purchase Order, pre‐approval from the Texas Department of State Health Services (TDSHS) if hospital based, Texas Department of Licensing & Regulations (TDLR) when applicable as defined by code will be required.
Also recommended in some clinical projects prior to construction start are baseline Indoor Air Quality (IAQ) tests performed by Harris Health System’s Industrial Hygienist. Projects requiring a City construction permit will need an asbestos survey.
Utility shutdown meetings will require a minimum of 3 weeks’ notice (well in advance in case multiple meetings are needed to coordinate shutdowns) to schedule all risk assessments. Some shutdowns require additional time for procurement of services or products such as med gas certification and standby oxygen bottles.
CODES AND STANDARDS
This section addresses codes, guidelines, and standards that the Design Professional shall appropriately apply in designing building components. The Design Professional shall design Harris Health System construction projects to comply with all current building codes and healthcare standards. Facilities Planning will also require compliance with these Design Guidelines and standards listed herein.
The Design Professional shall review the current codes for each project. When there is a conflict between codes, the Design Professional shall design to the more stringent or robust code. The Design Professional shall familiarize themselves with the codes, guidelines, and standards and incorporate all applicable requirements within the Contract Documents.
The Design Professional shall determine applicability of the codes, guidelines, and standards (Appendix as listed) and identify any and all other pertinent ordinances and assure compliance thereto at the time of permitting. As per the Design Professional’s project codes, guidelines and standards, the design and construction shall meet the recommended standards prescribed in the latest editions.
The AHJ (Authority Having Jurisdictions) are City and State inspectors.
0.5.1 RADIATION SHIELDING STANDARDS
Shielding calculations shall be performed by or reviewed and approved by the medical school physicist licensed by the Texas Board of Licensure for Professional Medical Physicists with a specialty in Medical Health Physics or the applicable specialty of Diagnostic Radiological Physics, Therapeutic Radiological Physics, or Medical Nuclear Physics.
0.5.2 CODE AND GUIDELINES
Harris County Codes
FGI Guidelines for Design and Construction of Hospitals, current edition
City Codes and Ordinances
State Codes
TDSHS (Texas Department of State Health Services) includes NFPA 101 Life Safety Code
TDLR (Texas Department License and Regulation) Texas Accessibility Standards (TAS)
IBC (outside city jurisdictions)
Federal Guidelines
CMS (Centers for Medicare and Medicaid Services)
ADA
DNV (the accreditation organization that Harris Health is a member to comply with CMS)
1.0 DIVISION 01 GENERAL REQUIREMENTS
OVERVIEW
This section describes minimum Design Professional deliverables for each design submission phase expected by Harris Health System. Refer to applicable division sections for additional Owner requirements unique to particular systems and construction assemblies. This section does not address intermediate submissions or supplementary information that may be required by the Contractor for pricing.
The Design Professional will be required to present and then submit Contract Documents including plans and a project manual to the Harris Health System Project Manager for review and comment at intervals as outlined in the Design Professional Agreement. Intermediate reviews may be required if the project scope has been changed or if an earlier review found the contract documents unacceptable.
As part of the Schematic Design deliverable package, the Design Professional shall include a document titled “Basis for Design” that describes the complete architectural and engineering design intent for the project including design guiding principles, assumptions, issues, recommendations, and narrative assessment of the architectural and infrastructure systems that comprise the project.
Design submittal reviews performed by Harris Health System are for verification of compliance with the Owner's Design Guidelines and Project Scope. The Design Professional is solely responsible for completeness, accuracy, code compliance and coordination of all Contract Documents. Submittals that reveal incompleteness or lack of coordination will not be accepted or reviewed. Rejection of submittals shall not alleviate the Design Professional's responsibility to meet project schedules.
The Design Professional shall prepare an acceptable review comment format for Harris Health System’s use at each design phase. The Design Professional shall provide a detailed written response to each of Harris Health System’s review comments indicating where and how the comment has been addressed. The Design Professional shall submit the complete response document for the preceding design submittal with the subsequent submittal, including affirmation by the firm principal that previous review comments have been fully addressed and incorporated in the current submittal. Submit responses to review comments in electronic format via email.
The Design Professional shall include within each design submittal a detailed written description clearly defining any information and/or directions required from the Owner affecting the next phase of design.
The Civil, Structural, Mechanical, Electrical, Plumbing and Fire Protection Engineering, and other consultants as applicable shall participate in all reviews, work sessions and presentations where the appropriate discipline is involved.
The Design Professional shall obtain Owner's written approval of the work of each phase before proceeding to the next phase. Documents at any phase of submittal shall be considered “complete” when all areas of design (such as Civil, Architectural, Structural, and MEP) are 100% complete as defined herein and agreed upon by Harris Health System.
1.1.1 SPECIAL CONTRACT DOCUMENT REQUIREMENTS
The final approved code analysis summary shall be placed within the project construction document Drawings for future reference.
The Design Professional shall be required to provide an affirmation statement that the project is designed in compliance with applicable codes and standards. The following statement shall be located on the drawing index page or adjacent the project building code summary:
Life Safety Code Compliance: The Design Professional acknowledges that construction projects for the Harris County Hospital District shall, at a minimum, be designed in accordance with the requirements of National Fire Protection Association (NFPA) 101, Life Safety Code, as currently adopted by the State Fire Marshal.
Therefore, Design Professional affirms that, to the best of his/her professional judgment, knowledge, and belief, the design of this project satisfies the requirements of NFPA 101, Life Safety Code, as well as any other codes or standards made applicable to the project by the professional services agreement.
Harris Health System requires the Design Professional to comply with the local fire department that provides fire protection services for the facility. This may include locations and dimensions for firefighting access, including fire lanes; locations and specifications for standpipes, fire hose cabinets, fire control room, fire extinguisher cabinets and fire hose connections; elevator requirements; signage; fuel storage; and other similar matters.
Specific consideration shall be given to ASHRAE/IESNA Standard 90.1 and energy codes. The Engineer of Record will be required to sign and seal certification that stipulates that the design complies with the requirements of this standard. This written certification with backup documentation shall be submitted to Harris Health System at the time of completion of the Construction Documents.
Include certain minimum information on each standard drawing title block. Submit a mock‐up of the title block to the Project Manager for review before reproduction on drawing sheets or use. Information to be included on drawing title blocks shall include, at a minimum:
Harris Health System, name of facility, facility address and project name
Design Professional’s name and street address
Design Professional’s consultants’ names and professional discipline(s)
Location for the date of issue of the plans with space for several revision dates
Location for professional seals
Location for the sheet title
Location for the sheet number and “___ of ___ Sheets”
Include a project data sheet in each set of documents. The project data sheet shall include, at a minimum, the following information specific to the project design and the construction documents:
Abbreviations used and their meaning
Alternate bid descriptions
Codes and standards analysis summary
Indicate construction type and occupancy type
Project address
Date of documents
Drawing symbols and symbol descriptions
Future provisions for expansion (all design disciplines)
List of Drawings, Tables and Schedules
Materials legend
Design Professional’s name, phone number and address
Design Professional’s consultants’ names and addresses
Project name and Harris Health System project number
Square footage per project level and the project total (gross and assignable square footage)
Vicinity map
Facility location floor plan
Harris County Public Infrastructure Department will provide the appropriate wage rates to be used for the project. The Design Professional shall include the prevailing wage rates in the Project Manual where instructed.
Wage rates are published quarterly and the contract rates are based on the time of bid.
PROGRAMMING
This phase may be referred to as “pre‐design” since floor plans have not been developed. Provide bubble diagrams, space needs matrix, and relationships of people and materials flows as required to illustrate the scope.
Meet with User Groups, Administrators and Facilities Planning for consultation to establish and document functional needs and relationships. The following include detailed requirements for a project to consider at this phase.
Design objectives, limitations, and criteria
Develop an assumptions list, this will help guide the project team to stay within the project scope
Develop initial approximate gross facility areas and space requirements
Identify Key Personnel (Project Team). Develop a directory for the project in Excel with names, title, company or department, email, best phone numbers, assistant’s contacts, and if necessary, add tabs to group sets of people
Send out a questionnaire prior to User Group meetings. Setup interviews with all groups and repeat as necessary for key groups.
Visit other similar sites for outside viewpoints and industry trends and standards
Flexibility and expandability, consider space requirements in 5, 10 and 20 years from project completion
Special equipment and systems
Review Site and Facility conditions; begin site assessment and all above ceiling conditions
Validation of a preliminary budget for the work based on programming and scheduling studies
Operating procedures
Security criteria
Information Technology criteria
Engineering criteria, review existing plant capacities
Communications relationships
Room by Room Matrix – Listing of existing and proposed spaces. This list is validated by interviews of direct and support staff and by reviewing data for numbers of people do specific task. This will help develop a design that is evidence based and not based on conjectures.
Space Flow Diagrams ‐ Space relations. Take people through different daily tasks and how they interact with each other and outside people and events. Review internal functions, Human, vehicular and material flow patterns; Analysis of operating functions; Adjacency; Special facilities and equipment; Flexibility and expandability
Project Schedule
Document and Distribute Deliverables
Presentation and Approval
Existing Facilities Surveys ‐ researching, assembling, reviewing, and supplementing information for projects involving alterations and additions to existing facilities or determining new space usage in conjunction with a new building program and including:
Photography
Field measurements and observations
Review of existing design data
Analysis of existing structural capabilities
Analysis of existing mechanical capabilities
Analysis of existing electrical capabilities
Review of existing Drawings for critical inaccuracies, and the development of required measured Drawings.
Site Analysis Phase ‐ The stage in which site‐related limitations and requirements for a project are established for additions and new exterior structures.
Site Analysis and Selection ‐ consisting of:
Identification of potential site(s)
On‐site observations
Movement systems, traffic, and parking studies
Public transportation and parking availability
Topography analysis
Analysis of deed, zoning, and other legal restrictions
Studies of availability of labor force to staff Owner's facility
Studies of availability of construction materials, equipment, and labor
Studies of construction market
Overall site analysis and evaluation
Comparative site studies
Site Development Planning ‐ preliminary site analysis, and preparation and comparative evaluation of conceptual site development designs, based on:
Land utilization
Structures placement
Facilities development
Development phasing
Movement systems, circulation and parking, ambulance and support traffic, fire truck access
Public transportation and site access to building. Confirm Metro access to site.
Review patient and staff drop‐off and pick‐up queuing.
Utilities systems
Surface and subsurface conditions
Ecological requirements
Deeds, zoning, and other legal restrictions (see below)
Slope analysis and site drainage
Vegetation
Review of soils report
Landscape concepts and forms and materials
On‐Site Utility Studies ‐ establishing requirements and preparing initial designs for on‐site:
Electrical service and distribution
Gas service and distribution
Water supply and distribution
Site drainage
Sanitary sewer collection and disposal
Process wastewater treatment
Storm water collection and disposal
Central‐plant mechanical systems
Fire systems
Emergency systems
Security
Pollution control
Site Illumination
Communications systems
Zoning or Deed Restriction Processing ‐ consisting of:
Assistance in preparing applications
Development of supporting data
Preparation of presentation materials
Attendance at public meetings and hearings
SCHEMATIC DESIGN
The stage in which the general scope, conceptual design, and the scale and relationship of components of a project are established. The primary objective of the Schematic Design phase is to clearly define a feasible concept based on project scope and programming for Owner approval. Produce a diagrammatic representation of the project, including site plans, general floor plans and sketches of the building exterior/interior spaces. List specification sections to be incorporated and Basis of Design document as previously described. The design shall be generated from the approved Program, resulting conceptual studies, and alternative schemes developed in conference with Harris Health System.
Architectural Design/Documentation ‐ responding to program requirements and preparing:
Review of Owner's Program and Budget
Conceptual site and building plans minimum 1/8” plans
Enlarged ¼” Floor Plans
Preliminary sections and elevations
Preliminary selection of building systems and materials
Development of approximate dimensions, areas, and volumes
Perspective sketch(s)
Study model(s)
Outline Specs
Presentation and Approval prior to next design phase
A copy of the approved Facility Program
Design Intent narrative of the scope and character of architectural development.
Code review.
Site description and conditions
Drawings (1/8” scale and schematic in nature):
Site plan indicating project location, building footprint, adjacent structures, access, and proposed site improvements.
Floor plans (final agreed scheme) showing room layout, room titles, gross areas.
Selected critical areas (identified by Harris Health System) to be shown in a larger scale.
At least two exterior elevations (final agreed scheme), building profile section showing floor‐to‐ floor dimensions, ground floor elevation to MSL.
At least two perspective renderings in color or a model if authorized.
Descriptive Specifications: Brief narrative description of the proposed component systems, materials, and equipment in the Construction Specification Institute (CSI) format.
Landscape Design/Documentation ‐ consisting of:
Consideration of alternate materials, systems and equipment and development of conceptual design solutions for land forms, lawns and plantings based on program requirements, physical site characteristics, design objectives, and environmental determinants.
Design Intent narrative of the scope and character of landscape development, both hardscape and softscape, including proposed special features such as fountains, sculpture, etc.
Show areas (in plan) proposed to be planted and irrigated at a scale consistent with the
Architectural Site Plan.
Show major space defining elements such as trees, walls, fences, major vehicular and pedestrian circulation patterns, etc. to convey overall site design concept.
Include location and identify all existing trees and landscaping features. Indicate intent of removal or incorporation into new design.
Show location of water source for irrigation.
Structural Design/Documentation ‐ recommendations regarding basic structural materials and systems, analyses, and development of conceptual design solutions for:
A predetermined structural system
Alternate structural systems
Provide criteria for geotechnical survey once building or addition is located and number of floor determined
Design Intent narrative describing the proposed foundation design and structural framing system
Provide Drawings indicating proposed foundation design and structural framing system
Mechanical/Plumbing Design/Documentation ‐ consideration of alternate materials, systems and equipment, and development of conceptual design solutions for:
Energy source(s)
Energy conservation
Heating and ventilation
Air conditioning
Plumbing
Fire protection
General space requirements
Survey existing facilities and capacities for renovations etc.
Design Intent narrative description of all proposed HVAC systems, including but not limited to controls, gross design loads, supply and return air, steam, hot and chilled water
Design Intent narrative description of all proposed plumbing and fire protection systems
Drawings: (1/8” scale and schematic in nature):
Site plan showing location of utility sources and characteristics.
HVAC floor plans showing major equipment layout in mechanical rooms; main trunk ductwork in single line format; piping mains.
Electrical Design/Documentation ‐ consideration of alternate systems, recommendations regarding basic electrical materials, systems and equipment, analyses, and development of conceptual solutions for:
Power service and distribution
Lighting
Telephones
Fire detection and alarms
Security systems
Electronic communications
Special electrical systems
General space requirements
Survey existing facilities and capacities for renovations etc.
Low voltage analysis for existing facilities and review and incorporate HCHD standards for data telephone systems, Nurse calls, and Fire alarm systems, and security systems
Design Intent narrative description of the proposed services including electrical, communication, fire detection/alarm, security, monitoring, and controls intent including power quality, building power metering, lighting controls, critical load monitoring system, etc., and of electrical distribution including switchgear/voltages, lighting fixture types, illumination levels, gross design loads.
Drawings:
Site Plan, showing location of utility source; characteristics.
Floor plans (1/8” scale) showing typical lighting and power layouts, switchgear, primary mechanical and plumbing equipment that requires power such as pumps, air handling units, etc.
and uninterruptible power supply(s) and emergency generator locations.
Civil Design/Documentation – provide a design intent narrative of the scope of civil work involved and description of proposed hardscape including discussion of storm water collection, detention, and disposal.
Provide consideration of alternate materials and systems and development of conceptual design solutions for:
On‐site utility systems
Fire protection systems
Drainage systems
Paving
Review utility availability requirements and capacity requirements
Interior Design/Documentation ‐ space allocation and utilization plans based on functional relationships, consideration of alternate materials, systems and equipment and development of conceptual design solutions for architectural, mechanical, electrical and equipment requirements in order to establish:
Partition locations
Furniture and equipment layouts
Types and qualities of finishes and materials for furniture, furnishings, and equipment.
Materials Research/Outline Specifications ‐ consisting of:
Identification of potential architectural materials, systems and equipment and their criteria and quality standards consistent with the conceptual design.
Investigation of availability and suitability of alternative architectural materials, systems, and equipment.
Coordination of similar activities of other disciplines.
DESIGN DEVELOPMENT
This submittal indicates continued development of the project design and detailing, refinement and confirmation of program requirements and Schematic Design efforts, and specifications that fully describe the nature and intent of the project. The design is a continuation of Schematic Design documents, resulting studies, and alternative schemes developed in conference with Harris Health System. All major design decisions shall be made during this phase.
In this phase, the project shall be developed to a level of detail necessary to work out a clear, coordinated description of all aspects of the project. Major elements including equipment, fire protection, mechanical, electrical, structural, telecommunications, security, and plumbing systems shall be designed and coordinated through enlarged scale Drawings, detailed elevations, sections and plans as required. The Design Development phase is the last opportunity for design input that involves Harris Health System User Groups. Any change to the project’s scope or program during this phase will likely incur budget and schedule impacts. The Design Professional shall be focused on integrating all program requirements into the design and providing the Contractor with information necessary to complete a comprehensive GMP Proposal.
The Design Professional is responsible for submitting to Harris Health System, an updated Design Intent Document that addresses all comments received as a result of Harris Health System’s review of this document when initially submitted as part of the Schematic Design deliverable. Design Professional shall provide design and construction components to meet LEED principles of energy efficiency without the LEED certifications.
The stage in which the size and character of a project are further refined and described, including architectural, structural, mechanical, and electrical systems, materials, and such other elements as may be appropriate. During this phase the End User and support departments provide final input. It will be required to obtain End User sign‐ off.
Architectural Design/Documentation ‐ continued development and expansion of architectural Schematic Design documents to establish the final scope, relationships, forms, size, and appearance of a project through:
Plans, sections, and elevations
Building plans minimum 1/8” plans
Enlarged ¼” Floor Plans
Typical construction details
Three‐dimensional sketch(s) / Study model(s)
Final materials selection, finish boards and presentation (Planning first and then users)
Furniture/Equipment Room to Room layouts
Budget
Preliminary Specs
Medical Equipment Manual
Medical Equipment Vendor site specific documents
Data and Telephone devices and outlets locations, include cable tray layouts and data room layouts
Security devices and outlet locations include cable (including cameras and panic buttons card readers, gate controls)
Artwork selection and location plans
Signage design and location selections (Use Harris Health System and TMC standards)
Coordination of all design disciplines
Include security and safety bollards
Updated Design Intent narrative to reflect progression of architectural design.
Complete code review of the entire scope of the project: Occupancy Classification, Construction Type, Fire Protection Systems
Site conditions and constraints, survey, sub‐surface conditions, existing structures and improvements, demolition
Special design criteria such as acoustics, environmental, transportation, security
Include color selections for specified materials included in the design documents. Harris Health System standards for interior finishes and colors shall be adhered to. All deviations shall have approval from Facilities Planning.
Provide equipment scheduling in the design documents for all equipment requiring a space allocation and/or architectural / mechanical / electrical / plumbing service and/or a rough‐in. Equipment schedules shall be placed on the Drawings with cross‐references to the specification section (or description of the equipment, as required) with the specific location(s) of the equipment on the Drawings. The equipment shall be grouped into the following categories:
Contractor Furnished ‐ Contractor Installed (CFCI)
Owner Furnished ‐ Contractor Installed (OFCI)
Owner Furnished – Owner Installed (OFOI)
Owner Furnished – Vendor Installed (OFVI)
Complete scaled Drawings to include the following:
All site plans including project location, adjacent structures, access, site improvements, topographical contour lines, landscaping scheme.
All proposed floor plans showing overall dimensions, room titles and sizes, door swings, furniture layout, equipment layout, fire rated walls, gross area, and net assignable area calculations.
Roof plan showing storm drains and roof slopes.
All major exterior elevations with exterior materials indicated, building sections, typical wall sections (exterior and interior).
Wall sections typical of the principal wall sections at large scale.
Preliminary room finishes and door schedules.
Reflected ceiling plans indicating light fixtures and significant devices attached to the ceiling system that impact design and coordination.
Interior elevations of special areas where fixed equipment, cabinet/casework, millwork, mechanical, and electrical devices need to be shown in elevation and dimensioned. Indicate mounting height of casework or equipment where necessary.
Provide details as necessary for construction showing the adjacent materials.
All special equipment descriptions/schedule.
Bid alternates.
Descriptive Literature: Upon request by Harris Health System, provide catalog data cut‐sheets of proposed systems, materials, and equipment.
Specifications for all materials, systems, and equipment, complete in final mark‐up form (final editing can be delayed until construction document submittal).
Structural Design/Documentation ‐ continued development of the specific structural system(s) and Schematic Design documents in sufficient detail to establish:
Basic structural system and dimensions
Final structural design criteria
Foundation design criteria
Preliminary sizing of major structural components
Critical coordination clearances
Provide an Outline of Structural Criteria. The purpose of the Outline of Structural Design Criteria is to establish early agreement between the structural design engineer and Harris Health System as to overall design approach and detailed design assumptions. The Outline of Structural Design Criteria shall include the following:
Project, title, project number, location
Architect, firm name, address, phone
Structural Engineer, firm name, address, phone
Code review
Occupancy classification, fire resistance rating, and construction type
Brief Description of Structure:
Building functions
Number of floors, floor‐to‐floor height
Building height
Exterior walls, interior partitions
Overall building dimensions and frequency of expansion joints including those at exposed exterior building components
Unusual design features
Structural System Selected:
Describe frame floor and roof system.
Discuss reasons for selection of system. This should include comments on system economics as opposed to other types, unusual spans, and loads, fireproofing and any other factors governing selection of structural system.
The structural engineer shall specify type of finish or topping for concrete floor slabs.
Concrete topping shall be placed over concrete pan joist and waffle floor systems unless
Harris Health System agrees to omit it.
Stress Distribution in Frame:
Give a brief statement of method of distributing loads and moments throughout frame. Except for complex structures, any recognized method will be satisfactory.
Discuss method of distributing wind loads. Wind loads shall be taken to the integral parts of the structure.
Structural Analysis and Proportioning Members:
State method of stress analysis (such as working stress, ultimate strength).
List codes, standards, and pertinent references to be used as criteria for sizing members.
Give class and strength of structural materials to be used.
Major analysis and design assumptions shall be briefly described in the “Structural Notes” on the design Drawings.
Design Loads:
If the Design Professional believes that the project is of a nature as to ensure against changes in function and increases in future applied loads, Design Professional should inform Harris Health System. A live load schedule can then be determined to fit the specific requirements of the structure.
Floor design live loads: uniform and concentrated.
List roof loads.
List wind loads.
Foundation Design:
As soon as soils investigations have been completed, give detailed descriptions of foundation type and soils capacities actually used in sizing foundation members. Give anticipated settlements if known.
Discuss waterproofing below grade if required, and method of removing water at exterior walls and under ground level slab.
Discuss lateral load…