This is a fee sheet for a Construction Manager at Risk (CMAR) engagement with the Atlanta Independent School System for the Midtown High School Building and Site Improvements project located in Georgia. The project scope encompasses pre-construction and construction phase services. Pre-construction services are structured as lump sum fees for four distinct tasks: Schematic Design ($15,000.00, due 7/1/2026), Design Development ($15,000.00, due 9/15/2026), 80% Construction Documents ($15,000.00, due 11/15/2026), and Bidding/GMP Submittal/GMP Negotiations/Award of GMP Amendment ($15,000.00, due 1/15/2027). All dates listed are tentative. The total pre-construction fee is $60,000.00.
The construction phase compensation structure includes a Construction Manager's Fee calculated as a percentage of general conditions, with specific percentages to be negotiated and documented by the contractor. The fee sheet indicates that detailed terms for the construction phase fee calculation are to be completed by the submitting firm, demonstrating that this portion of compensation remains subject to negotiation between the Atlanta Independent School System and the selected CMAR.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FEE SHEET
Construction Manager at – Risk
26-040126-52-P-AW -Midtown High School Building and Site Improvements
FIRM NAME:
DATE:
PRE- CONSTRUCTION SERVICES
As compensation for pre-construction services, the CM shall receive a fee as negotiated below:
LUMP SUM FEE
(PER TASK)
COMPLETION/
DUE DATES
1. Schematic Design (NTP DATE) $15,000.00 7/1/2026 (Tentative)
2. Design Development. $15,000.00 9/15/2026
(Tentative)
3. 80% Construction Documents $15,000.00 11/15/2026
(Tentative)
4. Bidding / GMP, Submittal / GMP, Negotiations / Award of
GMP Amendment $15,000.00 1/15/2027
(Tentative)
TOTAL PRE- CONSTRUCTION FEE $60,000.00
CONSTRUCTION PHASE
6. Construction Manager’s Fee:
a. percent of general conditions
b. percent fee